Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Browse
Search
Address Info: 1150 O Street, P.O. Box 758, Greeley, CO 80632 | Phone:
(970) 400-4225
| Fax: (970) 336-7233 | Email:
egesick@weld.gov
| Official: Esther Gesick -
Clerk to the Board
Privacy Statement and Disclaimer
|
Accessibility and ADA Information
|
Social Media Commenting Policy
Home
My WebLink
About
20141526.tiff
PLANNED UNIT DEVELOPMENT (PUD) CHANGE OF ZONE APPLICATION FOR PLANNING DEPARTMENT USE DATE RECEIVED: RECEIPT#/AMOUNT# /$ CASE#ASSIGNED: APPLICATION RECEIVED BY PLANNER ASSIGNED: Parcel Number 1 2 0 7 0 7 2 0 0 0 0 9 (12 digit number-found on Tax I.D. information,obtainable at the Weld County Assessor's Office,or www.co.weld.co.us) (Include all lots being included in the application area. If additional space is required,attach an additional sheet.) Legal Description LOT B REC EXEMPT RECX11-0002 , Section 7, Township 3 North, Range 68 West Property Address (If Applicable) 16898 Weld County Road 1, Longmont, CO 80504 Existing Zone District: Ag Proposed Zone District: PUD Total Acreage: 39.4 Proposed#/Lots 2 Average Lot Size: 18.65 net Minimum Lot Size: 18.65 net Proposed Subdivision Name: North Country PUD Proposed Area (Acres)Open Space: Zero/None Are you applying for Conceptual or Specific Guide? Conceptual I 1 Specific I I FEE OWNER(S) OF THE PROPERTY(If additional space is required,attach an additional sheet.) Name: Johnny Ray Frits and Nancy Arlene Frits Work Phone# 507-363-1047 Home Phone# 507-4564189 Email Address frits33@gmail.com Address: 16898 Weld County Road 1 City/State/Zip Code Longmont, CO 80504 APPLICANT OR AUTHORIZED AGENT(See Below:Authorization must accompany applications signed by Authorized Agent) Name: John Frits Work Phone# 507-363-1047 Home Phone# 507-4564189 Email Address frits33@gmail.com Address: 16898 Weld County Road 1 City/State/Zip Code Longmont, CO 80504 UTILITIES: Water: Longs Peak Water District Sewer: Individual Sewage Disposal Systems Gas: Propane Electric: Poudre Valley REA Phone: CenturyLink DISTRICTS: School: St. Vrain Valley School District RE-1(J) Fire: Mountain View Fire Protection District Post: Longmont United States Post Office I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be i ncluded indicating the signatory has the legal authority to sign for the corporation. I (we), the undersigned, hereby request hearings before the Weld County Planning Commission and the Board of County Commissioners concerning the proposed Change of Zone for the above-dascribeAwincorporated area of Weld County, Colorado: 2/naturwner or Authorized Agen ate Siggature: Ov,(ner or Authorized Agent to / UU "7" NORTH COUNTRY PLANNED UNIT DEVELOPMENT Specific Development Guide For the Weld County Department of Planning Services Change of Zone Application Submittal By John and Nancy Frits On February 10, 2014 Introduction The North Country PUD two-lot development is located on 39.4 acres of land that in the Northwest Quarter of Section 7,Township 3 North, Range 68 West of the 6th P.M., Weld County, Colorado. The development is more generally described as being in the southeast corner of the intersection of Weld County Road 1 and Weld County Road 36. The development is bordered on the west by Weld County Road 1 and on the north by Weld County Road 36. The development currently has two existing, approved accesses (Weld County Access Permit Number AP11-00401) on Weld County Road 1 located approximately 590 feet and 950 feet south of the intersection of Weld County Road 1 and Weld County Road 36 and located directly across from two existing residential driveways. The North Country PUD is a proposed two-lot single family residential development that will create two approximately equal sized agricultural 'rural estate' type lots. The associated uses to be allowed with the single family residences will reflect the rural and agricultural nature of the properties. Agricultural activities may include growing wheat, barley, and prairie grass, and supporting some livestock including horses, cows, sheep and chickens on the large undeveloped portions of the property. Applicant is choosing to utilize the Weld County PUD development process to create the two lots due to recent changes in the Recorded Exemption regulations that impact residual lot size. The development currently has a single family residence and one agricultural shed constructed within the proposed Lot 1 area utilizing the existing and approved south access on Weld County Road 1. The development is situated above any agricultural ditches and has been and will continue to be farmed using dry land agricultural practices. No gas or oil wells exist on the property. According to FEMA Flood Insurance Maps and the Weld County Public Works Department, the property is not located in a floodplain. There are no current municipal or Weld County approved subdivisions within/ mile of the site. The Town of Mead's Comprehensive Land Use Plan Map identifies the site as Agricultural for the Town's future planning purposes. The Weld County Code specific development guide (Section 27-6) sets forth the standards and conditions for development within the PUD. The development guide addresses eight (8) major components of the PUD development in order to evaluate compliance of the proposal. The following information reflects the specific development guidelines for the North Country PUD. 1. Environmental Impacts 2 The following information addresses the potential environmental impacts the North Country PUD two-lot development may have on the site, as well as neighboring sites, and how the North Country PUD development will plan for and accommodate those impacts. A. Noise and Vibration The North Country PUD two-lot development will have uses that reflect the rural and agricultural nature of the properties. Agricultural activities may include growing wheat, barley, and prairie grass, and supporting some livestock including horses, cows, sheep and chickens. Other than for standard residential and agricultural farming activities, no other machinery or equipment will be used on the properties creating noise or vibration impacts to neighboring sites. B. Smoke, Dust and Odors The North Country PUD two-lot development will have uses that reflect the rural and agricultural nature of the properties. Agricultural activities may include growing wheat, barley, and prairie grass, and supporting some livestock including horses, cows, sheep and chickens. Measures will be incorporated during residential and agricultural activities, including construction and farming, that will minimize smoke, dust and odors emanating from those events. No other activities will be allowed to take place that generate smoke, dust and odors that negatively impact neighboring sites. C. Heat, Light and Glare The North Country PUD two-lot development will have exterior lighting for residential and agricultural uses that will be low intensity and directed so as to not affect neighboring sites. No unusual heat or glare will be generated from the residential and agricultural practices. D. Visual/Aesthetic Impacts The North Country PUD two-lot development will have very low density that reflects the rural and agricultural nature of the properties. The very low residential density and agricultural practices are consistent with neighboring sites and will not create visual and/or aesthetic impacts for neighboring sites. E. Electrical Interference 3 The North Country PUD two-lot development will have uses that reflect the rural and agricultural nature of the properties. No activities will be allowed that create electrical interference impacts to neighboring sites. F. Water Pollution The North Country PUD two-lot development will institute Best Management Practices to control run off during residential construction and farming activities to mitigate potential water pollution. No ditches or waterways exist on or near the property. Therefore, surface run off generated on site will be directed to the existing drainage course that traverses generally from south to north. Internal driveways within the development will incorporate drainage swales to direct surface runoff to the existing drainage course. Culverts are installed at both of the existing access points to facilitate access to the lots without interfering with the existing drainage course. Due to the size of the individual lots, historical flow patterns and storm water run off amounts that are generated onsite will be naturally maintained without an engineered storm water diversion and detention system. No additional measures will be necessary to control potential water pollution. G. Wastewater Disposal The North Country PUD two-lot development will follow the recommended and approved design and construction specifications for individual wastewater treatment systems for site specific conditions. No public sewer systems exist within two miles of the property. Therefore, domestic sewage system for the development will be individual on-lot septic disposal systems. The existing residence on the south Lot 1 has an approved septic system. A new residence constructed on the north Lot 2 will also incorporate an approved septic system. H. Wetland Removal The North Country PUD two-lot development is located on dry land property, with no natural or man-made water sources, and no wetlands present on the site. Therefore, no wetland removal will occur with the development of this property. I. Erosion and Sedimentation 4 The North Country PUD two-lot development will institute Best Management Practices during residential construction and farming activities to mitigate potential erosion and sedimentation from occurring. Permanent landscaping, hard surfaces and pasture grass will control erosion and sedimentation over the extended life of the development. J. Excavating, Filling and Grading The North Country PUD two-lot development will require only minimal earthwork to construct the single new residence and extend the existing driveway on Lot 2. During construction, temporary measures will be put in place to limit impacts of excavating, filling and grading. Upon completion of construction, the disturbed areas will be reseeded with native