HomeMy WebLinkAbout20122836.tiff AMENDMENT TO CHANGE ORDER NO. 1 dor Zt THIS AMENDMENT TO CHANGE ORDER NO. 1 is made this day of , 2014, is by and between the County of Weld, a body corporate and politic of the State of Colorado, by and through the Board of County Commissioners of the County of Weld,whose address is P.O. Box 758, 1150 O Street, Greeley, Colorado 80632, hereinafter referred to as "County,"and Hall-Irwin Corporation, whose address is 301 Centennial Drive, Milliken, Colorado 80543,hereinafter referred to as "Hall-Irwin." WITNESSETH: WHEREAS, on October 22, 2012, County accepted a bid from Hall-Irwin regarding Bid B1200123, for the design and construction of the Hokestra Gravel Pit slurry walls, clay liner and other infrastructure, entering into a document entitled, "Contract Bid Documents and Specifications for the Hokestra Gravel Pit Clay Liner-Slurry Wall Design-Build Contract(Bid B1200123)" ("the Contract"), and WHEREAS, said design and construction by Hall-Irwin proceeded thereafter until the flood event which occurred September 11-13, 2013, when damage occurred to the Hokestra Gravel Pit slurry walls, clay liner and other infrastructure, and WHEREAS, in response to said flooding and consequential damage, County and Hall- Irwin entered into Change Order No. 1 to the Contract("Change Order 1"), wherein Hall-Irwin agreed to perform the work necessary to repair the damage to the Hokestra Gravel Pit slurry walls and clay liner, and to perform additional work and be paid by County to do so, and WHEREAS, the "Project Special Provisions" section found on page 66 of the Contract includes a modification to Subsection 107.17 of the Colorado Department of Transportation, 2011 Standard Specifications for Road and Bridge Construction and the State Engineer's Guidelines for Lining Criteria for Gravel Pits,being the following: Subsection 107.17 - Delete the third paragraph beginning with"Loss, injury, or damage to the contract work..."and replace with the following: "Loss, injury or damage to the contract work due to unforeseeable causes beyond the control of and without fault or negligence of the Contractor or acts of God, such as flood, earthquake,tornado, or other cataclysmic phenomenon of nature, shall be restored by the Contractor at no cost to the County." WHEREAS, County and Hall-Irwin have agreed the language in Subsection 107.17 of the Contract obligates Hall-Irwin to perform the work necessary to repair the damage to the Hokestra Gravel Pit slurry walls and clay liner; however, certain work will need to be performed by Hall-Irwin and paid for by County, thereby necessitating an amendment to Change Order 1, and cc: pvv, Fran tockhig- u G I 20 1z-Z1d 3 G, CC: 9u-`RE,t v) 4.n. t4 EG oo64, WHEREAS, certain work included in Change Order 1 needs to be deleted therefrom as it has nothing to do with the repair of the Hokestra Gravel Pit slurry walls and clay liner due to the flooding. NOW, THEREFORE, in consideration of the mutual promises and covenants contained herein,the parties hereto agree to amend Change Order l as shown in the attached Exhibit"A," and as follows: 1. Change Order 1 Work Items to be Performed by Hall-Irwin At Its Cost: Change Order 1 work items numbers 1000, 1010, 1020, 1040, 1050, 1060, 4000,4020,4030,4040, 4050, 4060, 5030, 5040, 5050, 6010, 6020,and 6030 shall be performed by Hall-Irwin at its cost. 2. Change Order 1 Work Items to be Performed by Hall-Irwin But Paid by County: Change Order 1 work items numbers 1030, 3000, 3010, 3020,4010,4020R, 4030R,5000, 5010, 5020,and 6000 and work items under the"September Flood Remediation Work" shall be performed by Hall-Irwin but paid for by County. 3. Work Items to be Removed from Change Order 1: Work items under the designation "Saint Vrain South River Bank Restoration"and"Topsoil Reclamation" (work order item 7000)and"10' Concrete Trail"(work order items 2000, 2010, 2020,2030) shall be removed from Change Order 1. 4. Other Provisions of Contract Remain the Same: All other provisions set forth in the Contract shall remain the same. Il Signed this 7 _day of Apr' 1 . 2014. County of Weld, a body corporate and politic of the State of Colorado,by and td .� through the Board of County ATTEST: �/ G Commissioners of the County of Weld • By: �� / / �Mrr.,` By dh-1r-, De. ty Clerk to the Dougla Radema her, Chairman • � APR 0 9 2014 ft•.g1.,�1�1 Hall-Irwin Corporation By: _' �-'+ Title: (, 2 0,9oia- 07(1'36 or a . T i L n a LO ` C .O +' ai a+ b o 4' O O 0 O Y p 70 U O O el d ti L el 0LT, 0 cu c °s a w Co m n v u a 'a m Co 0 °� . v 0 LA C C C a C C C C a 10 m a o vi -O c 3 3 3 n N3 i .3 3 3 .am . nm cu = ace Ti 71 ac — Ec_ - c = n n o u o vu o E I m a t 'n 2 u Z 2 2 E '� Q U ° U E '- E V >- >- a E V s S .O n o 3 ° 3 3 0 -° 'a a -° '°O CU a a v z v « a v E E E , a E E E E > " > N > o w `o a v o ° `o a E E E E d W N N V W N ° m c N N cc a a a E E a a o- a s K °e o u E O C a 0 a u w a m in IN w , 0 0 0 0 0 0 • 0 0 0 E ₹ 0 0 0to Q _ 1n 1n 1n a voi 1oi� aoi� a 00 in in 0 Co n v c I w 0-1 3 0 O U `w a' no s L.' o o o 0 0 0 o 0 0 N CO 0 0 a c w '+ 001 Ls; No o m 0 •NJ N N 1- O n o E am c R N min O M ro t-f M d in m �N-I Y E or tut' M• N m a4 or n d t N '-I L Q fa V O rn 1�i00 +/T 1/! i/L C M w V V i° b y 0 .1 v0 0 0 0 .n 0 0 o m o 0 0 O inNo O N O o 0 0 �y o N Vl to m O h 0 O N O '0 N Ln m ON ri r-4 Ol m ' N N N m N C N N M V N '-I Wco N el Z 1ni. in V} 1Mh 1R .n 1R in -CO an in ro S V U ° N t C L ° .