HomeMy WebLinkAbout20142490.tiff TASK ORDER /Cti 15 Date: Task Order#: Master Agreement CMS#: 14 HA4 64551 Task Order CMS#:1411A4 71567 07/15/2014 20051ERI Project#:C 030-061 (20051) PO:400000155/331001024 In accordance with §7 of the Master Agreement("Master Agreement")(routing number 14 HA4 64551) between the State of Colorado, Department of Transportation ("State" or "CDOT"), and WELD COUNTY ("Local Agency"),beginning 04/09/2014 and ending on 04/08/2019, the provisions of the Master Agreement, and any amendments thereto affected by this task order("Task Order")are modified as follows: 1) TASK ORDER DESCRIPTION The State accepts the Local Agency Offer dated June 6, 2014,which is incorporated by reference herein. Local Agency shall perform the Emergency Repair Work authorized in this Task Order at WCR 17 CR 50A Bridge over Big T in accordance with the Master Agreement and the attached Local Agency Offer. All terms not defined in this Task Order shall have the meaning given in the Master Agreement. 2) PRICE/COST The maximum amount payable by the State to Local Agency for performance of this Task Order is limited to the amount identified as the"Total Estimated Payment to Local Agency" in Section 2 of the attached Task Order Budget (identified as "Exhibit C — Funding Provisons"), as determined by the State from available funds. Local Agency agrees to provide any additional funds required for successful completion of the Work. Funding for each phase of Work(as identified on the attached Task Order Budget)shall be encumbered as each phase is authorized pursuant to a unilateral Task Order amendment by State authorized pursuant to §8.A.ii of the Master Agreement. 3) PERFORMANCE PERIOD Local Agency shall complete its obligations under this Task Order on or before the expiration date of the Master Agreement. 4) EFFECTIVE DATE This Task Order shall not be effective or enforceable until it is approved and signed by the Colorado State Controller,or their designee,("Effective Date"). 5) APPROVALS STATE OF COLORADO John Hickenlooper,Cover or By. 9`l Jo to Laipply, I:,Chief F,ngi c Co rado Depart of Transportation Date: 7//‘12/3 � ALL CONTRACTS MUST BE APPROVED BY THE STATE CONTROLLER CRS §24-30-202 requires the State Controller to approve all State contracts. This Task Order is not valid until signed and dated below by the State Controller,or delegate. Except as provided in§8.F of the Master Agreement,the Local Agency is not authorized to begin performance until such time. Except as provided in §8.F of the Master Agreement, if the Local Agency begins performing prior to the date below,the State of Colorado is not obligated to pay for such performance or for any goods and/or services provided. State Contro er Robert r P MBA,J I By: Date: fa�J/ 2014-2490 derrlilluni cnW Ca OEM 1,t,4) t"3coow5 2-11-420/f 97.3// EGool o EXHIBIT 0 - FORM OF LOCAL AGENCY OFFER - ER1 Local Agency Offer 9 Y C 030-061 In accordance with Section 7 of the Master Agreement, 14 HA4 64551 ("Master Agreement") between the State of Colorado, Department of Transportation("CDOT") and Weld County ("Local Agency"), the authorized person signing below for Local Agency hereby submits this Local Agency Offer to CDOT for creation of a Task Order under the Master Agreement for the purpose of authorizing Local Agency to perform Work in the Flood Damaged Area Identified below and receive reimbursement for such Work. All terms not defined in this Local Agency Offer shall have the meanings given in the Master Agreement. The Local Agency hereby approves the attached documents and incorporates them by reference for the creation of a Task Order for the Flood Damaged Area in CR 17 ER ("Project Location"): • Task Order Scope • Task Order Budget • Local Agency Contract Administration Checklist • Damage Inspection Report(Form FHWA 1547) Completion of the Work under this Local Agency Offer is estimated to be 8 months. Pursuant to§4.L of the Master Agreement,the Local Agency contact Information for the project specified in this Local Agency Offer is: Roy Rudisill,Weld County Office of Emergency Management, Director 1150 O Street, Greeley, CO 80632 rrudisill@co.weld.co.us (970)304-6540 Local Agency hereby requests the creation of a Task Order for the Project Location. "Person signing for the Local Agency hereby swears and affirms that he/she are authorized to act on the Local Agency's behalf(as Indicated In Exhibit B of the Master Agreement)and acknowledge that the State Is relying on his/her representation to that effect. PO/ea Roy Rudisill Director, Weld County Office of Emergency Management Q.rte e Z°«l Date' Page 1 of 1 Task Order Scope Project Name: ERLA WCR 17 CR 50A BRDGE OVER BIG T Project Number: C 030-061 Subaccount No: 20051 Local Agency: Weld County CDOT Contact: Adam Hanks COOT Flood Recovery Office 1901 56'"Avenue, Suite 100 Greeley, CO 80634 Emergency Repairs Emergency work consists of the work to repair the flood damages described in the Emergency DDIR and Revised Emergency DDIR.Work for the emergency repairs includes the backfilling behind the scoured bridge abutments and backfilling the embankment,shoulders, and roadway to restore essential traffic. Emergency work to protect the existing structure includes placing riprap as scour protection. Permanent Repairs Permanent work consists of the work to repair the flood damages described in the Permanent Repair DDIR. Permanent repairs Include restoring the bridge approach, roadside embankments, and shoulders to pre-disaster conditions. Permanent repairs also Include paving the damaged roadway and replacing scour protection at the bridge abutments and piers. Pagel of 1 EXHIBIT C -FUNDING PROVISIONS Task Order#: 20051 ER1 Estimated Cost of Work Project Name: ERLA WCR 17 CR 50A BRDGE OVER BIG 1' The estimated total cost the Work is as follows: BUDGETED FUNDS a. Federal Funds $95.084.00 (100%of Participating Costs) S52,642.00 (82.79%of Participating Costs) _S42,442.00 h. Local Funds $8,823.00 (0%of Participating Costs) (17.21%of Participating Costs) 58,823.00 _ c. State Funds $0.00 (0%of Participating Costs) TOTAL BUDGETED FUNDS:I S103,907.00 $103,907.00 2 JESTIMATED PAYMENT TO LOCAL AGENCY*: a. Federal Funds Budgeted(la) 595,084.00 $95,084.00 b. State Funds Budgeted(lc) S0.00 $0.00 I TOTAL ESTIMATED PAYMENT TO LOCAL AGENCY":I$95,084.00 I$95,084.00 3 FOR CDOT ENCUMBRANCE PURPOSES WBS Element Phase Function Payable ParlklpUlagPercentage Budgeted Encumbered Fa nth Funds** Design 3020 ROW 3111/3114 (Acq/Reloc) ROW 3114 Incidentals Coast(100%) 3301 Const(82.79) 3301 20051.10.50 Miscellaneous 3404 SI03,907.00 $103,907.00 Utlitles 3988 Environmental 3403 I TOTAL ENCUMBERED FUNDS:I l$103,907.00 LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST The following checklist has been developed to ensure that all required aspects of a project approved for Federal funding have been addressed and a responsible party assigned for each task. After a project has been approved for Federal funding In the Statewide Transportation Improvement Program, the Colorado Department of Transportation(CDOT) Project Manager, Local Agency project manager, and CDOT Resident Engineer prepare the checklist. It becomes a part of the contractual agreement between the Local Agency and CDOT. The CDOT Agreements Unit will not process a Local Agency agreement without this completed checklist. It will be reviewed at the Final Office Review meeting to ensure that all parties remain in agreement as to who is responsible for performing individual tasks. xvi COLORADO DEPARTMENT OF TRANSPORTATION LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST Project No. STIP No. Project Code Region C 030-081 ER 20051 HA4 Project Location Date CR 17 _ 5/1/14 Project Description ERLA WCR 17 CR 50A BRDGE OVER BIG T Local Agency Local Agency Project Manager Weld County Richard White/Clay Kimmi CDOT Resident Engineer COOT Project Manager Miranda Lange,PE Adam Hanks,PE INSTRUCTIONS: This checklist shall be utilized to establish the contract administration responsibilities of the individual parties to this agreement. The checklist becomes an attachment to the Local Agency agreement.Section numbers correspond to the applicable chapters of the COOT Local Agency Manual. The checklist shall be prepared by placing an"X"under the responsible party,opposite each of the