HomeMy WebLinkAbout20133508.tiff Document G701 Change Order PROJECT:(Name and Address) CHANGE ORDER NUMBER:1 OWNER ❑� IT Remodel Rooms 132,133,127, 128,129, 131,145,144,143 1401 N. 17`h Ave.Greeley,Co. DATE: 3/18/2014 ARCHITECT ❑ ARCHITECT'S PROJECT NO: CONTRACTOR O TO CONTRACTOR:(Name and Address) FIELD ❑ DS Constructors LLC 3780 N Garfield Ave.3101 CONTRACT DATE:01/14/14 OTHER ❑ Loveland Colorado 80538 CONTRACT FOR:Cent.Center Bathroom remodel The Contract is changed as follows: (Include, where applicable,any undisputed amount attributable to previously executed Construction Change Directives) Change the rooms per the attached demo and new floor plan attachments A&B. Existing doors are to be reused with new keying by others Doors not used are to be stock piled in this building Paint the walls in a color to match existing Paint the reused door frames We will handle the obtaining a building permit which we understand to be a no cost permit This work is tax exempt. We are to be furnished auto cad files of the existing building to be able to produce new auto cad files of the new floor plan. We have not included time to make new autocad drawing files. Flooring,fire sprinkler work,security work,HVAC work is by the owner There is no plumbing work is needed and therefore not included The original Contract Sum was $ $209,900.00 The net change by previously authorized Change Orders $ $0.00 The Contract Sum prior to this Change Order was $ $42,798.00 The Contract Sum will be increased by this Change Order in the amount of $ The new Contract Sum including this Change Order will be $ $42,798.00 The Contract Time will be increased by 30 days after permit ( 30 )days The date of Substantial Completion as of the date of this Change Order therefore is 30 days after a permit is obtain for this scope of work (Note: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.) NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. DS Constructors LLC Weld County, Colorado ARCHITECT(rim name) CONTRACTOR(rim name) OWNER(Frm name) 3780 N Garfield Ave.Ste.101,Loveland, 1150 0 Street P.O. Box 758 Colorado 80538 Greeley. Colorado ADDRESS A RESS DDRESS BY(Signature) ' BY(Signature) V(Sign ure) Melinda Denney, President Douglas Rademacher, Chair Typed name Typed name Typed name 3)MII9 MAR 1 9 2014 DATE DATE DATE N • c J p E 0 j a r l - C. 21 eli • J O 1 a J to cr‘ P a 9 4 i ----Nr, I____ a , r, y q) 1!O1 Es- N. il Eo g 111 i ir w w v) I _ L 1- :•! g 3- ofi I O et1 I s' ay :r I III_ I ' -----0 O, I " -,f = I -�. �_� -. 11 -JI ,� .4-.b •Cie It' IONS' los �' O...c 2) .t•-.S.I 1 - - - ia -- ---a ---- - II - ---- ni,:a- . 'ICS a. 4 c } r-iii „ mu 7 :, 1-..,,,,..,,,a 1 fp-4 tj 1 k_s_zj in § &.--,..„4-- - - ----7,------,k, . 