- to E 0 o m C U o > o � Y .. m Y i.0 1i cc •u w v c v3 0 v ° > m vim '0 « V C 3 a U . Y a '0 6 s m m o- 3 > vz Ea 3 m m cv a c C E in E = c > E o u `° v v E E - ° v >� > 3 n H ° t o t 4- A n o 0 = w a w o m '^ n w ° i a N •N ° �- '° u u a o t c E o 5 a ° 0 ° ? ° _ ° a N J N C V L i-' C° N ° 11 'Y ry i '' C O 0 cu Y U :IFI -O A -43 `°° 'o CD 30 E � < jEo ¢ w - cz,Y cc v 3 J Y v v o = a N d C W i U ° U N s_ >O ° >> c Y n 3 >° E re m 3 cln u o v -°a m o cc o cc ¢ m cc E o 0 0 0 0 0 0 o rl N m a DI 0° 0 0 0 0 0 0 0 0 0 0 0 0 0 v — N to ti el N N N c a v • o « a n a •j a m a v v a a a o 'o o L i w 3 C r c Cu CO Cu Cu u 8 ai _ I O Cu e �_ 0 q v J. N .=o = = 4-4 Y a D S V1 .0 a V1 c c c c L L 2 a Tr u O LI 3 5.. 3 c 3 c ₹ 3 3 a Q o v u = o E - o i o 2 'o z ao i i 'o i `3' � L. E >- , 0 3 ,u >u ,U > >U o o '3 0 a Cu a E -a v v 'a a 'a c N a a N o 4_, E E E E E E L o m a a.NM. E o cc o a 2 i a. off- d ? N a 0 CO 0 0 0 o r 0 0 0 0 �+I vi o 0 0 0 0 0 0 0 w 0 vl .n 40 to O O a O M O m O o O O O O 0 N 6 in 0 aQ j 4l 0 0 VL c N m (vj O vl o i in W Cu m U c ra o 'x O m l0 W 0 N O '1 O O N M O vl V1 O 6 O W o O N N O O Q W m W 1 N N CI 6 C Q in '-I N VI V1' (/1 M 1/1 C O CO L ) W m 3 a c a C 0 CO O o w v m `w 0 $ CO -a a 'o m 'a F- • o C c y o C N a c o o v a Cu > v Cu a ._ C " C H ], c 0 E C m o @ m ≥ o o ar -a O c QJ t N _ m C a_ J W O pp O N C pp N O a 0 2 — .O v > m O in Cu — c to 0 Cu `w C > i u Oc s m c O 3 A '^ m O (.0. o .. m 3 > o c a 0 w a 1.3' I E O E -0 a o u v ... 0 m m Q `= o c CC V) 'c .0 C O O a ` v U '" E ci C ll Cu U0 N C n 0 a y O U cc o 0 o 0 0 0 0 0 M 0 N N O rl N 0 " Cal Cal Cal 0. 0 O o O O O o V c c c c a m 0 m3 o yiv mZ' •' n • Y o C Y v c o a o c = v x > c o Y ., 0 0 0 u ooa 3 =rot) a _ .o V '^ xa uix m m m - = = _ o v a _ a v - x ix = C_ N to T T' C C N o o j O �0 U O• 2 'O LT C_ C_ C a' — Qa 3 3 3 a E O -o my > -aa "v C = Y 3 3 u a a v V = -L. o o > a a -a 3 to a s o = = = s Cs., E x x x o a a o E c a u 3 v a u al i s s o u o a n a o o. a a 5 o c a E a n .13 aa, ,a o m a a v a a Co o L « c c Co▪ o a a m al E my a -6 E E E :loom t v v'3 t a '" to v E E E o c .. tn > 4 0 o c C c - ` c o _ o `o 0 0 o m v — — "- 't a E N E a a i E v F- a 0 E '� 3 v a ov. a 3 v W O W 2 d N d O O O 0 O O O O O O o Ui 0 0 0 oU a 0 0 0 O 0 O O O an o^ o In 6 0 0 in ,n ,n ,n o re of of ,n , n n , e in MIN - in in in N m o o to o a = o o W N O O n 3 O O O O O O O to N Ln Mo a i O O O ao co o 'n a ,a Ni + o in in in v r.' rn rn .-. an ,n in h .C • `o N z N-1 0 e-10 a o 0 0 0 0 0 c6 0 o N o • ad in0 0 o 0 O 0 N a O a O p Val a tip 0 in - v CO to n o of w .y m V 'i (V Vf m N .y ,n a in •in in �^ •'+ +n yn in ,r. v. in > al L- eo w ° o w Z t v v a Lei C p m a o o H VI c/P a 0 C Co � o 0 0 'v .- Co m 3 a ma to 0 C a el C y O y Co To N E o � o = Co E0. Co c u, 3 s. E z c z tio m v > a m 0 •av, v o = v v c v — o c Co re a c o a z '� 3 v '" 3 m o a c um-o N o o ma o __ 0 0 a- C `a w c o v `o m 'o a a m `w o y J a _ c m a 3 c N z & v v o 'Y " v o z. 3 `o z > n v c o ' m c x' m 3 m w -o o r.3 a3i Co -o 0 c v E , 3 z c a O a 'at < N u - .cc m 4 o o �0 c `l Q O O Co o Co `Co a, O m 3 c v a ✓ E u -c 'c . o c m m m el y_, v V O o O Co C O v p > U U a u E F- > al CID el L- ce 5 a = 0 0 0 0 0 O o 0 0 0 0 m a in tO 0 ci N m a Ln m a a a a a o O 0N o 0 0 • C L C 9 C D C ✓ 3 con > ` O 172 p I`p v m 0 L Co O O O c o > > In > UI > 0 2 v a' vi O in O VI 0 m > _ .= .4± N Y Ln v Vt umi v vt v N VI o n .. m m _co a.; = a pi � api S' ▪ c C C G C N N V O K V O d. O =E 3 3 3 a a c u a c U .Op c U '-i . 0 p . 0 I . O o o - - O a 1-2, `m a 2 2 f° O m'- O o O p 3 O p • a i u c u a u a u a o ' a a a s E a E a `v E a `m E a `v c '"6.1 p a 1:14) o o - oy -o oy -o oy O • o v v v Cu c c c a a E E E a ` a J -o r J D c p °°'C `o o '' — m v 0 41 m • o w o 0 0 0 E E E v a a i E n E > E > E > J = vo vp W w 'a. Q. N a' « 2 c c 0 o o o 0 0 06 0 O o 0 o 0 0 0 0 0 a w o O 0 Ip 0 0 O 0 0 N m o o o m o 0 o 0 0 O N +n 0. Mt N to V} vn VI N V' r1 -I O Vl N C O O a c o O O O O U y O O m o o vt N cm c o 0 0 o • 0 m o 0 E m in o O F.' Z' 0 v to n m m N Io 0lej `^ In ,ti in n, v Z. Iri vNiv1• N +n in w s 2 L'L LJ OO 6OVI p nOO O O OLi, N ~ C O O C' OL.c o I� m o o> O� 2 2 nr 0 Itn " `ti to N N on n C M M to O. vn N to h rf I N U V1 VF N 0 n c O O 3 m O — 0 O 3 ` v 0 u 0 5 — v 3 a = v — N m .2 YO 0 In = E m c a t m u 'o — d _ o m v C — L m p m n O 1ec o m m m VI O N O to O 0 3 3 0 0 n = c o in o l E = `a In In o 0 °c° u = 3 c c 'a .. • ` o CO o V O 3 O 0 to O O ai > v 1° _ Ea O 0 p' w a ? VI ry' O N v N VI = N 0 0 0 0 0 0 I' N M 0 O O O O 0 0 l0 0cow I� c .O a c ,o c .O C .O a C C a a j a � v .2 a 'A a v .E v '� v '° v 6 a > v > `a > v > `a > `a > `v > `v > `a 5 c � O to O N O Vl O N O VI 0 V1 0 V1 o a 3 a aim a s in a a n a o v. Vi win a a n in a v m h a u+ c oO Cl 0 a O1 m 9 O1 o 'O m u m u 'O m 0 1] m u a m u 2 s 02 = u o m u2 cc air Lima = 2 m o s a c u a c u 21 c u m C u 2 C U ,p C U a c U .aO U a C - o0 _- o `o - ran __ o p _,- o o - o - o - o a -o O o 3 0 0 0 0 3 0 a`o a O o O `ro ap >i O o 3 O 0 >i a E u u u a u a u 0- a o nT E w `@ ET a`, ET v ET v ET v ET `a ET a ET v a o c -a o s -o o sv ore -0 os -0 o sa o m -o O s -0 C a m -0 Y C C Cc_ s C C C w s c w c s , s c w s 0 N a -O c 0 � C 7 D C O 9 C O D C o ,O C O C 7 -O C a m mCO aa m v to m O m j m j COm j co j m ] cc > m ] m C o .- E > E > E > E ≥ E > E U E > E > E'o cc rc ce cc ¢ a C ce ¢ = o s 0 0 0 0 0 0 0 0 0 0 o N 0 o o o co o o o G o ri in H in of in V. in i h Y O 3 a 0 0 0 0 0 N o O III jp 0 0 0 0 ^ o m '"' a o aO N 0 COO nrc N N c a co Cl O VF N N a N N a a Cl 0 ea 00 ID CO V. in in- 4nin N LY m m N .0 0 O LL O 0 0 m o co 0 in a 0 o o N o o m N E o o o O ^ a O a CO Cl n N O Om 0 N 0 O N a O ill- N tiel W a N m �^ a s m n in VI- VI. N Ln N in in en V. V. N C to III a > w > a m c m a o ` a c Z " = 0 o a a .a 0 .0 N - a 3 o 0 '° 3 P' v a e' a m COc_ c i o E o = a C �C -C m C a to C O ?