Loading...
HomeMy WebLinkAbout20140526.tiff Keota-Redtail 115-kV Transmission Line Project Weld County USR and 1041 Application Appendix E : Communication Tower Report Keota - Redtail 115 -kV Transmission Line Project Keota Substation Communication Tower Report October 2013 Submitted to: Weld County Planning and Zoning Department of Planning Services 1555 N . 17th Ave. Greeley, CO 80631 Submitted by: TRI - STATE Generation and Transmission Association, Inc. .\ Touchstone EnereCo operarive 1100 W 116th Ave. Westminster, CO 80234 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report CONTENTS OVERVIEW 1 PURPOSE AND NEED 1 KEOTA COMMUNICATIONS FACILITY LOCATION 1 TRI-STATE COMMUNICATION SYSTEM DESIGN CRITERIA 1 TRI-STATE COMMUNICATION FACILITY CRITERIA 2 TRI-STATE COMMUNICATION SYSTEM DESCRIPTION 2 Keota Communication System Design 3 Known Obstructions 3 Facility Collocation Study 3 Basic Structure Height 3 Preferred Design Path Description 4 Path 1 (Weldona) 4 Path 2 (Point Of Rocks) 4 Site Collocation 5 SUMMARY: 6 EXHIBITS Exhibit A: Tri-State System Map (Partial for Weld County) Exhibit B: Communication Sites Evaluated i Keota-Redtail 115-kV Transmission Line Project Communication Tower Report This page intentionally left blank. ii Keota-Redtail 115-kV Transmission Line Project Communication Tower Report OVERVIEW Tri-State is a non-profit cooperative electrical utility and is registered with the Federal Communications Commission (FCC) as private carrier operating in the Microwave Industrial Business Pool under CFR Title 47 Part 101 . Part 101 allows for communication systems to be licensed for the purpose of supporting the overall business needs of the organization of providing reliable cost effective bulk electric power supply for its member organizations. As a bulk power utility, Tri-State is required to meet regulatory compliance as established by the Federal Energy Regulatory Commission (FERC), the National Energy Regulatory Commission (NERC), and Western Energy Coordinating Council (WECC). PURPOSE AND NEED The purpose for this communications system build-out is to provide a high speed geographically diverse digital communication link between the Tri-State operations control center computers located at Westminster, Colorado and Frederick, Colorado with the proposed Keota 345KV and Redtail 115KV substations. Requirements are to communicate with the Supervisory Control and Data Acquisition (SCADA) equipment, transmission line relay protection equipment, with the substation revenue metering equipment, the FERC mandated security systems for a bulk power substation , and voice communications for the safety of the maintenance personnel working around the energized equipment. KEOTA COMMUNICATIONS FACILITY LOCATION The proposed Keota Communications facility will be located approximately 1070 feet west of road CR-89 on the proposed substation property approximately 740 feet northeast of the Laramie River Station 345KV (LRS 345) line structure 203 and near to the proposed Keota 345KV substation at Latitude 40°44'32.8"N , Longitude 104° 13'27.2"W and at an elevation of 4958 feet above mean sea level. The location and elevation will vary slightly based on the final substation location and general arrangement. The area surrounding this proposed facility is agricultural grassland with only one residence located approximately one mile from the site. The general terrain is considered low rolling hills with no trees and the site will be located in a low elevation spot. TRI-STATE COMMUNICATION SYSTEM DESIGN CRITERIA Tri-State uses a mixture of various communications technologies such as the proposed point- to-point terrestrial microwave as well as fiber optic systems throughout its service territory to provide multi-channel communications to its various facilities. The type of technology and 1 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report method used depends on the communication requirements, costs and what system is available in the area. The critical nature of the Keota Substation as defined by FERC and NERC for the bulk power system requires a high