Loading...
HomeMy WebLinkAbout20143781.tiff RESOLUTION RE: DIRECTING CLERK TO THE BOARD TO HAVE PUBLISHED A NOTICE OF INTENT TO DESIGNATE THE SITE SELECTION AND CONSTRUCTION OF THOSE MAJOR FACILITIES OF A PUBLIC UTILITY CONSISTING OF NEW PIPELINES DESIGNED FOR TRANSMISSION OF WATER AND NATURAL GAS OR OTHER PETROLEUM DERIVATIVES AS A MATTER OF STATE INTEREST, PURSUANT TO C.R.S. § 24-65.1-401, AND SETTING OF A PUBLIC HEARING REGARDING SUCH DESIGNATION WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. § 24-65.1-401, the Board of County Commissioners has the authority to designate those activities listed in C.R.S. § 24-65.1-203 as "matters of state interest," which may then be subject to guidelines and regulations promulgated by the Board, pursuant to C.R.S. § 24-65.1-402, and WHEREAS, the Board desires to conduct a public hearing on January 19, 2015, to consider the designation of the site selection and construction of those major facilities of a public utility consisting of new pipelines designed for transmission of water and natural gas or other petroleum derivatives, and WHEREAS, pursuant to C.R.S. § 24-65.1-404(2)(a), the Board is required to publish notice of said public hearing in a newspaper of general circulation in Weld County at least thirty (30) days and not more than sixty (60) days prior thereto, and WHEREAS, pursuant to Weld County Code Section 21-1-210(B), the Board desires a recommendation from the Weld County Planning Commission regarding the proposed designation prior to the January 19, 2015, designation hearing. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Clerk to the Board be, and hereby is, directed to have published in the County Newspaper on December 12, 2014, notice that the Board intends to designate the site selection and construction of those major facilities of a public utility consisting of new pipelines designed for transmission of water and natural gas or other petroleum derivatives as a matter of state interest, pursuant to C.R.S. § 24-65.1-401. BE IT FURTHER RESOLVED by the Board that a public hearing to consider such designation be, and hereby is, set for January 19, 2015, at 9:00 a.m., in the Centennial Hearing Room located in the Weld County Administration Building at 1150 O Street, Greeley, Colorado 80631. BE IT FURTHER RESOLVED by the Board that the Clerk to the Board be, and hereby is, further directed to include in the notice of intent to designate the above stated information regarding the date, time and place of said public hearing. CC ?� )z/,3 2014-3781 PL0073 RE: DIRECTING CLERK TO THE BOARD TO PUBLISH NOTICE PAGE 2 BE IT FURTHER RESOLVED by the Board that the proposed designation be referred to the Weld County Planning Commission for consideration and a recommendation at the December 16, 2014, Planning Commission meeting. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 8th day of December, A.D., 2014. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: C�It aij ���R�� �dC� CC1/ la a emacher, Chair Weld County Clerk to the Board • Et / f ✓�arbara Kirkme er,pro-Tem B �� �_ , ,►. /f1. • t 3 \d De I Clerk to t e Boar ,� I ' J-�� - .1 can P. Conway APPROVED AS TO FORM: OuN Mike Fr / s County Attorney Wi is . Garcia Date of signature: 12115 2014-3781 PL0073 Hello