drought tolerant grasses. K. Drilling, Ditching and Dredging The North Country PUD two-lot development will require only minimal earthwork to construct the single new residence and extend the driveway on Lot 2. Other than constructing drainage swales along the driveway, no drilling, ditching or dredging activities will occur for the residential and agricultural activities. If, at a future date, the Mineral Estate owner seeks to extract minerals, it will be the responsibility of that Mineral Estate owner to seek proper approvals from the County and State for any drilling activities on the site. L. Air Pollution The North Country PUD two-lot development will institute Best Management Practices to control impacts of residential construction and farming activities on air quality. The very low density development will have low impact on air quality and pollution. M. Solid Waste The North Country PUD two-lot development will utilize legally authorized solid waste haulers to collect and transport the generated residential solid waste to a permitted land fill. N. Wildlife Removal 5 The North Country PUD two-lot development will continue to have dry land farming practices occur on the property. Due to the historic and proposed farming practices, no wildlife will need to be removed from the site. O. Natural Vegetation Removal The North Country PUD two-lot development will continue to have dry land farming practices occur on the property. Due to the historic and proposed farming practices, no natural vegetation exists on or will need to be removed from the site. P. Radiation/Radioactive Material The North Country PUD two-lot development will have land uses that reflect the rural and agricultural nature of the properties. There are no known radioactive materials present on the site. No activities will be allowed that place radioactive material on the site. Q. Drinking Water Source The North Country PUD two-lot development will receive domestic water service from the Longs Peak Water District. Service to the two lots will be from the District's water lines located in Weld County Road 1. A residential water tap is in place and active for the existing residence for the south Lot 1. No additional waterline construction is necessary to provide service to the single new residential water tap for the north Lot 2. The Water District incorporates the requirements for acquisition of water rights with each water tap issued in order to ensure a permanent supply of water. The Water District's treatment and transmission facilities are subject to the Colorado Department of Health permitting and testing. The District also encourages and promotes water conservation. R. Traffic impacts The North Country PUD two-lot development will generate 19 vehicle trips per day on Weld County Road 1, according to the Weld County Public Works Department. Because the south Lot 1 has an existing residence, only half of those generated vehicle trips will create new impacts to Weld County Road 1 with the completion of the Lot 2 residence. The North Country PUD two-lot development has an existing approved access permit (AP11-00401) for two accesses on Weld County Road 1 that will serve each lot. The 6 south approved entrance is used to serve the existing residence on Lot 1, and the north approved entrance, which is currently used for agricultural activities, will be used to serve the north Lot 2. These two accesses align with two residential accesses directly across the street and will create no new stopping points for school buses. Both existing accesses will lead to gravel driveways. Both existing accesses meet the minimum access requirements related to line of sight, distance between, culvert size and access width. No additional roadway or access construction will be necessary for the site. 2. Service Provisions Impacts The following information addresses the North Country PUD two-lot development provisions to ensure that services have been adequately planned for and are available to serve the site now and into the future. A. Schools The North Country PUD two-lot development will be located within the service area of the St. Vrain Valley School District RE-1(J). The Mead elementary school, middle school and high school will provide service for the site. Based upon the available school capacity analysis by the School District, a cash-in-lieu school capacity mitigation fee will be due for the creation of one new residential unit on Lot 2. This cash-in-lieu school capacity mitigation fee will be made payable prior to the residential building permit phase for Lot 2. The cash-in-lieu school capacity mitigation fee was previously paid for Lot 1 prior to construction of the existing residence. Maintaining the two existing approved accesses, located directly across the street from existing residences, will create no new bus stops necessary for the School District bus service. B. Law Enforcement The North Country PUD two-lot development will be located within the service area of the Weld County Sheriff's Department. The Sheriff's Department currently carries out routine patrolling of the area. The Sheriff's Department has determined that no new provisions will be necessary to provide adequate service to the existing residence on the south Lot 1 or to a single new residence on the north Lot 2. C. Fire Protection 7 The North Country PUD two-lot development will be located within the service area of the Mountain View Fire Protection District. The Fire District currently carries out emergency response service for the area from Station #3 in the Town of Mead. The Fire District has determined that no new responder provisions will be necessary to provide adequate emergency response to the existing residence on the south Lot 1 or to a single new residence on the north Lot 2. However, the Fire District must review the proposal for any new structures to be constructed on either lot. Depending on the proposed structure use, additional fire suppression equipment may be necessary to meet fire flow requirements. Any new residential structure constructed on Lot 2, that equals or exceeds 3,600 gross square feet, will be required to install an approved fire sprinkler system. D. Ambulance The North Country PUD two-lot development will be located within the service area of the Mountain View Fire Protection District. The Fire District currently carries out emergency response service, including ambulance service, for the area from Station #3 in the Town of Mead. The Fire District has determined that no new responder provisions will be necessary to provide adequate emergency response to the existing residence on the south Lot 1 or to a single new residence on the north Lot 2. E. Transportation The North Country PUD two-lot development will generate 19 vehicle trips per day on Weld County Road 1, a paved Weld County collector road, according to the Weld County Public Works Department. Because the south Lot 1 has an existing residence, only half of the 19 generated vehicle trips will create new impacts to Weld County Road 1 with the completion of the Lot 2 residence. In order to accommodate future road expansion contemplated for Weld County Road 1, the North Country PUD will reserve an additional 10 feet of right-of-way, in addition to the existing 30 feet of right-of-way, for future road improvements. Weld County Road 36, adjacent to the Lot 2 north property line, is a gravel Weld County road that currently has the required 30 feet of reserved right-of-way for future road improvements. The North Country PUD two-lot development has an existing approved access permit (AP11-00401) for two accesses on Weld County Road 1 that will serve each lot. The south approved access is used to serve the existing residence on Lot 1, and the north approved access, which is currently used for agricultural activities, will be used to serve 8 the north Lot 2. Both existing accesses will lead to internal gravel, non-curbed driveways. Both existing accesses meet the minimum access requirements related to line of sight, distance between, culvert size and access width. No additional collector roadway or driveway access construction improvements will be necessary for the site. F. Traffic Analysis The North Country PUD two-lot development will generate 19 vehicle trips per day on Weld County Road 1, according to the Weld County Public Works Department. Because the south Lot 1 has an existing residence, only half of the 19 generated vehicle trips will create new impacts to Weld County Road 1 with the completion of the Lot 2 residence. Due to limited additional traffic impact on Weld County Road 1, a traffic impact analysis is not required by the Weld County Public Works Department G. Storm Drainage The North Country PUD two-lot development will institute Best Management Practices to control run off during residential construction and farming activities to mitigate potential storm drainage. No ditches or waterways exist on or near the property. Therefore, surface run off generated on site will be directed to the existing drainage course that traverses generally from south to north. Internal driveways within the development will incorporate drainage swales to direct surface runoff to the existing drainage course. Culverts are installed at both of the existing access points to facilitate access to the lots without interfering with the existing drainage course. Due to the size of the individual lots, historical flow patterns and storm water run-off amounts that are generated onsite will be naturally maintained. Therefore, the Weld County Public Works Department has waived the requirement for an engineered storm water diversion and detention system for the site. No additional measures will be necessary to control potential storm drainage on or off site. H. Utility Provisions The North Country PUD two-lot development will receive electric service from the Poudre Valley Rural Electric Association. The existing residence on the south Lot 1 has adequate electric service in place. A new residence on the north Lot 2 will be required to purchase a slack pole and electric meter from Poudre Valley REA to receive electric service from the existing Poudre Valley REA infrastructure located directly across the street. 