� = a a L '^ O n C Cp On. 0. 2 O O O u a C co N a v _ Z T a v a cc d o va a) m ` 3 W C O O Z m W CO 1. Z CO no o v. c _o CDv > ? a a o 01 a t a H n m a m X a T L 0 Q C - w R F ` ac w = a z v v c l9 00 0 0 W o C C c C c 3 c 'a 0°3 o _ 3 o C) 3 - O '- o ry = o Cu — o C - O r- _ a 2 u 2 = 2 U Cu▪ E C N , T Y U T o oa '^ .+ .o .. in .. n �. ,n ., a T -0 00 .- 3 La o E o o E o : o E uo 3 mp c - T u = `a " u •c o o _ `o T v v — c u an i n u MO n V m � .C Cu 4O m C C) Cu C v Cu C v -o 2 E C m>,u w E w E o_ :o wE a a = t a m o a m o ' 0p, a0 O ' a v w v u a o o O c o C = O 2 ._ E v o a a v p 4 a 8 oE o a d L W C L Ce c a o '9 o '5 c ._ o- o J N 0 v o u u o u o' 2 0 E z Y ._ a z 3 & = 3 N cc 3 Cl 71 o o O o v O O O O o n N No mr o e ti m 01. 4O V1 ,W .a N. 10 o o O O O 0 o a o O O O 0 0 o O W in vn v} Yn v� O N in O O o 0 N N O O 0 o c o a a n N N O 0 „IUD rr N rl N O +n .n +n m in y E C a1 O C N _d a = u ' w U p a a 0 ' O Cu o_ — Cu m C 9 N A O u W r O W▪ C C o a Ti m N Cu a E a c a o. Es• o Cu C N •- V N d 9 o o a O V 0j m N K RECEIVED DEC 9 1 2013 WELD COUNTY 861'ke COMM!SS@ONERS JflMEMORANDUM TO: Clerk to the Board DATE: December 11, 2013 FROM: Clay Kimmi, Public Works Department SUBJECT: BOCC Agenda Change Order No. 1 for the Hokestra Gravel Pit Clay Liner-Slurry Wall Design-Build Contract with Hall-Irwin Construction in the amount of$903,544.69. Bid#B 1200123 One Change Order No. 1 is attached. M:\Francie\AGENDA memos\tagendaClayKimmi.docx do/02—28'34 X 4/8 i /7 � `�/ EC 0064 yt� b #� \1 MEMORANDUM TO: Rose Purchasing P.E CFM, Pu DAb Worksember 11, 2013 FROM: Clay Kimmi, COLORADO SUBJECT: Bid Number B1200123, Hokestra Gravel Pit Clay Liner- Slurry Wall Design-Build Contract Hall-Irwin was awarded the contract to design and construct the Hokestra slurry walls, clay liner, and other infrastructure in October 2012. In September, 2013 flooding along the St. Vrain River caused flood damages to the Hokestra property. Damages included scour of the slurry walls, scour of the clay liner, scour to an existing wetland, scour to the riverbank, destruction of the concrete Rural Return Flow Ditch, and destruction of the bike trail along the river. On November 26, 2013, the BOCC returned a pass around that approved the recommendation to issue a change order to Hall-Irwin to repair the flood damages. The cost of the change order is $903,544.69. The backup documentation provided to the BOCC has been attached to this memorandum. Weld County Public Works recommends that the change order be approved in the amount not to exceed $903,544.69. Email&Original: Rose Everett,Purchasing pc: Hokestra Pit File cc: Dave Bauer,Public Works Page 1 of 22 M:\Clay\GravelPits\Hokestra\Slurry Wall Design\Bid Documents Hokestra Pit Slurry Wall Change Order Recommendation.doc ct ro u I1�26 BOARD OF COUNTY COMMISSIONERS PASS-AROUND REVIEW/WORK SESSION REQUEST RE:Change Order for Flood Repairs at the Hokestra Gravel Pit DEPARTMENT:Public Works DATE: November 22,2013 PERSON REQUESTING: Clay Kimmi and Dave Bauer Brief description of the problem/issue: The September 2013 floods caused damages to the Hokestra property including the two slurry walls,clay liner,concrete Rural Return Flow Ditch,the unused bike path,wetlands,and riverbank. Before the project can resume and be completed,the flood damages to the ditch,slurry walls, and clay liner need to be repaired. In order to protect the Hokestra project from future flood damages, the river bank needs to stabilized and the wetland needs to be repaired. The unused bike path can be repaired at the discretion of the Board. Base Tactical has informed Public Works that the repair work is a reimbursable expense from FEMA. Public Works has communicated and worked with Base Tactical to prepare a summary of damages and a plan for permanent repairs. The contractor who is constructing the slurry walls,clay liner, and ditches has prepared an estimate for the repair work. The estimate to repair the flood damages and return the site to the condition that existed before the flood is approximately $900,000. According to Base Tactical,the contractor could be authorized to do the repair work with a change order to the existing contract. What options exist for the Board? (Include consequences,impacts,costs,etc.of options) Option 1: Approve the change order for flood damage repairs in order to protect Weld County's investment in the slurry walls and clay liner. Without repairing the flood damages to the concrete ditch,the two slurry walls, and the clay liner, the Hokestra project cannot be completed. Repairs to the wetland and to the riverbank will help protect the County's investment in the conversion of the gravel pits to water storage. Option 2: Do not approve the change order. The Hokestra project cannot be completed and the County will not be able to maximize the investment Without repairing the ditch,the County will have no conveyance system to return augmentation water to the river. Recommendation: Since the change order is a reimbursable expense for flood recovery,Public Works recommends that the BOCC sign the change order and authorize Hall-Irwin to begin repairs on the project. Approve Schedule Recommendation Work Session Other/Comments: William F.Garcia,Chair Douglas Rademacher Sean P.Conway . Mike Freeman me- Barb Kirkmeyer � ,.. Description of Damage On September 12,2013,the Saint Vrain River,Rural Ditch, and Last Chance Ditch overtopped and spilled into the Hokestra Gravel Pit site. Water from the Last Chance Ditch continued to flow into one of the cells for several weeks after the flooding event. The Hokestra Gravel Pit site is composed of several cells. Weld County was in