Loading...
HomeMy WebLinkAbout20141523.tiff BEFORE THE WELD COUNTY, COLORADO, PLANNING COMMISS EXHIBIT RESOLUTION OF RECOMMENDATION TO THE BOARD OF COUNTY COM l�r Moved by Benjamin Hansford, that the following resolution be introduced for passage l Planning Commission. Be it resolved by the Weld County Planning Commission that th . CASE NUMBER: PUDZ14-0001 APPLICANT: JOHN & NANCY FRITS PLANNER: KIM OGLE REQUEST: CHANGE OF ZONE REQUEST FROM THE A(AGRICULTURAL)ZONE DISTRICT TO THE PUD(PLANNED UNIT DEVELOPMENT)ZONE DISTRICT FOR TWO(2) LOTS WITH ESTATE ZONE DISTRICT USES. LEGAL DESCRIPTION: LOT B REC EXEMPT RECX11-0002;PART W2NW4 SECTION 7,T3N,R68W OF THE 6TH P.M.,WELD COUNTY, COLORADO. LOCATION: EAST OF AND ADJACENT TO CR 1; SOUTH OF AND ADJACENT TO CR 36. be recommended favorably to the Board of County Commissioners for the following reasons: 1. The submitted materials are in compliance with the application requirements of Section 27-5-30 of the Weld County Code. 2. The submitted materials are in compliance with Section 27-6-120 of the Weld County Code as follows: A. Section 27-6-120.8.2.a The proposal is consistent with any intergovernmental agreement in effect influencing the PUD and Chapters 19 (Coordinated Planning Agreements), Chapter 22 (Comprehensive Plan), Chapter 23(Zoning), Chapter 24(Subdivision)and Chapter 26(Regional Urbanization Areas) of the Weld County Code. The proposed site is not influenced by an Inter- Governmental Agreement nor is it located within an urban growth boundary. The proposal is consistent with the aforementioned documents as follows: 1) Section 22-3-50.B.1, P.Goal 2"Require adequate facilities and services to assure the health, safety and general welfare of the present and future residents of the County."The proposed PUD will be serviced by the Longs Peak Water District and Individual Sewage Disposal Systems will handle the effluent flow. B. Section 27-6-120.6.b- The uses which would be allowed in the proposed PUD will conform with the Performance Standards of the PUD Zone District contained in Article II, Chapter 27 of the Weld County Code, with the following exceptions. Section 27-2-20 states: "All PUD developments will be served by an internally paved road system according to County standards.An exception to paving may be granted by the Director of Public Works for residential PUDs of nine(9)lots or less located in nonurban areas as defined in Chapter 22 of this Code, when the PUD is not located within close proximity to other PUDs, subdivisions and municipal boundaries, and when access to the PUD is not from a public road which is paved or will be paved within a year of approval of the PUD. (Weld County Code Ordinance 2002-9) The applicant is choosing to utilize the Weld County PUD development process to create two equal sized lots due to recent changes in the Recorded Exemption regulations that impact residual lot sizes. The proposed North Country PUD two-lot development has an existing approved access permit(AP-11-00401)for two separate accesses onto Weld County Road 1 that can serve each lot. The south approved access is used to serve the existing residence on Lot 1,and the north approved access,which is currently used for agricultural activities, can be used to serve Lot 2. Both existing accesses meet the minimum access requirements related to line of sight, distance between, culvert size and access width. No additional collector roadway or driveway access construction improvements would be necessary for the site. The standard PUD requirement for paved internal roadways is a significant financial burden on the applicant. Therefore, the applicant requests a variance from the standard PUD requirement for a single, paved common access road for the development. The applicant seeks approval to utilize the two existing approved accesses, and to maintain both gravel driveways, with no additional impacts to the site,to neighboring sites,or to County services and emergency agencies. The Department of Public Works in their referral dated February 28, 2014 required the applicant to submit a letter requesting an exception to this requirement. r RESOLUTION PUDZ14-0001 JOHN & NANCY FRITS PAGE 2 Section 27-2-40. Bulk requirements — The applicant has chosen to adhere to the bulk requirements of the E (Estate) Zone District for the two (2) residential lots. Section 27-2-50. states: "Development within a PUD Zone District shall be designed and constructed to include adequate, safe and convenient arrangements for pedestrian and vehicular circulation,off-street parking and loading