Loading...
HomeMy WebLinkAbout770978 r, RESOLUTION RE: ESTABLISHING ASPHALT, LOW DENSITY AND SEAL COATING PRIORITIES ON WELD COUNTY ROADS FOR 1977. WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the following priorities have been recommended by the Weld County Engineer to the Board of County Commissioners for asphalt paving, low density surfacing and seal coating for Weld County roads for 1977: ASPHALT PAVING Road 2 4 miles 83rd Ave. 2 miles 20th St. 1 mile 35th Ave. 3 miles (due to widening) 64th Ave. 1 mile Total 11 miles 2" asphalt paving LOW DENSITY SURFACING Road 90 7 miles Road 74 7 miles Road 49 10 miles Keenesburg 18 and 59 1 mile 47th Ave 1 mile Undetermined 10 miles Total 36 miles SEAL COATING 20 miles of seal coating at undetermined locations, and WHEREAS, the Board of County Commissioners of Weld County, Colorado desire to establish as priorities for asphalt paving, low density surfacing and seal coating, the above-set forth schedule for the year 1977. NOW, THEREFORE, BE IT RESOLVED by the Board of County Com- missioners of Weld County, Colorado, that priorities be, and here- by are established for asphalt paving, low density surfacing and seal coating as the same are set forth in this Resolution. 770978 CC r • � t k._ /� 4 ' .ti,; ,t J /i of- /' ,, ./. G`'S �"� 5'0 n n 1 µ.. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 27th day of April, A.D. , 1977. The above and foregoing Resolution was read into the record and signed on the 2nd day of May, A.D. , 1977. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO 1, , 1E. ATTEST: avw4. I Weld County Clerk and Recorder and Clerk to the Board B eputy County lerk AP O D AS TO FORM: dereehil County Attorney -2- WELD COUNTY COLORADO Ir ,..w, For Action TeCommi ssi over Stei nmarkDote April 14, 1977 I For Info To WELD CUNTY CE1*$ IEIS L Your Action Or Repl�jrf Subject: On Or Before APR 181977 1' LSI .tom GREELEY. COLO. Weld County has a total of 4400 miles of roads. The County has approximately 600 miles of paved roads (asphalt) , 3000 miles of graveled and graded roads of earth, and 800 miles of unimproved or primitive roads . The County maintains 3600 miles of roads on a regular maintenance schedule. For comparison the State of Wyoming has a total of approximately 4000 miles of roads and highways. The County of Weld also has approximately 1400 bridges. The State of Colorado in total has 4200 bridges ; therefore , 33% of the state ' s total is located in Weld County. The Engineering Department prepared a theoretical study in the Fall of 1976 and determined that if we replaced bridges at the rate of twenty sevenper year it would take until the year 2011 to reach a basis of being even. Based on a ten year program of bringing the paved roads in Weld County up to present day standards , it will require sixty miles of paving per year. The Engineering Department is looking at stage construction in this program and will work to achieve a 60 mile per year average. The Department of Engineering is presently working to achieve this result by stage construction as mentioned and also by recycling all asphalt surfacing in the future . Due to the increase in asphalt product prices the amount of asphalt paving for 1977 will be approximately 12 to 15 miles. There is a projected expenditure for 26 miles of low density surfacing and this would result in 20 miles of seal coating. Based on these pro- jections the $243,000. 00 for asphalt products would be totally expended. Presently all roads scheduled for work in 1977 have been "counted" by the Traffic Division. Presently , the Traffic Division is counting the traffic on all paved county roads and will start counts on graveled roads when the paved count is complete . rtt.,_� .>,7I 7 2. Proposed Priority (asphalt paving) Road 2 4 miles dead--13-- 2 miles 83rd Ave. 2 miles 20th St . 1 mile 35th Ave . 3 miles (due to widening) 64th Ave. + 1 mile TOTAL 13 miles 2" asphalt paving Low Density Surfacing Road 90 7 miles Road 74 7 miles Road 49 10 miles Keenesburg 18 and 59 l mile 47th Ave 1 mile TOTAL 26 miles Seal Coating 20 mil 41/4es4ithin-e-LaV G, Frank Smith, mfm Hello