the process of converting the various cells to water storage. There are 5 cells that are being converted to water storage. Cells 3, SE-1, and Page 1 of 20 M:\Cla \GravelPits\Hokestra\Slurr Wall Design Repair\Passaround to repair Hokestra Flood Y Y gp Damages.doc CHANGE ORDER NO. 1 Hokestra Gravel Pit Clay Liper-Slurry Wall Design-Build Contract Date: t2/iu/r3 Project: Hokestra Gravel Pit Clay Liner-Slurry Wall Design-Bulld Contract described in the Invitation for Bids,Bid No.B1200123 Owner: Weld County.Colorado Contractor: Hall-Irwin Construction The following change is hereby made to the Contract Documents: Repair of flood damages due to the September 2013 flood including: • Repairs to the Clay Liner as described in the attached cost estimates • Repairs to the South Slurry Wall as described in the attached cost estimates • Repairs to the North Slurry Wall as described in the attached cost estimates • Repairs to the Rural Ditch Return Flow Ditch as described in the attached cost estimates • Repairs to the concrete trail as described in the attached cost estimates • Repairs to the wetland slough as described in the attached cost estimates • Repairs to the south side of the St.Vrain River bank as described in the attached cost estimates • Topsoil replacement as described in the attached cost estimates • General site repair as described in the attached cost estimates CHANGE TO CONTRACT PRICE: Original Contract Price: $4,749,222.39 Current Contract Price adjusted by previous Change Order:$ 4.207,226.57 The Contract Price due to this Change Order will be increased by: $ 903,544.69 The new Contract Price,including this Change Order,will be$5,110,771.26 CHANGE TO CONTRACT TIME: The Contract Time will be increased by 120 calendar days. The date for completion of all Work will be May 31.2014 RECOMMENDED: Owner Representative: Date: l v/r-2 Engineer: G /Gvnvm/ Date: /.2/io/73 APPROVALS: Contractor:' Z ' f ���- 1 a..►•.J Km" Date: /Z Owner: ( Date: DEC 1 6 2013 Description of Damage On September 12, 2013, the Saint Vrain River, Rural Ditch, and Last Chance Ditch overtopped and spilled into the Hokestra Gravel Pit site. Water from the Last Chance Ditch continued to flow into one of the cells for several weeks after the flooding event. The Hokestra Gravel Pit site is composed of several cells. Weld County was in the process of converting the various cells to water storage. There are 5 cells that are being converted to water storage. Cells 3, SE-1, and SE-2 were surrounded by a soil-bentonite slurry wall (South Slurry Wall). Cell 4 was surrounded by a soil-bentonite slurry wall (North Slurry Wall). Cell 2 was in the process of being lined with a clay liner(Clay Liner). There was also a concrete return flow ditch (Rural Ditch Return Flow structure)that had been constructed to convey water from the Rural Ditch into the North and South Slurry Walls. The return flow ditch extended from the Rural Ditch headgate to the Saint Vrain River. Flood damages to all of the above mentioned structures were sustained. The South Slurry Wall sustained damage to the southeast corner of the wall when the Rural Ditch overtopped and breached into the pit(see Sheet C-05). The North Slurry Wall sustained damage from the Saint Vrain River when it came out of its banks and flowed into and out of the cell. The majority of the damage to the slurry wall occurred in the northeast corner(see Sheet C-04). The slurry wall cap was eroded away and approximately the top foot of the slurry wall was washed out. In order to prevent the water that was flowing out of the cell after the flood waters receded from causing further damage to the slurry wall, the contractor was authorized to pump the water level in the cell down to a level below the top of the slurry wall. The Clay Liner sustained damage when the Saint Vrain River came out of its banks and the Last Chance ditch overtopped its banks and flowed into the cell. The majority of the damage happened in the northeast and southwest corners of the pit (see Sheet 2). The corners where the pit was breached were severely eroded by water flowing into the cell. The flowing water eroded into the clay liner. In addition to damage to the clay liner, the protective layer of material around the entire length of the cell was eroded. In order to stop the flow of water from the Last Chance Ditch from entering the Clay Liner,the contractor was authorized to remove a blockage from the ditch and to repair the breach. The floodwaters also scattered pipe that was being installed as part of a sub-drain. The contractor was authorized to gather the pipe in order to determine how much pipe had been lost or damaged. In the vicinity of the Clay Liner, there was also damage to a wetland slough that washed out, damage to a concrete walking trail, and damage to the streambank. The damage to these areas will need to be repaired. The Rural Ditch Return Flow structure was damaged in multiple areas. Approximately 855 feet of the structure was completely washed away (see Sheet CH1). Runoff from the surrounding lands and overflow from the Rural Ditch also damaged several shorter sections of ditch (see Sheets CH2-CH4). In these shorter sections of ditch, the ditch buckled and cracked due to the water flowing into the ditch. In some areas, one side of the ditch was partially eroded causing failures. Page 2 of 22 M:\Clay\GravelPits\Hokestra\Slurry Wall Design\Bid Documents\Hokestra Pit Slurry Wall Change Order Recommendation.doc Permanent Repairs The following items describe the work that will have to be done in order to permanently repair the Hokestra Gravel Pit site: 1. Rural Return Flow Ditch a. Mobilization