Loading...
HomeMy WebLinkAbout20142329.tiff >� lvl. R(�l ..e LAND USE APPLICATION SUMMARY SHEET 2_GaHNTY PLANNER: C. Gathman HEARING DATE: July 15, 2014 CASE NUMBER: COZ14-0003 APPLICANT: Big Thompson Investments Holdings, LLC ADDRESS: 22785 County Road 62, Greeley CO. 80631 REQUEST: Change of Zone from the A (Agricultural)Zone District to the 1-3 (Industrial)Zone District. LEGAL: Lot A of Recorded Exemption RE-4915; Part S2SE4 of Section 35, Township 6 North Range 65 West of the 6`" PM, Weld County, Colorado LOCATION: North of and adjacent to County Road 62 and approximately 1,000 feet west of County Road 47. ACRES: +/-4.32 acres PARCEL#: 0803 35 400023 POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS The Department of Planning Services' staff has received responses from the following agencies: With Comment: Greeley-Weld County Airport Authority, referral received March 19, 2014 Weld County Department of Public Health and Environment, referral received April 9, 2014 Weld County Department of Planning Services- Engineering, referral received April 9, 2014 West Greeley Soil Conservation District, referral received March 27, 2014 City of Greeley, referral received April 9, 2014 Without Comment: Weld County Department of Building Inspection, referral received April 8, 2014 Weld County Code Compliance, referral received March 14, 2014 Colorado Parks &Wildlife, referral received April 15, 2014 Town of Kersey, referral received March 27, 2014 Western Hills Fire Protection District, referral received March 17, 2014 COZ14-0003 Page 1 of 9 The Department of Planning Services' staff has not received responses from: Weld County Sheriff's Office Colorado Division of Water Resources North Weld County Water District COZ14-0003 Page 2 of 9 1�I � � ADMINISTRATIVE RECOMMENDATION UL p'J N � CHANGE OF ZONE PLANNER: C. Gathman HEARING DATE:July 15, 2014 CASE NUMBER: COZ14-0003 APPLICANT: Big Thompson Investments Holdings, LLC ADDRESS: 22785 County Road 62, Greeley CO. 80631 REQUEST: Change of Zone from the A (Agricultural)Zone District to the 1-3 (Industrial)Zone District. LEGAL: Lot A of Recorded Exemption RE-4915; Part S2SE4 of Section 35, Township 6 North Range 65 West of the 6`" PM, Weld County, Colorado LOCATION: North of and adjacent to County Road 62 and approximately 1,000 feet west of County Road 47. ACRES: +/-4.32 acres PARCEL#: 080335400023 REQUEST SUMMARY: The applicants are proposing to rezone an existing 4.32 acre lot from (A) Agricultural to 1-3 (Industrial). There is an existing single-family residence and outbuildings on the parcel. The parcel currently borders a Planned Unit Development (Union Colony Industrial Park PUD)for C-3 Commercial, I-1, 1-2 and 1-3 (Industrial) uses on the east, west and north. The parcel to the south has submitted an annexation application to the City of Greeley and is proposing to develop this lot for Industrial uses. A pre-annexation agreement has been signed for this lot and has been submitted to and accepted by the City of Greeley. Per this agreement, the property would be annexed to the City of Greeley no later than March 1, 2016. THE DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-50 of the Weld County Code. 2. The submitted materials are in compliance with Section 23-2-30 of the Weld County Code, as follows: A. Section 23-2-30.A.1. - That the proposal is consistent with Chapter 22 of the Weld County Code. COZ14-0003 Page 3 of 9 Sec. 22-2-80. Industrial development Goals and Policies. A. I.Goal 1. Promote the location of industrial uses within municipalities, County Urban Growth Boundary areas, Intergovernmental Agreement urban growth areas, growth management areas as defined in municipalities' comprehensive plans, the Regional Urbanization Areas, Urban Development Nodes, along railroad infrastructure or where adequate services are currently available or reasonably obtainable. 1. I.Policy 1.1. Ensure that adequate industrial levels of services and facilities are currently available or reasonably obtainable to serve the industrial development or district. 2. I.Policy 1.2. Encourage new industrial development within existing industrial areas. F. (.Goal 6. Minimize the incompatibilities that occur between industrial uses and surrounding properties. The proposed change of zone would change the zoning of a lot that borders a PUD (Union Colony Industrial Park) for C-3 commercial uses, and I-1, 1-2 and 1-3 Industrial Uses on the north, west and east. The Greeley-Weld Airport is located to the west of the site. Additionally, an annexation petition has been submitted to the City of Greeley for a proposed industrial use for the property to the south of this site. The size of the parcel (4.32) acres is not consistent with the existing agricultural zoning minimum lot size of 80 acres. Given the site is surrounded on three sides by commercial/industrial property and is planned for future annexation to the