Loading...
HomeMy WebLinkAbout20140462.tiff SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW (USR) APPLICATION FOR PLANNING DEPARTMENT USE DATE RECEIVED: 11/25/13 RECEIPT#/AMOUNT# is 2500.00 CASE #ASSIGNED: uSR13-0053 APPLICATION RECEIVED BY PLANNER ASSIGNED: Diana Parcel Number 1 6 1 0 3 0 0 0 0 1 4 (12 digit number-found on Tax I.D.information,obtainable at the Weld County Assessor's Office,or www.co.weld.co.us) Legal Description LOT 0 RECORDED EXEMPTION NO.1061-3-1 RE 226 , Section 3 , Township 4 North, Range 68 West Zone District:A Total Acreage: 124.91 , Flood Plain:ZONE X , Geological Hazard: NONE , Airport Overlay District: NONE FEE OWNER(S) OF THE PROPERTY: Name:PTI USA MANUFACTURING, LLC Work Phone# 970.670.6190 Home Phone# Email peteriones@ptigroup.com,brenkoIh@ptigroup.com Address:390 MOUNTAIN VIEW DRIVE Address: City/State/Zip Code BERTHOUD, CO 80513 Name: Work Phone# Home Phone# Email Address: Address: City/State/Zip Code Name: Work Phone# Home Phone# Email Address: Address: City/State/Zip Code APPLICANT OR AUTHORIZED AGENT(See Below:Authorization must accompany applications signed by Authorized Agent) Name: PTI USA MANUFACTURING, LLC Work Phone# 970.670.6190 Home Phone# Email Address: 390 MOUNTAIN VIEW DRIVE Address: City/State/Zip Code BERTHOUD, CO 80513 PROPOSED USE: STORAGE AREA FOR MODULAR UNITS. I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included indicating that the signatory has to legal au ority to sign for the corporation. Signature: OW*or Authorized Agent Date' Signature: Owner or Authorized Agent Date NOTARIAL CERTIFICATE CANADA ) ) PROVINCE OF ALBERTA ) ) TO WIT ) I, CHARLES R. DALTON, A Notary Public in and for the Province of Alberta, by Royal Authority duly appointed, residing at the City of Edmonton, in the said Province, do certify and attest that the paper writing hereto annexed is a true copy of a document produced to me and purporting to be: 1. PTI USA MANUFACTURING LLC CONSENT OF SOLE MEMBER The said copy having been compared by me with the said original document, an act whereof being requested, I have granted the same under my notarial form and seal of office to serve and avail as occasion shall or may require. IN TESTIMONY WHEREOF I have hereto subscribed my name and affixed my seal of office at the City of Edmonton, in the Province of Alberta, this 4th day of November, 2013. / Charles R. Dalton A Notary Public in and for the Province of Alberta F:V anelleAGeneral-Notarial Certificate(99353819).Doc PTI USA MANUFACTURING LLC CONSENT OF SOLE MEMBER The undersigned, being the sole member of PTI USA MANUFACTURING LLC, a Delaware limited liability company (the "Company"), and acting pursuant to Section 18- 302(d) of the Delaware Limited Liability Company Act, does hereby consent to, approve and adopt the following resolutions by written consent in lieu of an annual meeting: Ratification of Acts of Officers RESOLVED, that all of the acts of the officers of the Company for the fiscal year ended December 31, 2012, be, and they are hereby ratified and approved. Election of Officers RESOLVED, that in accordance with Section 9 of the Limited Liability Company Agreement, the election of the persons listed below to the offices set forth opposite their names be, and they hereby are, ratified, confirmed and approved, such persons to hold such offices until their respective successors shall have been duly elected and qualified or until their earlier resignation or removal: Ronald Green President Fred Bannon Vice President Sean Crockett Vice President Bernie Dauvin Vice President William Derenbecker Vice President Timothy Diadiun Vice President —Tax Bradley Dodson Vice President Lou Doiron Vice President Robert W. Hampton Vice President and Assistant Secretary Robert Maze Vice President Allan Schoening Vice President Lias J. Steen Vice President and Assistant Secretary Jason Hall Secretary and Controller Mark Menard Treasurer and Chief Financial Officer Jennifer Elding Assistant Secretary Clinton H. Wood Assistant Treasurer IN WITNESS WHEREOF, the undersigned has executed this consent effective as of the 10th day of May, 2013. PTI GROUP USA LLC By: Name: Lias J. Steen, Vice President and Assistant Secretary BEING THE SOLE MEMBER OF PTI USA MANUFACTURING LLC jire ;PHI), DEPARTMENT OF PLANNING SERVICES ' 1555 N 17'h AVE �D�• G353-6 .0631 353-6 PHONE (970) 1000 Ex, Ex₹. .540 COLORADO FAX: (970) 304-649S AUTHORIZATION FORM .. _ < ) n4 y represent I 4 = _for the property (Agent/Applicant) (Owner) located at dui e )(Ls,con- l_, is ^'t r'} l u a ri ) ( e .22.C t . cz. LEGAL DESCRIPTION: SEC ,., TWN �1— RNG h () _ SUBDIVISION NAME: LOT BLK I can be contacted at the following phone#'s: Home 3°7 -/`}-G "73 )2 Work 970 644 .2,4i) Fax# r311-1 . K-oT++ �� ern l 612-00 P, Co r1 The property owner can be contacted at the following phone#'s Home Work Fax# Correspondence mailed to (only one): Agent/Applicant ❑ Property Owner DATE N)✓• is/(< / ( OWNER'S SIGNATURE ` Hat( PTI USA Manufacturing, LLC Storage Yard;Weld County USR Application Package November,2013 Site Specific Development Plan and Use by Special Review (USR) - Questionnaire 1. Explain, in detail,the proposed use of the property. PTI USA Manufacturing, LLC (PTI) recently purchased a parcel of land north of and adjacent to their existing manufacturing plant facility located at 390 Mountain View Drive in Johnstown , CO (mailing address is Berthoud, CO). The subject parcel (County Parcel#1061-03-0-00-014) is 124.9 acres in size. The parcel is bound on the east by Interstate 25, on the north by Colorado Highway 60 (Weld County/Larimer County line), on the south by Industrial/Commercial businesses (located within the Town of Johnstown and comprised of I-25 Gateway Center Filings No. 3 Re-plat A, Filing No. 4, and Filing No. 5) and on the west by agricultural land consisting of dairies and associated farm houses and out buildings (Weld County Zoning-A). PTI intends to construct an open air storage yard, encompassing approximately 21.6 acres, in the southwest corner of the purchased parcel and adjacent to their manufacturing facility (existing facility County Parcel#1061-03-4-11-002) which will be used to temporarily store modular units which were constructed in the manufacturing facility and are waiting to be shipped. The storage yard will be surfaced with gravel and/or recycled asphalt and will be accessed from the northeast corner of the existing PTI manufacturing plant facility. Utility service (water, sewer, electric, gas, etc.) is not proposed with this project. The storage yard area will be enclosed with a screen fence (along eastern and northern sides) and a chain link fence (along western and southern sides)for screening and security purposes. Twelve evergreen trees are proposed to be planted east of the storage yard's eastern screen fence. 2. Explain how this proposal is consistent with the intent of the Weld County Code, Chapter 22 of the Comprehensive Plan. Sec. 22-2-10. Agriculture B. The intent of the agricultural Goals is to support all forms of the agricultural industry and, at the same time, to protect the rights of the private property owners to convert their agricultural lands to other appropriate land uses. The County recognizes the importance of maintaining large contiguous parcels of productive agricultural lands in nonurbanizing areas of the County to support the economies of scale required for large agricultural operations. Interpretation: The subject property is located within an urbanizing area, as the proposed storage yard site is located within the Urban Growth Boundary for the Town of Johnstown. The storage yard use being proposed with this USR application is consistent with surrounding uses, as the proposed storage yard is an extension of the adjacent land uses to the south, which include the PTI manufacturing plant facility. This application is proposing to impact less than 201 of the overall property with the change of use. Page I 1 PTI USA Manufacturing, LLC Storage Yard;Weld County USR Application Package November,2013 Sec. 22-2-20.Agriculture goals and policies B. A. Goal 2. Continue the commitment to viable agriculture in Weld County through mitigated protection of established(and potentially expanding)agricultural uses from other proposed new uses that would hinder the operations of the agricultural enterprises. 2. A. Policy 2.2. Allow commercial and industrial uses, which are directly related to or dependent upon agriculture, to locate within agricultural areas when the impact to surrounding properties is minimal or mitigated and where adequate services and infrastructure are currently available or reasonably obtainable. These commercial and industrial uses should be encouraged to locate in areas that minimize the removal of agricultural land from production. Interpretation: The proposed industrial storage yard use will have minimal impact to surrounding properties, and will be further mitigated through the use of fencing to provide screening and security. Services and infrastructure are not required to support the use. The proposed use minimizes the removal of agricultural land from production. Sec. 22-2-20.Agriculture goals and policies D. A. Goal 4. Promote a quality environment which is free of derelict vehicles, refuse, litter and other unsightly materials. 