b. Remove, haul-off, and replace damaged sections of concrete ditch that were damaged c. Reconstruct the platform and the concrete ditch in the areas where it was completed washed out. d. Surveying e. Construction oversight and materials testing 2. Concrete Walking Trail a. Mobilization b. Remove and haul-off damaged sections of trail c. Replace damaged sections of trail d. Surveying e. Construction oversight and materials testing 3. Wetland Slough Repair a. Repair slough damage b. Surveying c. Construction materials testing 4. Clay Liner a. Clean out debris and sediment from Last Chance Ditch b. Repair Last Chance Ditch breach and repair road around the cell c. Gather and inventory sub-drain pipe d. Mobilization e. Dewatering of the cell to remove the flood waters f. Construction dewatering to ensure that groundwater does not build up in the cell g. Repair of southwest corner h. Repair of northwest corner i. Repair of protective cover over the clay liner j. Construction materials testing k. Surveying I. Potential removal of flood debris—there is still water in the pit so the extent of flood debris is unknown 5. North Slurry Wall a. Dewatering to prevent slurry wall from failing b. Dewater the cell so the leak test can begin again c. Surveying d. Repair slurry wall and cap e. Cleanup flood debris around the wall f. Potential removal of flood debris—there is still water in the pit so the extent of flood debris is unknown 6. South Slurry Wall a. Dewater the pit to remove flood waters so the leak test can begin again. b. Repair erosion control measures around the cell c. Surveying d. Repair of southeast corner Page 3 of 22 M:\Clay\GravelPits\Hokestra\Slurry Wall Design\Bid Documents\Hokestra Pit Slurry Wall Change Order Recommendation.doc 7. Topsoil Replacement a. Import and replace topsoil that was washed away during the flood event 8. Saint Vrain River Bank Restoration a. Mobilization b. Surveying c. Engineering and testing d. Erosion control measures e. Clear and grub existing vegetation f. Reshape river bank and excavate the slope g. Riprap delivery and installation h. Final Grading Weld County proposes to use the contractor who was already under contract and on the site to perform all of the repair work. A change order will be issued to the contractor. Total cost of the repair work is expected to be approximately$900,000. Page 4 of 22 M:\Clay\GravelPits\Hokestra\Slurry Wall Design\Bid Documents\Hokestra Pit Slurry Wall Change Order Recommendation.doc Pre Flood Vicinity Map { Hokestra Ptt Proposed Project Map • '-4.,,,.-t7 raIg' ci. • IF Hifi"' 1r h`tom = k } .�,s �` ��. ,4 .Fr �as+cia Dun 0r m t R S f. ti x{g �; •kkto ..1 {f rS�p la , ....1494 kite. . ... .4.a ?asl Ch-nce '�� turn Fbw .dch a \rfi r,- `r `"` '� °s � -' . '.,y ur-fi pitch aturn Fl•w Itch • •, ggg .. %,...--(A, it(' •,..„•);• i: titif ;ant i' ' s xlkt -w5rfix "+'r a f �� : i ✓ t far r 9 i } r5, r �. Iir,tn'> 4 i �fi`L:'=/ °4 !• L vim, pgI iti Feet i rt H $i77t! Lafi a £ 13 t xna ""'v .tir �VLt�CI �A t f y iriorFtSb ., 3, 1 a4 -4 1//fc" /Yl r_avu. -k .... ....��.{ t. I „- a, S x nr Page 5 of 22 M:\Clay\GravelPits\Hokestra\Slurry Wall Design\Bid Documents\Hokestra Pit Slurry Wall Change Order Recommendation doc � � r mq+ n : I *. P^ i � u a xav Y, 3cti,' }„ a.. `' +tw'₹` R c Fa+.. wgrrsr + a.ry i :34)•':,, ;: ':.yw;, k^q'a k*` ,:ri^q may.>a= 4:,..Z; ` '� T " to .,:c:,,, �i#- 's rI`'k.' T, a ; ,k< � •X>d+ n,.3*k 9 *'sl,t YhS* • fitt 3 - F p y+ i wck Ttz • "� �,sy -} 'may#} 1�N> 4:4:,i n {p " ' srx^ r 52^' ra1.:agta9u. is C.x,erg... .,,, ..-- Slurry k' sm ri '.'.°i.‘ 2.. wx,.� ..° vv.w�;rxr:;,..._.S . . _ v„v Photo 1: View of the SE corner of the South Slurry Wall looking NW. Note that the flooding caused a headcut that eroded back into o the clay cap over the slurry wall. Photo taken September 18,2013 at 11:35 am. '.p'i 'r�a^T^'gRF�G'�'^'T'14 ^'^Y=x _ TMrc Y '."i4^ h Y' i ' . ,,pp L y6 LLB I } r { 7. } r, %,‘, 4',.... u, 'L '�kiwfgP v t*i` t;,CYrP „i G�} }Cii jlF} Hlr.i. '- '°y45 '.. t t m; } 't*, . .I S,s r = 1iI tyr. ,,u7"t " } ' t '" . ,'1+"-yy+ 4 '� : .! my „ : 5 i}k '4,',..,4,, :iii: ,w .it":F ..4.4:..:. . ° .4wa. u r '' .,Frtr 7 ad v y-.4-:::Syq { .NSF ' �.°� k� t4,2*,,,.,, ....."," �' s.+ •-..t.,:!,t.a .t, +�.v. _t.' "ajo c.c l:.::..a. ; ,. ts : -k a ,i �� s 's �"� r: :. ,y. .v. .2, r wsu,uuf.fi� sue^£- C '" 5G",,. ,,, ad:u++�+� v 5d '� rir} ry.. ah tam ';'�x t r`P #. y, "a"' 2'_ ✓ .. 'gyp. .7'7:2,t;� .` t'c" °„ • `' ,#�"g9�s' '�1t ;{TM"' {•ie• ' r.. dr '-'-11.-'•";. 9 ..i `wrz Vi5 %frF v F, }t' s- H.syp v - C; ? ,; r xY" • ,mss'*' +-cam tn�z nws, ;;Z fi . xut,y: w'etsct 'VV•;•-'a x •,:gt,`4'.tto zfrw° c Jdh. • • ,s �,*5''R t;i:W 4m :'' r ^*. 'w.� * C's :s`." y z `Y1n '. •.":„=r t .. r�S ;r ''7, 1'' �.Rr Er '"�' l� Y h,,-,,. --•'...."..).1•.; r, Y N •• k Photo 2: Damage to the NE corner of the North Slurry Wall looking west. Picture taken September 20,2013 at 8:44 am. Page 6 of 22 M:\Clay\GravelPits\Hokestra\Slurry Wall Design\Bitl Documents\Hokestra Pit Slurry Wall Change Order Recommentlation.tloc 1, 5t - . g 7 a63 iv e rckk n # ',,,e4 .i+ sL• ,:} :; ll:1 a,a r'r-' :.*:*1.4.9`.+::' '-b'.t r t v• :$ { ' '4. s,i N } ve( '�''42 �� �. _._ k f6.` i, .y t . s,' ' s i t �i� v P,' Rr�- �x x `S,#.� s '� 'a'� .�+ � �'`r"urJ.. p r fi f- '.141. y_ �' vk^ e'¢'f. L1 u:^!'E°?""3! _ k 3-. a . ji,"�^ ta,'s ,r Bt a 4/5:417,� `�•� 7 , 5 1, �p�� y y„- xp Air* s,;,,,,,r2,?:....;`,Li y.,�„` a,, . " i:.-4 r 1'`gym ,lavrti a4t30,4-7-: x yp+. 'iCf.e t i?34'( yfp. r�,.f 'f3 1a.R, ,9' itt +Ki,. ?It � f. ,''.p+� yam''" It ''ngs ,X-.' o't 5f. a. , Photo 3: Damage to the NE corner of the North Slurry Wall looking south. Photo taken September 20,2013 at 8:45 am. en.t.e nir r R rr F 1�a t v •{6 1yrl N !!I t ,,, t`�`':._ sl.i s-f; !''' Lt' "}4 c i} •- . J.p118 °•;:': • rrx ' .a ry i ES!