HomeMy WebLinkAbout20140783.tiff t,t) s e y 1861 PUBLIC WORKS DEPARTMENT t/ 1 111 H STREET , r, - `� P.O. BOX 758 ,.I \ GREELEY, COLORADO 80632 v� N T Y PHONE (970)304-6496, EXT. 3706 o—URE: EM-BR 27.5/48A Flood Repairs—FHWA Time Extension Memo 3-05-2014 Weld County is requesting a time extension related to the completion of emergency flood repairs at this site. In the months following the flood in 2013, the County sent work crews to this site to construct emergency flood repairs required to get the roadway(Two Rivers Parkway)reopened to traffic. During that construction effort, the water in the Big Thompson River was still very high and the work crews were limited to working only in areas outside of the flowing river. Inspections for the bridge structure could not be completed due to the high water at that time. The County has hired a design consultant to investigate and design additional emergency repairs at this site. The river water elevations are still considerably high but low enough to facilitate inspection, surveying, and engineering emergency design at the site. As a result of these recent design efforts, the consultant has recommended additional emergency flood repair work to help ensure the integrity of the site and to help avoid the additional flood damages which could result in road closure. The County is preparing to contract out these recommended repairs prior to Spring runoff peak flow in the Big Thompson River. Colorado is expected to have a significant spring melt and run-off which may impact the public infrastructure that has yet to be fully restored. It is anticipated by the Weld County Public Works Department, that many of the damaged facilities may require additional protective measures to minimize potential further damages and loss. Such protective measures may include seeding, mulching, erosion control blankets, turf reinforcement mats, erosion logs, structural backfill, riprap, etc. Given this current condition,the County requires adequate time to complete the design,bidding, and construction of emergency flood repairs at this site. ant/ 2014-0783 49-ao/y CO 4-"/ � . O67 „de ei 4cr 3-//- 6e eVys FHWA Disaster Number: Emergency Repair CO-13-1 Time Extension Request Federal-aid Route Number: Location (Name of Road and Milepost(if applicable)) State: County: CO County Site: EM-BR 27.5/48A Prepared By: Richard White, P.E. Location: WCR 27.5 East of Milliken Type of Extension Requested Check all that Apply 2 Time 2 Pro Rata Shan Time Extension Information Construction Notice to Proceed Date: Estimated Number of Contract Days Estimated Completion Date 9/13/2013 365 9/13/2014 Site Specific Reasons for Extension Check all that Apply Planning RI Time Necessary to Identify all of Agency's Damage ❑Identification of Funding Available for Emergency Repairs ❑Availability of Agency Project Managers ❑Budgeting of Known Available Funds E Planning of Overall Agency Emergency Work Execution ❑✓ Availability of Agency Forces ❑� Availability of Emergency On-Call Forces E Limited Site Access ❑Public Input on Proposed Repairs 2 Shortage of Materials E Time to Complete Procurement 2 Time to Set Up Response and Recovery Operatior Funding ❑Confirmation of Available Funds Engineering ❑Estimation of 1% Event H&H 2 Securing the Necessary Right-of-Way Environmental ❑� Extreme Cold Weather 2 High Stream Water E Winter Maintenance Responsibilities 2 Permits O Frozen Ground Others/Comments: Attach Separate Sheets: See attached memo dated 3-05-2014. Hello