1. A. Policy 4.1. Property owners should demonstrate responsibility of ownership by minimizing safety and health hazards resulting from, but not limited to, unsafe or dangerous structures and noncommercial junkyards. Interpretation: The proposed storage yard will include the use of fencing to provide screening and security. The storage yard will be an extension of the existing PTI manufacturing plant facility which is fully fenced and has gates/locks to maintain security during business and non-business hours. The purpose of the storage yard is to temporarily store completed modular units prior to shipping. Through the use of access controls, screening, and utilizing the area only for the temporary storage of completed products, derelict vehicles, refuse, litter, and other unsightly materials will be minimized. Additionally,through the aforementioned controls, a safe and healthy environment will be preserved. Sec. 22-2-20.Agriculture goals and policies G. A. Goal 7. County land use regulations should protect the individual property owner's right to request a land use change. 3. A. Policy 7.3. Conversion of agricultural land to urban residential, commercial and industrial uses should be considered when the subject site is located inside an Intergovernmental Agreement area, Urban Growth Boundary area, Regional Urbanization Area or Urban Development Nodes, or where adequate services are currently available or reasonably obtainable.A municipality's adopted comprehensive plan should be considered,but should not determine the appropriateness of such conversion. Page 12 PTI USA Manufacturing, LLC Storage Yard;Weld County USR Application Package November,2013 Interpretation: The subject property is located within an urbanizing area, as the proposed storage yard site is located the Urban Growth Boundary for the Town of Johnstown. The storage yard use being proposed with this USR application is consistent with surrounding uses, as the proposed storage yard is an extension of the adjacent land uses to the south, which include the PTI manufacturing plant facility. The proposed use will be screened to help protect the character of the area, which is in conformance with the Town of Johnstown Land Use Regulations. Additionally, services and infrastructure are not required to support the use. Sec. 22-2-20.Agriculture goals and policies H. A. Goal 8. Ensure that adequate services and facilities are currently available or reasonably obtainable to accommodate the requested new land use change for more intensive development. 1. A. Policy 8.1. The land use applicants should demonstrate that adequate sanitary sewage and water systems are available for the intensity of the development. Interpretation: Services and infrastructure to support the proposed use are not required. 3. A. Policy 8.3. The land use applicants should demonstrate that the roadway facilities associated with the proposed development are adequate in width, classification and structural capacity to serve the proposed land use change. Interpretation: Since the proposed use is for temporary storage of completed modular units which are produced at the existing PTI manufacturing plant facility,the proposed use will not increase traffic for surrounding roads, highways, and interstates. 4. A. Policy 8.4. The land use applicants should demonstrate that drainage providing stormwater management for the proposed land use change is adequate for the type and style of development and meets the requirements of county, state and federal rules and regulations. Interpretation: The proposed land use change will minimize grading and drainage characteristics of the existing site topography and will include the use of two water quality ponds designed in accordance with Weld County Public Works requirements to mitigate stormwater quality from the developed area. Page 13 PTI USA Manufacturing, LLC Storage Yard;Weld County USR Application Package November,2013 3. Explain how this proposal is consistent with the intent of the Weld County Code, Chapter 