reliability design be deployed for a 345-kV substation . The following criterion is used for designing the communication system to accomplish this. • Use of existing wholly owned , joint-owned or partner owned communication facilities whenever possible. New facilities to be considered if no adequate facilities are available. • Path Reliability will be better than 99.9995% (2.6 minutes/year outage time) to achieve the overall network reliability of 99.995% (26.2 minutes/year outage time). • Obstruction Clearance criteria will be 20 feet above the highest point of the obstruction . (Some modification consideration can be given for the type of obstruction and the location with-in the path) • Tower Heights (minimized) due to cost, structural , maintenance and safety issues. • East / West path designs will be avoided where possible due to propagation issues caused by sunrise/sunset and storm path issues. TRI-STATE COMMUNICATION FACILITY CRITERIA Tri-State's communication facility requirements are: • 220 VAC single phase commercial power available sufficient to handle the building , DC plant and HVAC loads. • Standby emergency generator system (EGS) that will run for 6 days before refueling • 48VDC plant with a 12 hour run time a full equipment load • HVAC sized to maintain 77 deg F inside building air temperature with a 100 deg F outside air temperature. • Automatic waveguide pressurization system to keep water condensation out of the waveguide. • Three feet of front and rear clearance for all equipment installed in the building for maintenance activities. • Road access by 2-wheel vehicle except during inclement weather conditions where 4- wheel drive and/or snow cats can be used . TRI-STATE COMMUNICATION SYSTEM DESCRIPTION To meet the FERC, NERC and WECC regulatory requirements, Tri-State operates a high- speed fiber and microwave communications network across its four-state service territory. The back-bone system consists of several SONET self-healing geographical diverse rings to provide protection against fiber cuts, microwave propagation outages, and equipment failures. Three of those rings currently traverse the southern portion of Weld County using six of the approximately 400 locations that make up the Tri-State network. See Exhibit A for a partial route map. 2 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report KEOTA COMMUNICATION SYSTEM DESIGN To meet the protection requirements for a high reliability multi-channel communications system, a new standalone facility complete with a communications tower will be required on the substation property for the expressed purpose of providing multi-channel communications for Keota and the Redtail substations. In order to meet regulatory compliance, system reliability and safety, the existing system will be modified to extend the route diversity communication route to Keota. See the Point Of Rock, Keota, Weldona paths shown in red on Exhibit A. The installation and commissioning of this communication system is proposed to be completed in the 3nd Quarter of 2014 to allow for the substation to be placed in-service. To meet Tri-State's long term communication needs, the facility will be developed to handle microwave, fiber, multiple address polling radio (MAS) and mobile radio system needs for this area. KNOWN OBSTRUCTIONS The near end obstructions that were noted are the LRS 345-kV transmission line structures 203, 204, 205 and 206 located just south of the proposed Keota communication site. The proposed Weldona and Point Of Rock microwave paths must cross in-between the structures listed . Per the LRS line plan and profile drawings, the average height of these structures with their associated lines is 100 feet above ground level (agl). FACILITY COLLOCATION STUDY As per FERC/NERC and Weld County requirement, Tri-State considered eleven of the existing Tri-State / partner facilities and found only three locations that meet the path requirements. The Tri-State partner facility, Weldona, owned by Western Area Power Administration (WAPA) and the partner facility, Point-Of Rocks, operated by Basin Electric (Weld