Loading...
HomeMy WebLinkAbout20140922.tiff RESOLUTION RE: APPROVE WORK ORDER FORM (FLOOD REPAIRS - EM-BR53/58A) PURSUANT TO AGREEMENT FOR CONSTRUCTION INSPECTION SERVICES AND AUTHORIZE CHAIR TO SIGN -ATKINS NORTH AMERICA, INC. WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Work Order Form (Flood Repairs - EM-BR53/58A) Pursuant to Agreement for Construction Inspection Services between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and Atkins North America, Inc., commencing April 1, 2014, and ending June 1, 2014, with further terms and conditions being as stated in said work order form, and WHEREAS, after review, the Board deems it advisable to approve said work order form, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Work Order Form (Flood Repairs - EM-BR53/58A) Pursuant to Agreement for Construction Inspection Services between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and Atkins North America, Inc., be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said work order form. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 24th day of March, A.D., 2014. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: U.ak,t) p;ve. EXCUSED Douglas Rademacher, Chair Weld County Clerk to the Boar• '# a ♦�\\ -.Fa La ai rbara Kirkmeyer, Pro-Tem BY: Dept y Clerk to the Bo��' ) j; �, �• ���. Ivor an P. Conway APP D AS Q - .,. `®t,�1ut�I .a0 c�•e��__ _ Mike Fr n bunt' t orney ( it iam F. Garcia, Acting Chair Pro-Tem I Date of signature: "t 3•/4 _> I �iQA�Qp CCAPu.)LF Q CAS, Fi , Acr- , CfrC6.0, S. A) -fro Pio Cs' c.,1) )4.8 • I4-I 2014-0922 3 a td • EG0070 BC0045 WORK ORDER FORM(FLOOD REPAIRS) PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND ATKINS NORTH AMERICA,INC. DATED: March 20,2014 Work Order Number: Atkins-6 Project Title: EM-BR53/58A Construction Inspection Services Commencement Date: April 1,2014 Completion Date:June 1,2014 Limitations on compensation: Not to exceed$36.178.00 Professional agrees to perform the services The attached forms are hereby accepted and identified above and on the attached forms in incorporated herein: Exhibit A — Scope of accordance with the terms and conditions Work, Exhibit B — Cost/Fee Breakdown, contained herein and in the Professional Exhibit C—Proposed Schedule. Services Agreement between the parties, dated January 13, 2014. In the event of a conflict between or ambiguity in the terms of the Weld County Public Works Department Professional Services Agreement and this work ���4-.��J order (including the attached forms) the By: 51-4-12). iq,E, Professional Services Agreement shall control. Project Manager Date: 3 7t+ ZO1 s By: / Atkins North America,Inc. County Eng' •er 'but, Date: 4 /DV n 4 By:j?4, -4.- 2 f J_ By: MAR 42014 Title: 1(•-P, P,(-6,s I(rE` t- Direc or% f blic Works to/ 101,4— Date: By; William F.9arcia, Acting Chair Pro-Tem '3 e '` MAR 2 4 2014 -=a ATTEST: le c--, kt2 diatt4A1 uleitO;tik 1851 ' eld County Clerk to the Boar as7.''''.1'. Depu Clerk to th oard 2014-0922 EXHIBIT A SCOPE OF WORK FOR WELD COUNTY POST FLOOD CONSTRUCTION INSPECTION Em-Br53/58A I. GENERAL Description of the project The scope of services will include the work items necessary to perform construction management for the project EM-BR53/58A. This will include inspection, measurement for payment, and documentation of all work. In addition, design services during construction will be provided as needed. Assignments of responsibilities of the parties involved Weld County Project Manager: Michael Bedell, PE Weld County Public Works 1111 H Street Greeley, CO 80632 Names of Key Personnel Responsible for Work: Atkins Project Manager: Tim Hammer,PE 4601 DTC Boulevard, Suite 700 Denver, CO 80237 720-475-7145 office 303-921-8954 cell Timothy.Hammer@atkinsglobal.com Dan Liddle,PE, Principal in Charge Josh Hollon,PE, Deputy Project Manager II. SCOPE OF SERVICES AND COST ESTIMATE The scope of services for the project includes construction project management, inspection,measurement of quantities, and documentation of all work associated with the project. The following work tasks will be completed for the preparation of one abbreviated construction plan package for the recommended restoration activities. General Scope of Work The scope of work is for one Consultant Project Engineer and for design services during construction as needed. The Project Engineer will be responsible for the documentation and inspection of construction activities, supervision and documentation of time and material work,and preparation of daily diaries documenting contractor activities and relevant observations. Inspection of materials and methods of construction to verify compliance with contract specifications,preparing pay estimates,change orders,reviewing and approving Methods of Handling Traffic(MHT's),monitoring the project schedule and financial status,resolving material and traffic control issues,and coordination/contact with local entities and business with respect to construction activities. Work Duration Scope of Services Weld County Post Flood Construction Engineering Em-BR53/58A The time period for the work described in this scope of work covers the period from approximately April 1, 2014(or upon notice to proceed)to June 1,2014. Authorization to Proceed Work will not commence until written Notice to Proceed is received by Atkins, and will be completed in the time specified. Routine Billing& Reporting Atkins will provide monthly billing formats,suitable to Weld County, for all contract activities performed by the Consultant. Project Standards All documentation and work will be in accordance with the latest versions of the Colorado Department of Transportation's Construction Manual, Colorado Department of Transportation Inspector's Checklist, Standard Specifications for Road and Bridge Construction, applicable M&S standards, and the construction Contract currently in use when the construction project is advertised, revised under advertisement,and as modified by change order,unless otherwise directed by Weld County. Labor,Materials,Vehicles& Equipment Atkins will furnish all personnel, equipment and transportation,including appropriate vehicles(equipped with flashing amber beacon), cell phone, digital camera,computers,and miscellaneous equipment(calculator,office and lab supplies, safety equipment,etc.)required for performing the work. Design Support During Construction Atkins will provide design support during construction as required to address changes. Post Construction Support Completion,Inspection and Punch List:Participate in the final inspection with the Contractor,Weld County upon substantial completion. The result of the inspection is the development of a punch list of remaining and/or outstanding work to be performed by the Contractor prior to final project acceptance. As-Constructed Drawings:Complete as-constructed drawings of work completed by the Contractor including final pay quantities. Completion Inspection and Close-Out: Following the completion of all punch list items by the Contractor, participate in the final inspection with representatives from the Contractor and Weld County,to confirm the completion of all work.The result of this inspection will constitute final project acceptance. Preparation of Final Pay Estimate: Determine final quantities with appropriate supporting documentation and checks and prepare final pay estimate. 2 of 2 a ;a iw 9 $ 8„ 8 a '9r S w S d. 8 Et "=8 G nr g [_ 8 o S a sg- a g Si e See •8sa 5 w A g S 3 8 ge ao 55 v m°8 a 5g .57 Q 2 S g • 'x 8' n aaG t $_age • 58 igg' See a e 8 a g 9 tt ₹ a�u 2 08 e 5 @ I S 6 2 EXHIBIT C WELD COUNTY POST FLOOD CONSTRUCTION INSPECTION Em-Br53/58A I. ESTIMATED PROJECT SCHEDULE Project Kickoff Meeting 4/01/14 Begin Project Inspection and Documentation 4/02/14 Complete Project Inspection and Documentation 5/12/14 Delivery of Final Construction Documents 6/01/14 Hello