space. Pedestrian and vehicular circulation shall relate to the circulation system external to a PUD Zone District.All streets within the PUD Zone District, whether private or public, shall be designed and constructed to meet the requirements of the Department of Public Works and Chapters 24 and 26 of this Code, if applicable." The applicant is choosing to utilize the Weld County PUD development process to create two equal size lots due to recent changes in the Recorded Exemption regulations that impact residual lot sizes. The applicant seeks approval to utilize the two existing approved accesses, and to maintain both gravel driveways to each individual residence. The applicant requests a variance from the standard PUD requirement for pedestrian circulation, off-street parking and loading space. The Department of Public Works in their referral dated February 28,2014 recommended approval of the Change of Zone plan as submitted. Section 27-2-60. states"Common open space is defined as any usable parcel of land or water unimproved and set aside, dedicated,designated or reserved for public or private use or for the use and enjoyment of owners or occupants of land adjoining or neighboring such area. Common open space includes landscape areas that are not occupied by buildings or uses such as storage or service areas, private courtyards, parking lots and islands. In all PUD districts, except for those containing residential uses, common open space may include landscape setbacks adjacent to roadways, where the setbacks are not utilized as parking or storage areas. The amount and type of common open space provided in a PUD Zone District shall be proportional to the intensity of the zone districts called for in the PUD or uses specified in the application,unless specifically delineated in Chapter 26. Common open space shall be designed to be useful to the occupants and/or residents of the PUD Zone District for recreational and scenic purposes. Common open space in the PUD Zone District shall be owned and maintained in perpetuity by an organization established specifically for such ownership and maintenance purposes. (Weld County Code Ordinance 2003-10) The applicant is choosing to utilize the Weld County PUD development process to create two equal sized lots due to recent changes in the Recorded Exemption regulations that impact residual lot sizes. The North Country PUD is located in a non-urban area; is not adjacent to other PUD's,subdivisions, municipal or urban growth corridors, a n d is identified as Agricultural in the Town of Mead's Comprehensive Land Use Plan for future planning purposes, and is located outside of the Weld County RUA and Intergovernmental Agreement areas. The proposed North Country PUD will create two approximately equal sized rural estate type lots. The rural and agricultural nature of the properties will be reflected in the associated uses. Agricultural activities may include growing wheat, barley, and prairie grass,and support some livestock including horses,cows, sheep and chickens on the large undeveloped portions of the lots. Based upon the style of the PUD,the rural location and proposed residential and agricultural uses,the applicant requests a variance from the standard PUD requirement for common open space, landscaping requirements for the common open space,and a homeowner's association to oversee control and condition of the common open space. The applicant seeks approval to not include common open space for the two large agriculturally active lots, and to not create a governing homeowner's association or landscape requirements for such common open space. Further, per Section 27-2-140 non-urban scale developments comprised of nine (9) or fewer residential lots located in a non-urban area as defined by Chapter 22 of the Weld County Code are not subject to the common open space requirement. Section 27-2-80 states: "The design standards and improvements agreements of Chapter 24, Article VII, and Sections 24-9-10 and 24-9-20 of this Code shall be utilized when applicable to the PUD final plan review and development.Certain PUD final plan requirements may differ from those specifically listed in Chapter 24. Final recording shall not occur until the required improvements agreements have been approved and collateral tendered." The applicant is choosing to utilize the Weld County PUD development process to create two equal size lots due to recent changes in the Recorded Exemption regulations that impact residual lot sizes. RESOLUTION PUDZ14-0001 JOHN&NANCY FRITS PAGE 3 The applicant seeks approval