CUP-37) were selected based on Tri-State's path / site selection criteria. To meet the County code requirement to examine other existing structures in Weld County not associated with Tri-State, another 16 locations were identified and considered for collocation or as intermediate repeater sites to lower the required Keota tower height using the GIS map supplied by Weld County and research done using the FAA and FCC Antenna Registration System databases. Only one site, Nobel Energy (Weld USR-13-0013) was found to be possibly close enough to be considered in lieu of a facility build . Evaluation of this location is addressed in more detail . Three additional sites were identified and evaluated as possible intermediate repeater sites. Exhibit B lists all of the sites evaluated . BASIC STRUCTURE HEIGHT The basic structure height to clear the LRS 345-kV transmission line and structures to the south and east of Keota is 130 feet plus 10 feet for any mobile radio antennas and a lightning rod. 3 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report A space diversity antenna system will require an additional 30 feet of separation for the upper antenna making the structure 160 feet. The permitted structure height to include the lighting rod and possible mobile radio/MAS antennas would then be 170 feet. The remaining 90 feet is required to clear topographical obstructions. PREFERRED DESIGN PATH DESCRIPTION Path I (Weldona) Based on a new facility build required at Keota, the WAPA owned Weldona Communication site was chosen based on Tri-State's site selection and system design criteria. It was determined that the path length is 24.5 miles, and would require the space diversity antennas at Keota to be located at the 240/210-foot agl elevations and at 170/140-foot agl elevations at Weldona to clear a terrain obstruction located at 5.44 miles from Keota to make the path reliability requirements. o ��t��} %PIM litatla'.' 1 � ~. _ �iN at ' . tir ` -- Point 0 R Ks� p. , . . 1 i 6 1 1. _ '� _M' .... Lam, r - _ � T ! �� ( C earth "r awe �� N-w.'4arvY 5. -'l nlni.j v - - .aj '•. „., .y,n w.9ev.ca♦ sr. wc$••+c. n:a o^. :an an _ v!-- Ae ala =Tee Gude :In $MOH „ni .0 m0 .pnu AA^n ]9+, Aim ;n m To make the Weldona 240-foot antenna elevation will require a 250-foot-tall supporting structure at Keota. The overall structure height including lighting rods and mobile radio antennas will be 260 feet. Path 2 (Point Of Rocks) Based on a new facility build required at Keota, the Basin Electric owned Point Of Rocks Communication site (Weld CUP-37) was chosen based on Tri-State's site selection and system design criteria requirements. It was determined that the path length is 16.5 miles, and 4 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report would require the space diversity antennas at Keota to be located at the 180/150-foot agl elevations and at 180/150-foot agl elevations at Point Of Rocks to clear a terrain obstruction at 6.95 miles from Keota to make the path reliability requirements. 1 Ala ' 1 i r ii I is a. • r/ "It_ • ' t g - _ — 'en e222:11 I1 ;0,18iI 5 it-1i11-6.28'8('‘'W eiw w& !! an r ..; ft +'eras., P,W,[. :9l m: cU.Gs":a,. . vi .'A• n... - .y n•- ..usmo. / ^1 Site Collocation Eleven additional facilities were looked at for possible collocation as required by Weld County. Nobel Energy, USR 13-0013, was contacted about collocation at their site approximately 1900 feet away on the adjacent property to see if a new site build at the substation could be avoided . It was determined that their tower as designed and permitted would not be able to support Tri-State's antenna requirements. This removed any option of avoiding a communications site build along with a communications tower at the Keota Substation. The three sites USR-974, USR-1750 and CUP-42 reviewed as intermediate repeater locations for the Point Of Rocks path were eliminated based a decrease in system reliability and would not eliminate the site build at the Keota Substation. The use of additional radio paths would require addition FCC transmit frequency pairs to be available in an area that already very congested . 