9 The North Country PUD two-lot development will receive telephone service from CenturyLink. The existing residence on the south Lot 1 has adequate telephone service in place. A new residence on the north Lot 2 will be required to install a private service line from the street to the residence to receive telephone service installed by CenturyLink from the existing infrastructure located directly across the street. The North Country PUD two-lot development will receive natural gas (propane) service through individual, on-lot tank storage systems served by local propane providers. No natural gas utility services exist within two miles of the property. The existing residence on the south Lot 1 has propane tank storage system for heating. A new residence constructed on the north Lot 2 will also incorporate a propane tank storage system for heating. I. Water Provisions The North Country PUD two-lot development will receive domestic water service from the Longs Peak Water District. Service to the two lots will be from the District's water lines located in Weld County Road 1. A residential water tap is in place and active for the existing residence for the south Lot 1. No additional waterline construction is necessary to provide service to the single new residential water tap for the north Lot 2. The water tap for the north Lot 2 has already had the water dedication component of the tap fee satisfied. The balance of$13,300.00 must be paid to the Longs Peak Water District for the Lot 2 water tap to be activated. This fee will be paid after completion of the North Country PUD Final Plat process. The Water District incorporates the requirements for acquisition of water rights with each service tap issued in order to ensure a permanent supply of water. The Water District's treatment and transmission facilities are subject to the Colorado Department of Health permitting and testing. The Water District also encourages and promotes water conservation. The Water District water commitment letter, confirming the service conditions outlined above, was submitted for the Weld County Attorney's Office review and approval as part of the Weld County PUD Change of Zone process. J. Sewage Disposal Systems The North Country PUD two-lot development will receive sewer service through individual, on-lot disposal systems. No public sewer systems exist within two miles of 10 the property. The existing residence on the south Lot 1 has an approved septic system. A new residence constructed on the north Lot 2 will also incorporate an approved septic system. Adequate water service, geotechnical and environmental impact information were provided to the Weld County Department of Public Health and Environment to satisfy their requirements for Individual Sewage Disposal Systems. A site specific geotechnical report will be prepared for Lot 2 for the design of an approved septic system at the time a building permit application is submitted. K. Structural Road Improvements The North Country PUD two-lot development will generate 19 vehicle trips per day on Weld County Road 1, a paved Weld County collector road, according to the Weld County Public Works Department. Because the south Lot 1 has an existing residence, only half of the 19 generated vehicle trips will create new impacts to Weld County Road 1 with the completion of the Lot 2 residence. In order to accommodate future road expansion contemplated for Weld County Road 1, the North Country PUD will reserve an additional 10 feet of right-of-way, in addition to the existing 30 feet of right-of-way, for future road improvements. Weld County Road 36, adjacent to the Lot 2 north property line, is a gravel Weld County road that currently has the required 30 feet of reserved right-of-way for future road improvements. The North Country PUD two-lot development has an existing approved access permit (AP11-00401) for two accesses on Weld County Road 1 that will serve each lot. The south approved entrance is used to serve the existing residence on Lot 1, and the north approved entrance, which is currently used for agricultural activities, will be used to serve the north Lot 2. Both existing accesses will lead to internal gravel, non-curbed driveways. Both existing accesses meet the minimum access requirements related to line of sight, distance between, culvert size and access width. No additional collector roadway structural improvements or driveway access improvements will be necessary for the site. 3. Landscaping Elements The following information addresses the landscaping and aesthetic elements of the North Country PUD two-lot development and the compatibility of those elements with surrounding land uses. A. Landscape Plan 11 The North Country PUD two-lot development will not have a formal landscaping plan due to the simple Recorded Exemption style configuration of the development. Individual lot owners will be responsible for establishing and maintaining appropriate landscape elements including turf, shrubs, and trees around the residences. All trees, shrubs, grasses and decorative plants that are used shall be acclimated to this region and shall be drought tolerant. The large portions of the two lots not improved will continue to be used for agricultural dry land farming practices. No shared access or common areas are incorporated into the development that may otherwise require specific and separate landscaping elements. B. Statement of Proposed Treatments or Buffering The North Country PUD two-lot development will not have a formal buffering plan due to the simple Recorded Exemption style configuration of the development. Individual lot owners will be responsible for establishing and maintaining appropriate buffering elements including trees and fences around the residences. The large portions of the two lots not improved will continue to be used for agricultural dry land farming practices and will utilize natural grass buffers along roadways and fences. C. Landscape Maintenance Schedule The North Country PUD two-lot development will not have a formal landscaping maintenance schedule due to the simple Recorded Exemption style configuration of the development. Individual lot owners will be responsible for establishing and maintaining appropriate landscape elements around the residences. The large portions of the two lots not improved will continue to be maintained annually using appropriate agricultural dry land farming practices. D. On-Site Improvements Agreement The North Country PUD two-lot development will not have an on-site improvement agreement due to the simple Recorded Exemption style configuration of the development. Individual lot owners will be responsible for establishing and maintaining their own structural improvements according to Weld County Building Department requirements. No shared access or common areas are incorporated into the development that may otherwise require on-site improvement agreements. E. Adequacy of Water to Support Landscaping 12 The North Country PUD two-lot development will receive domestic water service from the Longs Peak Water District. Service to the two lots will be from the Water District's water lines located in Weld County Road 1. Each residential water tap from the Water District is sized to provide adequate water service for in-house water needs as well as supporting residential landscaping water needs. The Water District water rates are set to encourage efficient water use by customers. The large portions of the two lots not improved will continue to be used for agricultural dry land farming with practices that rely only on natural precipitation for water supply. 4. Site Design The following information addresses the North Country PUD two-lot development advantages and limitations, as well as the compatibility with surrounding land uses. A. Description of Unique Property Features The North Country PUD two-lot development is located near the high point of a local hill along Weld County Road 1 northeast of the City of Longmont. The site is above any irrigation ditches and has been historically farmed using dry land agricultural practices. The site slopes generally from south to north and has mostly unobstructed views of the northern Front Range Rocky Mountains. B. PUD Rezoning Goal Consistency The two 18.6 acre single family residential and rural estate, non-urban agricultural type lots within the North Country PUD two-lot development are consistent with the PUD Zone District Estate Zoning goals. The scale and density of the North Country PUD two- lot development, with one residence and supporting agricultural structures on each lot, are compatible with the surrounding rural residential and agricultural uses. C. PUD Zone District Compliance The two 18.6 acre single family residential and rural estate, non-urban agricultural type lots within the North Country PUD two-lot development are consistent with the PUD Zone District Estate Zoning bulk requirements. The scale and density of the North Country PUD two-lot development, with one residence and supporting agricultural structures on each lot, are compatible with the surrounding rural residential and 13 agricultural uses. No conflicts exist between the North Country PUD two-lot development proposed land uses and the PUD Zone District performance standards. D. Surrounding Lands Compatibility The two 18.6 acre single family residential and rural estate, non-urban agricultural type lots within the North Country PUD two-lot development are consistent with the PUD Zone District Estate Zoning bulk requirements. The scale and density of the North Country PUD two-lot development, with one residence and supporting agricultural structures on each lot, are compatible with the surrounding rural residential and agricultural uses. No conflicts exist between the North Country PUD two-lot development proposed land uses and the surrounding land uses. E. Flood Hazard, Geologic Hazard or Airport Overlay District The North Country PUD two-lot development site is not located within or near a Flood Hazard, Geologic Hazard or Airport Overlay District, as identified by maps officially adopted by Weld County. The Weld County Public Works Department confirmed that the site is not in a Special Flood Hazard Area as determined by the Federal Emergency Management Agency. 