to not be required to submit an Improvements Agreement and be required to submit Final Plans for the development. Given the intensity of development, the Department of Planning Services supports this request. Section 27-2-100 states"No building permit shall be issued for any building or any portion of a PUD until the landscaping required by the landscape plan map is in place and/or an on-site improvements agreement has been entered into which complies with the requirements in Section 24-9-10 of the Weld county Code." The applicant is choosing to utilize the Weld County PUD development process to create two equal sized lots due to recent changes in the Recorded Exemption regulations that impact residual lot sizes. The applicant seeks approval to not include a Landscape Plan map as a requirement of this PUD. Section 27-2-165 states"Parks, playgrounds,trails,paths and other recreational areas and open spaces, scenic and historic sites are public purposes. A public purpose may also include productive agricultural lands; riparian areas and their buffers; wetlands and their buffers; conservation areas; buffer zones or areas; scenic areas; view corridors; floodways and floodplains; groundwater resources and recharge areas; historic, archaeological and cultural features;scenic viewsheds from public roads;wildlife preserves;and conservation areas.Areas such as wetlands and their buffers;conservation areas;buffer zones or areas;scenic areas;and view corridors are areas that may or may not allow public access. These spaces shall serve a public purpose by providing for the protection of environmentally sensitive lands, agricultural practices and scenic areas or corridors. (Weld County Code Ordinance 2001-1; Weld County Code Ordinance 2003-10) The applicant is choosing to utilize the Weld County PUD development process to create two equal sized lots due to recent changes in the Recorded Exemption regulations that impact residual lot sizes. The two residential parcels are being created for private individuals who will request that there be no public access without invitation. This site is not located within an urban growth boundary area nor coordinated planning area of a municipality. The site is located in a rural area and is not located within 1/4 mile of the nearest subdivision/PUD.The nearest subdivision is Summit Peaks Estates Subdivision 2550 feet to the south(approximately 0.5 mile).As a result this is not considered an urban scale development and is not subject to the fifteen-percent open space allocation. Section 27-6-90, Signage—Section 27-2-90.C. states:"Signage within a PUD shall adhere to all requirements in this Chapter and Chapters 23 and 26 of this Code, if applicable." The applicant is choosing to utilize the Weld County PUD development process to create two equal sized lots due to recent changes in the Recorded Exemption regulations that impact residual lot sizes. The applicant seeks approval to not include a Development sign as a requirement of this PUD. Given the intensity of development,the Department of Planning Services supports this request. C. Section 27-6-120.6.c - That the uses which would be permitted shall be compatible with the existing or future development of the surrounding area as permitted by the existing Zoning, and with the future development as projected by Chapter 22 of the Weld County Code or master plans of affected municipalities. The proposed PUD is not located within the boundaries of a coordinated planning area or urban growth boundary area. It is located within the 3-mile referral area of the Towns of Berthoud and Mead. It is also located within the 3-mile referral area of Boulder County. No referral responses have been received from Berthoud, Mead, and Boulder County. This site is located in a rural agricultural area. Conditions of Approval will require a weed management plan be submitted with the final plat application. According to the Public Works drainage referral, "No stormwater detention pond shall be required for rural residential development at nine(9)lots or fewer,where the average lot size is equal to or greater than three (3) acres per lot." RESOLUTION PUDZ14-0001 JOHN& NANCY FRITS PAGE 4 D. Section 27-6-120.6.d-That the PUD Zone District shall be serviced by an adequate water supply and sewage disposal system in compliance with the Performance Standards in Article II the Weld County Code. The applicant has submitted a letter from Long's Peak Water District stating, that the raw water dedication requirement has been satisfied,and therefore the County Attorney's office