Mar:.. 24,2014
Mr:Kim Ogle
Weld County Planning;Services
► `-C
y �
155 North 17thAvenue. A GRE 5�J�11
Greeley,CO 80631 INDUSTRIES ,`.: : i.'
Re: Temporary Variance-Hours of Operation
4t.Am1JSR877—Longmont Distel Operations '
I Dear Irn: a
I
Aggregate industries:r(Al)has been awarded the contract for Colorado Department of Transportation I
>(COOT)Project NoilM 0253-21.4,as noted in the enclosed notice of award from COOT dated March 7,
2014. The project ineludesrubbilization,asphalt paving„shouldering and other associated work on
portions of 1-25 in Weld County as noted below,which requires mandatory night work in order to .
maintain the least disruption to traffic flow. In order to accommodate the terms of this public works, l
project,Al needs to exercise a temporary variance from the Longmont Distel USR permit limitation cif t
daylight hors of operation to allow night operation of the asphalt plant,truck loading and haulingof
material bo.the project site. The following provides summary information related to this project:;
CDO.T1.47.0".kit IM 0253-214
Gener>tls'Confraetor: Aggregate Industries-WCR,Inc.:
Project Location: 1-25 —From MP 259.934 to MP 264.524
Project Description; .Rubblization,asphalt paving,concrete panel replacements,edge drains,
aggregate shouldering,embankment,-cable barrier,and guardrail.
project Dates(apx.): April 21,2014 to October 31,2014(131)nights projected dependent_p weather)
Estimated Tons; Approximately 1200 tons/night •
Night Truck Haul Approximately 50 round-trip truck trips/ni k: Project:includes backb i of"
millings.
.Night Plant Operation: It is estimated thatihe hot plant will run at night for 4 or more holu0:. E.
Contacts;
CDOT; 'Jason Velasquez,Resident Engineer-(970);622-1270
Benjamin RoWles,Project Engineer- (970)622-1277'
A gregatejndt Mike Altergott;Project Manager-(303)716-5368;Cell-(303)435.-2868
Rob Wise,Project Manager—(303)716-5333;Cell(303) 570-2168;
Joe MoKernan,Project:Superintendent-(303)619-7909
;Paving is to be conducted generally between 9,000 p.m.and 5'00 a.m.;with possible weekend operations if
r
required by COOT. Approximately 1200 tons=.of asphalt per night will be processed. Asphalt and/or
d/or
;aggregate material will be loaded out and hauled to the project site,requiring approximately 50
round-trip truck hauls per night. Operation of the hot plant will inch:*use of a loader to feed the plant,
Aggregate!nth-Stites, 2014-1022
West Central Region,lne4 i,
1687 Cole Boulevard,Suite:3fl0� t
Golden,C084it21 '. PL)L4I,B
An Equal Opportunity Employer
Telephone:303-985+:'1:0.70
avv,r uA.n i carvv a..) 3-31-to(q
AGGREGATE
INDUSTRIES
Mr.Kim Ogle,Weld County Planning Sgtiices
March 24,2014
Page Two
and on nights when a g8 -
ate rnaterialsare hauled to the site,a loader will be used to load out from
stockpiled material to haul trucks.
Al does not propose deviation from the primary haul route designated in the permit for the plant. The
primary haul route from the Longmont Distel plant is Weld County.Road 20-1/2 east to Weld County
Road 7,then north on Weld County Road 7 to:Hwy. 119. Al has entered into road maintenance and
improvements agreements with Weld Coithty Public Works which include long-term repairs and
maintenance of the designated haul routes and Al is committed to continued adherence to the terms of
those agreements.
If you have any questions or need any additional information please:conta.ct me at(970)396-5252.
Inquiries regarding this pr vtmay also be directed to the project contacts as listed.gb.,.pve,;
Very truly yours,
Connie N.Davis
Land Advisor
Enclosures
Ee: Bethany Salzman,Weld County Planning
Aggregate Industries—
Mike Refer
John Conlin •
Mice Altergott
Rob Wise
Joe McKernan E
Lu Toxvard
STATE OF COLORADO.
DEPARTMENT OF TRANSPORTATION
Contracts and Market Analysis Branch 1M 0253-214
4201 East Arkansas Avenue,Suite 200 1-25 RUBILIZATION-HARMONY RD SOUTH
Denver,Colorado 80222 Project Code:178005.
Telephone(303)757=9297
Faesiriile(303)757-9867
March 7;2014
Aggegate Industries-WCR Inc. F:
1687 Cole Blvd Suite 300
Golden,CO 80401.
this is confirming:noticei*record,that today, on March 7,2014,you were:awarded the contract;for.the
.
construction ofproject.T11r1':023-214,'on the basis of the bid as submitted.
At the bid opening briefing held on February 6,2014 the following people were:present; Greg Jones and
Marci Gray. l'
The work and the contract time will commence as authorized in writing by the Chief Engineer in the
"Notice.to Proceed". No work is to begin until the"Notice to Proceed"is received from the Department Of
Trtisportation.
if contract item 625 and/or 629.were a part of your bid proposal for this project, surveyors. and/or
`Engineers'Professional'Liability:insurance is required for the amount ot not.less than-81,.000,000:in the
aggregate,as indicated in sullsecttton 107.15.fourth paragraph of the Standard Specifications for Road and.
Bridge Construction. See the specifications for additional insurance requirements winch include, but are:
not limited to:shop drawings,mix designs,contractor performed design work.change orders,and approved
value engineering change proposals.
A pre construction conference will be set by the resident engineer. Jason Velasquez is the Resident
Engineer on the project.
Sincerely you ,
1,1
N arci Gray l'
Award Officer
JSW/jw
cc: `Kerrie Neet(Region 05) 'region Traffic(Region 05),
Maint.Super.(Region OS). :Proicci and Grants
Business Mgr.(Region 05} Loeper(I-IQ-Staff COnst.)
Shawn Yu(I-IQ.4'"Floor,EEMA) CENTRAL FILES
Traffic Engr:(Region 05). Status Papers f
Tara Galvez(Public Info) Region.Planner(Region l)05)
•
6C