HomeMy WebLinkAbout20141169.tiff RESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF COUNTY ROAD 23 BETWEEN STATE HIGHWAY 52 AND COUNTY
ROAD 8 FOR FOUR (4) WORKING DAYS, FOR CULVERT REPLACEMENT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.:
"...local authorities, with their respective jurisdiction may, for the
of road construction and maintenance, temporarily purpose P Y close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
to through traffic and to regulate, warn and guide vehicular traffic on said County roads by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of
Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on
County roads and any intersections thereof, and it hereby authorizes and orders the posting of
such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic
thereon for the safety of the general public and that said traffic control devices shall conform to the
Federal Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 23, between State Highway 52 and
County Road 8, be temporarily closed, with said closure being effective April 29, 2014, for
approximately four (4) working days for a culvert replacement, and further, that standard official
traffic control devices shall be erected at said closure giving notice of the restrictions.
2014-1169
EG0024
ROAD CLOSURE - CR 23
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 14th day of April, A.D., 2014.
BOARD OF COUNTY COMMISSIONERS
ELD COUNTY, COLORADO
(}
ATTEST:W w �� n� 'k\-iwcAL +-C1&Li
CC// Douglas/Rademachyr, Chair
Weld County Clerk to the Board S L
s' ra Kirkmey r, Pro-Tem/
B CEQ Q4. JI QI7 b1 `a C
De ty Clerk to the Board
riP e P. Conway
®
AP ED FORM:
Mike r
•
ounty Attorney
Wi iam . Garcia
Date of signature: 1/072/N
2014-1169
EG0024
�i861
'► r , MEMORANDUM
C U N T Y� TO: Clerk to the Board DATE: April 10, 2014
FROM: Janet Carter, Public Works Department
SUBJECT: BOCC Agenda Item
WCR 44 between WCR 41 and WCR 43 is scheduled to be closed from 4/28/2014 to 5/9/2014
for a bridge deck replacement.
WCR 23 between State Highway 52 and WCR 8 is scheduled to be closed from 4/29/2014 to
5/2/2014 for a culvert replacement.
Attached are the traffic detour diagrams.
M:\Francie\AGENDA memos\Agenda Road Closures-2 docx
2014-1169
a OO 1:11 m m o
m
nj-
w Ct a FO,
m O
PLn m 'CN L o r Lc O V
'I ! C N CN o N o co
2 W
CL i Rill C '2 N op M co O N S F'
N o N .— rt ¢ N d2Ee LO a. Ct
U V U c o W <
)- L 10 9 � � � U V u� . I— 0
m n 3 c
moo c
Tr y c o W W
2 � y� Mai�� W Z
C N L U N INn O A o} y J Q
d N x } N � C-.�j
• m ma cr rmy= o
?� N y = U LO-a c o o 1.,'O V V CE c C ,n N als c ,
daL02 al N 0 o 0._. Ca) al d ar-oN-oo °j U a D umNc dON c aid -CW C Y- N W ..L.._. N3 V o f0 Np } [[ C.) c al U a) aQ > Ec m[ rt z o z a a
rel il
�"
N ' o€E CO
/ c., \ .---
C a0
4
0
U g
Hello