HomeMy WebLinkAbout20140333.tiff RESOLUTION RE: APPROVE WORK ORDER FORM (FLOOD REPAIRS -WEL-BR27.5/48A) PURSUANT TO AGREEMENT FOR DESIGN SERVICES AND AUTHORIZE CHAIR TO SIGN - AYRES ASSOCIATES, INC. WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Work Order Form (Flood Repairs - WEL-BR27.5/48A) Pursuant to Agreement for Design Services between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and Ayres Associates, Inc., commencing January 13, 2014, with further terms and conditions being as stated in said work order form, and WHEREAS, after review, the Board deems it advisable to approve said work order form, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Work Order Form (Flood Repairs - WEL-BR27.5/48A) Pursuant to Agreement for Design Services between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and Ayres Associates, Inc., be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said work order form. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 3rd day of February, A.D., 2014, nunc pro tunc January 13, 2014. BOARD OF COUNTY COMMISSIONERS r ELD COUNTY,9OLORADO IV v �, �.� )�� K2 ATTEST: ; , pp " •Stae(s Rademacher, Chair Weld County Clerk to the Boar 12,61 'J��=�� // ''f���( �'Y'�p �`/ ,, ' a n,, n 0 �1�•••.�ff_ra Kirkme,9rer, Pro-Tem De uty Clerk to the Board - - / Sean P. Conway AP FORM: x Mike Freprn y Attorney Wjf Q / d am Garcia Date of signature 093-4 ale : /% , 60i 2014-0333 O2- 7-/'Y EG0070 BC0045 i WORK ORDER FORM(FLOOD REPAIRS) PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND AYRES ASSOCIATES INC. DATED: January 31,2014 Work Order Number: Ayres- 1 Project Title: WEL-BR27.5/48A Design Services(Immediate Needs Prior to Spring Runoff) Commencement Date: January 13,2014 Completion Date:April 30,2014 Limitations on compensation: Not to exceed$24,400.00 Professional agrees to perform the services The attached forms are hereby accepted and identified above and on the attached forms in incorporated herein: Exhibit A — Scope of accordance with the terms and conditions Work, Exhibit B — Cost/Fee Breakdown, contained herein and in the Professional Exhibit C—Proposed Schedule. Services Agreement between the parties, dated January I3, 2014. In the event of a conflict / between or ambiguity in the terms of the Weld Count• ic Wo Depa• Professional Services Agreement and this work f order (including the attached forms) the By: /��l Professional Services Agreement shall control. Proj c amber Date: - 4 By: Ayres Associates Inc. Director of Public Works /// Date: FEB 0 3 2014 By: ...„9-1 Title: 3,1 44.4/OCrteei Date: /44 By:L--7()1(17(a 7) Douglas Ra4emacher, CC Chair ATTEST: tie Weld County Clerk to the Boar 4 tiq*By: .., Depu Clerk to the Board t (/•i ���� 2014-0333 G ovkc 5 EG O AVRE5 Ayres Associates Inc ASSOCIATES EXHIBIT A - SCOPE OF WORK Weld County 2013 Flood Recovery WEL027.5-48.0A County Road 27.5 over Big Thompson River Structure Description: This three-span bridge is 153.5 feet long with three nearly equal-length spans. The bridge has double-tee concrete girders and concrete abutments with flared wingwalls. The piers and abutments are believed to be founded on piles but this has not been verified. The concrete piers are continuous walls under the full width of the bridge deck. The 2010 bridge inspection report gave a Sufficiency Rating of 96.8 and an Item 113 (scour critical) code of 5. which means the structure was expected to be stable under anticipated scour conditions. and that the estimated scour line is within the piles (e.g. below the pile cap) of at least one substructure element. • . • _41 :•z �� �' • ►�.��-' fitIll Flood Damages and Ongoing Issues: Ayres staff visited the crossing site with Richard White of Weld County on January 16, 2014. The main damage sustained at this crossing was caused by road overtopping over large stretches of the road both north and south of the bridge. The nature of the damage was erosion of the embankment side slopes (mostly along the east side of the road but also some along the west side) along with undercutting of the paved shoulders. This site is located in an area where the river channel is highly sinuous. The river channel pattern here is bimodal. in that it is composed of a small low flow channel meandering within a larger high-flow meandering course. There are numerous historic and pre-historic cutoffs located on the floodplain upstream and downstream of the bridge. These cutoffs indicate that the channel in this reach is highly active with regard to meander migration. Given that the roadway and bridge are located within the neck of a large meander loop and that the banks of the upstream and downstream limbs of the loop are as close as 300 feet, the potential for a neck cutoff across the roadway during the next major flood that overtops the roadway is a distinct possibility. It is especially concerning that the lowest point in the roadway, which is nearly level with the floodplain, is also coincident with the closest proximity of the upstream and downstream limbs of the river. { AWES Ayres Associates Inc ASSOCIATES Work Recommended Prior to Spring Runoff(Phase 1): • Armor the toes of the abutments and wingwalls, along