Loading...
HomeMy WebLinkAbout20141014.tiff RESOLUTION RE: APPROVE APPLICATION FOR ENERGY AND MINERAL IMPACT ASSISTANCE PROGRAM GRANT FOR COUNTY ROAD 390 IMPROVEMENT PROJECT (TIER I) AND AUTHORIZE ELECTRONIC SUBMITTAL WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with an Application for the Energy and Mineral Impact Assistance Program Grant for the County Road 390 Improvement Project(Tier I)from the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Finance and Administration, to the Colorado Department of Local Affairs, commencing upon full execution, with further terms and conditions being as stated in said application, and WHEREAS, after review, the Board deems it advisable to approve said application, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Application for the Energy and Mineral Impact Assistance Program Grant for the County Road 390 Improvement Project (Tier I) from the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Finance and Administration, to the Colorado Department of Local Affairs be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the electronic submittal of this application be, and hereby is, authorized. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 31st day of March, A.D., 2014. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: j j ;e1 ougl Radema a hair Weld County Clerk to the Board }t `❑ ra Kirkmeyer, Pro-Tem BY: 1/42 Deputy C k to the Board teat ''' P. Conway AP S ORM: � '�"y"(1,..R-c r- - / � Mike Fre Co my Attorney ` J Wi is F. G Date of signature: Van CG'S th /ZiJ6c' CC:�w Jt“), Ace-, FL, 4./4-/4 2014-1014 FI0059 1861 - 2011 MEMORANDUM TO: Board of County Commissioners s . WELD COUNTY DATE: March 27, 2014 II FROM: Elizabeth Relford, Transportation Planner SUBJECT: DOLA Application —2014 April Cycle These proposed applications were discussed with the Commissioners in a work session at Public Works on March 5, 2014. As a result, staff put together two DOLA applications for the county and assisted with Town of Grover on a third Tier 1 application. The Town of Grover is submitting their application. If approved, staff would submit both the Tier 1 and Tier 2 grant applications for the April cycle. The proposed Tier 1 application is for a $200,000 CR 390 Improvement Project, which is intended to cover a portion of the cost of materials. Pursuant to funding, this HARP project is anticipated to begin in July. The proposed Tier 2 application is for a $2,000,000 HARP Project List, which included full depth reconstruction of portions of County Roads 126, 13, and 19. Depending on contracting timelines this project is anticipated to begin in Spring of 2015. Staff recommends authorization of signature on the DOLA applications. I am available at your convenience to further discuss this matter. 2014-1014 Rev.3/5/14 (For Use by State) State of Colorado - Department of Local Affairs ENERGY AND MINERAL IMPACT ASSISTANCE PROGRAM APPLICATION Tier I or Tier II Applications Must Be Submitted Electronically -Directions on Last Page -You are Highly Encouraged to Work with your Regional Field Manager with Completing your Application- A. GENERAL AND SUMMARY INFORMATION 1. Name/Title of Proposed Project: Weld County Road 390 Improvement Project 2. Applicant: Weld County (In the case of a multi-jurisdictional application,name of the"lead"municipality,county,special district or other political subdivision). In the case of a multi-jurisdictional application, provide the names of other directly participating political subdivisions: 3. Chief Elected Official(In the case of a multi-jurisdictional application, chief elected official of the"lead" political subdivision): Name: Douglas Rademacher Title: Chair Mailing Address: 1150 O Street Phone: City/Zip: Greeley, CO 80550 Phone: 970-356-4000 E-Mail Address: drademacher@weldgov.com 4. Designated Contact Person (will receive all mailings)for the Application: Name: Barbara Connolly Title: Controller Mailing Address: 1150 O Street Phone: City/Zip: Greeley, CO 80550 Phone: 970-3564000 E-Mail Address: bconnolly@weldgov.com 5. Amount of Energy/Mineral Impact Funds requested: (Tier I; Up to $200,000 or Tier II; Greater than $200,000 to $2,000,000) Tier 1 -$200,000 6. Brief Description of the Project Scope of Work: (Give a brief introduction to the project in 100 words or less, including the various tasks involved in the project) Weld County requests funding to improve CR 390 from gravel to a paved road. This project is one piece of a larger effort because Weld County will be paving CR 390 from CR 118 south to CR 105. This application helps Weld County complete the north section up to Grover Town Limits. Due to record breaking oil and gas activity in 2013,Weld County struggles to keep up with road damage from oil and gas activity. Gravel roads maintain a different level of service than paved roads. CR 390 is a major collector road in the northeast region of the county and the increased truck traffic is making it difficult to function safely as a gravel road. In order to address the increased heavy loads, Public Works will also implement cement treated base (CTB) in this project to reinforce the subgrade(below the asphalt) in order to support truck traffic. This grant request is to purchase additional materials to extend the County's existing paving project to Grover Town Limits. 