Loading...
HomeMy WebLinkAbout20133567.tiff BEFORE THE WELD COUNTY, COLORADO, BOARD OF HEALTH RESOLUTION OF RECOMMENDATION TO THE BOARD OF COUNTY COMMISSIONERS Moved by Frederick Hepner, that the following resolution be introduced for passage by the Weld County Board of Health. Be it resolved by the Weld County Board of Health that the application for: CASE NUMBER: ORDINANCE 2013-13 PRESENTED BY: MARY EVETT AND LAUREN LIGHT REQIEST: WELD COUNTY CODE ORDINANCE#2013-13, IN THE MATTER OF REPEALING AND RE-ENACTING, CHAPTER 30 SEWAGE SYSTEMS OF WELD COUNTY CODE. be recommended favorably to the Board of County Commissioners for the following reasons: Motion seconded by Doug Printz. VOTE: For Passage Against Passage Absent Barbara Murphy Bill Wood Frederick Hepner Doug Printz Kenneth Andrews John Rohn The Chair declared the resolution passed and ordered that a certified copy be forwarded with the file of this case to the Board of County Commissioner's for further proceedings. CERTIFICATION OF COPY I, Cindy Salazar, Recording Secretary for the Weld County Planning Commission, do hereby certify that the above and foregoing resolution is a true copy of the resolution of the Board of Health of Weld County, Colorado, adopted on December 3, 2013. Dated the 3rd of December, 2013. CF....1;4 ---,Glyn Cindy Salazar Secretary 2013-3567 ARTICLE I CHAPTER 30 ON-SITE WASTEWATER TREATMENT SYSTEMS REGULATIONS 1. Opposed to operations and maintenance plan oversight (note: Colorado Department of Public Health and Environment, Water Quality Control Division's requirement if allow size and separation distance reductions for higher level treatment systems). 2. Sec. 30-5-40. Detailed Soil Investigation A. Approved language requiring a competent technician or other similar professional Section 30-5-40.D.1. Procedure for Performing Percolation Tests and Section 30-5-40.E.1. Visual and Tactile Evaluation of Soil Requirements 3. Sec. 30-5-50. Percolation Holes, Profile Holes, and Profile Test Pits Excavations — Marking A. Soil profile pit shall be immediately covered after evaluation by third party (professional engineer, geologist, competent technician or other similar professional). Section 30-5-50.A. Percolation Holes, Profile Holes, and Profile Test Pits Excavations-Marking 4. Sec. 30-5-80. As Built Drawings A. Installer is responsible for as-built drawings. Section 30-5-80.A. As-Built Drawings Hello