5 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report SUMMARY: • There is not any existing nearby communications facilities that will defer constructing a new communications facility with a tower to serve the proposed Keota Substation. • The 250-foot structure at Keota will allow Tri-State to meet Federal requirements for relay protection of a critical substation by providing geographical route diversity paths to Point Of Rocks and Weldona. • The reduction in system reliability by adding additional collocation sites and equipment does not outweigh the minimal cost savings of reduction in tower height. 6 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report Exhibit A: Tri -State System Map ( Partial for Weld County) Keota-Redtail 115-kV Transmission Line Project Communication Tower Report This page intentionally left blank. Keota-Redtail 115-kV Transmission Line Project Communication Tower Report Trt-Stale(.cnc'rallot, L — CREEK and Tran•mh•kan I ' : I :1AIt t I \ . I \ Telecom i i I- roll all SIDNEY; SIDNE', i • 1 —x,705 • L,.. DC TIE ' KIMBALL • I CHEYENNE ARCHER �•����, �,,,. eY • SUB:- ••;LA «< a I 'SIDNEY • BO- ••• ''� :ENNE i • 1 • , / • • E i • / slmiNG CHEYENNE i `PEETZ CAIWION es.-•. --I-------------- --a- o •JUNGTION ----------r-1--+�F-- — ``TAB ' �TC�T�A EN • • k i IOWL ! '?CREEK ,390 R, _Vila REDTAIL A. Proposed Sites Ir .) A Noah - Proposed Links s ihnn0 ! Backbone KEOTA Stags Pak l; O _ / •- Telecommunication Site WAVERLv • -. - wellieenf I .t .A11 Fiber Telecommunication • HARD Site F� ULTlerce I I1 Sterling,,--,.. • Spur Telecommunication Site Colons • GA?•tY.•• • POINT OF •. . '^�• RbcKs Remote MAS Radio Site I ,I,�_ I MERINO O OFF.D Other Comm Site W rids et WELDONA I ' BALD I I »_�_�-.•..r ® Backbone MOUNTAIN• • `•• (AeCiei l ••• Fiber ..WA PA�"- Lilxi v , I LONESTAR E . in I 1 -. t Spur - - ., r• � `� 1'a,fl.t '::II i STORY J ••,' Counties _ettfi d .•1 0 t,i 230KV I :I I t Lyon O 1 ,.,, .- • I .. SLATER a h9c l�Tl' AKRON I DEL Cal IWO stv TCH ,•• , ongm a5 wee. ••• uwox J 1 `f vtttEr • .? aEF/cE ►' CAI �••. Ni •..I ;Rttw]rcxitan�e[?scHaFr= J •S rn I:lL tVec.14 oft I' • •0 • rr`,TR1-STATE r. �. t „ rt • Boulder � iG•Hl+3N... ............... li• ----- r 1 1 r�. WAY FIFE �_—_—_—_—_—sesi • .L.:!..?. .. , , GREEN 8R AILEY I hot:utter ;ELL'':::• •• tt ! ' Gfp(;'t'c :, l?+J ••• He PRAethIRIE,1' sue '�G BR1GHrO1: I .•ban Sl u•■t]ADIWIi]I L••.t" r- is 1 l�Z !•(•t- , Tf 1 ' E Itt. VNe E I ,..na•:Tru terkaol MINI Menial �• •( KASIIING7l N `•rUA■..x.. lw .` a et Il STMINSTER mp moludes rr•6lnhal mftot•to•of In-Stai- Het�tlld BPS 2I -111 Nod pries TAn CIC DOA and morn not sotto 29. 63.Ir1 , toed to my thud pay Ito.err sing.t..Ivry .r vada r. tnhll_r,• I 1-- dorm too nmfdt•utlmd.w dlWh-rn4.th .' I.-- -ti OROW � ,/II;w''�f. r —'r-� !.•-4 �1'r•AAT1lIN$ /_ .lty.m hate my.fttntw..g•.adm•Oa•.t' ,.- r �_ �C. +a WvTn-State In}al dopmfmn,. -. 2436 j `� _ _—_—_—_—_—_—_—_— —36 O.— Amused maps n mt.Ne to In-Stair Orara•t row CI Mt • .11fOf it ZAP / ` \' drd a.ttremlmemshoo to led Tn Sts. Lakewt _ Z.- 1 •• nuuo.w•tra•aer No user of Tn•S,we tad moot mg-) writ est el•. M r 5 • ‘I(r�l•:�ll t Il 4 mown throne TndWtr stain nto I'I RtiI f1 ``\\ , arra.Smd.1•.cnaru NmpAnnsof fe • - roil,. . •fl Greenwood Village \ l _ -g_— ------ r' aamq. l't•r..h•li rill aal,.on•rrtptr(wld \\\ \\\\\ (r �Lr cu am, t A-1 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report This page intentionally left blank. A-2 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report Exhibit B : Communication Sites Evaluated Keota-Redtail 115-kV Transmission Line Project Communication Tower Report This page intentionally left blank. Keota-Redtail 115-kV Transmission Line Project Communication Tower Report f 12N 12N 2N - 1214 12N 12N 1414 I 1 12N 59W 170 F7 12$ 57W �86W 84W / 631114-C - f �� Radio C mm Tower(2) 58W �wN\ 11 NOAA. rP 1nfor4years ��•' 11A I -f- _SUP-141 00 Mic Towe i • 57W - .meFt Bluffs Comrowavemunity TVr ASR 1268467 I —�^ 11N L__.__ UP-58 11N 11N 11N 11N 1114 4 j 1 58W 65W 64W—s-- 63W 62W 1W Unable to ID I J. ■.