7. Local priority if more than one application from the same local government(1 of 2,2 of 2,etc.) 2 of 2 Page 1 of 8 Rev. 3/5/14 B. DEMOGRAPHIC AND FINANCIAL INFORMATION. 1. Population a. What was the 2010 population of the applicant jurisdiction? 254,230 b. What is the current population? 276,076 (Current/most recent conservation trust fund/lottery distribution estimate is acceptable.)What is the source of the estimate? c. What is the population projection for the applicant in 5 years? 319,286 What is the source of the projection? DOLA 2. Financial Information (Current Year): In the column below labeled"Applicant"provide the financial information for the municipality,county,school district or special district directly benefiting from the application. In the columns below labeled"Entity", provide the financial information for any public entities on whose behalf the application is being submitted(if applicable). Complete items "a through j" for ALL project types: Applicant Entity Entity a. Assessed Valuation (AV)Year: 2013 $7,014,069,937 b. Mill Levy 16.804 c. Property Tax Revenue(mill levy x AV) $117,864,431 d. Sales Tax (Rate/Estimated Annual Revenue) 0%/$0 %/$ %/$ e. Total General Fund Budget Revenue $107,005,862 f. Total Applicant Budget Expenditures $255,832,866 (Sum of General Fund and all Special Funds) g. General Fund Balance as of January 1 of this $0 current calendar year. h. General Fund Balance(Unrestricted)as of $0 January 1 of this current calendar year. i. Total Multi-year Debt Obligations (all funds*) $0 j. Total Lease-Purchase and Certificates of $0 Participation obligations* For projects to be managed through a Special Fund other than the General Fund (e.g. County Road and Bridge Fund)or managed through an Enterprise Fund (e.g.water,sewer, county airport),complete items "k through o": Identify the relevant Special Fund or Enterprise Fund: k. Special or Enterprise Fund Budget Amount $55,581,423 I. Special or Enterprise Fund Multi-Year Debt $0 Obligations* m.Special or Enterprise Fund Balance as of $28,000,000 January 1 of this calendar year n. Special or Enterprise Fund Balance (Unrestricted) as of January 1 of this calendar $0 year o. Special or Enterprise Fund Lease-Purchase $0 and Certificate of Participation Obligations* p. Special Fund Mill Levy(if applicable) $11,500,000 For Water and Sewer Project Only complete items "q through s": q. Tap Fee r. Average Monthly User Charge (Divide sum of annual residential revenues by 12 and then divide by the number of residential taps served.) s. Number of Taps Served by Applicant *Include the sum of the year-end principal amounts remaining for all multi-year debt obligations, lease purchase agreements or certificate of participation notes Page 2 of 8 -0 • m@ o f° c - Z o o c• E O Z Z N LL O } y0 E d -o @ O -0 O C co N N C a O- L CO — d y. EA O y- - O O -c @ c m a) O 0) W O m O NlO O O CO Cl) CU CO 0 v Cl 0 0 @@ EC c N co CO a w O 'o EA ER EA fR >._,, m e c C C El @ O @ O C J > a N O O @ CO o C O E O < E co 2 . CC C = I- @J L y O LL LL N to 1.... 7 � @-O O- @ N O N CO azr:2- 4-5• > " .c E EEoo L � o- .0o rem m � m- 2a CO to3 w - o — m @ U @ @ t- -O N c of O o J - ++ L CO d N 0 O c g G C -O `0 a+ en fJ @ @ >` d m N o 1C @ m l0 - ] 92 J J a N N co w p O y UO C N W N 0. * W EL ill v, e� a LUCK < 3 C m 00 E w to C) O — 0 O co 0/ w co O 10 O O 01 O O .0 0 o co o ,i r Of o a o 0 — N co = co CO O I CO N-: 10 4 N o CO O N J CO co N a- 0 a- a- CO Co CO CO ` C EA EA W. EA EA CA EA EA EA fA EA U O J Cl) m a I— w O as a) O N m Cl) ~ GC 7 aI a R N 9 N N L .as L. Et. N 0 @ x 0 v — U— eF U II rn U_ coco c co O CD CO a J E w y '' d R m as a ` m I 0 Lu d N N M N: - Co v o in C) C) OI L m a) m z. J O W N co O I- in c E M O C C C O N () @ W s. Ci m W N co ++ f.1 C 0 0 r_ E6 O) @ • '8 c' m tn to co QI OI N i C c m o d ma m 0 QQUS c f/1 Mt- m Q V C C @ N 3 r c G G CO O •(6 O � O O a1 x _ Er U — U w � d � = rail a co > N cc Rev.3/5/14 D. PROJECT INFORMATION. The statutory purpose of the Energy and Mineral Impact Assistance program is to provide financial assistance to "political subdivisions socially or economically impacted by the development, processing or energy conversion of minerals and mineral fuels." 