City of Greeley, Industrial zoning is appropriate for this property. B. Section 23-2-30.A.2. - The uses which would be allowed on the subject property by granting the change of zone will be compatible with the surrounding land uses. The parcel to be rezoned is surrounded by an existing commercial/industrial PUD (Union Colony Industrial Park) on the east, north and west and the parcel to the south is in the process of annexing to the City of Greeley to be developed as an Industrial site. C. Section 23-2-30.A.3. - Adequate water and sewer service can be made available to the site to serve the uses permitted within the proposed zone district. The parcel is currently served by the North Weld County Water District. A pre-annexation agreement has been drafted between the City of Greeley, Triton Water Disposal Services and Peckham Development Corporation. The City of Greeley has agreed to supply water and sewer to this property as a condition of the pre-annexation agreement. D. Section 23-2-30.A.4. - Street or highway facilities providing access to the property are adequate in size to meet the requirements of the proposed zone districts. The site accesses onto County Road 62, a local paved road. Per the Weld County Department of Public Works, future development shall utilize the existing access onto County Road 62. E. Section 23-2-30.A.5. - In those instances where the following characteristics are applicable to the rezoning request, the applicant has demonstrated compliance with the applicable standards: 1) Section 23-2-30.A.5.a. -At the time of site plan review/construction any uses will be required to adhere to the requirements of the Airport Overlay District (Article V, Division 1 — Weld County Code). The Greeley-Weld Airport, in their referral dated March 19, 2014, indicated that a height limit of 50-feet needs to be set for structures. COZ14-0003 Page 4 of 9 2) Section 23-2-30.A.5.b. — A geology report was prepared by a Professional Engineer indicates that commercially recoverable gravel resources were not identified at the site. 3) Section 23-2-30.A.5.c. — The site is located within the West Greeley Soil Conservation District. Onsite soil limitations are identified as "slight" according the West Greeley Soil Conservation District referral dated March 24, 2014. A soils report or open hole inspection report will be required to be submitted for any future building permits on the site. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Change of Zone from the A (Agricultural) Zone District to 1-3 Zone District is conditional upon the following: 1. Prior to recording the plat: A. The applicant shall provide the Weld County Department of Planning Services with a Statement of Taxes from the Weld County Treasurer showing no delinquent taxes exist for the original parcel. (Department of Planning Services) B. The applicant shall address the conditions of the Greeley-Weld County Airport Authority, as stated in their referral dated March 24, 2014. Written evidence of such shall be provided to the Department of Planning Services. (Greeley-Weld County Airport Authority) C. Submit documentation from the City of Greeley indicating that water service is available. (Department of Public Health and Environment) D. There is a single-family residence located on the property. This is not an allowed use under I-3 Industrial Zoning. The applicant shall do one of the following: 1) Complete and submit a Nonconforming Use of Structures application to the Department of Planning Services. OR 2) Convert the residence into an accessory structure. The applicant shall submit evidence to the Department of Planning Services that the kitchen facilities have been removed and any septic systems have been disconnected from the accessory building for storage purposes. (Department of Planning Services) OR 3) Remove the residence with appropriate demolition permit. (Department of Planning Services) E. Submit a copy of the signed and executed pre-annexation agreement between the City of Greeley, Peckham Development Corporation and Triton Water Disposal Services LLC. (Department of Planning Services) COZ14-0003 Page 5 of 9 2. The plat shall be amended to delineate the following: A. All sheets of the plat shall be labeled COZ14-0003. (Department of Planning Services) B. The plat shall adhere to Section 23-2-50.C and D. of the Weld County Code. (Department of Planning Services) C. All recorded easements shall be shall be shown and dimensioned on the Change of Zone plat. (Department of Planning Services- Engineering) D. County Road 62 is designated on the Weld County Road Classification Plan as a local paved road, which requires 60 feet of right-of-way at full build out. The applicant shall verify the existing right-of-way and the documents creating the right-of-way and this information shall be noted on the plat. All setbacks shall be measured from the edge of future right-of-way. If