HomeMy WebLinkAbout20141022.tiff I Mar:.. 24,2014 Mr:Kim Ogle Weld County Planning;Services ► `-C y � 155 North 17thAvenue. A GRE 5�J�11 Greeley,CO 80631 INDUSTRIES ,`.: : i.' Re: Temporary Variance-Hours of Operation 4t.Am1JSR877—Longmont Distel Operations ' I Dear Irn: a I Aggregate industries:r(Al)has been awarded the contract for Colorado Department of Transportation I >(COOT)Project NoilM 0253-21.4,as noted in the enclosed notice of award from COOT dated March 7, 2014. The project ineludesrubbilization,asphalt paving„shouldering and other associated work on portions of 1-25 in Weld County as noted below,which requires mandatory night work in order to . maintain the least disruption to traffic flow. In order to accommodate the terms of this public works, l project,Al needs to exercise a temporary variance from the Longmont Distel USR permit limitation cif t daylight hors of operation to allow night operation of the asphalt plant,truck loading and haulingof material bo.the project site. The following provides summary information related to this project:; CDO.T1.47.0".kit IM 0253-214 Gener>tls'Confraetor: Aggregate Industries-WCR,Inc.: Project Location: 1-25 —From MP 259.934 to MP 264.524 Project Description; .Rubblization,asphalt paving,concrete panel replacements,edge drains, aggregate shouldering,embankment,-cable barrier,and guardrail. project Dates(apx.): April 21,2014 to October 31,2014(131)nights projected dependent_p weather) Estimated Tons; Approximately 1200 tons/night • Night Truck Haul Approximately 50 round-trip truck trips/ni k: Project:includes backb i of" millings. .Night Plant Operation: It is estimated thatihe hot plant will run at night for 4 or more holu0:. E. Contacts; CDOT; 'Jason Velasquez,Resident Engineer-(970);622-1270 Benjamin RoWles,Project Engineer- (970)622-1277' A gregatejndt Mike Altergott;Project Manager-(303)716-5368;Cell-(303)435.-2868 Rob Wise,Project Manager—(303)716-5333;Cell(303) 570-2168; Joe MoKernan,Project:Superintendent-(303)619-7909 ;Paving is to be conducted generally between 9,000 p.m.and 5'00 a.m.;with possible weekend operations if r required by COOT. Approximately 1200 tons=.of asphalt per night will be processed. Asphalt and/or d/or ;aggregate material will be loaded out and hauled to the project site,requiring approximately 50 round-trip truck hauls per night. Operation of the hot plant will inch:*use of a loader to feed the plant, Aggregate!nth-Stites, 2014-1022 West Central Region,lne4 i, 1687 Cole Boulevard,Suite:3fl0� t Golden,C084it21 '. PL)L4I,B An Equal Opportunity Employer Telephone:303-985+:'1:0.70 avv,r uA.n i carvv a..) 3-31-to(q AGGREGATE INDUSTRIES Mr.Kim Ogle,Weld County Planning Sgtiices March 24,2014 Page Two and on nights when a g8 - ate rnaterialsare hauled to the site,a loader will be used to load out from stockpiled material to haul trucks. Al does not propose deviation from the primary haul route designated in the permit for the plant. The primary haul route from the Longmont Distel plant is Weld County.Road 20-1/2 east to Weld County Road 7,then north on Weld County Road 7 to:Hwy. 119. Al has entered into road maintenance and improvements agreements with Weld Coithty Public Works which include long-term repairs and maintenance of the designated haul routes and Al is committed to continued adherence to the terms of those agreements. If you have any questions or need any additional information please:conta.ct me at(970)396-5252. Inquiries regarding this pr vtmay also be directed to the project contacts as listed.gb.,.pve,; Very truly yours, Connie N.Davis Land Advisor Enclosures Ee: Bethany Salzman,Weld County Planning Aggregate Industries— Mike Refer John Conlin • Mice Altergott Rob Wise Joe McKernan E Lu Toxvard STATE OF COLORADO. DEPARTMENT OF TRANSPORTATION Contracts and Market Analysis Branch 1M 0253-214 4201 East Arkansas Avenue,Suite 200 1-25 RUBILIZATION-HARMONY RD SOUTH Denver,Colorado 80222 Project Code:178005. Telephone(303)757=9297 Faesiriile(303)757-9867 March 7;2014 Aggegate Industries-WCR Inc. F: 1687 Cole Blvd Suite 300 Golden,CO 80401. this is confirming:noticei*record,that today, on March 7,2014,you were:awarded the contract;for.the . construction ofproject.T11r1':023-214,'on the basis of the bid as submitted. At the bid opening briefing held on February 6,2014 the following people were:present; Greg Jones and Marci Gray. l' The work and the contract time will commence as authorized in writing by the Chief Engineer in the "Notice.to Proceed". No work is to begin until the"Notice to Proceed"is received from the Department Of Trtisportation. if contract item 625 and/or 629.were a part of your bid proposal for this project, surveyors. and/or `Engineers'Professional'Liability:insurance is required for the amount ot not.less than-81,.000,000:in the aggregate,as indicated in sullsecttton 107.15.fourth paragraph of the Standard Specifications for Road and. Bridge Construction. See the specifications for additional insurance requirements winch include, but are: not limited to:shop drawings,mix designs,contractor performed design work.change orders,and approved value engineering change proposals. A pre construction conference will be set by the resident engineer. Jason Velasquez is the Resident Engineer on the project. Sincerely you , 1,1 N arci Gray l' Award Officer JSW/jw cc: `Kerrie Neet(Region 05) 'region Traffic(Region 05), Maint.Super.(Region OS). :Proicci and Grants Business Mgr.(Region 05} Loeper(I-IQ-Staff COnst.) Shawn Yu(I-IQ.4'"Floor,EEMA) CENTRAL FILES Traffic Engr:(Region 05). Status Papers f Tara Galvez(Public Info) Region.Planner(Region l)05) • 6C� Hello