1. Demonstration of Need: a. Why is the project needed at this time? This project is needed to improve safety. WCR 390 has seen some of the greatest increases in truck traffic county-wide. On average the increase has been 60%,with some sections seeing as high as 70%. As a result,the impact to county roads is significant and therefore difficult to maintain. Weld County has approximately 3,000 miles of road of which 800 of them are paved. Many of the county's existing paved roads were not designed to withstand the increased oil and gas truck traffic and therefore; are structurally deficient. Due to the limited amount of paved roads in the north and the functionality of CR 390,this gravel road is in dire need to improvement. Weld County request paving CR 390 which is one of the most deteriorated county roads,which support oil and gas activity. b. How does the implementation of this project address the need? Implementation of this project addressed the immediate need for safety improvements. c. Does this project, as identified in this application, completely address the stated need? If not, please describe additional work or phases and the estimated time frame. Do you anticipate requesting Energy and Mineral Impact Assistance funds for future phases? Yes,this project addresses the identified need. Once these projects are completed the grant will be closed out. d. What other implementation options have been considered? The County is using property tax and direct distribution severance funds for county road improvements. Weld County has hired additional crews and bought more equipment to help assist with maintaining the road improvements created from oil and gas impacts. e. What are the consequences if the project is not awarded funds? If funding is not awarded, CR 390 will continue to deteriorate and become an even worse safety problem. Dust and soft spots will worsen and the county may have to reduce the speed limit and continuing signing the area with "road damage"signs. 2. Measurable Outcomes: a. Describe measurable outcomes you expect to see when implementation of this project is complete. How will the project enhance the livability*of your region, county, city, town or community(e.g. constructing a new water plant will eliminate an unsafe drinking water system and provide safe and reliable drinking water; the construction of a new community center will provide expanded community services, or projects achieving goals regarding energy conservation, community heritage, economic development/diversification, traffic congestion, etc.)? *(Livability means increasing the value and/or benefit in the areas that are commonly linked in community development such as jobs, housing,transportation, education, emergency mitigation, health and environment) The value of these roads is significant. CR 390 is a collector road that carries significant daily traffic for the northeast region of Weld County. b. How many people will benefit from the project? (i.e., region, county, city, town, community, subdivision, households or specific area or group; or any portion thereof) 9 R The motorists,Towns, County, and surrounding region all benefit from this project. c. How will the outcome of the project be measured to determine whether the anticipated benefits to this population actually occur? This project will be easy to measure because when a gravel road becomes pave increased traffic flow typically occurs. Traffic counts will assist in determining if this happens. d. Does this project preserve and protect a historic building, facility or structure? If yes, please describe. N/A e. Will this project implement an energy efficiency/strategy that could result in less carbon footprint or conserve energy use or capitalize on renewable energy technology? If yes, please describe. Yes, by improving the road from gravel to paved, you significantly improve the air quality by reducing particulate matter generated from fugitive dust. 3. Relationship to Community Goals a. Is the project identified in the applicant's budget or a jurisdictionally approved plan (e.g. capital improvement plan, equipment replacement plan, comprehensive plan, utility plan, road maintenance and improvement plan or other local or regional strategic management or planning document)? What is its ranking? Yes,the project has been identified in Weld County Public Works budget. Page 4 of 8 Rev. 3/5/14 