°6'".�2 s"4gt „„,. io u''. •'h' .t�r i is ;a #�NI ho“04'°amt—Jc ;; Y a.a "`itkt s t ''3 h 'i':`''^ 4},77,13;<1;;•41tl � • '':-P r ' m .e- x ~n ""yx+.1gxu Mat.. "* s .g- i� a gta 'h= `sN�`I r� + 4, "'k7 s4' a i�"'a "*St frig c-.4.4,e4;;.,,,� `` ,,,r n s W y ys t e • -hv'" x _A,AAS " 3z.Ar ,°.`N.fi.:l i ,luwy'S3 > :, -Ti �txu' -s .,jai ,..e,-.A .'`- _ + - -.+ ,a, '"e .igS#55 ttiEti' &'_S§ Fmcirec .NS` 2 i. * v 44.:..x._y !:--r.-- . � ee"t�, , ,u} iw.:: 3i1J+`%1;de s3ai� Si x 4 h:rxl AP .,< v z x• t.'1' • 1,' "d h s ',4$. t ` Photo 4: View of the NE corner of the Clay Liner spilling into the wetland slough. Photo taken September 16,2013 at 9:21 am. Page 7 of 22 M:\Clay\GravelPits\Hokestra\Slurry Wall Design\Bitl Documents\Hokestra Pit Slurry Wall Change Order Recommendation.doc ,t t' gptii!.. rem _ ETiwir t 4 .. , 4.4, F yid�a 4 t iii 4 R t '',^Jy n :.. tajiillin ,�e t f € ,. c k i ,+R !i 1, i e .'+7 vz 1777,% . J -.-r file Y xk ikti iii 4 '1 .,arl,. y,,, „;t2 d x.. a!Tp ,,�£tr ' ,,,�1# ' li"a$§ % w>R' ;x :L'g tt2;At. x** 5 at Y tt e 'r2'ir1 A. xx +5":;:: -,"t P Yr < y :k l ,- -:.,s, r r ,trM' �',.>5J 2 - r tG a"E , sf a,�. „ s i i ,09111fit2`D13 085'4 a s 1� ti, * f$ f ty 4 u� - ,!tr 1 r h' r n2 b x, b p"t" 'p. 18gir l f4j,,.g ,,+ e. " ins i t i ,% i t t .f.,.ia .s. ' Photo 5: View of the SW corner of the Clay Liner looking south. The pit is currently being dewatered so the full extents of damages to the clay liner are not known at this time. `s � i nrimp ` rFATIa� t,1t �PAWL.— 1r,1 s-tii Tag ri.�ac lit i . f '_ aE ,51 � 4, — t I k s•.d f 1 15' t 4 'il 4 sails _ �e t I v i i, 4 i if 1 t k i i�yti , t i , k. d is _ ' r litiliC Stlt l e t AflØ;it> 42 ^ rte. ^ey'`a„• t.._7 mS y ,g, t`AA* ' .-,= s' 2 .s;;` s..14,„-u ., � ~ i ,.y; rt �yr i ��' >bro t Vin; ,♦ .4 - , 4u��e:T# ' x , ;;`, Photo 6: Blockage in the Last Chance Ditch which caused the overtopping see in the photo above. Photo taken September 24,2013 at 11:11 am. Page 8 of 22 M: layravelPitsokestralurry Wall Design \C \G \H \S \ d Documents\Hokestra Pit Slurry Wall Change Order Recommendation.doc -w, � .s¢h 'i>f° '.y,{ q+sc i� z".'nldlapl� rb�r^. �s'5'z�₹ ".4 :. 3 r�� "a,,+ I ,. t• 1 -W'y;".ge Y9 .y atrk e yk' a 4ti m i my ..,..,...5,,,541,4;:ivfdw.h; us • 2 Y s q4. a;,...• 4. .r yyq�y� ..t M '- .-+p<•AsiMeu pp.. tl -'� T'} a x� • - • �x 54Pb N::' Rh :11,4.7‘...,4[L, .me. - ° ,,• in F3l.st 'II!, 5t ' "`2. y4 '1 ,i'�r. �;Y i' � L s x� 'ate. ₹ s, "F'i �' 'a i Y i h L �atd'>2 .;,L#. ':w"s r""t'k y v `Xs. '` a P3 ,y't'tt',�up � Y+ , '� t.+7'z $•r"5't -t.''' } 'y'Ci' hx j r ,tat 21-�, +_ y�c�'at,{�-�- a5 . t; 09d'18/20413 08 23 . ,fi iilei;sa r . ,;,,.4,r, ' � l'Y: d, -.rx rt 1 r rt Photo 7:View of the damage to the wetland slough looking north towards the St.Vrain River. � r tis ,. ,` , fit£,*. YitS } if `'s`u" '",I'}"'g�4 +} f r� ',5:,u' err Xx :..,1 ''%I •. f a g�->~ � 7'C y s ,., : .,., ,"r"a�-5,o-S 2.t t- a stafii ,.::•k; f "y'�5^ x> :a ✓ §`{t `�'>;*" ' "'`ic. �'kt a '+° 14 �.: k7 ips ty,-i.` a`y t > e c nF to �itit " aro tdt. a�,k r, r A5." 74'17:1rl. ` �� , {.yr•lt ,:. ..' "'`s.. �` sY L -4-4,,k re- ' r , SA444 t ar e-flr r • n iY a.'d 4 $1 'F�{r * -£'M4 rc ° •Syr �C�; rr' I �`' s^"� +C AY,F P 4� T �•; l bs1,41';',14S",:','. n + x dr.r raYrSx'�'u ; )'A u''' a j " bit » r �n '��r` :� ;„`—. rY fi r, + 1.. .- k . i x 4+ ,': tbl�.:r,:'G'.?:�,•*' w� vt\.; rya t 2k ,+ry�fe ;. r. Es. t;'' to k6�''N k ' .\'Il "d � '+' } f. ,,_ � "-'€ fv 1' k 'X 09/1811'2�0�1u3 08 34 s *? a. Y (ii'5. irn y�,, r .rc��s } ; 1t, *" x*4 1 L Photo$View of river bank damage looking west towards the CR 9.5 Bridge. Note the old river bank was at the line of trees on the right side of the photo. Page9of 22 M:\Clay\GravelPits\Hokestra\Slurry Wall Design\Bid Documents\Hokestra Pit Slurry Wall Change Order Recommendation do '�. • '.,e flap s s r , G` a i u `"'tl a0. .tft ;t; yp -,1.,4,11.-CE' i II I t ! lk i yr l :+ 4 i k fi,ilu, t>f�i iij i.....2:......:*-.-,."-; x -.-,:- a. ,;. . rbT, :C . : s 3,3 :.. �' %�0:'s 3 S� AR, ri fu 'Y.dik..: u:., _._....,...,... `!U Su � �t`'yy lit "i ll {r tT. " ` u¢ ,�ar'?xAitigrien "s�' M. i +sy,ydti�iiki: f .„ a \ Y .e 1';o- 4 f '` ± 1' ii� l�l A t9 "iR`v �h �" x`.q,^*.,'�� - i1 4. ,iv u : z1j{'},„/ vi�`"-B4 {. •t i +:i.�4. 3' iS w ,v1„�.+ L 4 y �P .L.7' x A+ :~;'^ ! c .fin -y,"` ,,it3 as ,-?4:441:-1-1,- f , S r "C s:r `k 1 , . ' �. . ! t o 44.1,..,.t...,,,,,, % n g8/18j1�908 3 4 ( � � -7-';--,:',;:t AN''''' ae x � i t E' �` k4 ' >"� $i a t.,' a c �a "� k (tr Photo 9: Another view of the streambank and concrete trail damage. Looking west towards the CR 9.5 bridge. erfdisp A:Nooks 33 4 i P—. $, 5 a°{F'.: a 'ice , ` „,2, u$ ti4yC sdt r t � 9t` tI:i�g „4.,43,,10!„,...„ '° ,1 >F e YAK -: vP z k..r r R a �.Yu �} is 'at rp 3 r 3 'r'7rr ' ivy, + gym .•'" .j--ti , •..?...,,•,1•:---,:;- : ;*? t c �+y- • a / . :. .. .gre tal a---- ! ';p7i, es'7, ll .�.�fl x"a�'4"s"� .t 4^) JI t a..ngy3lfi• rt T .r F S g,��M^, a.�:.r y t 4Pr•,�.* .4i._...; 4:„.-:...0 ti .!�� -aF5' 4 l� y�.-va.- y ".- r �yt♦ �$'!-----•?;-*.„ y 444-tPhoto 50: View of the Rural Return Flow Ditch which was destroyed by flooding(looking south from the outfall into the riven. Approximately 855 feet of ditch was damaged beyond repair and several other sections to the south were also damaged. Pa M:\Clay\Gravge10of22elPits\Hokeslra\Slurry Wall Design\Bid Documents\Hokestra Pit Slurry Wall Change Order Recommendatien.doc uCF <vM ,,,,ii i6 p.„1 Y a te.,:,'h ,, st.*N ?, ,Ui6, ge'x n i,„ ,1 s:1 .