finds there is evidence of adequacy of water. Individual Sewage Disposal Systems will handle the effluent flow. E. Section 27-6-120.6.e - That street or highway facilities providing access to the property are adequate in functional classification, width, and structural capacity to meet the traffic requirements of the uses of the proposed PUD Zone District. Intersection sight distance triangles at the development entrance(s) will be required. All landscaping within the triangles must be less than 21 feet in height at maturity,and noted on the final roadway plans. The applicant has an approved point of ingress and egress for each parcel. The access permit number is AP11-00401 and the minimum access width requirements is twenty (20) feet clear without encumbrances, be an all weather and maintained roadway. F. Section 27-6-120.6.f-An off-site road improvements agreement and an on-site improvements agreement proposal is in compliance with Chapter 24 of the Weld County Code as amended and a road improvements agreement is complete and has been submitted, if applicable. An improvements agreement will not be required prior to recording of the final plat. G. Section 27-6-120.6.g - That there has been compliance with the applicable requirements contained in Chapter 23 of the Weld County Code regarding overlay districts,commercial mineral deposits, and soil conditions on the subject site. The site is not located within any overlay district. Building Permits issued on the proposed lot will be required to adhere to the fee structure of the County Wide Road Impact Program. Building Permits issued on the proposed lot,will be required to adhere to the fee structure of the County Facility Fee and Drainage Impact Fee Programs. H. Section 27-6-120.6.h - Consistency exists between the proposed zone district(s), uses, the specific or conceptual development guide. The submitted Specific Development Guide does accurately reflect the performance standards and allowed uses described in the Estate zone district, The E (Estate) lots shall comply with all (Estate) requirements as described previously. The Department of Planning Services is recommending that this Change of Zone be approved as a specific development plan and that it be reviewed administratively at the final plat stage. This approval recommendation is based upon compliance with Chapter 27 requirements. The Change of Zone from A(Agricultural)to PUD for Two(2) residential lots with Estate uses is conditional upon the following: 1. Prior to recording the Change of Zone plat: A. The applicant shall submit a letter to Public Works requesting a waiver of the pavement requirement for the PUD. (Department of Public Works) RESOLUTION PUDZ14-0001 JOHN& NANCY FRITS PAGE 5 AB. The plat shall be amended as follows: 1) All sheets of the plat shall be labeled PUDZ14-0001. (Department of Planning Services) 2) "Weld County's Right to Farm" statement as provided in Section 22-2-20.J.2 of the Weld County Code shall be placed on any recorded plat and recognized at all times. (Departments of Public Health and Environment and Planning Services) 3) Front, side and rear utility easements are not required to be indicated on the Change of Zone plat and shall be removed.Topographical lines, interior lot lines and internal roads, mailbox locations and delineation of all structures shall also be removed from the plat.The property boundary and all recorded easements shall be shown on the plat.(Department of Planning Services) 4) County Road 1 is designated on the Weld County Road Classification Plan as a collector road, which requires 80 feet of right-of-way at full build out. There is presently 60 feet of right-of-way.An additional 10 feet shall be delineated on the plat as future County Road 1 right-of-way. All setbacks shall be measured from the edge of future right-of-way. The applicant shall verify the existing right-of-way and the documents creating the right-of-way and this information shall be noted on the plat. If the right-of-way cannot be verified,it shall be dedicated. This road is maintained by Weld County. (Department of Public Works) 5) County Road 36 is designated on the Weld County Road Classification Plan as a local gravel road,which requires 60 feet of right-of-way at full build out.The applicant shall verify the existing right-of-way and the documents creating the right-of-way and this information shall be noted on the plat. All setbacks shall be measured from the edge of future right-of- way. If the right-of-way cannot be verified, it shall be dedicated. This road is maintained