'I Bede 15;\t"--4 g ii ti E. g. tr \ k \ \V \ \I,\\\ \\QA I 13 1 41) j A V N. ' Li )*4 I I i l` m $ O1Z Lit - 4 - � �I y• J-� r � f 14 � '� � 2 lice .c ct r 0 O 1 4- i 0 vv et O y -► l' I D a c� 4 ° I r - :l ri _ r_________ ti4Ciee.7774 -- . I ..oi . `) a I 111' g ,b y a i t 1I,, it ' _11, \III4 i ,golx •� rDIN CY Ugh el I-4 ; l`I. �' < <C -ail � 'J, ,ki (':1 ill \ 0 tLia:I l�� i- ,� N F , / I t i a ,--.._I -.) DI's L_________ . _ , kr 0 ""si '18 L-71 i... .i . .,- 3' O r -- ' 2.NC, --1, > , • M � V 7 te :t 1 'i f ll u ' % 0 Q? I Z :lb 1-- - ;1_ --. 2 -g15 I _\ --- i i -"t - Ili / 7 1 — C :.) ll libmi IL 40 ill- t) r La— 1 iHi Cz U0. G � 'i - riii ic. . . i , :I 15, �Oin a,ti O F c�� I I 1111 r Imei • � e0c. 4 2a 1 in Ial lil L Li. ires. ftl -A1 I *.N14 71 1I �.fJII I ' I in .• . i (.\ i Q I--Zi C- - io d L F-- 3 k^ o —) z oCI i et -_ Ls. 1 a3 in I I (4 r? fra 4- _ i,—.% i I \ wei i 151 \'s i \\11.; ra' -i ti I ► 4/. \ J u ir w LJ.1 i 1 u_ 1 ! iii tti d .41 te_74 .tils.6; I •••leam awes...419f .4. i . D. - - - 9 7 .•.h. re--. , 1 ILA II • U . . Q ri Cl a- Its'" - L - - --- ^ n�'1' ty S✓ - J (- ` %� i . ''' :Ft, A II1/4:":41:3\ I fi tn -tit Ii" QJ5 ft to --i 7 f O o 3 t 7,______,s____ _ ______17.ri cc:::1I I ) J I ' I•. cat d \� '9 I`: 1 3 '� 1 6 0 3 7 y# cs::t \ J I i 1 Y u ell ! .� .s r FA, • ft ! kip- m r 3 , 1,, t , in t• t c- .. Q - — --- = ' - ; T • a in I O / w L�1 7: .- e 7- sr tS- ev' . nill"..............HIL S I . I clij .O1! +17 Ili 4 F I f`� ' I 5m i 0hc� ti Q 1 I it \Iii J 1f---- • . ,Y_ z ::4 V tt 3 E___ 3 Is& 6 ne ti.t 4 C ri — — � j 1 I L4 , �._ --J '4 ZO e Z 1 a �'` cjoV _ L o O •1 L tir icz, I *2 tir.: `,4 ?; .. , . , , , . .‘• .., . , 0 , .. 4 .. < . N ! , '7 '' 4 .C4 i ,,I I I H in r 1-1 E 2 2. t 4 i : , ..r.r, %ire 1/4„.9.: u ()Cep.. ..' .. '-- ..1 • i Le) ! ___ • ,) --1tlt ' e•1 DEPARTMENT OF BUILDINGS AND GROUNDS t1� T r, PHONE: (970)304-6531 FAX: (970)304-6532 WEBSITE: www.co.weld.co.us G II 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 January 6, 2013 To: Board of County Commissioners From:Toby Taylor Subject: Centennial Restroom Remodel; Bid #61300193 As advertised, this bid is to perform a remodel of twelve restrooms in the Centennial Center Building. The low bid received was from Construction Concepts Inc. After submitting their bid, Construction Concepts Inc. retracted their bid due to a clerical error they made in the total price. The next low bidder was DS Constructors for $209,900 and meets specifications. Therefore, Buildings & Grounds is recommending the bid be awarded DS Constructors. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director os Construction Concepts,. Designing and Building the Future December 30,2013 RE: Weld County Restroom Rid Marcia Walters: Please withdraw our recent bid that we submitted to Weld County for the restroom renovations. We had an internal error with our estimating software that left over$30,000 dollars out of our bid. I want to apologize for this issue; this is the first time we have had to withdraw a bid in our 20+ years in business. I assure you that Construction Concepts is a well organized and quality contractor, and that