5. Common Open Space Usage The following information addresses the common open space usage of the North Country PUD two-lot development and the compatibility of those elements with surrounding land uses. The North Country PUD two-lot development site is configured similar to a Recorded Exemption and is located in a non-urban area, is not adjacent to other PUD's, subdivisions, municipal or urban growth corridors, is identified as Agricultural in the Town of Mead's Comprehensive Land Use Plan for future planning purposes, and is located outside of the Weld County MUD, RUA, and Intergovernmental Agreement areas. Therefore, no public or private common open space areas are proposed for the two large agricultural rural estate lots. A. Common Open Space Restrictions The North Country PUD two-lot development is configured similar to a Recorded Exemption and will not have any common open space areas; therefore, there will be no common open space restrictions for the PUD. 14 B. HOA Establishment The North Country PUD two-lot development is configured similar to a Recorded Exemption, will not have any common open space areas and will only have two lots; therefore, there will be no Homeowners Association for the PUD. C. HOA Membership The North Country PUD two-lot development is configured similar to a Recorded Exemption, will not have any common open space areas and will only have two lots; therefore, there will be no Homeowners Association or membership for the PUD. D. Common Open Space Responsibility The North Country PUD two-lot development is configured similar to a Recorded Exemption, will not have any common open space areas and will only have two lots; therefore, there will be no Homeowners Association responsibilities associated with liability insurance, taxes, or maintenance of common open space. E. Levy Power to Maintain Common Open Space The North Country PUD two-lot development is configured similar to a Recorded Exemption, will not have any common open space areas and will only have two lots; therefore, there will be no property levy powers established to maintain common open space. F. Alternatives Funds to Maintain Open Space The North Country PUD two-lot development is configured similar to a Recorded Exemption, will not have any common open space areas and will only have two lots; therefore, no backup funding mechanisms, such as a Weld County property tax lien, will be required to maintain common open space. G. Urban PUD Open Space The North Country PUD two-lot development is configured similar to a Recorded Exemption, is not an Urban Scale Development, will not have any common open space 15 areas and will only have two lots; therefore, there will be no Urban Scale common open space allocation. H. Common Open Space Cash-In-Lieu Alternative The North Country PUD two-lot development is configured similar to a Recorded Exemption, is not an Urban Scale Development, will not have any common open space areas and will only have two lots; therefore, no common open space cash-in-lieu alternatives apply. 6. Signage The following information addresses sign configuration for the North Country PUD for compliance with sign restrictions. The North Country PUD two-lot development site is configured similar to a Recorded Exemption and is located in a non-urban area, is not adjacent to other P.U.D.'s, subdivisions, municipal or urban growth corridors, is identified as Agricultural in the Town of Mead's Comprehensive Land Use Plan for future planning purposes, and is located outside of the Weld County MUD, RUA, and Intergovernmental Agreement areas. The North Country PUD has existing approved separate accesses for the two lots. The Weld County Sheriff's Department, Mountain View Fire Protection District, Weld County Public Works Department, St. Vrain Valley School District and United States Post Office have no requirements for a subdivision sign for a PUD configured similar to a Recorded Exemption with two separate accesses. Therefore, no central PUD sign will be used for the two large agricultural rural estate lots. A. Sign Regulations The North Country PUD two-lot development will not utilize a common, central PUD sign; therefore, no Weld County Code sign regulations will be utilized. B. Sign Plans The North Country PUD two-lot development will not utilize a common, central PUD sign; therefore, no Weld County Code sign plans will be submitted. 7. RUA Impact 16 The following information addresses the North Country PUD in relation to the Weld County Regional Urbanization Area (RUA). The North Country PUD two-lot development site is configured similar to a Recorded Exemption and is located in a non-urban area, is not adjacent to other P.U.D.'s, subdivisions, municipal or urban growth corridors, is identified as Agricultural in the Town of Mead's Comprehensive Land Use Plan for future planning purposes, and is located outside of the Weld County MUD, RUA, and Intergovernmental Agreement areas. Therefore, RUA development standards and criteria will not apply to the North Country PUD two-lot development. 8. Intergovernmental Agreement Impacts The North Country PUD two-lot development site is not located within the Intergovernmental Agreement Area. However, the site is located within the three mile referral area for the Town of Mead, Town of Berthoud and Boulder County. None of these referral agencies responded to the Weld County Planning department with concerns or objections to the North Country PUD two-lot development. Due to the referral responses and the site location, Intergovernmental Agreement development standards and criteria will not apply to the North Country PUD two-lot development. 17 oat- LONGS PEAK WATER DISTRICT • • 11P,", .?.:..:I I ::,ugnc,J ro spb:14 3 - T ,�3 n44i i:fi ;. • --013i !i :I [tk fa" January 20, 2014 To Whom It May Concern; This letter is to confirm that the Longs Peak Water District is the service provider for domestic water service to properties located in the NW 1/4 SEC 7 T3N R68W. Lot 1 and Lot 2 of the proposed North Country PUD, PUDK13-0003, are and have historically been situated within the boundaries of the Longs Peak Water District, and therefore are eligible to receive domestic water service subject to the Bylaws, Policies and Regulations of the District. The proposed Lot 1, 16898 Weld County Road 1, has a water tap that has been paid for and is currently in service. The proposed Lot 2, TBD address, has met the raw water dedication requirement, and must pay the balance of$13,440.00 for a water tap to be obtained and placed into service. The District has adequate infrastructure in place to provide domestic water service to both of these proposed lots. Should you have questions or need additional information, please contact me. Best regards, Gary S Al I en Gary Allen General Manager • Weld County Treasurer Statement of Taxes Due Account Number R6780510 Parcel 120707200009 Assessed To FRITS JOHNNY RAY 1295 PRAIRIE LN NE OWATONNA,MN 55060-6906 Legal Description Situs Address PT W2NW4 7 3 68 LOT B REC EXEMPT.RECX 11-0002 EXC UPRR RES 16898 1 CR WELD 000000000 Year Tax Interest Fees Payments Balance Tax Charge 2013 $80.61 $0.00 $0.00 ($80.61) $0.00 Total Tax Charge $0.00 Grand Total Due as of 02/07/2014 $0.00 Tax Billed at 2013 Rates for Tax Area 2325-2325 Authority Mill Levy Amount Values Actual Assessed WELD COUNTY 16.8040000* $15.64 AG-DRY FARM LAND $3,188 $920 SCHOOL DIST REIJ 53.6790000 $49.92 AG-WASTE LAND $11 $10 NORTHERN COLORADO WATER 1.0000000 $0.93 Total $3,199 $930 (NC ST VRAIN LEFT HAND WATER(S 0.1840000 $0.17 MOUNTAIN VIEW FIRE 11.7470000 $10.92 HIGH PLAINS LIBRARY 3.2640000 $3.03 Taxes Billed 2013 86.6780000 $80.61 *Credit Levy ALL TAX LIEN SALE AMOUNTS ARE SUBJECT TO CHANGE DUE TO ENDORSEMENT OF CURRENT TAXES BY THE LIENHOLDER OR TO ADVERTISING AND DISTRAINT WARRANT FEES. CHANGES MAY OCCUR AND THE TREASURER'S OFFICE WILL NEED TO BE CONTACTED PRIOR TO REMITTANCE AFTER THE FOLLOWING DATES: PERSONAL PROPERTY AND MOBILE HOMES-AUGUST 1, REAL PROPERTY-AUGUST 1. TAX LIEN SALE REDEMPTION AMOUNTS MUST BE PAID BY CASH OR CASHIERS CHECK. Weld County Treasurer•P.O. Box 458,Greeley CO 80632• 1400 N 17th Ave,Greeley CO 80631 •(970)353-3845 ext.3290 WELD COUNTY TREASURER Pursuant to the Weld County Subdivision Ordinance, the attached Statement(s) of Taxes Due, issued by the Weld County Treasurer, are evidence that, as of this date, all property taxes, special assessments and prior tax liens currently due and payable connected with the parcel(s) identified therein have been paid in full. Sign • Date 02, -o `j "lc/ WELD COUNTY ACCESS PERMIT s�oCC� Weld County Public Works Dept. k. y� Phone: (970)304-6496 1111 H Street After Hours: (970) 356-4000 P.O. Box 758 -o Sr co Emergency Services: (970)304-6500 x 2700 Greeley, CO 80632 C' -wry Inspection: (970)304-6480 WWC) Permit Number: AP11 -00401 Issuance of this permit binds applicant and its contractors to all requirements, provisions,and ordinances of Weld County,Colorado. Project Name: Expiration date: 03/14/2012 Applicant Information: Property Owner Information: Name: Erik Anglund Name: ---- Company: JNET, LLC Company: Phone: 970-231-1007 Phone: Email: jnet@mesanetworks.net Email: Location: Proposed Use: Access is on WCR: 1 Temporary: Nearest Intersection WCR: 1 &WCR: 36 Single Residential: n Distance From Intersection: 600 Industrial: Number of Existing Accesses: 3 Small Commercial: Planning Process: RE Oil&Gas: Large Commercial: Road Surface Type&Construction Information: Subdivision: Road Surface: Gravel Field (Agricultural Culvert Size&Type: 18"CMP proposed Only)/Exempt: Start Date: 11/01/2011 Finish Date: 11/01/2012 Materials to Construct Access: Class 6 Road Base proposed Required Attached Documents Submitted: Traffic Control Plan: Yes Certificate of Insurance: Access Pictures: Yes A copy of this permit must be on site at all times during construction hours Daily work hours are Monday through Friday DAYLIGHT to 1/2 HOUR BEFORE DARK(applies to weekends if approved) Approved MUTCD traffic control/warning devices are required before work begins and must remain until completion of work Special Requirements or Comments There are 3 existing accesses close 2 accesses to open 2 new accesses point. Locate the new access points across from the existing accesses on WCR 1. WCR 1 is a collector roadway. Approved by: Weld County Public Works Date: 10/26/2011 Print Date-Time: 10/26/2011 7:47:28AM Report ID: PW00008v001 Page 1 of 1 nrr. ✓ 273 et-in 4 , ss •_p` I p e, /� .'F� v otiirvt/ e ao'a eta. 4_ 1 8 8 q ; .