23 (Zoning) and the zone district in which it is located. Sec. 13-3-40. Uses by special review S. Any use permitted as a Use by Right, an ACCESSORY USE, or a Use by Special Review in the COMMERCIAL or industrial zone districts,provided that the property is not a Lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any regulations controlling subdivisions. PUD development proposals shall not be permitted to use the special review permit process to develop. Interpretation: The proposed use is consistent with the intent of the Agricultural (A) Zone District and applicable Use by Special Review regulations. The proposed use is compatible with future development of the surrounding area permitted by existing zoning and applicable master plans. The proposed USR is not located within and Intergovernmental Agreement (IGA) area. The proposed storage yard use will not be more intense or have a greater impact that many existing uses allowable by right, and is consistent with surrounding development. 4. What type of uses surround the site(explain how the proposed use is consistent and compatible with surrounding land uses). The parcel is bound on the east by Interstate 25, on the north by Colorado Highway 60 (Weld County/Larimer County line), on the south by Industrial/Commercial businesses (located within the Town of Johnstown and comprised of I-25 Gateway Center Filings No. 3 Re-plat A, Filing No. 4, and Filing No. 5) and on the west by agricultural land consisting of dairies and associated farm houses and out buildings (Weld County Zoning-A). The proposed use is consistent with surrounding uses, especially to the south, which consist of Industrial and Commercial businesses. The existing PTI manufacturing plant facility and the two parcels directly east of the PTI manufacturing plant facility contain storage yard areas. The proposed use will be an extension of PTI's current storage yard. 5. Describe, in detail,the following: a. Number of people who will use this site It is anticipated that no more than 10 people will be using the site at various times during the hours of operation. b. Number of employees proposed to be employed at this site PTI's existing manufacturing plant employs approximately 360 people. The storage yard will be used by existing employees. Page 14 PTI USA Manufacturing, LLC Storage Yard;Weld County USR Application Package November,2013 c. Hours of operation The hours of operation for the manufacturing plant are 6 am to midnight (as needed). The storage area will have the same hours of operation. d. Type and number of structures to be erected (built)on this site The proposed storage yard will temporarily house modular units which are constructed within the existing manufacturing plant. Construction of modular units within the storage area is not anticipated. Construction of structures to be erected on this site is not proposed. e. Type and number of animals, if any,to be on this site Animals will not be within the proposed storage yard. f. Kind of vehicles(type,size,weight)that will access this site and how often Vehicles accessing the site will consist of semi-tractor trailers. The approximate vehicle weight (unloaded) is 30,000 lbs. Trucks will be loaded within PTI's existing manufacturing plant facility and access the storage yard area from the northeast corner of the existing facility. The plant output ranges from 10-15 modular units per week. Therefore, it is estimated that there will be less than 10 trips per day accessing the site to either drop-off completed modular units from the manufacturing plant facility, or to pick-up the completed modular units for shipment. g. Who will provide fire protection to the site Fire protection is provided by the Berthoud Fire Protection District. h. Water source on the property(both domestic and irrigation) The property currently has existing irrigation ditch shares from the Consolidated Home Supply Ditch and Reservoir Company (12 shares) and the Harry Lateral Ditch Company(8 shares). Domestic and irrigation water service to the storage area is not being proposed. Domestic water service for the PTI manufacturing plant facility is provided by the Town of Johnstown (see Appendix D for copies of water bills). Should water service be required in the future, it will be requested to be provided by the Town of Johnstown. Page 15 PTI USA Manufacturing, LLC Storage Yard;Weld County USR Application Package November,2013 i. Sewage disposal