this was simply a software error that occurred. Please continue to invite us on future projects. If you have any questions please contact me at 970-567-1516. Respectfully, _--r Dan Grelle Vice President Construction Concepts, Inc. 14125 MEAD STREET LONGMONT, CO 80504 Y'(970)535-0600 x'FAX 970 535-0299 WELD COUNTY PURCHASING 1150 O Street Room 107, Greeley CO 80631 $� E-Mail: mwaltersco.weld.co.us E-mail: reverett(c�co.weld.co.us rJ ] Phone: (970) 356-4000, Ext 4222 or 4223 f 4 f _ 1„ 111 Fax: (970) 336-7226 _C0UNTY DATE OF BID: DECEMBER 201", 2013 REQUEST FOR: RESTROOM REMODEL/CENTENNTIAL CENTER (12) DEPARTMENT: BLDGS & GROUNDS DEPT BID NO: #B1300193 PRESENT DATE: DECEMBER 23RD, 2013 APPROVAL DATE: JANUARY 6TH, 2013 VENDORS TOTAL AMOUNT COMPLETION DATE CONSTRUCITON CONCEPTS INC ***WITHDREW 00 days 14125 MEAD STREET WITHDREW BID*** 1/2/14-3/4/14 LONGMONT CO 80504 DS CONSTRUCTORS LLC $209,900.00 1/31/14-3/29/14 3780 N GARFIELD AVE STE 101 FT COLLINS CO 80538 NEWSTROM-DAVIS CONSTRUCTION CO $243,385.00 5/14/14 13949 WEST COLFAX SUITE 110 LAKEWOOD CO 80401 CLASSIC CONTRACTORS INC $255,221.00 5/30/14 BOX 2798 LOVELAND CO 80539 BARBA & SONS CONSTRUCTION INC $259,582.00 210 Days 15269 NAVAJO ST BROOMFIELD CO 80023 GROWLING BEAR CO INC $277,736.00 4/30/14 2330 4TH AVENUE GRELEEY CO 80631 SEAGREN CONSTRUCTION LLC $313,084.00 9 weeks 21353 E NICHOLS PKWY after start AURORA CO 80016 BLUE LINE BUILDING SERVICES INC $330,698.00 5/2014 3225 BLAKE ST#13 DENVER CO 80205 MARK YOUNG CONSTRUCTION INC $339,513.00 5/27/14 7200 MILLER PLACE FREDERICK CO 80504 **TOBY TAYLOR- BLDGS & GROUNDS IS REVIEWING THE BIDS AT THIS TIME WELD COUNTY PURCHASING i$�a 1150 O Street Room 107, Greeley CO 80631 E-Mail: mwalters(cr�co.weld.co.us E-mail:hon reverett(aco.weld.co.us 42 Phone`. (970) 356-4000, Ext 4222 or 4223 if Fax: (970) 336-7226 GOUNTY , .. DATE OF BID: DECEMBER 20TH, 2013 REQUEST FOR: RESTROOM REMODEL/CENTENNTIAL CENTER (12) DEPARTMENT: BLDGS & GROUNDS DEPT BID NO: #B1300193 PRESENT DATE: DECEMBER 23R°, 2013 APPROVAL DATE: JANUARY 6TH, 2013 VENDORS TOTAL AMOUNT COMPLETION DATE CONSTRUCITON CONCEPTS INC $195,394.00 90 days 14125 MEAD STREET 1/2/14-3/4/14 LONGMONT CO 80504 DS CONSTRUCTORS LLC $209,900.00 1/31/14-3/29/14 3780 N GARFIELD AVE STE 101 FT COLLINS CO 80538 NEWSTROM-DAVIS CONSTRUCTION CO $243,385.00 5/14/14 13949 WEST COLFAX SUITE 110 LAKEWOOD CO 80401 CLASSIC CONTRACTORS INC $255,221.00 5/30/14 BOX 2798 LOVELAND CO 80539 BARBA & SONS CONSTRUCTION INC $259,582.00 210 Days 15269 NAVAJO ST BROOMFIELD CO 80023 GROWLING BEAR CO INC $277,736.00 4/30/14 2330 4TH AVENUE GRELEEY CO 80631 SEAGREN CONSTRUCTION LLC $313,084.00 9 weeks 21353 E NICHOLS PKWY after start AURORA CO 80016 BLUE LINE BUILDING SERVICES INC $330,698.00 5/2014 3225 BLAKE ST#13 DENVER CO 80205 MARK YOUNG CONSTRUCTION INC $339,513.00 5/27/14 7200 MILLER PLACE FREDERICK CO 80504 **TOBY TAYLOR- BLDGS & GROUNDS IS REVIEWING THE BIDS AT THIS TIME z e075 Hello