4. Local Commitment and Ability to Pay/Local Effort a. Why can't this project be funded locally? This project can't be entirely funded locally because the oil and gas impacts to the County are so significant that we cannot use all of our resources on every road annually. b. Has this project been deferred because of lack of local funding? If so, how long? Yes,the past 2 years due to the size and scope of the project in relation to other county priorities, such as flood repair. Due to increased truck traffic,these roads have emerged with emergency repair needs that Public Works cannot solely address. c. Explain the origin of your local cash match. (Note: Whenever possible, local government cash match on a dollar for dollar match basis is encouraged.) The project will be funded out of Public Works Fund. d. What other community entities, organizations, or stakeholders recognize the value of this project and are collaborating with you to achieve increased livability of the community? Please describe how your partners are contributing to achieve the improvement to the livability of the community through this project. If in-kind contributions are included in the project budget, detailed tracking will be required on project monitoring report. All motorists utilizing these roads recognize the value of this safety project. i. Please describe the level of commitment by each collaborator. (e.g. fee waivers, in-kind services, fundraising, direct monetary contribution, policy changes.) Weld County will fund the cash match from Public Works Fund. ii. Please list the value of the resources that each collaborator is bringing to the program. e. Has the applicant dedicated the financial resources in their current budget, reserve funds and/or unused debt capacity that are being used for the local matching funds? Explain if No Yes,the funds have been dedicated to the 2014 budget. f. Have the applicant's tax rates, user charges or fees been reviewed recently to address funding for the proposed project? Weld County has so many impacted roads that all available funding is going into PW General Fund/HARP Program to improve as many county roads as possible. This grant will help us accomplish more critical needs than we can accomplish in house. g. If the tax rate, user charges or fees were modified, what was the modification and when did this change occur? N/A h. Has the applicant contacted representatives from local energy or mineral companies to discuss the project? If yes, when was the contact and what was discussed. These types of activities are discussed at Weld County's Oil and Gas Working Group bi-monthly meeting. The O&G Working Group is made up of industry partners where we discuss impacts affecting us all in the field and problem solve how we can work together to minimize or remediate the problem. The industry typically helps Weld County project with in-kind support such as water hauling,gravel,trucking,and stock piling. i. Has the applicant requested financial support from the industry? If yes, when was the contact, what amount did you request? What were the results? If no, why not? Yes,Weld County asked the industry for monetary support. However, over the past five years it has become apparent it is easier for the industry to provide in-kind support rather than monetary support. Therefore,the reciprocity of these relationships continues to improve and expand. 5. Readiness to Go a. Assuming this project is funded as requested, how soon will the project begin? Select One (X)Within 3 months, (_)3-6 months, (_)6-9 months or(_)9-12 months? What is the time frame for completion? Select One (_)Within 3 months, (_)3-6 months, (_)6-9 months, (_)9-12 months or(_) >12 months. b. Describe how you determined that the project can be completed within the proposed budget as outlined in this application? Are contingencies considered within the project budget? No design is needed for this project. Therefore, once this project is under contract it can begin immediately. This project needs to be under construction by July of 2014. c. Has the necessary planning been completed? How? What additional design work or permitting must still be completed, if any? When? How did the applicant develop project cost estimates? Is the project supported by bids, professional estimates or other credible information? Please attach a copy of any supporting documents. Yes,the planning has been done for this project since the construction will occur this summer and be within the existing right-of-way, therefore, only surveying is needed to input the information into the GPS Grader,which is done in-house. No other design is