system on the property(existing and proposed) There currently are no existing sewage disposal systems located on the property. Sewage disposal and/or service to the storage yard area is not being proposed. Sanitary sewer service for the PTI manufacturing plant facility is provided by the Town of Johnstown (see Appendix D for copies of the sanitary sewer bills). Should sanitary sewer service be required in the future, it will be requested to be provided by the Town of Johnstown. j. If storage or warehousing is proposed,what type of items will be stored Completed modular units which are constructed within the existing PTI manufacturing plant facility will be temporarily stored on the proposed site. The modular units are approximately 12 ft wide x 60 ft in length. 6. Explain the proposed landscaping for the site.The landscaping shall be separately submitted as a landscape plan map as part of the application submittal. The improved storage yard area is proposed to be surfaced with gravel and/or recycled asphalt material and disturbed areas not covered with this material will be re-vegetated with native grasses. An 8 ft tall metal panel screen fence is proposed to enclose the eastern and northern side of the storage yard area. An 8 ft tall chain link fence is proposed to enclose the western and a portion of the southern sides of the storage yard area. The remaining portion of the south side of the storage yard will utilize an existing chain link fence. Twelve (12) evergreen trees are proposed to be planted east of the metal panel screen fence along the eastern side of the storage yard and will be planted in two (2) groupings of six (6). The remaining land on the parcel is not proposed to be improved and will be available for crop production. 7. Explain any proposed reclamation procedures when termination of the Use by Special Review activity occurs. The storage yard surfacing would be removed from the site and the area will either be re- vegetated with native grasses or turned back into farmland to be consistent the adjacent area of the property. 8. Explain how the storm water drainage will be handled on the site. Grading and stormwater drainage for the storage yard area will be consistent with the existing drainage patterns for this area. The storage yard area is divided into 2 basins, and runoff generated from each basin will sheet flow from west to east across the storage yard and will outfall to two proposed water quality ponds. The water quality ponds have been designed in accordance with Weld County Public Works requirements. Page 16 PTI USA Manufacturing, LLC Storage Yard;Weld County USR Application Package November,2013 The remaining area of the property is not proposed to be improved with this application and the existing drainage patterns will remain, which generally include the property drainage from west to east via sheet flow. 9. Explain how long it will take to construct this site and when construction and landscaping is scheduled to begin. The storage yard is anticipated to take between 1 to 2 months to construct. Construction is anticipated to begin in early 2014. 10. Explain where storage and/or stockpile of wastes will occur on this site. Storage and/or stockpiling of wastes is not planned to occur on this site. The proposed use is not anticipated to generate any waste. If wastes are generated or discovered,they will be collected and deposited in the adjacent PTI USA Manufacturing Plant facility's roll-off dumpsters, which does have normal dumpster haul off service. Page 17 PTI USA Manufacturing, LLC Storage Yard;Weld County USR Application Package November,2013 Traffic Narrative The overall parcel is bound by the following Public Roads/Rights of Way: • East—Interstate 25 (CDOT R.O.W.) • North—Highway 60 (CDOT R.O.W.) • West—No Public R.O.W. adjacent to property • South—Basher Drive (Town of Johnstown R.O.W.) The overall parcel has three (3) existing accesses located off Highway 60 to the north and one (1) existing access located to the south from Basher Drive. Based on coordination with CDOT(see attached e-mail correspondence dated October 30, 2013), the existing three (3) accesses located off Highway 60 are considered legally grandfathered as agricultural accesses. If the traffic utilizing any of these accesses increases, CDOT will require that an access permit be obtained. For this application increased trips utilizing these existing access points is not proposed. Access