¢3(rr t-. • fi - L, s� # C " y ` e u:nir''Ur s J� F t I f e 1' v �.G ris t: 4 5 .4 t ail; s,... f"1,: k; es� "t:".••••1343" r 341 'x n. x �r •toyg � t -..'-^ +`"o-- "e1a1��r} 'xr^K$- ' .,r` � ..,,..ti,.•+p d'i 1P,4 � z .t..*:' ''t,1v- 9 ^: m iT'td > ' S 'iafarg +,ix i <r �Fs ' s� ,r ,, y t,u •,141:',.:'. k:,`�' r >z ,r'i'"$ ' 21411. I� ''�` - 'i;F3 rte :na � b .`s �. g�. ,_ 'tf =3 `tip t + '. � sk t2 C ;Y''r ta'S 3K .1+}•t '\ Wrif it � &,.::?�a?nti.,k ,a' a�'• p.'i:clk.1 ... v .R'..... e '§. y Photo 11: Damage to the Rural Return Flaw Ditch between the Oast Chance Ditch and CR 22.5. photo taken October 13, 2013 at 12:23 Pm. .s`' s � y�x4i:1,1 r 3 f . '4 h Mi•Y '33 r }" 13: ? i wa'�"�S ' . y`x �� 31.•:1103,343y+ h '`r ` t $ f A` t r {Fr<3 R<. :1:- .-•.3h3+ t' ,r 1,.it .i43 � r Y ' ! tti i'.4..,..?:::. 4 .r "* y Es f it s rytPufkV: . '. 1.y .: st .t�:,4 g:. wi tii 4 E31xf £ a+ +t `ypx* y.,t 's'� .'ro + . 9lrtf&^9`C if ` x ti P` t'✓ A sy n. 1 ', TFGf � n a f fret i! t i o f# R4s 'x �q t S'L ' aEt tfit3 . '` 71 `�.m ' 'r 'Pr,v '' # f .. h .rz�,y.a S _ t t. x" t ? `Xkrm 4 i ,,fr" x 1!xy �°'e ' 'w- L ` 22 r+t- £C, i ✓S; qr ifrT6 k., J Lt.r YG . .�...0 . .. u- "k,'q ta "�.: ,, P'Y. t 5 � f �' 4:, a 5 : x "e+x.� i e a r,, t>, > l~.�r t , � �- 1110512O1t 12 1%2- """ l 84+ ti v tt tf . ''4t �fts ,:ti ,.\::.... ..:,:.. t ,„,,,,, ,,,,,..:.:„„:,,,,,./., to it R' z :(''5,1,, :„.,,.,„-d....±,...",;4 et :m .* { "-.,/.1'. t.V: xdJ9k3ti:. w•"'t, ',.`wiT x<.>a "- 'Kt -0 s. 4'''''''''''' . xi Photo 12: View of flood related damaged to the south end of the Rural Return Flow Ditch(loking south at the west side of the ditch. Page 11 of 22 M:\Clay\GravelPits\Hokestra\Slurry Wall Design\Bid Documents\Hokestra Pit Slurry Wall Change Order Recommendation.doc • dr 301 Centennial Drive Milliken,CO 80543 Andy Laycack HALL-SRWIN Phone:970.587.7320 effieSTRUCTIONernes*. Fax: 970.587.7330 To: Weld County Colorado Date: November 12,2013 1111 H Street,P.O.Box 758 Project: Flood Repairs-St.Vrain Bank Greeley,CO 80632 Location: Hokestra Project Attn: Mr.Clay Kimmi Phone: 970-304-6496 x 3741 Email: ckimmi.co.weld.co.us Change Order Request#9-Flood Repairs Saint Vrain South River Bank Restoration j, °t gi 7.:.'3+,ra s;p130giR710N ..y..,.. _:OTY. t7NRS'r' UWTPRICE - ..EYi9�RlOq`. :: Mobilization 1 LS $ 3,250.00 $ 3,250.00 Survey to Topo Existing River Bank Condition 8 HR $ 70.00 $ 560.00 Survey Limits of Slope Protection 8 HR $ 70.00 $ 560.00 As-Built Survey of Slope Protection 12 HR $ 70.00 $ 840.00 Engineering/Testing and Coordination for River Bank Repair 1 LS $ 26,250.00 $ 26,250.00 Installation of Silt Fence between working area&St.Vrain River B00 LF $ 1.50 $ 1,200.00 Grub Existing Vegetation within Work Area.No Haul-Off 48,000 SF $ 0.10 $ 4,800.00 Re-Shape River Bank and Excavate Slope 6,855 CY $ 3.95 $ 27,077.25 • Type H Rip Rap Supply and Delivery 8,800 TN $ 24.80 $ 218,240.00 Type H Rip Rap Placement-Non Grouted/Na Topsoil 8,800 TN $ 6.25 $ 55,000.00 I Re-Shape/Grade Top of Slope up to/around 10'Trail 1,453 CY $ 3.10 $ 4,504.30 • Total $ 342,281.55 i EXCLUSIONS and NOTES: 1)Proposal is based on a 15'wide armoring eta 3:1 slope keyed in to edge of river at approx.5'below existing river invert. 2)Type H Rip Rap will be placed at a 3'depth,non-grouted and exposed. 3)Armoring will extend approx.800'east of the frontage road bridge abutment along the south bank of the river. 4)Rip Rap below ground water will be installed in the wet,minimal dewatering is included. 5)Proposal based on anticipated pricing through first quarter of 2014. 6)A Change Order Request will be issued upon Weld County's intent to proceed on work. 7)The issued Change Order Request will include a request for an extension of days to our original contract durations. • • If acceptable,please sign in the space provide below and return one copy to Hall-Irwin Corporation. Retain a copy for your records. Special attention Is called to the attached Terms and Conditions,as they are a binding part of this contract This quotation in its entirety, including all attachments,shall be included as an attachment or by reference to any other contract to which it may become a part. Hall-Irwin Corporation Weld County Colorado Submitted By: Accepted By: Printed Name Printed Name Title Title Signature Signature Date Date Hokestra Flood Repairs St.Vrain River S.Bank Repair Hall-Irwin Corporation 1 Page 12 of 22 M:\Clay\GravelPits\Hokestra\Slurry Wall Design\Bid Documents\Hokestra Pit Slurry Wall Change Order Recommendation.doc 4/ 301 Centennial Onve Milliken,CO 80543 Andy Laycodi WALL—XRWIN Phone:970.587.7320 C66666UCTI0Y 01V11101 Fax: 970.587.7330 TO: Weld County Colorado Dale: October 23,2013 1111 H Street,P.O.Box 758 Protect: Flood Repairs Greeley.CO 80632 Location: Hokestra Project Attn: Mr.Clay 1Ummi Phone: 970-304-6496 x 3741 Email: ckimmt.00.weld.co.us Cost Proposal-Hokestra Gravel Pit Flood Remedlation Work Rural Concrete Ditch i ei:,..%7,--.1, QTY'. 'UNTTS '.UNIT PRICE ' E)C'rENSION 1000 Moblllzatlon 1 LS $ 2250.00 $ 2,250.00 1010 Remove,Replace and Haul-off damaged sections of Rural Concrete 350 LF $ 65.50 $ 22925.00 Ditch South of Complete Washout Areas 1020 Remove Washed-out section of Rural Concrete Ditch between Last 855 LF $ 4.10 $ 3,505.50 Chance Ditch&SL Vrain River and Haul-off Site 1030 Reconstruct Rural Concrete Ditch Platform between Last Chance 855 LF $ 5.75 $ 4,91625 Ditch&St.Vrain River Replace damaged section of Rural Concrete Ditch between Last 855 LF $ 41.40 $ 35,397,00 1040 Chance Ditch&St.Vrain River 1050 Additional Survey Work 16 HR $ 70.00 $ 1,120.00 1060 Construction Observation and Testing 8 DY $ 1.015.90 $ 8,12720 Total $ 78,240.95 10'Concrete Trail h*-14.7`r-7 ';`.:•,*;:`::1) ION: OTT UNITS UNIT PRICE EXTENSION 2000 Mobilization 1 LS $ 2,250.00 $ 2,250.00 2010 Remove,Haul-Off and Replace Damaged sections of sidewalk east 650 LF $ 87.65 S 56,972.50 &north o1 Clay Liner-Western Limits stop at Frontage Road Bridge 2020 Additional Survey Work 16 HR $ 70.00 S 1,120.00 2030 Construction Observation and Testing 4 DY $ 1,015.90 $ 4063.60 Total $ 64,406.10 Existing Slough Repair kletlilst w7n,N;11ki?