tasks.The"X"denotes the party responsible for Initiating and executing the task.Only one responsible party should be selected.When neither CDOT nor the Local Agency is responsible for a task,not applicable(NA) shall be noted. In addition,a"#'will denote that CDOT must concur or approve. Tasks that will bo performed by Headquarters staff will be indicated.The Regions,in accordance with established policies and procedures,will determine who will perform all other tasks that are the responsibility of CDOT. The checklist shall be prepared by the COOT Resident Engineer or the COOT Project Manager,in cooperation with the Local Agency Project Manager,and submitted to the Region Program Engineer.if contract administration responsibilities change,the COOT Resident Engineer,in cooperation with the Local Agency Project Manager,will prepare and distribute a revised checklist. RESPONSIBLE NO. DESCRIPTION OF TASK PARTY LA CDOT TIP/STIP AND LONG-RANGE PLANS 2-1 Review Project to ensure it is consistent with STIP and amendments thereto 1 X FEDERAL FUNDING OBLIGATION AND AUTHORIZATION 4.1 ' Authorize funding by phases(COOT Form 418-Federal-aid Program Data.Requires FHWA X concurrence/involvement) PROJECT DEVELOPMENT 5.1 _Prepare Design Data-CDOT Form 463_ 5.2 Prepare Local Agency/COOT Inter-Governmental Agreement(see also Chapter 3) X 5.3 Conduct Consultant Selection/Execute Consultant Agreement 5.4 Conduct Design Scoping Review Meeting 5.5 Conduct Public Involvement 5.6 Conduct Field Inspection Review(FiR) 5.7 Conduct Environmental Processes(may require FHWA concurrencelnvotvement) X 5.8 Acquire Right-of-Way(may require FHWA concurrencel1nvolvement) 5.9 Obtain Utility and Railroad Agreements 5.10 Conduct Final Office Review(FOR1- 5.11 Justify Force Account Work by the Local Agency X 5.12 Justify Proprietary,Sole Source,or Local Agency Furnished Items X 5.13 Document Design Exceptions-COOT Form 464 5.14 Prepare Plans,Specifications and Construction Cost Estimates 5.15 Ensure Authorization of Funds for Construction X COOT Form 1243 01/13 Pagel of 4 Previous editions are obsolete and may not be used RESPONSIBLE NO. DESCRIPTION OF TASK PARTY LA CDOT PROJECT DEVELOPMENT CIVIL RIGHTS AND LABOR COMPLIANCE 6.1 Set Underutilized Disadvantaged Business Enterprise(UBDE)Goals for Consultant and _ Construction Contracts(COOT Region EEO/CINI Rights Specialist) 8.2 Determine Applicability of Davis-Bacon Act X This project❑is ®is not exempt from Davis-Bacon requirements as determined by the functional classification of the project location(Projects located on local roads and rural minor collectors may be exempt.) Miranda Lange.PE 05/01/2014 COOT Resident Engineer(Signature on File) Date 6.3 Set On-the-Job Training Goals.Goal is zero If total construction is less than$1 million(COOT X Realm EEO/Civil Rights Specialist) 6.4 Title V(Assurances Ensure the correct Federal Wage Decision,all required Disadvantaged Business Enterprise/On-the-Job Training special provisions and FHWA Form 1273 are included In the Contract(COOT Resident Engineer) ADVERTISE,BID AND AWARD 7.1 Obtain Approval for Advertisement Period of Less Than Three Weeks 7.2 Advertise for Bids 7.3 Distribute'Advertisement SeC of Plans and Specifications 7.4 Review Workeite and Plan Details with Prospective Bidders While Project Is Under Advertisement 7.5 Open Bids 7.8 Process Bids for Compliance Check COOT Form 715-Certificate of Proposed Underutilized DBE Participation when the low bidder meets UOBE goals X Evaluate COOT Form 718-Underutilized DBE Good Faith Effort Documentation and determine If the Contractor has made a good faith effort when the low bidder does not meet X DBE goals Submit required documentation for CDOT award concurrence 7.7 Concurrence from COOT to Award X 7.8 Approve Rejection of Low Bidder _. X 7.9 Award Contract 7.10 Provide"Award"and"Record"Sets of Plans and Specifications CONSTRUCTION MANAGEMENT 8.1 Issue Notice to Proceed to the Contractor 8.2 Project Safety 8.3 Conduct Conferences: PreConstruction Conference(Appendix B) _ il Pre-survey _- T :;(�J' • Construction staking • Monumentation Partnering(Optional) Structural Concrete Pre-Pour(Agenda is in COOT