for the storage yard, which will primarily consist of semi-tractor trailers, is proposed to be gained through the existing PTI manufacturing plant facility. Semi-tractor trailers are anticipated to utilize the storage yard to either drop-off completed modular units taken directly from the adjacent manufacturing plant facility, or to pick-up the completed modular units for shipment. For access trips related to shipment of the modular units, trips leaving the storage yard area will be routed south through the existing PTI manufacturing plant facility onto Longs Peak Road (current public access utilized by the PTI manufacturing plant facility,Town of Johnstown Public R.O.W.). From here, Longs Peak Road will be utilized to gain access by either Mountain View Drive or Basher Drive to Gateway Circle, or by Gateway Drive. Mountain View Drive, Basher Drive, Gateway Circle, and Gateway Drive are all Town of Johnstown Rights of Way. Gateway Circle and Gateway Drive will then be utilized to gain access to County Road 48, then onto Interstate 25. The plant output ranges from 10-15 modular units per week. Therefore, it is estimated that there will be less than 10 trips per day accessing the storage yard site to either drop-off completed modular units from the manufacturing plant facility, or to pick-up the completed modular units for shipment. With the proposed use of the storage yard and current use of the PTI manufacturing plant facility,there will be no additional trips generated from the use of the storage yard and overall parcel. Page I 1 From: Lance To: "Joe Erjavec" Subject: FW: PTI USA Manufacturing -Proposed Storage Yard -Weld County Date: Wednesday,October 30,2013 3:22:38 PM From: Hice-Idler, Gloria [mailto:gloria.hice-idler@state.co.us] Sent: Wednesday, October 30, 2013 1:34 PM To: Lance Cc: Gloria Hice-Idler Subject: Re: PTI USA Manufacturing - Proposed Storage Yard - Weld County None of the accesses have actual permits. They are considered legally grandfathered as agricultural accesses. If traffic using them is proposed to increase, CDOT would have the warrant necessary to require new permit(s)be obtained. In that process CDOT would look to bring the accesses into conformance with the State Highway Access Code. The Code would allow one access to serve the entire parcel. If you have any questions, please contact me. Gloria Hice-Idler Region 4 Permit Manager State of Colorado, CDOT Region 4 Permits 1420 2nd Street, Greeley, CO 80631 office: 970.350.2148 I cell: 970.381.2475 I fax: 970.350.2198 email: Gloria.Hice-Idler@state.co.us PTI USA Manufacturing, LLC Storage Yard;Weld County USR Application Package November,2013 Waste Handling Plan No wastes are expected to be generated on site. No chemicals will be stored on site. The developed portion of the site is for temporary storage of completed modular units waiting to be shipped. Litter and other debris which is found on site will be collected/picked-up upon discovery and deposited in the adjacent PTI USA Manufacturing Plant facility's roll-off dumpsters. PTI utilizes Gallegos Sanitation, Inc. for trash removal services and roll-off dumpsters are emptied on a daily basis. Gallegos Sanitation disposes of the waste at the Ault Waste Management Facility. No vehicles or equipment will be washed on site. PTI USA Manufacturing has an Environmental Health and Safety program, which is supervised by an Environmental Health and Safety (EHS) Manager. Through this program the PTI provides on-going training to their employees in the recognition of spills of hazardous waste and potential pollutants. Upon discovery, notification is made to the EHS Manager, who in turn implements spill control measures and processes for the proper cleanup, disposal,testing, and reporting. Page I 1 PTI USA Manufacturing, LLC Storage Yard;Weld County USR Application Package November,2013 Dust Abatement Plan During the construction phase of the project,the Contractor will utilize water trucks to maintain dust suppression. Also,the Storm Water Management Plan will be developed and followed to mitigate soil erosion,fugitive dust, and sedimentation during the construction phase. After construction is completed the site will be stabilized through the use of gravel and/or recycled asphalt surfacing for all access points, driving, and storage yard areas. Native vegetation, which will not be allowed to grow over 12" high, will be utilized for all disturbed slopes and areas not