HomeMy WebLinkAbout20141682.tiff DEPARTMENT OF BUILDINGS AND GROUNDS 'I IA r 1, PHONE: (970)304-6531 4k-in FAX: (970)304-6532 WEBSITE:www.co.weld.co.us COUNTY j 1105 H STREET P.O.BOX 758 GREELEY,COLORADO 80632 October 13,2014 To: Board of County Commissioners From:Toby Taylor Subject:Change Order#2 for Motor Pool CNG Modification The electrical plans require a new circuit be fed from the existing CT box. Upon review and coordination with Xcel Energy, it was found the existing CT box and meter socket do not meet the current Xcel Energy standards. Therefore,to proceed with the electrical modifications,Xcel Energy will require the CT box and socket set to be replaced. This change order is priced to conduct this building power outage after business hours. Buildings and Grounds Is recommending approval of this change order for$4,736.00. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director Ce ; .84 (Y7) 02014-lusa /p-l5- /V /�- ►5-/'1 i36 not to Document 714 Request for Change Order PROJECT: Name and address) CHANGE ORDER NUMBER 2 Motor Pool CNG/LNG 1399 N. 17th Ave. DATE: 10-Oct-14 Greeley, CO 80631 ARCHITECTS PROJECT NUMBER CONTRACTOR: (Name and address) Classic Contractors, Inc CONTRACT DATE 23-Jun-14 P.O. Box 2798 Loveland,CO 80539 CONTRACT FOR: Motor Pool Modifications CNG/LNG We are requesting the following changes to the Work: (Include all changes in the work below, use additional sheets if required) Replace electrical service CT box and meter socket per RFI 3 $ 4,736 The original ( Contract Sum) (Guaranteed Maximum Price)was $ 548974.00 The net change by previously authorized Change Orders $ 5482.00 The Contract Sum (Guaranteed Maximum Price) prior to this Change Order was $ 554456.00 The Contract Sum ( Maximum Price)will be increased/decreased/unchanged by this Change Order in the amount of $ 4736.00 The new(contract Sum) (guaranteed Maximum Price) including this Change Order will be $ 559192.00 LIST SCHEDULE IMPACT BELOW IF ANY Add 5 days to schedule N/tq Classic Contractors, Inc Weld County Government ARCHITECT(Firm name) CONTRACTOR(Finn name) OWNER(Finn name) PO Box 2798, oveland, CO 805: 1150 O St., Greeley, CO 80632 ADDRESS ADDRF,b A RESS' /r/ BY(Signature) /BY(Sign ure) /Y(Signature) 7 Kart Schmidt Barbara Kirkmeyer, Pro-Tem (Typed Name) (Typed Name) (Typed Name) Sept. 15, 2014 OCT 1 5 20t4 DATE DATE DATE fit? 4-)l ' 1861 y DEPARTMENT OF BUILDINGS AND GROUNDS PHONE: (970) 304-6531 J p FAX: (970) 304-6532 _G O_.V N T Y WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 September 17, 2014 To: Board of County Commissioners From: Toby Taylor Subject: Change Order for Motor Pool CNG Modification During the installation of the new heating systems, it was discovered these items need to be moved around to a different locations accommodate a code clearance issue. To add this additional piping and move the systems will cost$5,482.00. Buildings and Grounds is recommending approval of this change order. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director Cie: 136 2oiq-iL�'2. qua �� 3606I% Document 714 Request for Change Order PROJECT: Name and address) CHANGE ORDER NUMBER 1 Motor Pool CNG/LNG DATE: Sept. 15,2014 1399 N. 17th Ave. Greeley, CO 80631 ARCHITECTS PROJECT NUMBER CONTRACTOR: (Name and address) Classic Contractors, Inc CONTRACT DATE 23-Jun-14 P.O. Box 2798 Loveland, CO 80539 CONTRACT FOR: Motor Pool Modifications CNG/LNG We are requesting the following changes to the Work: (Include all changes in the work below, use additional sheets if required) Added gas lines to radiant heaters per RFI 1 $ 5,482.00 • The original ( Contract Sum) (Guaranteed Maximum Price)was $ 548974.00 The net change by previously authorized Change Orders $ 0.00 The Contract Sum (Guaranteed Maximum Price) prior to this Change Order was $ 548974.00 The Contract Sum ( Maximum Price)will be increased /decreased/unchanged by this Change Order in the amount of $ 5482.00 The new(contract Sum) (guaranteed Maximum Price) including this Change Order will be $ 554456.00 LIST SCHEDULE IMPACT BELOW IF ANY Add 5 days to schedule N/A Classic Contractors, Inc Weld County Gnvarnmant ARCHIT T(Firm name) CONTRACTOR(Finn name) 0WNER(Fimt name) PO Box 2798, veland, CO 805£ 1150 O Street- Grpat ay CO 80632 ADDRESS ADDR S ADDRESS \ (CPS T f BY(Signature) - Y(Signature) •(Sign:ture) Karl Schmidt Don&ac Radamnrher, (Typed Name) (Typed Name) (Typed Name) Sept. 15, 2014 SEP 2 2 2014 DATE DATE DATE 1861 �' DEPARTMENT OF BUILDINGS AND GROUNDS PHONE: (970) 304-6531 FAX: (970)304-6532 G 0 UN T Y WEBSITE:www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 June 17, 2014 To: Board of County Commissioners From: Toby Taylor Subject: Motor Pool Modifications for CNG & LNG; Bid#B1400096 As advertised, this bid is to perform modification of the facility to accommodate the maintenance of CNG and LNG vehicles. The low bid received was from Classic Contractors Inc and meets specifications. Therefore, Buildings & Grounds is recommending the bid be awarded Classic Contractors Inc. for $548,974. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director 070/1/- $02 O73 3600/6 WELD COUNTY PURCHASING w` �86� 1150 O Street Room #107, Greeley CO 80631 E-mail: mwalters(a�co.weld.co.us E-mail: reverettCa�co.weld.co.us + 1 y[Ufi I,lI I Phone: (970) 356-4000, Ext 4222 or 4223 _c p u 1Y Fax: (970) 336-7226 DATE OF BID: JUNE 3RD, 2014 REQUEST FOR: MOTOR POOL MODIFICATIONS-FOR CNG & LNG DEPARTMENT: BUILDINGS & GROUNDS DEPT BID NO: #B1400096 PRESENT DATE: JUNE 9, 2014 APPROVAL DATE: JUNE 23, 2014 TOTAL PROJECT VENDOR COST COMPLETION DATE CLASSIC CONTRACTORS INC $548,974.00 SEPT 30, 2014 P O BOX 2798 LOVELAND CO 80539 MW GOLDEN CONSTRUCTORS $596,737.00 SEPT 12, 2014 1700 NORTH PARK ST CASTLE ROCK CO 80109 ***BIDS ARE BEING REVIEWED BY TOBY TAYLOR/BLDGS & GROUNDS AT THIS TIME. 2014-1682 �� >66 dal/ Hello