Construction ManuaO Concrete Pavement Pre-Pavin A enda Is In COOT Consaustbn Manua HMA Pre-Paving(Agenda is in COOT Construction Manual) 8.4 Develop and distribute Public Notice of Planned Construction to media and local residents 8.5 Supervise Construction A Professional Engineer(PE)registered in Colorado,who will be"In responsible charge of construction supervision." Richard White/Clay Kimmi 970-3046496 Local Agency Professional Engineer or Phone number X CDOT Resident Engineer _ CDOT Form 1247 01/13 Paget of 4 Previous editions are obsolete and may not be used RESPONSIBLE NO. DESCRIPTION OF TASK PARTY LA CDOT Provide competent,experienced staff who will ensure the Contract work is constructed In accordance with the plans and specifications Construction inspection and documentation 8.6 Approve Shop Drawings 8.7 Perform Traffic Control Inspections 8.8 Perform Construction Surveying 8.9 Monument Right-of-Way 8.10 Prepare and Approve Interim and Final Contractor Pay Estimates Provide the name and phone number of the person p neon authorized for this task. Richard White/Clay Klmml 970-304-6496 Local Agency Representative Phone number 8.11 Prepare and Approve Interim and Final Utility and Railroad Billings 8.12 Prepare Local Agency Reimbursement Requests X 8.13 Prepare and Authorize Change Orders 8.14 Approve All Change Orders X 8.15 Monitor Project Financial Status 8.16 Prepare and Submit Monthly Progress Reports 8.17 Resolve Contractor Claims and Disputes 8.18 Conduct Routine and Random Project Reviews Provide the name and phone number of the person responsible for this task. X Miranda Lange.PE 970-962-4017 CDOT Resident Engineer Phone number MATERIALS _9.1 I Conduct Materials Pre-Construction Meeting 9.2 Complete CDOT Form 250-Materials Documentation Record • Generate form,which Includes determining the minimum number of required tests and applicable material submittals for all materials placed on the project • Update the form as work progresses • Complete and distribute form after work Is completed X 9.3 Perform Project Acceptance Samples and Tests 9.4 Perform Laboratory Verification Tests 9.5 Accept Manufactured Products inspection of structural components: • Fabrication of structural steel and pre-stressed concrete structural components • Bridge modular expansion devices(0"to 6"or greater) • Fabrication of bearing devices _ 9.6 Approve Sources of Materials 9.7 Independent Assurance Testing(IAT),Local Agency Procedures❑COOT Procedures • Generate IAT schedule • Schedule and provide notification • Conduct IAT X 9.8 Approve mix designs • Concrete • Hot mix asphalt 9.9 Check Final Materials Documentation 9.10 Complete and Distribute Final Materials Documentation CD0T Form 1243 01/13 Page3 of 4 Previous editions are obsolete and may not be used CONSTRUCTION CIVIL RIGHTS AND LABOR COMPLIANCE 10.1 Fulfill Project Bulletin Board and Pre-Construction Packet Requirements 10.2 Process CDOT Form 205-Sublet Permit Application Review and sign completed CDOT Form 205 for each subcontractor,and submit to - EEO/Civil Rights Specialist 10.3 Conduct Equal Employment Opportunity and Labor Compliance Verification Employee interviews. Complete CDOT Form 280 10.4 Monitor Disadvantaged Business Enterprise Participation to Ensure Compliance with the "Commercially Useful Function'Requirements 10.5 Conduct Interviews When Project Utilizes On-the-Job Trainees.Complete CDOT Form 200- OJT Training Questionnaire 10.6 Check Certified Payrolls(Contact the Region EEO/CMi Rights Specialists for Paining requirements.) 10.7 Submit FHWA Form 1391-Highway Construction Contractor's Annual EEO Report FINALS 11.1 I Conduct Final Project Inspection.Complete and submit CDOT Form 1212-Final X Acceptance Report(Resident Engineer with mandatory Local Agency participation.) 