HomeMy WebLinkAbout20140786.tiff F ft :� e io7 ,k 1861. PUBLIC WORKS DEPARTMENT 1111 H STREET l� T `� P.O. BOX 758 �L \ GREELEY, COLORADO 80632 N ? Y PHONE: (970)304-6496, EXT. 3706 RE: EM-BR 54/41A Flood Repairs—FHWA Time Extension Memo 3-05-2014 Weld County is requesting a time extension related to the completion of emergency flood repairs at this site. In the months following the flood in 2013, the County sent work crews to this site to construct emergency flood repairs required to get the roadway(WCR 54) reopened to traffic. During that construction effort,the water in the South Platte River was still very high and the work crews were limited to working only in areas outside of the flowing river. Inspections for the bridge structure could not be completed due to the high water at that time. The County has hired a design consultant to investigate and design additional emergency repairs at this site. The river water elevations are still considerably high but low enough to facilitate inspection, surveying, and engineering emergency design at the site. As a result of these recent design efforts, the consultant has recommended additional emergency flood repair work to help ensure the integrity of the site and to help avoid the additional flood damages which could result in road closure. The County is preparing to contract out these recommended repairs prior to Spring runoff peak flow in the South Platte River. Given this current condition, the County requires adequate time to complete the design,bidding, and construction of emergency flood repairs at this site. eG', �/, S-is-�oiy AR) di/ Mat 2014-0786 .9-//-/y FHWA Disaster Number: Emergency Repair CO-1a-1 Time Extension Request Federal-aid Route Number: Location (Name of Road and Milepost(if applicable)) State: County: CO Weld Site: EM-BR 54/41A Prepared By: Michael Bedell, P.E. Location: WCR 54 Near Evans Type of Extension Requested Check all that Apply ❑� Time ❑� Pro Rata Shan Time Extension Information Construction Notice to Proceed Date: Estimated Number of Contract Days Estimated Completion Date 9/13/2013 365 9/13/2014 Site Specific Reasons for Extension Check all that Apply Planning ❑� Time Necessary to Identify all of Agency's Damage ❑Identification of Funding Available for Emergency Repairs ❑Availability of Agency Project Managers ❑Budgeting of Known Available Funds ❑� Planning of Overall Agency Emergency Work Execution ❑� Availability of Agency Forces ❑� Availability of Emergency On-Call Forces ❑� Limited Site Access ❑Public Input on Proposed Repairs El Shortage of Materials ❑� Time to Complete Procurement ❑� Time to Set Up Response and Recovery Operatior Funding ❑Confirmation of Available Funds Engineering ❑Estimation of 1%Event H&H E Securing the Necessary Right-of-Way Environmental ❑� Extreme Cold Weather ❑� High Stream Water ❑� Winter Maintenance Responsibilities ❑� Permits ❑� Frozen Ground Others/Comments: Attach Separate Sheets: See attached memo dated 3-05-2014. Hello