by Weld County. (Department of Public Works) 6) Show the culvert size at each residential driveway entrance. (Department of Public Works) 7) Delineate all County road numbers, existing and future right-of-way, and section corner information. SC. The applicant shall either submit a copy of an agreement with the property's mineral owner/operators stipulating that the oil and gas activities have been adequately incorporated into the design of the site or show evidence that an adequate attempt has been made to mitigate the concerns of the mineral owner/operators. Drill envelopes can be delineated on the plat in accordance with the State requirements as an attempt to mitigate concerns. The plat shall be amended to include any possible future drilling sites. Section 22-5-80.A 1 CM.Policy 1.1. Access to future mineral resource development areas should be considered in all land use decisions in accordance with state law. No County governmental authority which has control over zoning shall, by zoning, rezoning,granting a variance or other official action or inaction, permit the use of any area known to contain a commercial mineral deposit in a manner which would interfere with the present or future extraction of such deposit by an extractor." Anadarko Petroleum Corporation stipulates that they have the subsurface mineral estate for hard rock mineral, including coal, which underlies the property. The applicant shall either submit a copy of an agreement with the property's mineral owner/operators stipulating that the commercial mineral activities have been adequately incorporated into the design of the site or show evidence that an adequate attempt has been made to mitigate the concerns of the mineral owner/operators. (Department of Planning Services) CD. Upon completion of Condition of Approval #1 above, the applicant shall submit three (3) paper copies or one (1) electronic copy (.pdf) of the plat for preliminary approval to the Weld County Department of Planning Services. Upon approval of the plat the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by the Department of Planning Services. The plat shall be prepared in accordance with the requirements of Section 23-2-260.D RESOLUTION PUDZ14-0001 JOHN& NANCY FRITS PAGE 6 of the Weld County Code. The Mylar plat and additional requirements shall be submitted within one hundred twenty(120)days from the date of the Board of County Commissioners Resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 2. The Change of Zone is conditional upon the following and that each shall be placed on the Change of Zone plat as notes prior to recording: A. A Change of Zone from A(Agricultural)to PUD for two(2)residential lots with Estate Zone Uses. (Department of Planning Services) B. Water service shall be obtained from Longs Peak Water District. (Department of Public Health and Environment) C. This subdivision is in rural Weld County and is not served by a municipal sanitary sewer system. Sewage disposal shall be by septic systems designed in accordance with the regulations of the Colorado Department of Public Health and Environment,Water Quality Control Division and the Weld County Code in effect at the time of construction, repair,replacement,or modification of the system. (Department of Public Health and Environment) D. Language for the preservation and/or protection of the absorption field shall be placed on the plat. The note shall state that activities such as permanent landscaping, structures, dirt mounds or other items are expressly prohibited in the absorption field site. (Department of Planning Services) E. The historical flow patterns and run-off amounts will be maintained on site. (Department of Public Works) F. During development of the site, all land disturbances shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions, at the request of the Weld County Department of Public Health and Environment,a fugitive dust control plan must be submitted. (Department of Planning Service G. In accordance with the regulations of the Colorado Air Quality Control Commission any development that disturbs more than 5 acres of land must incorporate all available and practical methods that are technologically feasible and economically reasonable in order to minimize dust emissions. (Department of Public Health and Environment) H. If land development creates more than a 25-acre contiguous disturbance,or exceeds 6 months in duration, the responsible party shall prepare a fugitive dust control plan, submit an air pollution emissions notice, and apply for a permit from the Colorado