the right-of-way cannot be verified, it shall be dedicated. This road is maintained by Weld County. (Department of Planning Services— Engineering) 3. The following notes shall be delineated on the Change of Zone plat: A. The Change of Zone allows for 1-3 (Industrial) uses which shall comply with the 1-3 (Industrial) Zone District requirements as set forth in Article III Division 5 of the Weld County Code. (Department of Planning Services) B. The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. (Department of Planning Services) C. With a Final Plat or Site Plan Review submittal, the applicant will need to provide a Master Drainage Report which adequately addresses the requirements listed in Weld County Code Chapter 8, Article 10, Section 8-11-120. (Department of Planning Services- Engineering) D. A detailed Traffic Impact Study may be required with the Final Plat or Site Plan Review application. Offsite roadway and/or intersection improvements may be required. (Department of Planning Services- Engineering) E. Access requirements will be determined when Traffic is reviewed with the Final Plat or Site Plan Review application. (Department of Planning Services - Engineering) F. Prior to recording a Final Plat or Site Plan Review Plat, the applicant may be required to enter into an Improvements Agreement for Improvements. (Department of Planning Services- Engineering) G. An On-site Geotechnical Soils Report needs to be submitted prior to recording of the Final Plat or Site Plan Review that includes a preliminary design for the roads to be constructed on-site. (Department of Planning Services- Engineering) H. Water service shall be obtained from the City of Greeley. (City of Greeley) This parcel is not served by a municipal sanitary sewer system. Sewage disposal shall be by septic systems designed in accordance with the regulations of the Colorado Department of Public Health and Environment, Water Quality Control Division and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. (Department of Public Health and Environment) COZ14-0003 Page 6 of 9 J. Activities such as landscaping (i.e. planting of trees and shrubs) and construction (i.e. auxiliary structures, dirt mounds, etc.) activities are expressly prohibited in the designated absorption field site. (Department of Public Health and Environment) K. During development of the site, all land disturbances shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions, at the request of the Weld County Health Department, a fugitive dust control plan must be submitted. (Department of Public Health and Environment) L. In accordance with the Regulations of the Colorado Air Quality Control Commission any development that disturbs more than 5 acres of land must incorporate all available and practical methods that are technologically feasible and economically reasonable in order to minimize dust emissions. (Department of Public Health and Environment) M. If land development creates more than a 25-acre contiguous disturbance, or exceeds 6 months in duration, the responsible party shall prepare a fugitive dust control plan, submit an air pollution emissions notice, and apply for a permit from the Colorado Department of Public Health and Environment. (Department of Public Health and Environment) N. A stormwater discharge permit may be required for a development/redevelopment /construction site where a contiguous or non- contiguous land disturbance is greater than or equal to one acre in area. Contact the Water Quality Control Division of the Colorado Department of Public Health and the Environment at www.cdphe.state.co.us/wq/PermitsUnit for more information. (Department of Public Health and Environment) O. The historical flow patterns and run-off amounts will be maintained. (Department of Planning Services-Engineering) P. This property is subject to future annexation to the City of Greeley per the Union Colony Pre-Annexation Agreement dated June 27, 2014 between the City of Greeley, Triton Water Disposal Services LLC and Peckham Development Corporation. (Department of Planning Services) Q. Should noxious weeds exist on the property or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling the noxious weeds, pursuant to Section 15-1-180 of the Weld County Code. (Department of Public Health and Environment) R. Any future structures or uses on site must obtain the appropriate zoning and building permits. (Department of Planning Services) T. Building permits may be required for any new construction, alteration, or addition to any buildings or structures on the property, per Section 29-3-10 of the Weld County Code. Currently the following has been adopted by Weld County: 2012 International Codes; 2006 International Energy Code; 2011 National Electrical Code. (Department of Building Inspection) (Department of Building Inspection) U. Building Permits issued on the proposed lots will be required to adhere to the fee structure of the Countywide Road Impact Program. V. Building Permits issued on the proposed lots, will be required to adhere to the fee structure of the County Facility Fee and Drainage Impact Fee programs. COZ14-0003 Page 7 of 9 W. Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations. (Department of Planning Services) X. Weld County is one of the most productive agricultural counties in the United States, typically ranking in the top ten counties in the country in total market value of agricultural products sold. The rural areas of Weld County may be open and spacious, but they are intensively used for agriculture. Persons moving into a rural area must recognize and accept there are drawbacks, including conflicts with long-standing agricultural practices and a lower level of services than in town. Along with the drawbacks come the incentives which attract urban dwellers to relocate to rural areas: open views, spaciousness, wildlife, lack of city noise and congestion, and the rural atmosphere and way of life. Without neighboring farms, those features which attract urban dwellers to rural Weld County would quickly be gone forever. Agricultural users of the land should not be expected to change their long- established agricultural practices to accommodate the intrusions of urban users into a rural area. Well-run agricultural activities will generate off-site impacts, including noise from tractors and equipment; slow-moving farm vehicles on rural roads; dust from animal pens, field work, harvest and gravel roads; odor from animal confinement, silage and manure; smoke from ditch burning; flies and mosquitoes; hunting and trapping activities; shooting sports, legal hazing of nuisance wildlife; and the use of pesticides and fertilizers in the fields, including the use of aerial spraying. It is common practice for agricultural producers to utilize an accumulation of agricultural machinery and supplies to assist in their agricultural operations. A concentration of miscellaneous agricultural materials often produces a visual disparity between rural and urban areas of the County. Section 35-3.5-102, C.R.S., provides that an agricultural operation shall not be found to be a public or private nuisance if the agricultural operation alleged to be a nuisance employs methods or practices that are commonly or reasonably associated with agricultural production. Water has been, and continues to be, the lifeline for the agricultural community. It is unrealistic to assume that ditches and reservoirs may simply be moved "out of the way" of residential development. When moving to the County, property owners and residents must realize they cannot take water from irrigation ditches, lakes, or other structures, unless they have an adjudicated right to the water. Weld County covers a land area of approximately four thousand (4,000) square miles in size (twice the size of the State of Delaware) with more than three thousand seven hundred (3,700) miles of state and County roads outside of municipalities. The sheer magnitude of the area to be served stretches available resources. Law enforcement is based on responses to complaints more than on patrols of the County, and the distances which must be traveled may delay all emergency responses, including law enforcement, ambulance, and fire. Fire protection is usually provided by volunteers who must leave their jobs and families to respond to emergencies. County gravel roads, no matter how often they are bladed, will not provide the same kind of surface expected from a paved road. Snow removal priorities mean that roads from subdivisions to arterials may not be cleared for several days after a major snowstorm. Services in rural areas, in many cases, will not be equivalent to municipal services. Rural dwellers must, by necessity, be more self-sufficient than urban dwellers. COZ14-0003 Page 8 of 9 People are exposed to different hazards in the County than in an urban or suburban setting. Farm equipment and oil field equipment, ponds and irrigation ditches, electrical power for pumps and center pivot operations, high speed traffic, sand burs, puncture vines, territorial farm dogs and livestock, and open burning present real threats. Controlling children's activities is important, not only for their safety, but also for the protection of the farmer's livelihood. 3. Upon completion of Conditions of Approval 1. and 2. And 3. above, the applicant shall submit three (3) paper copies or one (1) electronic copy (.pdf) of the plat for preliminary approval to the Weld County Department of Planning Services. Upon approval of the plat the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section 23-2-50.C. and D. of the Weld County Code. The Mylar plat and additional requirements shall be submitted within one- hundred-twenty (120) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. 