with the lower portions of the embankment side slopes, with riprap to a distance of 25 feet beyond the wing walls • Survey the right of way and the roadway within the right of way from 1600ft north to 600ft south of the bridge Work Anticipated for Phase 2: • Regrade and protect the east roadway embankment north (1600 ft) and south of the bridge (550 ft) with TRM and rock (see sketch below) to prevent more roadway damage in case of an exceptionally high spring runoff discharge • Replace the roadway patch • Protect the bank in the bendway that comes near the roadway on the east side • Remove or lower the point bar in the vicinity of the bridge Roadway Riprap v_ TRM m - Potential Phase 3 work for Betterments and/or Resiliency: • Place a guidebank on the right bank upstream of the south abutment • Build a crossing (or crossings) at the low point in the road north of the bridge (If a larger crossing looks probable, don't protect the bendway in Phase 2 —just monitor it) Detailed Scope of Work for Phase 1: 1. Kickoff Meeting. Ayres project manager/engineer and geomorphologist will meet with County project manager at County Public Works office. 2. Site Assessment. Ayres project manager/engineer and geomorphologist meet at the site with County project manager to observe current field conditions. assess geomorphology and discuss what emergency repairs were done. 3. Survey. Conduct boundary survey of the right of way limits and topographic survey of the road pavement and embankment within the right of way from 1600ft north to 600ft south of the bridge with greater detail around the bridge abutments. 4. Prepare brief environmental documentation for permitting the work at this site. 5. Progress Meeting. Conduct one progress meeting with County project manager at County Public Works office. 6. Design. Develop design of Phase 1 riprap work. 7. Plans and Deliverables. Prepare abbreviated Phase 1 construction documents (following CDOT "writeup plans" format). Estimate quantities and prepare engineer's estimate of probable cost for Phase 1 activities. Also prepare a ROW Plan for CDOT's review to cover anticipated work through Phase 2. Ni- NIL 0 O O CC N O O to — ^ 00 O u, O N 0 ac r N rn CO N VI Vn m w un O O O O (mil o u> ao CO p w w ✓/ co CO .- W e w an u9 Ow VI w N N w f� 11 r C N ER N QIn fn _ O U OU) N U) U) U) U) Q 00 In '('..n^l Q 0 `h r 4 N N V/ ~ r Q � N x o w w N OU) an an in O i a C7 `^ r (7 C) V e h n w C) E U) 46 Iii rn o e m 2 fn fn ua (n c o O c o N u) , U o e x • r- CO w N o n w in an U) . an o s m w • w o 0 v) w v v gC A a 2 m fn co fn V) y . - CI — co co u N N V rd oi C Q 0. i 0 0 0 0 0 0 0 O O 0 0 0 I"- s CD 91. w w w in O V) w w w 0 0O N CO CC) V) _ w _ O! m w w 7 a is 06 u.) w u) (!) .- V N :C CO C) I.2. Ii O O nL o U) U) O N 0 0 0 0 O 0 �0 0 M Cl.. • v0) a, w U) w w w w COn fn w w 69 . ✓N) CO 0 >•` w N M 07 c LL. U r y , V rn M 4: Oi w C'> VI VI i V) — (V o o pcq (Q C C N O a o • o (n L a) ~ 4- Q) I. Kl O O O 0 0 N 0 0 O'O an 0 0 n w w w w w N 0) (D w U) D) w V: U7 , O O Ii L W m O w w w CT V) V V r :) V) w N N m a) o co c < O• ' O 0ill O en en o) U) U) fn anet LO • p v c (p N iiW y .) t, Q I Ic O o 0 0 0 0 0 0 0 0 0 COO 0 w w w w w 0CD w w w w (C) O 0 CC) w w v. p o m C') w N — V C C Md E 0 N O v) ffl v) (n U) (n 47 v CO Ln n o U) o II) 1- N X 0 v) 0 0 0 0 O 0 0 0 0 0 0 an CO) r in w w in in (C) an w in w . y O it'',wO w v w N N V) 69 (f) V) N o o , ;, ,., w •w u' v, ,,-.7, 0 w N (o R j m U CJ ' E N o w In 9 cr) • j LL C C J y W Q O ~ in C U O U u C 0 —C d w c o c a > O 'a m CL x ns Y 4 J W I— _ ea fa la O O O N- H F- Exhibit C: Schedule of Weld County Flood Repairs on the Big and Little Thompson Priority Task Completion Site Task Task Start Date Date • Scoping Meetings January 13, 2014 January 28, 2014 Site Assessment January 16, 2014 January 31, 2014 Survey February 5, 2014 February 12, 2014 1 WEL027.5-048.0A Design & Plans February 13, 2014 February 28, 2014 Review&Revisions* February 28, 2014 March 7, 2014 Bidding* March 10, 2014 March 24, 2014 Construction* March 31, 2014 April 28, 2014 Scoping Meetings January 13, 2014 January 28, 2014 Site Assessment January 16, 2014 January 31, 2014 Survey February 8, 2014 February 15, 2014 2 WEL017.0-050.0A Design & Plans February 17, 2014 March 1, 2014 Review& Revisions* March 1, 2014 March 7, 2014 Bidding* March 10, 2014 March 24, 2014 Construction* March 31, 2014 April 28, 2014 Scoping Meetings January 13, 2014 January 28, 2014 Site Assessment January 16, 2014 January 31, 2014 Survey February 11, 2014 February 18, 2014 3 WEL013.0-044.0B Design & Plans February 19, 2014 March 5, 2014 Review& Revisions* March 5, 2014 March 12, 2014 Bidding* March 13, 2014 March 27, 2014 Construction* March 31, 2014 April 28, 2014 Scoping Meetings January 13, 2014 January 28, 2014 Site Assessment January 16, 2014 January 31, 2014 Survey February 11, 2014 February 18, 2014 4 WEL054.0-013.0A Design & Plans February 19, 2014 March 5, 2014 Review& Revisions* March 5, 2014 March 12, 2014 Bidding* March 13, 2014 March 27, 2014 Construction* March 31, 2014 April 28, 2014 *Schedule dependent upon other parties not Ayres Associates such as Weld County or the eventual contractor. Hello