Department of Public Health and Environment. (Department of Planning Services) I. "Weld County's Right to Farm"as provided in Section 22-2-220.J.2 of the Weld County Code shall be placed on any recorded plat. (Department of Planning Services) J. Activities such as landscaping (i.e. planting of trees and shrubs)and construction (i.e. auxiliary structures,dirt mounds,etc.)activities are expressly prohibited in the designated absorption field site. (Department of Planning Services) K. A separate building permit shall be obtained prior to the construction of any structure. (Department of Building Inspection) L. Building Permits issued on the proposed lot will be required to adhere to the fee structure of the County Wide Road Impact Program. (Department of Planning Services) M. Building Permits issued on the proposed lot,will be required to adhere to the fee structure of the County Facility Fee and Drainage Impact Fee Programs. (Department of Planning Services) RESOLUTION PUDZ14-0001 JOHN & NANCY FRITS PAGE 7 N. Installation of utilities shall comply with Section 24-9-10 of the Weld County Code. (Department of Planning Services) O. The property owner shall be responsible for complying with the Performance Standards of Chapter 27, Article II and Article VIII, of the Weld County Code. (Department of Planning Services) P. Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations. (Department of Planning Services) Q. The site shall maintain compliance at all times with the requirements of the Weld County Government and the adopted Weld County Code and Policies.(Department of Planning Services) R. No development activity shall commence on the property,nor shall any building permits be issued on the property until the final plan has been approved and recorded. (Department of Planning Services) S. The applicant shall comply with Section 27-8-50 Weld County Code,as follows: Failure to submit a Planned Unit Development Final Plan- If a PUD Final Plan application is not submitted within three (3) years of the date of the approval of the PUD Zone District, the Board of County Commissioners shall require the landowner to appear before it and present evidence substantiating that the PUD project has not been abandoned and that the applicant possesses the willingness and ability to continue with the submission of the PUD Final Plan. The Board may extend the date for the submission of the PUD Final Plan application and shall annually require the applicant to demonstrate that the PUD has not been abandoned. If the Board determines that conditions or statements made supporting the original approval of the PUD Zone District have changed or that the landowner cannot implement the PUD Final Plan, the Board of County Commissioners may, at a public hearing revoke the PUD Zone District and order the recorded PUD Zone District reverted to the original Zone District. (Department of Planning Services) T. The PUD Final Plan shall comply with all regulations and requirements of Chapter 27 of the Weld County Code. (Department of Planning Services) 3. The Change of Zone plat map shall be submitted to the Department of Planning Services'for recording within Sixty(60)days of approval by the Board of County Commissioners.With the Change of Zone plat map, the applicant shall submit a digital file of all drawings associated with the Change of Zone application. Acceptable CAD formats are .dwg, .dxf, and .dgn(Microstation); acceptable GIS formats are .shp(Shape Files),Arclnfo Coverages and Arclnfo Export files format type is.e00. The preferred format for Images is .tif(Group 4). (Group 6 is not acceptable). (Department of Planning Services) 4. In accordance with Weld County Code Ordinance 2005-7 approved June 1,2005,should the plat not be recorded within the required sixty (60) days from the date the Administrative Review was signed a $50.00 recording continuance charge shall added for each additional 3 month period. 5. At the time of Final Plan submission: A. The applicant shall delineate all easements of record, including the reception number and book and page for all easements and rights-of-way of record in accordance with County standards (Section 24-7-60)and/or Utility Board recommendations.