4. The Change of Zone plat map shall be submitted to the Department of Planning Services' for recording within one-hundred-twenty (120) days of approval by the Board of County Commissioners. With the Change of Zone plat map, the applicant shall submit a digital file of all drawings associated with the Change of Zone application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are .shp (Shape Files), Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif(Group 4) (Group 6 is not acceptable). 5. In accordance with Weld County Code Ordinance 2005-7 approved June 1, 2005, should the plat not be recorded within the required one-hundred-twenty (120) days from the date the Board of County Commissioners resolution a $50.00 recording continuance charge shall added for each additional 3 month period. COZ14-0003 Page 9 of 9 H N DEPARTMENT OF PLANNING SERVICES a $6i 1555 N 17th AVE GREELEY, CO 80631 WEBSITE: www.co.weld.co.us E-MAIL: cgathman@co.weld.co.us �f PHONE: (970) 353-6100, Ext. 3537 p - i FAX: (970)304-6498 r June 25, 2014 NAYLOR TIM 3050 67TH AVE STE 200 GREELEY, CO 80634 Subject: COZ14-0003 - Change of Zone from the A (Agricultural) Zone District to the 1-3 (Industrial) Zone District. On parcel(s)of land described as: PT S2SE4 SECTION 35, T6N, R65W LOT A REC EXEMPT RE-4915 of the 6th P.M., Weld County, Colorado. Dear Applicants: I have scheduled a meeting with the Weld County Planning Commission on July 15, 2014, at 1:30 p.m. A subsequent hearing with the Board of County Commissioners will be held on August 13, 2014 at 10:00 a.m. Both hearings will be held in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members or Board of County Commissioners may have. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant needs to provide the Weld County Planning Department with written certification indicating the above requirement has been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission and will be included in the staff report one week prior to the scheduled Planning Commission hearing. You may view the staff report at www weldcountyplanningcases org If you have any questions concerning this matter, please call. Respectfully, � Digitally signed y Kristine tanslem �y mason:Iamthe author of this document s�S "4 " Date:2014.06.25 08:54:32-0600' Chris Gathman Planner h N DEPARTMENT OF PLANNING SERVICES i ti 1555 N 17th AVE j ' r ^ GREELEY, CO 80631 WEBSITE: www.co.weld.co.us � E-MAIL: cgathman@co.weld.co.us iri_ �j, PHONE: (970)353-6100, Ext. 3537 X ? FAX: (970)304-6498 March 14, 2014 AGPROFESSIONALS, LLC TIM NAYLOR 3050 67TH AVE STE 200 GREELEY, CO 80634 Subject: COZ14-0003 - Change of Zone from the A (Agricultural) Zone District to the I-3 (Industrial) Zone District. On parcel(s)of land described as: PT NE4 SECTION 2, T5N, R65W of the 6th P.M., Weld County, Colorado. PT S2SE4 SECTION 35, T6N, R65W LOT A REC EXEMPT RE-4915 of the 6th P.M., Weld County, Colorado. Dear Applicants: Your application and related materials for the request described above are complete and in order at this time. I will schedule a meeting with you at the end of the review period to discuss the referral comments received by our office. It is the policy of Weld County to refer an application of this nature to any town or municipality lying within three miles of the property in question or if the property under consideration is located within the comprehensive planning area of a town or municipality. Therefore, our office has forwarded a copy of the submitted materials to the following Planning Commission(s)for their review and comments: Greeley at Phone Number 970-350-9741 Kersey at Phone Number 970-353-1681 Please call the listed Planning Commissions, for information regarding the date, time and place of the meeting and the review process. It is recommended that you and/or a representative be in attendance at each of the meetings described above in order to answer any questions that might arise with respect to your application. If you have any questions concerning this matter, please call. Respectfully, Digitally signed by Kristine Ranslem Fuson:I am the author of this document G Date:2014.03.1413:54:35-06'00' Chris Gathman Planner FIELD CHECK inspection dates: 7/1/2014 APPLICANT: Big Thompson Investments Holdings, LLC CASE #: COZ14-0003 REQUEST: Change of Zone from the A (Agricultural)Zone District to the 1-3 (Industrial)Zone District. LEGAL: Lot A of Recorded Exemption RE-4915; Part S2SE4 of Section 35, Township 6 North Range 65 West of the 6th PM, Weld County, Colorado LOCATION: North of and adjacent to County Road 62 and approximately 1,000 feet west of County Road 47. PARCEL ID #s: 0803 35 400023 ACRES: +/-4.32 acres Zoning Land Use N A N Industrial Lot E A E Industrial Lot S A S Cropland (in process of rezoning to industrial and annexing to Greeley) W A W Industrial Lot/Greeley-Weld Airport COMMENTS: Existing residence and outbuilding on parcel. Chris Gathman - Planner III Hello