�... - - #� . •�� ASR1283666 �• 2013-ANM-1988-OE ' I 1 \III APPROXIMATE PROPOSED 1014 56W 10N 10N 1 10N 10N 11 11S kV ALIGNMENT Whiting Oil 57W 65W 64W 63W 62W 61 >"*•--- 250 Ft Comm Tower A— U8R•1777 "ASR1025891 I l I 415 II Comm rower IKeota Comm .��. Greeley Cetlu ar —USR 1007 ASR 1024544 • 09N 1 ��- 100 Ft Comm Towe 1 56W 09N 09N • 199 Fj plus 09N 1r Keota Gas Plan ♦ 65W — 64W MCI Telecommunications 62W SR13-0013 0914 N 0 N --- MIN i N _ 59W ._ 63W ASR1 2. 6 !- ri, ASR 2 N N 70 R Mlcr v T.•-.-r 0814 08N S6W "" 08N 08N 0 N cs Se v Gas 5gyy 58W 57Y1 ASR1277389 64W 63W 6111A1 CUP-42 1 1 • 08N ASR 1275582 1lj II 80W 330 Ft Comm Tower ( • 27 51I I •r pr— ( USR•1n9 il 'A ,_ 3 Ott omm T. 0714 U '1 50 �Corndor of Interest : j___- , N _ 07N 07N ASR1023855ernii 0r•.N W 64W 63W STN t� 198 ft Cg 61YY l : r 59W 58W c$st rl a cas r Cellular Tower LCUP-A US Wes USR-974 250 R Rddlo et Basin eraria wecona Weld County Tower Sites CUP-37 06N N 01 06N ♦ I Its 6 _ with FCCAntenna Structure Registration ID 091111 I - — Wens Ranch na Tower USR11 0018 _ 05N 0514 i� J 62W 61W BA : Weld County Tower Sites Map B-1 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report This page intentionally left blank. B-2 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report B.2: Site Location List Tri-State and Partner Sites Site Name: Keota Comm ASR: FAA: Weld ID: City/State Keota, CO Location (DMS): N40°44'32.8", W104° 13'27.2" NAD83 Elevation (ft/amsl): 4958 Tower (ft/agl): 250, Lattice, Self-Supporting Owner: Tri-State G&T Assoc. , Inc 1100 W. 116th Ave Westminster, CO 80504 Notes: Proposed Site Location Site Name: Archer Comm ASR: 1008264 FAA: 78-RM-359-OE Weld ID: N/A City/State: Archer, WY Location [DMS]: N41 ° 8'39. 11 ", W104°39'3.71 " WGS84 Elevation (ft/amsl): 5980 Tower (ft/agl): 200, Lattice, Self-Supporting Owner: Tri-State G&T Assoc. , Inc 1100 W. 116th Ave Westminster, CO 80504 Notes: No direct path due to terrain obstructions Site Name: Ault Comm ASR: None FAA: 78-RM-354-OE Weld ID: CUP-44 City/State: Ault, CO Location [DMS]: N40°36'15.36", W104°48'51 .07" WGS84 Elevation (ft/amsl): 5120 Tower (ft/agl): 110, Lattice, Self-Support Owner: Tri-State G&T Assoc. , Inc 1100 W. 116th Ave Westminster, CO 80504 Notes: No direct path due to terrain obstructions Site Name: Cheyenne Junction ASR: 1008927 FAA: 2004-AN M-1713-OE Weld ID: N/A City/State: Cheyenne, WY Location [DMS]: N41 ° 0'25. 11 ", W104°46'23. 10" WGS84 Elevation (ft/amsl): 6253 Tower (ft/agl): 230, Lattice, Guyed Owner: Basin Electric B-3 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report 1717 East Interstate Ave Bismark, ND 58503-0564 Notes: No direct path due to terrain obstructions Site Name: Bald Mountain-WAPA ASR: None FAA: None Weld ID: N/A City/State: Cedar Cove, CO Location [DMS]: N40°21 '20.55", W105° 15'48.47" WGS84 Elevation (ft/amsl): 7100 Tower (ft/agl): 115, Lattice, Self-Supporting Owner: Western Area Power Admin. 5555 E. Crossroads Blvd . Loveland, CO 80538-8986 Notes: 65 mile path to long to make reliability requirements. Site Name: Merino ASR: None FAA: None Weld ID: N/A City/State: Merino, CO Location [DMS]: N40°30'0. 11 ", W103°24'34.75" Elevation (ft/amsl): 4260 Tower (ft/agl): 160, Lattice, Guyed Owner: Western Area Power Admin. 5555 E. Crossroads Blvd . Loveland, CO 80538-8986 Notes: No direct path due to terrain obstructions Site Name: Owl Creek Sub ASR: N/A FAA: N/A Weld ID: City/State: Nunn , CO Location [DMS]: N40°56'41 .34", W104°47'55.68" WGS84 Elevation (ft/amsl): 5842 Tower (ft/agl): N/A Owner: Tri-State G&T Assoc. , Inc 1100 W. 116th Ave Westminster, CO 80504 Notes: Full site development with a tall tower required . Site Name: Peetz Table ASR: None FAA: None Weld ID: N/A City/State: Peetz, CO Location [DMS]: N40°57'41 .92", W103°22'27.93" WGS84 Elevation (ft/amsl): 4760 Tower (ft/agl): 180, Lattice, Guyed B-4 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report Owner: Western Area Power Admin. 5555 E. Crossroads Blvd . Loveland, CO 80538-8986 Notes: No direct path due to terrain obstructions, tall tower required at Redtail Sub Site Name: Pine Bluffs Comm ASR: None FAA: None Weld ID: N/A City/State: Pine Bluffs, WY Location [DMS]: N41 ° 9'51 .24", W104° 4'34. 