��Vtice-�c�.r.�.✓Yp p�lYV2! 0 v�.cpb'fNt!�l.G'li pwc-V 00-1.1.11-044- ..,✓F.�n .:e 1,.. 4-p-L aity /1-e •-+. - .. 7�nnn.e/.� .6<p/rbl..P. ,t�9 e-wY��w/� �.v�d-�.✓...!I,,.�J.e�.�.�.a�.�.ei n.e 1.0�-✓lY1 rh✓l�-z.d�6L�+ �w L yam'''•''` „µ+ -u-w�.e:�-✓Y e-J .,d o.`d,r �?1.�n.vLi'oP:e.�.✓ i na.,..d!C.Ie..../�a.,...�yf/:UPu,.e/s .ww'CuCIeJc�/CJ p . 2-otJ l:�- �i�-'i..�...�-.,�.�J2 ,iL< i,L w,lL�,.,.✓�.,�y a.,� o.....eL rloo ��/f/-�J�Y,�wd� • Vyr✓ vLc dd n d d / il ✓e of /f�?�lAiliAi. . t c.e.eda:��_.e er.-i...,1--. s 'ii e.291/ fir:— Im-`PAZ e C �K,./L^ 4 2okd o� M �:� : 4, U„a-A .A_9 .. , s,9 A �� 6R YVL. OvPut t„✓.i tJ- / 8's 7 . 4 , .18 , • 1.L ° Jam✓ �� �. � � Q epp!� a � (p� ���y G. "J IWL>k2A/ � Jam✓ �d ti d 2 ` ate .0 I.M�QJ/1�+ iLaLaf ,÷ ..4 s q , L �.I , •C�e�l-..7 a�J.v�i e.•.,.�;.LQ�d� " aa.o� .1�' 440; -Li ed .A 8 tg3 ✓� a i�� nm/L�ed/ p._ :274 . . ..� , 'L 1 ..et ,-G�-4 L,,,..M t „4-,,,e, ,17 , a_. �_ .,c-�, „, mac- ,e ,r ., . ✓� C Wrve14. cx.e , ,vim ',wC-?,2,--...-✓1-w,.w-a..,.e.,_%,e aiGv. -2...-;: a .et ,de-c-la .-✓ jai`- .-44 22.--,•-d ✓ F `kt. (-c_ 1.4t . J4' /iti�. Card .., (., :44 QA,..o:.:.-� Le ,I _��...' .,, -a 4 ...,t,'" , ..Cat/.i7L-t- a.e-b,e e ..-_,.....,,,, ,,,,,a,+,76„, .._ ✓ in.,e,,, et. ✓_.r��kv et1,L.,..dL.c,��. epp, .„-,-.4,-__,73, t� 4 ° ' , c * . a.a� „6--,,a, _,..,, 7,,..,,,,t+, ,l7, g f U/.�a el, 11. I/�di ., .N.. „r-e . ,✓I 6 G a�at46 , -vf.�.Ls . . �Y�I ,p -e, �� ✓/ 6a '.._ , .4-444 tty.„;ta:. ._.t u, 4 i 5 6 ,�_..w. /v�l' ,... re. ..,.:.-017,---...4i,- u . . . ,M, • .4 sG - 67 , M..a,e. ,.e, .47Ir�L 4-4k., --4,% 6a.-4y � , ✓fr(i- ..L.,. ,,Ce- u..n.adA ,d a...we-,/may ate:c-.C a,,,e.av ,eke,_ -e. ! ...1,..“-Z-Q, 4.2:...,a�.a_ i.- . a4) 6, , ....ic -.,;.a.ei 3 P fe...e -,.-w.ca-c.2/.4n.2+/4 .J -4-. ‘...M.-4v 42.4147.44-1-.-el. . i Ak1.0I,4C-e..:211.wvt ,vv aol vi.e-olz,fr2,,1 a.,a&dt L,,t,, t/ ,a ,„. ,,t ,L.e. ,,act,,-a___G-t, ate!: ..,„4.,L, /rt./toy_c„,4.4.,..“-44.4i,-,4 4-.2a In.,-.2&44.;.4'74.-;-..4.-7-43, c;/-3 • ../V„a It /A1 ,vtw &Ai/ 4vL 2,-a d/ ,-..t„„4.4,45=-,2 .._v H -'l/ ..C. , 9 ,av Rt, 0L-7- d eaLi , 4 MK Ca/.-e , -e-to,-..,,,L,-- . -vLdiArt-p,v�// tP�v/ ppa 0ttA,e-pO1, ,t , p en,,,_,l.t -e d, 0_,.ai . Q.2„,.4.24,---4, 44Cvt.'. t ,ems-n..L.-,7f., a...t �.6 2_,.,,,-e!,-7 L-42,--c..,17-4.<.-1,- , p / p y. ,/ll JwuV up•./�L.%�,-.'¢-ate we otrJ✓..A .4-o. ,Le.c yr ol/,e..e�p, lkp./ wu/.41.aY•✓.we/Q Cwp✓!-.%�'>-�e.-.oVj�j..,..,w✓p�./fA .a..,✓1✓ V/�e ,-Le-az_. '.of&-<,...o-w!-e/4 . F�.'vW/...A,cw.1„.. A.'.A/I..a�L�L. V/L.„..+_dal, fi47.. , Ant .,:a/ t.. 2 e*t-e✓v, &-.:L AL—Li.,,�,2-�.,."'a ti,1�e _:f,.,.�-Q,y�YI —P-,.. ...e✓,.s ,/iv, . Lc 4p �-e,,�.at.,-c . ,e✓ :. �4. ,o I :�-- ✓J ,ave., o„ye,,✓. 22 �J>,,. .� - Cu' .A-44(.-,,,,z_,q . .44-___,7 -,/f ..9. a ', a<.- dx,f ik_c ..d.a..4..e....�✓�.�:. - en>lv a, av ..2e�w,ece,✓.�-F ,—..✓�eJ , P.L.ari —.a ai atr�,ti9 a ..4.. ./ ; ,,, e ,a a . „a. aa.a t.' 4/K: a t-ry- c. , s.a .�e.F/ L,,�..e _!gip{ �C / ✓ a , • I ^aT :4,,mp, -,{4.,1_E-V-44, ,4. 4442-...w, , ,`-,4,_ . 4-2-4 d.�y Ud-4..!-e4/:i$8 ,44.%..4.o. '/'L-C A n+.4-1,4 i tie q�✓�✓G.a.wd /cEa,...-c..✓Cl.�x'.r. : ,--�.,48a I V• -deal�A�pp oa...a/ � w 1t� -.�...% ems . / NORTH COUNTRY PLANNED UNIT DEVELOPMENT PU DK13-0003 Summary of PUD Sketch Plan Application Concerns and Corresponding Explanations of Resolution For the Weld County Department of Planning Services Change of Zone Application Submittal By John and Nancy Frits On February 13, 2014 Introduction The North Country PUD two-lot development site is the current Lot B of Recorded Exemption No. 1207-07-02, RECX11-0002, a non-urban, agricultural zoned 39.4 acre parcel of land that is located in the Northwest Quarter of Section 7,Township 3 North, Range 68 West of the 6th P.M., Weld County, Colorado. The site currently has two existing, approved accesses on Weld County Road 1 located directly across from two existing residential driveways. The site also has a single family residence and one agricultural shed constructed on the south half of Lot B. The North Country PUD will create two approximately equal sized agricultural 'rural estate' type lots with associated uses that reflect the rural and agricultural nature of the properties. Applicant is following the Weld County PUD subdivision process in order to create the two lots due to recent changes in the Recorded Exemption regulations that impact residual lot sizes. As part of the Weld County PUD Sketch Plan Application process, the Department of Planning Services sent out information related to the proposed North Country PUD for comments from referral agencies. Many of those agencies responded either with no conflicts or some comments. Some of the agencies did not respond within the allotted period. Therefore, at the direction of the Department of Planning Services staff, applicant attempted to contact the remaining referral agencies who had not previously responded, for any potential comments or conflicts. For the Change of Zone development phase, applicant is required to summarize comments and concerns made by all referral agencies, during or after the Sketch Plan development phase, and provide and explanation of how those concerns are addressed or resolved. The following information contains summaries of the concerns or conditions of each referral agency contacted, and what actions applicant is taking to address those concerns as part of the Change of Zone development phase. Longs Peak Water District The Longs Peak Water District reviewed the North Country PUD proposed two-lot subdivision and responded on November 17, 2013 with no conflicts and no objections. Both lots are within the Longs Peak Water District service area. The Longs Peak Water District currently has infrastructure in place to provide water service. The existing home on the south Lot 1 currently has a water tap that has been paid for and is in operation. The water tap for the north Lot 2 has already had the water dedication component of the tap fee satisfied. The balance of $13,300.00 must be paid to the Longs Peak Water District for the Lot 2 water tap to be activated. This fee will be paid after completion of the North Country PUD Final Plat process. An updated water commitment letter was prepared by Mr. Gary Allen, District Manager, and submitted on January 20, 2014 for the Weld County Attorney's Office review for the Change of Zone process. 2 Mountain View Fire Protection District The Mountain View Fire Protection District reviewed the North Country PUD proposed two-lot subdivision and responded on December 6, 2013 with comments and requirements, but no objections. Ms. LuAnn Penfold, District Fire Marshall, specified that any new residences equal to or greater than 3,600 gross square feet constructed must provide adequate water supply for fire protection. If water supply for fire protection is not available from a fire hydrant, a residential fire sprinkler system will be accepted as an alternate to meet the required fire flow for residential structures. All other future structures proposed for either lot in the North Country PUD may require fire protection depending on the intended use of the new structure. Prior to construction of any new residences or other structures, the Mountain View Fire Protection District will be consulted and the corresponding identified fire flow requirements will be met at that time. In a follow up email from Ms. LuAnn Penfold dated January 24, 2014, she stated that the Fire District treats "a two lot subdivision the same way we have done with a recorded exemption, we ask for access and water supply for fire protection. We have not asked for a specific signage for these types of subdivisions other than a visible address for the single family home." Based upon that guidance, and the proposed simple two-lot Recorded Exemption type configuration of the North Country PUD, the applicant will seek a variance from the standard PUD requirement for a separate, specific sign for the subdivision. Weld County Sheriff The applicant spoke with Weld County Sergeant Dave Clarke, Municipal Policing Group, on January 22, 2014 regarding the North Country PUD proposed two-lot subdivision to determine if the Weld County Sheriffs Department had any conflicts or objections. Sergeant Clarke indicated that the Weld County Sheriffs Department would have no conflicts providing service to the two lots on Weld County Road 1. Sergeant Clarke also commented that the Weld County Sheriff's Department had no requirements or rules requiring a single access point or a common subdivision sign for the two lots in the North Country PUD. Sergeant Clarke also relayed that the Weld County Sheriff's Department would provide official comments in writing if and/or when the Weld County Planning Department contacted them for such. Based upon that guidance, and the proposed simple two-lot Recorded Exemption type configuration of the North Country PUD, the applicant will seek a variance from the standard PUD requirement for a separate, specific sign for the subdivision and seek a variance from the standard PUD requirement for a single street access point for the subdivision. 