(Departments of Public Works, Planning Services) B. The applicant shall ad additional plat notes, including yet not limited to County road numbers, existing and future right-of-way, and section corner information. RESOLUTION PUDZ14-0001 JOHN & NANCY FRITS PAGE 8 C. Intersection sight triangles at the development entrance will be required. All landscaping within the triangles must be less than 21/2 feet in height at maturity, and noted on the final roadway plans. (Department of Planning Services) D. The applicant shall submit a time frame for construction in accordance to Section 27-2-200 of the Weld County Code. (Department of Planning Services) E. The applicant shall contact the Vegetation Weed Management Specialist with the Weld County Public Works Department to develop a weed management plan. The approved plan shall be included in the Final Plan application. (Department of Planning Services) F. The applicant shall submit an executed agreement securing water from the Longs Peak Water District for service to the PUD. Evidence of the agreement and sign off from the Longs Peak Water District shall be provided to the Department of Planning Services. (Department of Planning Services) 6. Prior to recording the final plat: A. The applicant shall provide evidence requirements of the RE-1J School District have been addressed. (Weld School District RE-1J) B. The applicant shall submit a digital file of all drawings associated with the Final Plan application. Acceptable CAD formats are.dwg, .dxf,and.dgn(Microstation);acceptable GIS formats are.shp (Shape Files), Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is.tif(Group 4)(Group 6 is not acceptable). (Department of Planning Services) Motion seconded by Nick Berryman. VOTE: For Passage Against Passage Absent Benjamin Hansford Bret Elliott Bruce Sparrow Jason Maxey Jordan Jemiola Joyce Smock Mark Lawley Michael Wailes Nick Berryman The Chair declared the resolution passed and ordered that a certified copy be forwarded with the file of this case to the Board of County Commissioner's for further proceedings. CERTIFICATION OF COPY I, Kristine Ranslem, Recording Secretary for the Weld County Planning Commission,do hereby certify that the above and foregoing resolution is a true copy of the resolution of the Planning Commission of Weld County, Colorado, adopted on May 6, 2016. Dated the 6th of May, 2016. Digitally signed by Kristine 93 G r1L.,`i')n/^I,p4Q{yt. Ranslem Date:2014.05.09 15:50:05-06'00' Kristine Ranslem Secretary pa nainair The Chair asked if there was anyone in the audience who wished to speak for or against this application. No one wished to speak. Motion: Amend Development Standard 4 to include the days of operation Monday through Saturday, Motion by Jason Maxey, Seconded by Benjamin Hansford. Motion carried unanimously. The Chair asked the applicant if they have read through the Development Standards and Conditions of Approval and if they are in agreement with those. The applicant replied that they are in agreement. The Chair advised the applicant to visit with staff for further direction on re-permitting the well for commercial use if he wishes to utilize the existing septic system. Motion: Forward Case USR14-0006 to the Board of County Commissioners along with the amended Conditions of Approval and Development Standards with the Planning Commission's recommendation of approval, Moved by Jason Maxey, Seconded by Bruce Sparrow. Vote: Motion carried by unanimous roll call vote (summary: Yes= 8). Yes: Benjamin Hansford, Bruce Sparrow, Jason Maxey, Jordan Jemiola, Joyce Smock, Mark Lawley, Michael Wailes, Nick Berryman. CASE NUMBER: USR14-0008 APPLICANT: ANADARKO E&P COMPANY LP PLANNER: CHRIS GATHMAN REQUEST: A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT FOR MINERAL RESOURCE FACILITY INCLUDING AN OIL AND GAS SUPPORT AND SERVICE FACILITY (STORAGE AND STAGING OF OIL AND GAS EQUIPMENT ALONG WITH BUILDINGS UTILIZED FOR AN OFFICE, LIGHT VEHICLE MAINTENANCE AND MATERIAL STORAGE) IN THE A (AGRICULTURAL)ZONE DISTRICT. LEGAL DESCRIPTION: N2 SECTION 2,T3N, R66W OF THE 6TH P.M.,WELD COUNTY, COLORADO. LOCATION: SOUTH OF AND ADJACENT TO CR 38 AND WEST OF ADJACENT TO CR 35. Chris Gathman, Planning Services, presented Case USR14-0008, reading the recommendation and comments into the record. The Department of Planning Services recommends approval of this application with the attached conditions of approval and development standards. Don Carroll, Public Works, reported on the existing traffic, access and drainage conditions and the requirements on site. Lauren Light, Environmental Health, reviewed the public water and sanitary sewer requirements, on-site dust control, and the Waste Handling Plan. David Grigsby, Landmark Builders, representing Anadarko, explained the layout of the site on the visual slide of the site plan. Anadarko is currently utilizing 8 different locations in Weld County; therefore they believe the