17" WGS84 Elevation (ft/amsl): 5345 Tower (ft/agl): 60, Lattice, Guyed Owner: Tri-State G&T Assoc. , Inc 1100 w116th Ave Westminster, CO 80504 Notes: No direct path due to terrain obstructions Site Name: Point Of Rocks ASR: None FAA: None Weld ID: CUP-37 City/State: Cornish. CO Location [DMS]: N40°31 '21 .86", W104°20'38.08" WGS84 Elevation (ft/amsl): 4941 Tower (ft/agl): 180', Lattice, Guyed Owner: Basin Electric 1717 East Interstate Ave Bismark, ND 58503-0564 Notes: Existing Collocation site Site Name: Story Comm ASR: 1288570 FAA: 78-RM-363-OE Weld ID: N/A City/State: Brush , CO Location [DMS]: N 40° 15' 11 .2", W 103°35'08.8" WGS84 Elevation (ft/amsl): 4348 Tower (ft/agl): 80 Owner: Tri-State G&T Assoc. , Inc 1100 W116th Ave Westminster, CO 80504 Notes: No direct path due to terrain obstructions Site Name: Weldona-WAPA ASR: None FAA: None Weld ID: N/A City/State: Weldona, CO Location [DMS]: N40°27'6. 10", W 103°57'24.00" WGS84 Elevation (ft/amsl): 4899 B-5 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report Tower (ft/agl): 200 (per WAPA drawing) Owner: Western Area Power Admin. 5555 E. Crossroads Blvd . Loveland, CO 80538-8986 Notes: Existing Collocation site Weld County Sites Site Name: N/A ASR: None FAA: None Weld ID: CUP-58 City/State: Grover, CO Location [DMS]: N40°55'00.00", W104° 13'38" Elevation (ft/amsl): NA Tower (ft/agl): 200 Owner: Pine Bluffs Community TV System P.O. Box 517 Pine Bluffs, WY 82082 Notes: Outside of area of interest Site Name: ASR1283666 ASR: 1283666 FAA: 2009-AN M-1945-OE Weld ID: City/State: Grover, CO Location [DMS]: N40°51 '51 .00", W104° 13'42.90" WGS84 Elevation (ft/amsl): 5074 Tower (ft/agl): 195 Owner: Industrial Tower and Wireless, LLC 40 Lone Street Marshfield , MA 02050 Notes: Outside of area of interest Site Name: ASR1024544 ASR: 1024544 FAA: 2003-ANM-1868-OE Weld ID: USR-555 City/State: Nunn , CO Location [DMS]: N40°44'54.81 ", W104°31 ' 13.58" WGS84 Elevation (ft/amsl): 5262 Tower (ft/agl): 207 Owner: SpectraSite Communications, LLC 10 Presidential Way Woburn , MA 01801 Notes: Outside of area of interest Site Name: ASR1277389 ASR: 1277389 FAA: 2010-AN M-1792-OE Weld ID: City/State: Ault, CO B-6 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report Location [DMS]: N40°36'35.89", W104°34'28.85" Elevation (ft/amsl): 4982 Tower (ft/agl): 350 Owner: Industrial Tower and Wireless, LLC 40 Lone Street Marshfield, MA 02050 Notes: Outside of area of interest Site Name: Wells Ranch ASR: None FAA: None Weld ID: USR11 -0018 City/State: Location [DMS]: N40°28'41 .78", W104°20'7.26" (from USR) Elevation (ft/amsl): 4966 Tower (ft/agl): 200 Owner: Wells Ranch Notes: Outside of area of interest Site Name: ASR1278551 ASR: 1278551 FAA: 2009-ANM-2342-OE Weld ID: USR-1750 City/State: Seven Cross Hills, CO Location [DMS]: N40°36'40.34", W104° 17'46. 18" WGS84 Elevation (ft/amsl): 4878 Tower (ft/agl): 350 Owner: Industrial Tower and Wireless, LLC 40 Lone Street Marshfield , MA 02050 Notes: Possible intermediate site for Point Of Rocks route Site Name: ASR1022976 ASR: 1022976 FAA: 1991 -ANM-945-OE Weld ID: USR-974 City/State: Briggsdale, CO Location [DMS]: N40°39'51 .80", W104° 17'7.64" WGS84 N40°39'54", W104° 17'07" (per e-mail from County) Elevation (ft/amsl): 5105 Tower (ft/agl): 192 Owner: Verizon Wireless (VAW) LLC 1120 Sanctuary Pkwy, #150 GASA5REG Alpharetta, GA 30009 Notes: Possible intermediate site for Point Of Rocks route Site Name: ASR1023853 ASR: 1023853 FAA: 2005-ANM-1793-OE Weld ID: CUP-42 City/State: Briggsdale, CO B-7 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report Location [DMS]: N40°38'21 .59", W 104° 13'10.71 " WGS84 Elevation (ft/amsl): 5032 Tower (ft/agl): 276 Owner: Southern Star Central Gas Pipeline, Inc. PO BOX 20010 4700 HW 56 Owensboro , KY 42304 Notes: Attempted voice contact, left call back message, no response Site Name: ASR1023855 ASR: 1023855 FAA: 2005-AN M-1795-OE Weld ID: CUP-41 City/State: New Raymer, CO Location [DMS]: N40°33'19.36", W 103°50'29.81 " WGS84 Elevation (ft/amsl): 4833 Tower (ft/agl): 299 Owner: Southern