3 State of Colorado Geological Survey The Colorado Geological Survey reviewed the North Country PUD proposed two-lot subdivision and responded on December 9, 2013 with comments and no objections. Ms. Jill Carlson, Engineering Geologist for CGS, stated in the response letter that the site appears to be suitable for the proposed residential estate/agricultural use and density. Ms. Carlson also stated that the proposed development will not preclude future subsurface resource (oil/gas) extraction. Ms. Carlson did note, however, that a site-specific, design-level geotechnical investigation should be performed on Lot 2 at the building permit application phase to determine the design criteria for the foundation. Based upon that guidance, and requirements by the Weld County Building Department, a site-specific design-level geotechnical investigation will be performed on Lot 2 as part of a residential building permit application, when needed. Longmont Conservation District The Longmont Conservation District reviewed the North Country PUD proposed two-lot subdivision and responded on December 10, 2013 with comments and no objections. The Longmont Conservation District recommended development of a weed control plan and dust abatement plan for the site, as needed. Based upon that guidance, applicant or owner will continue to farm the vacant portion of the two lots using best farming practices for dry land farming including an active weed management plan. At the time of construction for any new structures on either proposed lot, applicant or owner will consult with Longmont Conservation District on recommended control measures for potential dust caused by temporary construction activities. United States Postal Service After meeting with applicant on January 20, 2014, the Longmont United States Postal Service office reviewed the North Country PUD proposed two-lot subdivision and responded on January 21, 2014 with no conflicts and no objections. Based upon that guidance, and the proposed simple two-lot Recorded Exemption type configuration of the North Country PUD, the applicant will seek a variance from the standard PUD requirement for a shared mailbox structure for the two lots and will place one new mailbox at the driveway access for Lot 2. The residence on Lot 1, 16898 Weld County Road 1, currently has a mailbox in place and in use. St. Vrain Valley School District RE-1(J) 4 After meeting with applicant on January 20, 2014, the Longmont St. Vrain Valley School District office reviewed the North Country PUD proposed two-lot subdivision and responded on February 3, 2014 with comments and no objections. Mr. Ryan Kragerud, School District Planning and GIS Specialist, stated in a letter that the School District took a neutral position regarding the need for a shared access and bus stop location. Mr. Kragerud did indicate, however, that any future application for construction of a new residential building unit will require a cash-in-lieu payment to the School District to mitigate impacts to the school district caused by new students in the service area. Based upon that guidance, and the proposed simple two-lot Recorded Exemption type configuration of the North Country PUD, the applicant will seek a variance from the standard PUD requirement for a single street access point for the subdivision. Applicant or owner of Lot 2 will pay the required cash-in-lieu mitigation fee to the School District at the time of application for a new residential building permit. Anadarko Petroleum Corporation At the Change of Zone pre-application meeting, applicant was given the name and contact for the mineral estate owner under the North Country PUD two-lot development. On January 30, 2014 applicant contacted Ms. Bobbi DeRose, Senior Land Analyst with Anadarko Petroleum Corporation, regarding any potential surface use agreement needs. Ms. DeRose replied that Anadarko Petroleum Corporation would review the proposed North Country PUD two-lot development and respond soon with any comments. Applicant is waiting to receive a response from Anadarko Petroleum Corporation regarding any potential discussions that will need to take place before the Change of Zone process is completed. Town of Berthoud After meeting with applicant on January 22, 2014, the Town of Berthoud Planning Department reviewed the North Country PUD proposed two-lot subdivision and responded on January 22, 2014 with no conflicts and no objections. Based upon that guidance, and the proposed simple two-lot Recorded Exemption type configuration of the North Country PUD, no further actions are required by applicant at this time. Town of Mead After speaking with applicant on January 24, 2014, the Town of Mead Planning Department said that it would review the North Country PUD proposed two-lot subdivision again and respond to the Weld County Planning Department thereafter with no conflicts and no objections. Based 5 upon that guidance, and the proposed simple two-lot Recorded Exemption type configuration of the North Country PUD, no further actions are required by applicant at this time. Boulder County Planning The Boulder County Land Use Department reviewed the North Country PUD proposed two-lot subdivision and responded on November 18, 2013 with no conflicts and no objections. Based upon that guidance, and the proposed simple two-lot Recorded Exemption type configuration of the North Country PUD, no further actions are required by applicant at this time. Weld County Zoning Compliance The Weld County Zoning Compliance Officer reviewed the North Country PUD proposed two-lot subdivision and responded on November 18, 2013 with no conflicts and no objections. Based upon that guidance, and the proposed simple two-lot Recorded Exemption type configuration of the North Country PUD, no further actions are required by applicant at this time. Weld County Department of Public Health and Environment The Weld County Department of Public Health and Environment reviewed the North Country PUD proposed two-lot subdivision and responded on December 16, 2013 with no conflicts and no objections. Ms. Lauren Light, stated that individual sewage disposal systems will provide sewer for the two lots. Ms. Light also stated that the application satisfied Chapter 27 of the Weld County Code in regard to water service, the application satisfied Chapter 24 of the Weld County Code in regard to sewer service, and the application adequately addressed Chapter 27 of the Weld County Code in relation to environmental impacts. Based upon that guidance, and the proposed simple two-lot Recorded Exemption type configuration of the North Country PUD, no further actions are required by applicant at this time. Weld County Department of Public Works The Weld County Department of Public Works reviewed the North Country PUD proposed two- lot subdivision and responded on November 25, 2013 with comments and requirements, but no objections. Mr. Donald Carroll, Engineering Administrator, determined that the Engineering Geology Report submitted as part of the Sketch Plan application was satisfactory and that the North Country PUD is not in a Special Flood Hazard Area (SFHA) as determined by the Federal Emergency Management Agency (FEMA). Due to the average lot size, no stormwater detention 6 pond, drainage reports or erosion control plans are required as the historical flow patterns and run-off amounts will be maintained onsite. Mr. Carroll noted that the North Country PUD would generate a total of 19 vehicle trips per day based upon two single-family residential homes. Mr. Carroll pointed out that Weld County Road 1, adjacent to the west property line, is a collector road and will require 80 feet of right- of-way at full build out. Because there is only 60 feet of right-of-way currently dedicated for this road, applicant will identify an additional 10 feet of right-of-way on the plat map for future road widening. Weld County Road 36, adjacent to the north property line, is a local gravel road that requires 60 feet of right-of-way at full build out. Because 60 feet of right-of-way is currently dedicated for this road, no additional right-of-way is needed as part of this PUD process. Applicant will, however, make all appropriate county road, future right-of-way, and section corner labeling on the plat map. Mr. Carroll acknowledged that the two existing and separate access points, that were previously approved by the Weld County Public Works Department as part of Access Permit Number AP11-00401 and are currently in use, should be labeled with the Access Permit Number AP11-00401 for both lots on the plat map. Mr. Carroll also identified applicant's right to draft a letter requesting exception to paving of the driveways for the two lots. Based upon that guidance, and the proposed simple two-lot Recorded Exemption type configuration of the North Country PUD, the applicant will seek a variance from the standard PUD requirement for a single street access point for the subdivision in order to utilize the two existing and approved separate access points for the two lots. Applicant will also seek a variance from the standard PUD requirement for a paved roadway in order to maintain gravel driveways for the two lots. Weld County Department of Planning Services Applicant's North Country PUD Sketch Plan Application to the Weld County Department of Planning Services was determined complete on November, 17, 2013. Department of Planning Services staff provided comments based upon the Weld County Code chapters 19, 22, 23, 24, and 27 and determined that the North Country PUD was generally supported by the Weld County Code. Staff responded to applicant on January 10, 2014 with summary comments from the Sketch Plan development phase agency review process. In addition to the comments and concerns listed above, Staff noted that building permits are required prior to any construction, should be handled through the Weld County Department of Building Inspection, and will be subject to County-wide road impact fees, building permit fees, facility fees, and drainage impact fees. Staff also directed applicant to submit a Surface Use Agreement for the Mineral Estate. 