11.2 Write Final Project Acceptance Letter 11.3 Advertise for Final Settlement 11.4 Prepare and Distribute Final As-Constructed Plans 11.5 Prepare EEO Certification X 11.6 Check Final Quantities,Plans,and Pay Estimate;Check Project Documentation;and submit X Final Certifications 11.7 Check Material Documentation and Accept Final Material Certification(See Chapter 9) X 11.8 Obtain CDOT Form 17 from the Contractor end Submit to the Resident Engineer 11.9 Obtain FHWA Form 47-Statement of Materials and Labor Used... from the Contractor 11.10 Complete and Submit CDOT Form 1212—Final Acceptance Report(by CDOT) X 11.11 Process Final Payment 11.12 Complete and Submit CDOT Form 950-Project Closure X 11.13 Retain Project Records for Six Years from Date of Project Closure 11.14 j Retain Final Version of Local Agency Contract Administration Checklist cc: COOT Resident Engineer/Project Manager CDOT Region Program Engineer CDOT Region EEO/Civil Rights Specialist CDOT Region Materials Engineer CDOT Contracts and Market Analysis Branch Local Agency Project Manager COOT Form 1243 01113 Page4 of 4 Previous editions are obsolete and may not be used Sheet of U.S.Department a/ Report Number: TranepNaon DETAILED DAMAGE INSPECTION REPORT 2oo51,waid County_03A-ER Federal a a letratlo, (Title 23,Federal-aid Highways) Inspection Date: 10/30/2013 _ Location(Name of Road and Milepost) FHWA Disaster Number: CO-13-1 Weld County Site 03 Federal-aid Route Number: County Road 17(CR50A Bridge)Over Big Thompson River 00017 ' Description of Damage (ONLY ONE ITEM MAY BE CHECKED) State: County: El Emergency Repair ❑ Pemanent Repait O Debris Removal CO Weld anomie rain amounts caused floodwaters that overtopped the roadway and bridge,scouring the embankments and Work Order Number: shoulders,and wadied out the noat,roadway approach at Gldge abutments.Emergency repairs to restore manual traffic include backfllling embankments,shoulders,and roadway.Emergency repairs to protect the structure include placing rlprap In the channel. Cost Estimate Description of Work to Date Cost (Equipment,tabor,and Materials) Unit _ Unit Price . Quantity Completed Remaining Major EarthWgrk Items CY 0 0 Aggregate Base Course CY _ 0 0 Surfacing-HMA TN 0 0 Surfacing-Concrete SY 0 0 Structure Repairs LS 0 1 0 Wails SF 0 0 _ Drainage LE 0 0 Misc.items LS 0 0 General Construction items LS 0 0 Winter Work&Dewatering Items IS 0 0 Engineering Services(See Attached) Per Randy .'ens en , $ 25,900.00 ER Work to Restore Traffic(See attached) _ $ 29,262.57 Deduction-PR item(Pavement) $ (2,520.37) ER Work to Protect the Structure(See attached)* • $ 51,264.20 Construction Estimate Subtotal $ 103,906.40 Right-of-Way $ - •indicates item reimbursed at 80/20 rate due to work Preliminary Engineering $ occuring during the Emergency Repair Extension Construction Engineering $ - indirects $ - Method Estimated Project Total 9Lout Fortis O State Fortes Lj Contract $ 103,906.40 Environmental Assessment Recommendation Prepared By: Date: ❑' categorical Exclusion O ENE1S Adam Hanks,P.E. 05/08/2014 Concurrence aryu`y i a ( in FHWA Englr��,"M!ow ,uy .4 ,a In Yes ❑ No fiatr1U ll LYlt EL r m'pl µomco.awnswapee rut. Ot.sHu* Concurrence State Engineer(Print Name): Stateengineer(Sign' sere): Date: Yes ❑ No Miranda Lange,P.E. 51/14- Concurrence rc Loc/,a AAgency2int Name/):/ Local ency(S �natu/re): Da p. (Q 'a ❑ No 1CUY v4QAl �iU6v:/ '.$ /9 FHWA USE ONLY Form FHWA-1547 FEMA Eligible: O Yes ❑ No COOT 11.5.2013 For estimate purposes only. ALL reimbursements up through 3/30/14 are eligible for 100%. Any after are subject to regular reimbursable share. - Josh Kiel Esther Gesick From: Katie Wolff[kwolff@basetactical.comj Sent: Thursday, August 07, 2014 12:35 PM To: Esther Gesick Cc: Roy Rudisill Subject: FHWA Task orders email 3 Attachments: 53-58A TO#20053ER1 copy.pdf; 27.5#20052ER1 copy.pdf Ok,you should have executed emergency work task orders for the following sites: 1. 13/26 2. 13/44 3. 17/50 4. 27.5/48 5. 53/58 6. 54/13 7. 54/41 Let me know if you are missing any. Thank youl Katie Wolff Project Manager BASE TACTICAL DISASTER RECOVERY (c)803.920.5618 Kwo l ff P b a s eta ct i c a I.c o m www.basetactical.com This transmission is intended only for the person to whom it is addressed and contains confidential information.Any review or use of this information by persons other than the intended recipient is prohibited.If you receive this in error,please contact the sender and delete the information from your computer.Thank you. O6net mum i taj4A,taJ 8-j[- Jojy 30045 1 et 0010 Hello