Star Central Gas Pipeline, Inc. PO BOX 20010 4700 HW 56 Owensboro , KY 42304 Notes: Outside of area of interest Site Name: ASR1275582 ASR: 1275582 FAA: 2010-ANM-968-OE Weld ID: USR-1729 City/State: New Raymer, CO Location [DMS]: N40°36'37.30", W103°51 '43.22" Elevation (ft/amsl): 4840 Tower (ft/agl): 350 Owner: Industrial Tower and Wireless, LLC 40 Lone Street Marshfield, MA 02050 Notes: Outside of area of interest Site Name: ASR1025891 ASR: 1025891 FAA: 2010-ANM-725-OE Weld ID: USR-1007 City/State: Grover, CO Location [DMS]: N40°44'28.92", W 103°59'25.70" WGS84 Elevation (ft/amsl): 5041 Tower (ft/agl): 424 Owner: New Cingular Wireless Services, Inc. 2200 N . Greenville Ave. , 1W Richardson, TX 75082 Notes: Outside of area of interest B-8 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report Site Name: ASR1268467 ASR: 1268467 FAA: 2009-AN M-753-OE Weld ID: City/State: Grover, CO Location [DMS]: N40°54'46.92", W104° 524.04" WGS84 Elevation (ft/amsl): 5572 Tower (ft/agl): 265 Owner: Mark H . Fulling Notes: HA — Amateur KBOVGD, Outside of area of interest Site Name: N/A ASR: FAA: 2013-AN M-1988-OE Weld ID: USR-1777 City/State: Stoneham, CO Location [DMS]: N 40°48'13.70", W 103°41 '25.60" WGS84 Elevation (ft/amsl): 4658 Tower (ft/agl): Possibly 250 Owner: Verizon Wireless Notes: Under Construction , Outside of area of interest B-9 Keota-Redtail 115-kV Transmission Line Project Communication Tower Report Calculated Maximum Permissible Exposure (MPE) Limits for the Proposed Keota Communications Tower N N N N N N FCC Limits for General Population / Uncontrolled Exposure = 1 mW/cm2 ref. FCC OET Bulletin 65. Edition 97-01 August 1997 RF Parameters: Antenna Center-Line (ft): 240 Antenna Diameter (ft): 8 Antenna Gain (dBi): 40.8 Antenna Efficiency (%): 100 Power into Antenna (dB): 28.8 Transmit Frequency (MHz): 6700 Calculated Maximum Exposure: Near Zone 1 . Near Field Level (mW/cm2): .06498 2. Near Field Level (mW/cm2): .00002 3. Extent of Near Field Zone (m): 33.2 Far Zone 4. Far Field Level (mW/cm2 : .00106 5. Far Field Level (mW/cm�): .00000 6. Extent of Transition Zone (m): 261 .40 B-10 PROPOSED KEOTA COMMUNICATION TOWER _ ,_ FA ii 4 j a 4. i f M i } ii . --- - . , _ y,��llll j jC -I . - %� .. f I / / / J _ Y- - f -r _ ..,�• -may.. k _ �.. . f : . Existing Conditions . . �f( } �s j,.. ., Communication Tower Simulation .• i -...... ..... _ .• #rb•�/. __f .a_ '- . .e..L.r _ View looking northeast from field near existing transmission line off of Weld County Road 89 . ,.j ..,.. „ „frit \ P Keota a " ri '* Photograhic Information : Substation Keota Tower A, Proposed Proposed 9/24/ 13 at 10 :47a . m . m . • Site Fl Site • - Latitude : 40°44'27 . 00" N - / ' • 1 .. . a I . i ih 0 4 k •�=-� Longitude : 104° 13'31 . 73"W . Distance to proposed tower: 650 feet View Location Height of proposed tower: 260 feet F,,-, stS��T� - kTR1 — STATE shams 5% - GII.I Generation and transmission Association. Inc. 0 ` 250 " 510 _ , . '�,$QO 4= ��70 eet N :1 Touchstone Energy"Cooperative BORDER 4 11 X 17 REVISIONS EWE APPROVED DV DATE GRAVELED ACCESS ROAD PERIMETER GRAVEL 20' DOUBLE GATE (7E---N7 • 29' NW 44' 32.79"2 W104' 13' 7.19" 4958' AMSL GRAVEL 10' 96'-10" - n I -44'- Sc 1 I '-6" -34 - --� 16' I "%N. 0 - I Graveled compound is rz3816O sq ft. Groveled orea is x10,460 sq ft. 23'-10" Fence line is p362 ft. 28'-2" GRAVEL O 0 4111111111111 1_ 0 - 41-1 -- 1000 GAL PROPANE 36" MAN GATE PERIMETER GRAVEL "6 PROJECT: PROPOSED KEOTA COMM SI i E LAYOUT 108' DRAWN DATE CHECKED DATE APPROVED DATE 09/18/13 GETRI-SNERATION& TTA�TEN ASSOCIATION INCORPORATED `,.tit TIIIN97�IDRDfR4.OYC BORDER 4 11 X 17 REVISIONS ewE Araaa,O BY M1E UHF DUNI LIGHTING ROD 1. ANTENNA VELfl4A COMM AZ! 144.89 TN 29' + POINT OF ROCKS Ca1N AtiN AZ: MEM TN f3/43/44[il i lot / 2 254• 11'-6' + 1 36' 190' 1"_0' POINT OF ROCKS COMM WELDONA COMM AZ: 202.56 TN AZ: 144.89 TN PROJECT: Keota Sub Communications Proposed Equipment Shelter & Tower Elevations Notes : DRAWN DATE CHECKED DATE APPROVED DATE 1. Equipment Shelter will be a Fibrebond, Prierner Concrete, I 11'6' ❑D x 36'0' ❑D x 10'1' ❑D equiped with Emergency Generator