needed. Page 5 of 8 Rev.3/5/14 6. Energy & Mineral Relationship a. Describe how the applicant is, has been, or will be impacted by the development, production, or conversion of energy and mineral resources. CR 390 has been greatly impacted by development of energy and mineral resources in the area.The O&G industry, AG industry, mining operations and numerous support services utilize CR 390 as the main road for the northeast region of Weld County.The traffic volumes have significantly increased on CR 390 damaging the roadway. b. To further document the impact in the area, name the company or companies involved, the number of employees associated with the activities impacting the jurisdiction and other relevant, quantitative indicators of energy/mineral impact. The traffic volumes have increased from 92 vpd in 2005 to 219 in 2013 with a truck percentage of 60%,which means the traffic volumes have doubled and almost all the new traffic is larger trucks demolishing the roadway. 7. Management Capacity a. How will you separate and track expenditures, maintain funds and reserves for the capital expenditures and improvements as described in this project? Weld County's Accounting Department is recognized as a Tier 3 local government by the State and can manage all invoicing information through Banner Accounting System. In addition, Public Works will use the project management software PubWorks to assist in administering the project. b. Describe the funding plan in place to address the new operating and maintenance expenses generated from the project? Once the road is constructed,Weld County will continue to utilize local property tax and Highway Users Tax Fund (HUTF) revenues for maintenance expenses. c. Describe the technical and professional experience/expertise of the person(s) and/or professional firms responsible to manage this project. Weld County has proven expertise in roadway improvement projects. Elizabeth Relford,Transportation Planner with Weld County will be responsible for managing this project. d. Does the project duplicate service capacity already established? Is the service inadequate? Has consolidation of services with another provider been considered? This is a safety project and does not duplicate service capacity but creates it. Current service is inadequate and inefficient to meet current traffic demands. E. HIGH PERFORMANCE CERTIFICATION (HPCP) PROGRAM COMPLIANCE. Colorado Revised Statutes (C.R.S. 24-30-1301 to 1307) require all new facilities, additions, and renovation projects funded with 25% or more of state funds to conform with the High Performance Certification Program (HPCP) policy adopted by the Office of the State Architect(OSA) if: • The new facility, addition, or renovation project contains 5,000 or more building square feet; and • The project includes an HVAC system; and • In the case of a renovation project, the cost of the renovation exceeds 25% of the current value of the property; and • The project has NOT entered the design phase prior to January 1, 2008. The HPCP requires projects achieve the highest possible LEED certification with the goal being LEED Gold. Projects are strongly encouraged to meet the Office of the State Architect's (OSA) Sustainable Priorities in addition to the LEED prerequisites. Projects funded through DOLA are required to participate in the OSA's registration and tracking process. See DOLA's HPCP web page for more information or contact your DOLA regional manager. In instances where achievement of LEED Gold certification is not practicable, an applicant may request a modification of the HPCP policy or a waiver if certain conditions exist. Please answer the following questions: 1. What is the total building square footage of the new facility, addition, or renovation? 2. Does the project include an HVAC system? Yes No 3. Is the project a renovation? (If no, please skip to Question 6 below.) Yes No 4. What is the current property value*? $ 5. What is the total project cost for the renovation? $ 6. Will you need assistance locating resources, third party consultants, or technical assistance for LEED requirements, preparing cost estimates, or otherwise complying with the HPCP? Page 6 of 8 Rev.3/5/14 Yes No Explain F. TABOR COMPLIANCE. 