7 Applicant is currently working with Anadarko Petroleum Corporation, owner of the Mineral Estate, on a Surface Use Agreement for the Change of Zone development process. Staff pointed out that Weld County Code requires a shared public internal street system for subdivision lots. Staff also directed applicant to meet with the School District regarding any bus route concerns and to meet with the postal district to determine if a common mailbox area would be required. As stated above, neither the School District or Post Office had any conflicts or objections to the proposed two lots with separate access points and separate mail boxes. In addition, the Fire District, Sheriff's Department and Public Works Department all had no objections to the proposed two lots with separate access points. Based upon that guidance, the proposed simple two-lot Recorded Exemption type configuration of the North Country PUD, and the two existing and separate approved accesses, the applicant will seek a variance from the standard PUD requirement for a single street access point for the subdivision. Applicant also proposes to maintain the existing mailbox serving the residence at 16898 Weld County Road 1 (Lot 1) and add one single mailbox for Lot 2 when a new residence is constructed. All comments received by referral agencies are included with this document for reference. Additional details related to the North Country PUD development will be included in the North Country PUD Specific Development Guide submitted with the Change of Zone development application. 8 February 13, 2014 Mr. Kim Ogle, Planner Weld County Department of Planning Services 1555 North 17th Avenue Greeley, Colorado 80631 Subject: PUDK13-0003 - North Country PUD - Request for variance from Weld County PUD requirements, to allow for separate accesses from Weld County Road 1 into individual lots. Dear Mr. Ogle, Applicant is choosing to utilize the Weld County PUD development process to create two equal sized lots due to recent changes in the Recorded Exemption regulations that impact residual lot sizes. The North Country PUD two-lot development has an existing approved access permit (AP11-00401) for two separate accesses on Weld County Road 1 that can serve each lot. The south approved access is used to serve the existing residence on Lot 1, and the north approved access, which is currently used for agricultural activities, can be used to serve the north Lot 2. Both existing accesses meet the minimum access requirements related to line of sight, distance between, culvert size and access width. No additional collector roadway or driveway access construction improvements would be necessary for the site. Based upon referral comments from the Weld County Public Works Department, Weld County Sheriff's Department, St. Vrain Valley School District, Mountain View Fire Protection District and the Longmont United States Post Office, the two existing and separate approved accesses create no conflicts or objections if utilized for the North Country PUD two-lot development. Requiring a new common access for the two lots would cause an additional bus stopping point to be created, an additional roadway hazard point to be created, and additional farm ground to be removed from production. Therefore, the applicant requests a variance from the standard PUD requirement for a single common access point for the development. Applicant seeks approval to utilize the two existing approved accesses to serve Lot 1 and Lot 2 with no additional impacts to the site, to neighboring sites, or to County, service and emergency agencies. Sincerely, /John Frits February 13, 2014 Mr. Kim Ogle, Planner Weld County Department of Planning Services 1555 North 17th Avenue Greeley, Colorado 80631 Subject: PUDK13-0003 - North Country PUD - Request for variance from Weld County PUD requirements, to eliminate a subdivision sign and to allow for separate mailboxes for the individual lots. Dear Mr. Ogle, Applicant is choosing to utilize the Weld County PUD development process to create two equal sized lots due to recent changes in the Recorded Exemption regulations that impact residual lot sizes. The North Country PUD two-lot development has an existing approved access permit (AP11-00401) for two separate accesses on Weld County Road 1 that can serve each lot. The south approved access has a mailbox that is used to serve the existing residence on Lot 1. A new mailbox can be placed at the north approved access to serve the north Lot 2. Based upon referral comments from the Longmont United States Post Office, the addition of one new, separate mailbox creates no conflicts or objections for mail delivery service for the North Country PUD two-lot development. Therefore, applicant requests a variance from the standard PUD requirement for a shared common mailbox location for the development. Applicant seeks approval to place one new mailbox at the north approved access for Lot 2. With the Recorded Exemption style intent of the North Country PUD two-lot development, and the request to have separate lot accesses and separate mailboxes, a shared subdivision sign would not adequately identify the lots. The Weld County Sheriff's Department, Mountain View Fire Protection District, Weld County Public Works Department, St. Vrain Valley School District and United States Post Office have no requirements for a subdivision sign for a two-lot PUD configured similar to a Recorded Exemption with two separate accesses. Therefore, applicant request a variance from the standard PUD requirements for a shared subdivision sign. Applicant seeks approval to place separate address signs at individual lot accesses and eliminate a shared subdivision sign. Sincerely, ohn Frits February 13, 2014 Mr. Kim Ogle, Planner Weld County Department of Planning Services 1555 North 17th Avenue Greeley, Colorado 80631 Subject: PUDK13-0003 - North Country PUD - Request for variance from Weld County PUD requirements, to eliminate common open space, homeowners association and landscaping requirements. Dear Mr. Ogle, Applicant is choosing to utilize the Weld County PUD development process to create two equal sized lots due to recent changes in the Recorded Exemption regulations that impact residual lot sizes. The North Country PUD two-lot development is located in a non-urban area, is not adjacent to other PUD's, subdivisions, municipal or urban growth corridors, is identified as Agricultural in the Town of Mead's Comprehensive Land Use Plan for future planning purposes, and is located outside of the Weld County MUD, RUA and Intergovernmental Agreement areas. The North Country PUD will create two approximately equal sized agricultural 'rural estate' type lots. The rural and agricultural nature of the properties will be reflected in the associated uses. Agricultural activities may include growing wheat, barley, and prairie grass, and supporting some livestock including horses, cows, sheep and chickens on the large undeveloped portions of the lots. Based upon the Recorded Exemption style of PUD, the rural location and proposed residential and agricultural uses, and no conflicts or objections from referral agencies, applicant requests a variance from the standard PUD requirement for common open space, landscaping requirements for the common open space, and a homeowner's association to oversee control and condition of the common open space. Applicant seeks approval to not include common open space for the two large agriculturally active lots, and to not create a governing homeowner's association or landscape requirements for such common open space. Sincerely, 'ehn Frit/ i' February 13, 2014 Mr. Donald Carroll, Engineering Administrator Weld County Public Works Department 1111 H Street Greeley, Colorado 80632 Subject: PUDK13-0003 - North Country PUD - Request for variance from Weld County PUD requirements, to allow for separate gravel driveway accesses from Weld County Road 1. Dear Mr. Carroll, Applicant is choosing to utilize the Weld County PUD development process to create two equal sized lots due to recent changes in the Recorded Exemption regulations that impact residual lot sizes. The North Country PUD two-lot development has an existing approved access permit (AP11-00401) for two separate accesses on Weld County Road 1 that can serve each lot. The south approved access is used to serve the existing residence on Lot 1, and the north approved access, which is currently used for agricultural activities, can be used to serve the north Lot 2. Both existing accesses meet the minimum access requirements related to line of sight, distance between, culvert size and access width. No additional collector roadway or driveway access construction improvements would be necessary for the site. Based upon referral comments from the Weld County Public Works Department, Weld County Sheriffs Department, St. Vrain Valley School District, Mountain View Fire Protection District and the Longmont United States Post Office, the two existing and separate approved accesses create no conflicts or objections if utilized for the North Country PUD two-lot development. Requiring a new common access for the two lots would cause an additional bus stopping point to be created, an additional roadway hazard point to be created, and additional farm ground to be removed from production. In addition, the standard PUD requirement for paved and gutter internal roadways is a significant financial burden on the applicant and does not fit the intent of the Recorded Exemption style two-lot PUD. Therefore, the applicant requests a variance from the standard PUD requirement for a single, paved common access road for the development. Applicant seeks approval to utilize the two existing approved accesses to serve Lot 1 and Lot 2, and to maintain both gravel driveways, with no additional impacts to the site, to neighboring sites, or to County, service and emergency agencies. Sincerely, John Frits Submit by Email we Weld County Referral c-o=1u NI?Y November 18, 2013 The Weld County Department of Planning Services has received the following item for review: Applicant: Johnny Frits Case Number: PUDK13-0003 Please Reply By: December 16, 2013 Planner: Kim Ogle Project: A SKETCH PLAN FOR A PUD (PLANNED UNIT DEVELOPMENT) FOR 2 RESIDENTIAL LOTS WITH ESTATE ZONED USES Location: SOUTH OF AND ADJACENT TO CR 36; EAST OF AND ADJACENT TO CR 1 Parcel Number: 120707200009-R6780510 Legal: PT W2NW4 SECTION 7, T3N, R68W LOT B REC EXEMPT RECX11-0002 of the 6th P.M., Weld County, Colorado. The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. piWe have reviewed the request and find that it does/does not comply with our Comprehensive Plan because: We have review%the r quest and find no conflicts with our interests. See attached/6tter • ff/ I '1 Signature 1,' Date i Agency i?.