consolidation of this inventory material will create a reduction in traffic. The Chair asked if there was anyone in the audience who wished to speak for or against this application. No one wished to speak. The Chair asked the applicant if they have read through the Development Standards and Conditions of Approval and if they are in agreement with those. The applicant replied that they are in agreement. Motion: Forward Case USR14-0008 to the Board of County Commissioners along with the Conditions of Approval and Development Standards with the Planning Commission's recommendation of approval, Moved by Jordan Jemiola, Seconded by Benjamin Hansford. Vote: Motion carried by unanimous roll call vote (summary: Yes= 8). Yes: Benjamin Hansford, Bruce Sparrow, Jason Maxey, Jordan Jemiola, Joyce Smock, Mark Lawley, Michael Wailes, Nick Berryman. CASE NUMBER: PUDZ14-0001 EXHIBIT APPLICANT: JOHN & NANCY FRITS PLANNER: KIM OGLE $ Plitt/ N-100 ADl'/-J53 REQUEST: CHANGE OF ZONE REQUEST FROM THE A (AGRICULTURAL) ZONE DISTRICT TO THE PUD (PLANNED UNIT DEVELOPMENT) ZONE DISTRICT FOR TWO (2) LOTS WITH ESTATE ZONE DISTRICT USES. LEGAL DESCRIPTION: LOT B REC EXEMPT RECX11 -0002; PART W2NW4 SECTION 7, T3N. R68W OF THE 6TH P.M. , WELD COUNTY. COLORADO. LOCATION : EAST OF AND ADJACENT TO CR 1 ; SOUTH OF AND ADJACENT TO CR 36. Kim Ogle, Planning Services, presented Case PUDZ14-0001 , reading the recommendation and comments into the record. A letter of objection from Anadarko Petroleum Corporation was received regarding the subsurface mineral estate interests. Under Condition of Approval 1 . B the applicant shall submit a copy of the agreement with the property's mineral owner/operators or show evidence that an adequate attempt has been made to mitigate the concerns of the mineral owner/operators. The Department of Planning Services recommends approval of this application with the attached conditions of approval. Don Carroll, Public Works, reported on the existing traffic, access and drainage conditions and the requirements on site. Lauren Light, Environmental Health , reviewed the public water and sanitary sewer requirements. John Frits, 16898 CR 1 , stated that he currently resides on the property. They purchased the property with their daughter and her family with the intention of adding a second residence. They had hoped to do a Recorded Exemption; however they were ineligible. The Chair asked if there was anyone in the audience who wished to speak for or against this application. No one wished to speak. The Chair asked if the paving waiver can be addressed here or if Public Works will handle that. Mr. Carroll said that they would like to receive a document from the applicant requesting the paving waiver. Mr. Ogle recommended adding a Condition of Approval 1 .A that states "The applicant shall submit a letter to Public Works requesting a waiver of the pavement requirement for the PUD" and then re-letter accordingly. Motion : Add Condition of Approval 1 .A as state by staff and re-letter accordingly, Motion by Jason Maxey, Seconded by Benjamin Hansford. Motion carried unanimously. The Chair asked the applicant if they have read through the amended Conditions of Approval and if they are in agreement with those. The applicant replied that they are in agreement. Motion : Forward Case PUDZ14-0001 to the Board of County Commissioners along with the amended Conditions of Approval with the Planning Commission's recommendation of approval, Moved by Benjamin Hansford, Seconded by Nick Berryman. Vote: Motion carried by unanimous roll call vote (summary: Yes = 8). Yes: Benjamin Hansford, Bruce Sparrow, Jason Maxey, Jordan Jemiola, Joyce Smock, Mark Lawley, Michael Wailes, Nick Berryman. CASE NUMBER: USR14-0011 APPLICANT: PLUMB RIDGE LLC, CIO EXPEDITION WATER SOLUTIONS PLANNER: KIM OGLE REQUEST: A SITE SPECIFIC DEVELOPMENT PLAN AND SPECIAL REVIEW PERMIT FOR MINERAL RESOURCE DEVELOPMENT FACILITIES. OIL AND GAS SUPPORT FACILITY INCLUDING A CLASS II OILFIELD WASTE DISPOSAL FACILITY - SALTWATER INJECTION FACILITY, WATER RECYCLING AND A WATER SUPPLY & STORAGE UPLOAD FACILITY AND TRUCK TANKER WASHOUT FACILITY IN THE A (AGRICULTURAL) ZONE DISTRICT. LEGAL DESCRIPTION: LOTS A, B AND C OF REC EXEMPT RE 5024: PART W2 SECTION 36, T5N. R64W OF THE 6TH P. M. . WELD COUNTY, COLORADO. LOCATION: NORTH OF AND ADJACENT TO CR 50: EAST OF AND ADJACENT TO CR 59. Kim Ogle, Planning Services, presented Case USR14-0011 , reading the recommendation and comments into the record. No letters or electronic mail has been received from adjacent or surrounding property 3 Hello