1. Does the applicant jurisdiction have the ability to receive and spend state grant funds under TABOR spending limitations? Explain: Yes 2. If the applicant jurisdiction receives a grant with State Severance funds, will the local government exceed the TABOR limit and force a citizen property tax rebate? No 3. Has the applicant jurisdiction been subject to any refund under TABOR or statutory tax limitations? Explain. NO 4. Has the applicant sought voter approval to keep revenues above fiscal spending limits? Explain. Yes 5. Are there any limitations to the voter approved revenues? (e.g., Can revenues only be spent on law enforcement or roads?) All Weld County ad valorem tax levies for county purposes,when applied to the total valuation for assessment of the County,shall be reduced so as to prohibit the levying of a greater amount of tax revenue than was levied from ad valorem taxation in the preceding year plus five percent(5%)except to provide for the payment of bonds and interest thereon. 6. If the applicant jurisdiction is classified as an enterprise under TABOR, will acceptance of a state grant affect this status? Explain. NO G. ENVIRONMENTAL REVIEW. Indicate below whether any of the proposed project activities: 1. Will be undertaken in flood hazard areas. Yes No X List flood plain maps/studies reviewed in reaching this conclusion. Describe alternatives considered and mitigation proposed. 2. Will affect historical, archeological or cultural resources, or be undertaken in geological hazard area? Yes No X Describe alternatives considered and mitigation proposed. 3. Address any other related public health or safety concerns? Describe. Yes X No This project will improve public health air quality by eliminating fugitive dust particulate matter. j Page 7 of 8 Rev.3/5/14 APPLICATION SUBMISSION INSTRUCTIONS AND OFFICIAL BOARD ACTION DATE (REQUIRED) Application and attachments must be submitted electronically in WORD .DOC (Preferred) or .PDF Format (Unsecured) to: ImpactGrantstate.co.us Please Cc your Regional Field Manager all documents as well to ensure receipt. In email subject line include: Applicant Local Government name and Tier for which you are applying -example-Subject: Springfield County EIAF Grant Request, Tier 1 NOTE: Please do not submit a scanned application (scanned attachments ok). (If you are unable to submit electronically please contact your DOLA regional manager) For any questions related to the electronic submittal please call Bret Hillberry @ 303.866.4058 Attachments List(Check and submit the following documents, if applicable): ► Preliminary Engineering Reports ► Architectural Drawings ► Cost Estimates ► Detailed Budget ► Map showing location of the project ► Attorney's TABOR decision .,*,,..,,,....:,,:... ..:.:.......<.<...............*******..«,>.«**********,.......******..******,,**************,tk.,.....,.......<«...<,.< Official Board Action taken on March 31 , 2014 Date Submission of this form indicates official action by the applicant's governing board authorizing application for these funds. Page 8 of 8 cn co IY WCR WILSON AVENUE WCR 122 , ROVER L WCR CHATOGAAVENUE FERREE OOOOO I t 1 I 1 �I I ccI e UI I I I I I WCR.120-___ I I I I I I I I co.• I 1 i 1 I I I I I I I I I I I I I I I I I I I I I I co o 1 I c WCR 118 Et I - I OI - 21I 1 1. I I ; 1 I • I I \ I I \ I I •i.,I I ` .•'P I I \Leo I I \o 1 e \ I 1 \ I I \ 1 . , If \ I I Weld County Road 390 Feet N W'AVA F 0 1,300 2,600 5,200 .-co-;--1 cIJ • Improvement Project 1 inch=3,071 feet s Map Legend Other '4 r NW i gm � Highway t� 1i f - Paved ,------ .1 ---- Gravel • . i. I. - Municipal,Paved ' , ref Project Limit ^r,11:' ---- Municipal,Gravel I•, ' Parcels ill__Jr CountyBoundary IM imil 'om=rm Map Disclaimer 11 N 11 N 11 N 11 N 11 N This product has been developed solely for internal use only by Weld County. 63W 62W , 61W 60W 59W The GIS database and data in the product is subject to constant change and the accuracy and completeness cannot be and is not guaranteed. The designation of lots or parcels or land uses in the data base does not imply that the lots or parcels ; were legally created or that the land uses comply with applicable State or Local law. • UNDER NO CIRCUMSTANCE SHALL THE PRODUCT BE USED FOR FINAL 10N ' 10N '10N _' 10N 10N DESIGN PURPOSES. WELD COUNTY MAKES NO WARRANTIES OR 63W 62W j • TT. 60W 59W GUARANTEES,EITHER EXPRESSED OR IMPLIED AS TO THE COMPLETENESS, ACCURACY,OR CORRECTNESS OF SUCH PRODUCT,NOR ACCEPTS ANY .` „•,-. LIABILITY,ARISING FROM ANY INCORRECT,INCOMPLETE OR MISLEADING II ''-''' ---Ii.'•ti.rA= M...r INFORMATION CONTAINED THEREIN. No part of the product may be copied, reproduced or transmitted in any form or by any means whatsoever,including, but not limited to,electronic,mechanical,photocopying,recording,scanning, Map created on 3/26/2014 at 11:41:31 AM by erelford Weld County GIS;1400 or by any information retrieval system or any non-approved purpose without the N 17-3 Greeley,CO express written consent of Weld County. maps(_ico.weld.co.us;9703044b-6670 x 2520 Hello