receiving gravel/recycled surfacing. Speed limits will be minimized during use of the storage yard. If required, a water truck will also be utilized to control dust after construction. Page I 1 FOR COMMERCIAL SITES, PLEASE COMPLETE THE FOLLOWING INFORMATION BUSINESS EMERGENCY INFORMATION: Business Name:PTI USA MANUFACTURING, LLC Phone:970.670.6190 Address:390 MOUNTAIN VIEW DRIVE City, ST, Zip: BERTHOUD, CO 80513 Business Owner: Phone: Home Address: City, ST, Zip: List three persons in the order to be called in the event of an emergency: NAME TITLE ADDRESS PHONE KELLY HART PLANT MANAGER (SAME AS ABOVE) 970.646.3377 ANDY HEBBLEMAN PRODUCTION MANAGER (SAME AS ABOVE) 303.532.9715 PETER JONES SENIOR DIRECTOR (SAME AS ABOVE) 303.918.4053 Business Hours:6 AM TO MIDNIGHT(2 SHIFTS) Days: MONDAY THROUGH FRIDAY Type of Alarm: None Burglar Holdup Fire Silent Audible Name and address of Alarm Company:WESTERN STATES FIRE PROTECTION COMPANY, CENTENNIAL, CO Location of Safe: NOT APPLICABLE MISCELLANEOUS INFORMATION: Number of entry/exit doors in this building: N/A Location(s): N/A Is alcohol stored in building?N/A Location(s): N/A Are drugs stored in building?N/A Location(s): N/A Are weapons stored in building?N/A Location(s): N/A The following programs are offered as a public service of the Weld Count Sheriff's Office. Please indicate the programs of interest. El Physical Security Check Crime Prevention Presentation UTILITY SHUT OFF LOCATIONS: Main Electrical: N/A Gas Shut Off: N/A Exterior Water Shutoff: N/A Interior Water Shutoff:N/A Diana Aungst Subject: Hours of Operation clarification Original Message From: Brett Koth [mailto:Brett.Koth@ptigroup.com] Sent: Friday, December 27, 2013 4:55 PM To: Diana Aungst Subject: RE: Hearing date 2/18 and Mineral Owner notification Diana- This is 5 days a week. Mon-Fri. From: Diana Aungst[daungst@co.weld.co.us] Sent: Friday, December 27, 2013 3:04 PM To: Brett Koth Subject: RE: Hearing date 2/18 and Mineral Owner notification Brett; The hours of operation are stated as 6 to midnight—is that 7 days a week? Or ... Thanks, Diana Aungst Planner II Weld County Department of Planning Services 1555 N. 17th Avenue - Greeley, Colorado 80631 970-353-6100 ext. 3524 Fax: (970) 304-6498 daungst(a weldgov.com<mailto:ldodgeco.weld.co.us> www.weldgov.com Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. 1 PTI USA Manufacturing,LLC Storage Yard;Weld County USR Application Package November,2013 Water Quality Narrative Stormwater drainage for the subject property and the proposed storage yard improvement area will remain consistent with the historic drainage patterns for this area. Historically, stormwater runoff generally flows from west to east across the property and eventually crosses beneath 1-25 via existing storm drainage culverts. Once under 1-25,the runoff is routed northeast to the Big Thompson River via a tributary of the Big Thompson River. Offsite stormwater runoff from areas west of the property is cut off by 2 existing irrigation ditches (Harry Lateral and Consolidated Home Supply Ditch& Reservoir Company) located near/along the property's western boundary, which route the offsite flow to the north. The existing property is unimproved farmland with the exception of two existing irrigation ditches and an associated irrigation access road. With the proposed storage yard improvements,the overall property has a percent imperviousness of 9%. Therefore, water quality ponds are being proposed to be included for the storage yard improvements associated with this application. The developed storage yard area has been divided into 2 basins(labeled Basin A and B, per the attached Water Quality Exhibit), and runoff generated from each basin will sheet flow from west to east across the storage yard where each basin will outfall into its own proposed water quality pond. Basin A includes the northern two-thirds (approximate)of the storage yard area, as well as unimproved areas west and north of the storage yard. Basin B includes the southern one-third (approximate)of the storage yard area, as well as a minor portion of unimproved area west of the storage yard and a portion of offsite area south of the storage yard which includes a landscaped area and a portion of the graveled storage yard for the existing PTI USA Manufacturing Facility. The water quality ponds have been sized n accordance with Weld County Public Works Division requirements. The remaining area of the property is not proposed to be improved with this application. The existing drainage patterns will remain,which generally include the property drainage from west to east via sheet flow. There are no areas of known drainage issues associated with the property. Please refer to the attachments which follow this narrative for copies of water quality pond sizing calculations and a copy of the Water Quality Exhibit. Page 1 1 0 N _ CO 0 — ., OO r- r- N. M Gl O Cn ( N N No O ,-IO 0 0 0 O O O O a -- E C7 o o =� o u 'O O O O 0 0 0 O O O O a Q N N N m Ol 1-1 O c-; E u ..i r-1 m To < o- 00 00 Cn 01 CV VD O .