__---- 1��? J ( i Weld County Planning Dept. 1555 N 17th Ave,Greeley,CO.80631 (970)353-6100 ext.3540 (970)304-6496 fax Submit by Email '414. Weld County Referral c0`UNTY November 18, 2013 The Weld County Department of Planning Services has received the following item for review: Applicant: Johnny Frits Case Number: PUDK13-0003 Please Reply By: December 16,2013 Planner: Kim Ogle Project: A SKETCH PLAN FOR A PUD (PLANNED UNIT DEVELOPMENT) FOR 2 RESIDENTIAL LOTS WITH ESTATE ZONED USES Location: SOUTH OF AND ADJACENT TO CR 36; EAST OF AND ADJACENT TO CR 1 Parcel Number: 120707200009-R6780510 Legal: PT W2NW4 SECTION 7,T3N, R68W LOT B REC EXEMPT RECX11-0002 of the 6th P.M.,Weld County, Colorado. The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. I e have reviewed the request and find that it does/does not comply with our Comprehensive Plan because: L We have reviewed the request and find no conflicts with our interests. See attached letter. C i Signature ( �u.& cI � v Date d :27 cr n Agency Ti �y .r /c/it Weld County Planning Dept. 1555 N 17th Ave,Greeley,CO.80631 (970)353-6100 ext.3540 (970)304-6498 fax a. rain Valley School D istrict February 3, 2014 Kim Ogle Weld County Planning Department 1555 N 17th Avenue Greeley, CO 80631 RE: North Country PUD Dear Kim, I was contacted by Erik Anglund regarding the North Country PUD project. Erik and I met to discuss the project. Below are the St. Vrain Valley School District's comments. One of the issues we discussed was whether the District preferred one or accesses to County Line Road. The District is neutral regarding this issue. The District has reviewed the development proposal in terms of (1) available school capacity, (2) required land dedications and/or cash-in-lieu fees and (3) transportation/access considerations and has noted comments on this page and the enclosed attachment. A CIL payment will be due for the creation of a new buildable unit, payable at building permit. This conclusion is based on the accompanying chart that indicates Mead MS will exceed the 125% Capacity Benchmark in the 2017- 18 school year. The District is monitoring this situation and in the event Mead Middle School becomes over crowded, the District may take any of the strategies listed on the accompanying page, under mitigation options. Should this development be approved, the options for managing the short and long term overcrowding in the middle school may include adding modular classrooms and implementing split or staggered schedules as needed. Other options may include, but not limited to, implementing year-round schools or asking voters to approve new bonds for additional school facilities or a mill levy for additional operating funds. It should be noted that a lack of operating funds may be a factor in delaying construction and occupancy of new school facilities in this area. Detailed information on the specific capacity issues, the cash-in-lieu/land dedication requirements and transportation impacts for this proposal follow in Attachment A. The recommendation of the District noted above applies to the attendance boundaries current as of the date of this letter. These attendance boundaries may change in the future. If you have any further questions or concerns regarding this referral, please feel free to contact me via e-mail at kragerudryan@styran.k12.co.us or by calling 303-682-7317. Sincerely, Ryan Kragerud, AICP Planning/GIS Specialist Enc: Exhibit A- Specific Project Analysis ST.VRAIN VALLEY SCHOOL DISTRICT PLANNING DEPARTMENT.395 SOUTH PRATT PARKWAY, LONGMONT,CO 80501.SCOTT TOILLION, DIRECTOR. PHONE 303-682-7229. FAX 303-682-7344. ATTACHMENT A-Specific Project Analysis PROJECT: North Country PUD (1) SCHOOL CAPACITY The Board of Education has established a District-wide policy of reviewing new development projects in terms of the impact on existing and approved school facilities within the applicable feeder system. Any residential project within the applicable feeder that causes the 125% school benchmark capacity to be exceeded within 5 years would not be supported. This determination includes both existing facilities and planned facilities from a voter-approved bond. The building capacity, including existing and new facilities, along with the impact of this proposal and all other approved development projects for this feeder is noted in the chart below. MEAD ELEMENTARY CAPACITY INFORMATION CAPACITY BENCHMARK* (includes protected students,plus development's student impact) School Building Stdts. Stdt. 2013-14 2014-15 2015-16 2016-17 2017-18 Level Capacity Oct-13 Impact Stdts Cap. Stdts Cap. Stdts Cap. Stdts Cap. Stdts Cap. Elementary 470 477 1 468 100% 481 102% 493 105% 513 109% 550 117% Middle(MMS) 364 417 1 383 105% 396 109% 413 114% 432 119% 462 127% High(MHS) 825 776 1 678 82% 713 86% 731 89% 749 91% 761 92% I Total 2981 3 1530 1589 1638 1693 1773 `students from new housing are added according to a 5 year buildout of approved plats within the school feeder. Specific comments concerning this proposal regarding School Capacity are as follows: ✓ Specific Impact: This application will create the potential to add 1 new dwelling unit with a potential impact of 1 additional student in the Mead Elementary, Mead Middle and Mead High School Feeder. ✓ Benchmark Determination - Mead Middle school is projected to exceed 125% of capacity in 5 years with students from this development. The School District is therefore not supporting this application at this time. ✓ Additional Capacity Impacts - No new improvements are scheduled at the middle school level. In order to increase capacity at the middle school level a new bond would have to be passed. ✓ Mitigation Options - Weld County and the developer should also be aware that the School Board has developed a mitigation policy that would assist in providing capacity for the new students in this subdivision. Under the policy, should an applicant wish to begin construction on a residential development prior to the District's ability to provide additional capacity, the applicant may mitigate the development's impact on the feeder by agreeing to a voluntary, per-unit payment. Funds would be used to provide permanent or temporary capacity within the impacted feeder. The Planning Department would be happy to discuss this type of mitigation for the proposal with either the town or developer. (2) LAND DEDICATIONS AND CASH IN-LIEU FEES The implementation of the Intergovernmental Agreement (IGA) Concerning Fair Contributions for Public School Sites by the City of Longmont requires that the applicant either dedicate land directly to the School District along with provision of the adjacent infrastructure and/or pay cash-in-lieu (CIL) fees based on the student yield of the development. CIL fees only provide funds for land acquisition, which is only a small component of providing additional school capacity for a feeder. Specific comments regarding land dedications and CIL fees for this referral are as follows: ✓ Dedication and/or Cash-in-lieu Requirements - The District does not anticipate the need for another school site in this area. Since no land dedication is required, CIL fees will be assessed. Current fees are included on the attached chart; however fees paid will be those in effect at the time of payment. ✓ Number of Units covered by dedication/cash-in-lieu - All residential units will be subject to CIL fees. ✓ Dedication/Cash-in-lieu Procedures - Cash-in-lieu payments are to be made to the St. Vrain Valley School District Business Office -395 S. Pratt Parkway, Longmont, CO. 3)TRANSPORTATION/ACCESS Transportation considerations for a project deal with busing and pedestrian access to and from the subdivision. Pedestrian access, in particular, is an important goal of the School District in order to facilitate community connection to schools and to minimize transportation costs. Specific comments for this application are as follows: V Provision of Busing - Busing for this project, under the current boundaries, would most likely be provided. ST.VRAIN VALLEY SCHOOL DISTRICT PLANNING DEPARTMENT.395 SOUTH PRATT PARKWAY, LONGMONT,CO 80501.SCOTT TOILLION, DIRECTOR. PHONE 303-682-7229. FAX 303-682-7344. From: Brad Yatabe To: Kim Oale Subject: RE: Water Service Commitment for PUDK13-0003 Date: Wednesday,January 22,2014 1:22:01 PM Kim, Based upon the letter, specifically the representation that the raw water dedication requirement has been satisfied, adequacy of water at this time has been demonstrated by the applicant. Brad Yatabe Assistant Weld County Attorney 1150 O Street Mailing Address: P.O. Box 758, Greeley, CO 80632 tel: (970) 356-4000 ext. 4396 fax: (970) 352-0242 STATEMENT OF CONFIDENTIALITY & DISCLAIMER: The information contained in this email message is attorney privileged and confidential, intended only for the use of the individual or entity named above. If the reader of this message is not the intended recipient, you are hereby notified that any dissemination, distribution or copy of this email is strictly prohibited. If you have received this email in error, please notify us immediately by replying and delete the message. Original Message From: Kim Ogle Sent: Tuesday, January 21, 2014 4:17 PM To: Brad Yatabe Subject: FW: Water Service Commitment for PUDK13-0003 Brad For review PUDK13-0002 North Country PUD Wishing to move forward with a 2-Lot development Kim Ogle Planner Department of Planning 1555 North 17th Avenue Greeley, Colorado 80631 Direct: 970.353.6100 x 3549 Office: 970.353.6100 x 3540 Facsimile: 970.304.6498 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. Think Green - Not every email needs to be printed Original Message From: Erik Anglund [mailto:jnetlIc©q.com] Sent: Monday, January 20, 2014 7:18 PM To: Kim Ogle Cc: 'John Frits' Subject: Water Service Commitment for PUDK13-0003 Kim, Attached is an updated water commitment letter from the Longs Peak Water District for our proposed Lots 1 and 2 in the North Country PUD. Do I need to submit this commitment directly to the County Attorney's office for review or is that something your department does? If I need to submit it, is there a particular person you can recommend I send it to at the attorney's office? Thanks, Erik Anglund 970-231-1007
Hello