System (EGS) ❑ T 2. Tower will be galvanized 3-legged Valmont SST, Self-Supporting TRI— J /T A / 3. Tower location is N40°44'32.79', W104°13'27.19', Elevation: 4958 ft amsl E9 GENERATION & TRANSMISSION ASSOCIATION INCORPORATED C\pealed\reA\or^^Jt Mgr arm:good {minor 090:07 eaq L- oe At,;, o Mail Processing Center Aeronautical Study No . Federal Aviation Administration 2013 ANM 2275 OE Yz Southwest Regional Office '`vis" Obstruction Evaluation Group 2601 Meacham Boulevard Fort Worth , TX 76137 Issued Date : 10/22/2013 Jeff Selman Tri-State Generation & Transmission Assoc. , Inc. 1100 W. 116th Ave PO Box 33695 Westminster, CO 80233 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U .S . C. , Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77 , concerning : Structure: Tower Keota Comm Location : Keota , CO Latitude : 40-44-32 . 79N NAD 83 Longitude: 104- 13-27. 19W Heights: 4958 feet site elevation (SE ) 260 feet above ground level (AGL) 5218 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination , the structure is marked/lighted in accordance with FAA Advisory circular 70/7460- 1 K Change 2 , Obstruction Marking and Lighting , a med-dual system - Chapters 4 ,8(M-Dual ),& 12 . It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration , be e-filed any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I ) _X_ Within 5 days after the construction reaches its greatest height (7460-2 , Part II ) This determination expires on 04/22/2015 unless: (a) the construction is started (not necessarily completed ) and FAA Form 7460-2 , Notice of Actual Construction or Alteration , is received by this office. (b) extended , revised , or terminated by the issuing office . (c) the construction is subject to the licensing authority of the Federal Communications Commissio ( FCC) and an application for a construction permit has been filed , as required by the FCC , withi 6 months of the date of this determination . In such case, the determination expires on the date prescribed by the FCC for completion of construction , or the date the FCC denies the applicatio Page 1 of 3 NOTE : REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE E-FILED AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE . AFTER RE-EVALUATION OF CURRENT OPERATIONS IN THE AREA OF THE STRUCTURE TO DETERMINE THAT NO SIGNIFICANT AERONAUTICAL CHANGES HAVE OCCURRED , YOUR DETERMINATION MAY BE ELIGIBLE FOR ONE EXTENSION OF THE EFFECTIVE PERIOD . This determination is based , in part, on the foregoing description which includes specific coordinates , height: frequency(ies) and power . Any changes in coordinates , heights, and frequencies or use of greater power wi void this determination . Any future construction or alteration , including increase to heights, power, or the addition of other transmitters, requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks , etc. , which may used during actual construction of the structure . However, this equipment shall not exceed the overall height: indicated above . Equipment which has a height greater than the studied structure requires separate notice to FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance , or regulation of any Federal , State, or local government body. Any failure or malfunction that lasts more than thirty (30) minutes and affects a top light or flashing obstructio light, regardless of its position , should be reported immediately to (877) 487-6867 so a Notice to Airmen (NOTAM ) can be issued . As soon as the normal operation is restored , notify the same number. A copy of this determination will be forwarded to the Federal Communications Commission ( FCC) because tt structure is subject to their licensing authority. If we can be of further assistance, please contact our office at (310) 725-6591 . On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2013-ANM-2275-OE . Signature Control No: 198157297-199960583 ( DNE ) Tameria Burch Technician Attachment(s) Frequency Data cc: FCC Page 2 of 3 Frequency Data for ASN 2013-ANM-2275-OE LOW HIGH FREQUENCY ERP FREQUENCY FREQUENCY UNIT ERP UNIT 5925 6425 MHz 61 dBm Page 3 of 3 Hello