--i O N N N O N I- d N .--1 m . i .-i .--1 Q VCO $ m m O �a O ^ r•-- 0 o In Li-)-.4O o T. r� .--1 00 .-i c-1 v N /yh. N .-j n m Ur" Q ~ Q rn r Lri Ln In Q —? CCU F— CZ Q c _ o ru 0 0 0 U () E u 0 v Q Q ` > C O rr•-: d V —IN N N N 0 — Q O O o 0 Q a �' V O �� y `h° •N O O j Q 0 Q " d o 0 0 — — > C a) r LIJ _ .-1 N Cl) D- to m a v c., 00 N ON N V1 O N > y N r--- lfl H Ql Y Q m .4 ri a b 10 0 Z `Zr N N D C ro 1,- .- C w U C x w v a -� CJ Y ra w F C. N N 0 -O O Cl < lD V) O R N CT) >- N m O d> cr, C w (p G) N Q V Ql ro lD ('J N •O LO Leto J C O 111 ra D — D in 0 _O -O Z v) — E — a Q O L L — Y H m 3 Q C) Z Cd CV vcri 0 E < < °' N N o m 0. m C) C) v =a 0 O C C a c o M v - w w Q w U r 0 v-. 2 i o °i 6 Job. No. 13038 PT! USA MANUFACTURING, LLC 11/08/2013 PROPOSED STORAGE YARD WATER QUALITY CALCULATIONS WATER QUALITY CAPTURE VOLUME CALCULATION S Water Quality Capture Volume=WQCV=a*(0.91/3-1.19i 2+0.78i) (watershed inches) =Total Imperviousness Ratio= IwQ/99 a =40-hr Drain Time= 1.0 PERCENT WATER QUALITY IMPERVIOUSNESS BASIN IMPERVIOUSNES CAPTURE VOLUME, RATIO,i 5, I WQCV wo (percent) (watershed inches) A 27.0% 0.27 0.14 B 27.0% 0.27 0.14 Required Storage= [WQCV/12]*A*1.2 (acre-ft) A=Tributary Catchments Area (acres) 1.2 Factor= Multiplier to account for 20%sediment accumulation BASIN TRIBUTARY REQUIRED WATER REQUIRED WATER AREA,A* QUALITY STORAGE QUALITY STORAGE (acres) (acre-ft) (ft3) A 21.97 0.31 13,567 B 10.83 0.15 6,688 WQ POND VOLUME CALCULATIONS BASIN A Required Water Quality Capture Volume(WQCV): 13,567 (ft3) POND VOLUME =1/3(A1+A2+(A1*A2)^0.5)*D DETENTION POND INCREM CUMM. CUMM. ELEV AREA VOLUME VOLUME VOLUME SQ FT (ft3) (ft) (ac-ft) 5034.00 0 0 0 0.00 WQCV 5035.00 10,685 3,562 3,562 0.08 5036.00 12,549 11,605 15,166 0.35 WQ POND VOLUME CALCULATIONS BASINS B Required Water Quality Capture Volume(WQCV): 6,688 (ft3) POND VOLUME = 1/3(A1+A2+(A1*A2)^0.5)*D DETENTION POND INCREM CUMM. CUMM. ELEV AREA VOLUME VOLUME VOLUME SQ FT (ft3) (ft3) (ac-ft) 5034.00 0 0 0 - 0.00 WQCV 5035.00 4,547 1,516 1,516 0.03 5036.00 6,185 5,345 6,861 0.16 Crestone Consultants. LLC DRAINAGE CRITERIA MANUAL(V. 1) RUNOFF Table RO-3—Recommended Percentage Imperviousness Values Land Use or Percentage Surface Characteristics Imperviousness Business: Commercial areas 95 Neighborhood areas 85 Residential: Single-family Multi-unit(detached) 60 Multi-unit(attached) 75 Half-acre lot or larger * Apartments 80 Industrial: Light areas 80 Heavy areas 90 Parks, cemeteries 5 Playgrounds 10 Schools 50 Railroad yard areas 15 Undeveloped Areas: Historic flow analysis 2 Greenbelts, agricultural 2 Off-site flow analysis 45 (when land use not defined) Streets: Paved 100 Gravel (packed) 40 Drive and walks 90 Roofs 90 Lawns, sandy soil 0 Lawns, clayey soil 0 * See Figures RO-3 through RO-5 for percentage imperviousness. Ca = K , + (1.31i` — 1.44i' + 1.135i—0.12) for Ca ≥ 0, otherwise CA = 0 (RO-6) = K�. + (0.858i' -0.78612 + 0.774i+ 0.04) (RO-7) Cs = (CA + Ccn)/2 2007-01 RO-9 Urban Drainage and Flood Control District �n Jarrw�.m swrti•p war•--, ..—...fp clr,1•Cbnc i,- vnut 00 F�Me7• ....11.............ert>eserme 00 `kLNf109 013M § ;bY 717 V.NVIIIISNODallois J�) 0a`dfl 3�J IOlS ge ��;qsi Y�• Q a = LL `dSf1 Ild �, y.. V "" 0 0 O J a I I O a OI N Q Q co N Q pl Q O M M N 3 O U) rD 0 N O N /y v O O d O O II I— N I N II II i— II II N N N L w Q w a W 41 Q w a La W W g Q Z L 2 J 0 t/) -Z ' EA a a\ 0 5 3 O a bt o S 4 Cl- s o ct a 4 a Q a ? o .. F- W W Q I- W W Q 04 04 Q m j : J m m j j J W O J Q O Q 3 Q 3 M m UV UCJ 6Q 66 U) U)tp a 0 0 m d d Z I II Z N II =D >.-n d 0 0 M 00 M Q in 0D 0 aWW II 0WW II — r,CC 0 K CL 0 a�l g s lal W541 a K W N Q W K CLa3 <3cra3 I / — • \ \ ili'::.::i::...,.,- --.-t"."z /—*"...:." ligill:r.-6>;-:,:ti';:it•t::$1: It Miliig g r N . • .1� / lira . r! : : ----- : - _,7Eix .:...li IllitlimillliP '.., ki .I - - ��-s 7` --- --- :::i / S Hello