� sr r TN S PT10?l'_''-"' _QTY -UNHT'S UN ITPRICE EXTESIeION- 3000 Repair Existing Slough Damage East of Sidewalk with On-Site A50 CY $ 8.50 $ 3,825.00 Material Washed into Slough 3010 Additional Material Testing 1 DY $ 1,195.18 $ 1,195.18 3020 Addiranaf Survey Work 4 HR $ 70.00 $ 280.00 Total S 5,300.18 Clay Liner •-ra_:::,:::, 5,x;:2':::a,r,-,? TPTIOH . ... . . O7Y•' UNITS • war PRICE EJCTEMSbN 4000 Mobilization of Earthwork Equipment 1 LS $ 5,250.00 $ 5,250.00 initial Dewatering of Clay Liner•Includes set-up,monitoring, 4010 intake/discharge hoses,re-set intake as needed,metering.water 840 HR $ 51.50 $ 43,260.00 testing and tear down Construction Dewatering.Removal,Replacement&Finishing slopes 1,850 CY $ 7.31 $ 13,528.13 4020 at southwest corner Construction Dewatoring,Removal,Replacement&Finishing slopes 4,575 CY $ 7.88 $ 36,028.13 4030 at northeast corner 4040 Remove&Replace Bedding on North Slope to Inspect Clay Liner for 15,000 CY $ 2.75 $ 41,250.00 Damage 4050 Additional Material Testing 12 DY 3 1,195.18 $ 14,342.16 4060 Additional Survey Work 40 HR $ 70.00 $ 2,800.00 Total $ 166,458.41 Hokestra Gravel Pit Flood Remediatbn Proposal Hall-Irwin Corporation 1 Page 13 of 22 M:tClay\GravelPits\Hokestra\Slurry Wall Design\Bid Documents\Hokestra Pit Slurry Wall Change Order Recommendation.doc North Slurry Wall R91 DESCRIPTION CITY UNITS UNIT PRICE EXTENSION Initial Dewatering of North Slurry Wall-Includes set-up,monitoring, 5000 Intake/discharge hoses,re-set intake as needed,metering,water 72 HR $ 51.50 $ 3,708.00 testing and tear down 5010 Dig Trenches to Connect Original Dewatering Monitoring Sump 110 HR $ 255.00 $ 28,050.00 Holes to Expedite Dewatering Periodic Dewatering of North Slurry Wall During and After Trench 5020 Excavation-Includes set-up,monitoring,intake/discharge hoses,re- 360 HR $ 51.50 $ 18,540.00 set intake as needed,metering,water testing and tear down 5030 Survey to re-shoot slurry wall centerline&lop of North Slurry Wall 12 HR $ 70.00 $ 840.00 washout areas 5 040 Repair NE corner of Slurry Wall Cap. Price includes mobilization, 400 LF $ 10.45 $ 4,160.00 excavator/operator,dozer/operator&dump truck/operator 5050 Cleanup around North Slurry wall with D-65 Dozer 8 HR $ 210.00 $ 1,680.00 Total $ 56,9(16.00 South Slurry Wall `.IIEH - DESCRIPTION OTY UNITS UNIT PRICE EXTENSION Dewatering of South Slurry Wall-Includes setup,monitoring, 6000 Intake/discharge hoses,re-set intake as needed,metering,water 240 HR $ 51.50 $ 12,360.00 testing and tear down 6010 Repair silt fence along South Slurry Wall. 1,100 LF $ 1.35 $ 1,485.00 6020 Survey to re-shoot slurry wall centerline&top of South Slurry Wall & HR $ 70.00 $ 560.00 washout areas 6030 Repair SE corner of Slurry Wall Slope. Price includes mobilization, 650 CY $ 4.25 $ 2,762,50 excavator/operator,dozer/operator&dump truck/operator Total $ 17,167.50 Topsoil Reclamation -RE11 DESCRIPTION OTT UNITS UNIT PRICE EXTENSION 7000 Option Xl)Import and Spread 4.6"Topsoil 18,500 TN $ 9.25 $ 171,125.00 7010 Option#2)Generate On-Site Topsoil and Spread 4.6"Topsoil 18,500 TN $ 6.15 $ Total S 171,125.00 Grand Total $ 549,696.14 EXCLUSIONS and NOTES! 1)Proposal does not include reclamation work along south side of St.Vrain River. Proposal for that work to follow. 2)Clay Liner/North Slurry Wall proposals do not include any additional cost of potential damage/silt removal that cannot be visually inspected due to current water levels.Their conditions will need to be assessed/priced after dewatering efforts are complete. 3)Proposal based on anticipated pricing through first quarter of 2014. 4)A Change Order Request will be issued upon Weld County's intent to proceed on work. 5)The issued Change Order Request will include a request for an extension of days to our original contract durations. II acceptable,please sign in the space provide below and return one copy to Hall-Irwin Corporation. Retain a copy for your records. Special attention is called to the attached Terms and Conditions,as they are a binding part of this contract. This quotation in Its entirety, including all attachments,shall be included as an attachment or by reference to any other contract to which it may become a part. Hell-Irwin Corporation Weld County Colorado Submitted By: Accepted By: Printed Name Printed Name Title Title Signature Signature Date Data Hokestra Gravel Pit Flood Remediation Proposal Hall-Irwin Corporation 2 Page 14 of 22 M:\Clay\GravelPits\Hokestra\Slurry Wall Design\Bid Documents\Hokestra Pit Slurry Wall Change Order Recommendation.doc 301 Centennial Drive CHANGE ORDER REQUEST Milliken,CO 80543 Owner ■ Contractor ❑ HALL-XRWIN Office Phone: (970)587-7981 Field 0 CONSTRUCTION DIVISION Fax: (970)587-7989 Other 0 PROJECT: Hokestra Clay Liner-Slurry Wall Design-Build CHANGE ORDER REQUEST#: 08 OWNER NAME: Weld County Colorado 1111 H Street,P.O.Box 758 Greeley,CO 80632-0758 Mr.Clay Kimmi, P.E. DATE: 7-Oct-13 THE CONTRACT IS REQUESTED TO CHANGE AS FOLLOWS: September Flood Remediation Work Item# Description Quantity Units Unit Price Extension Dewatering North Slurry Wall Cell after 1 Flood Event with 8"Pump 138 HR $ 51.50 $ 7,107.00 Remove Sediment in Last Chance Ditch to Alleviate Breach into Clay Liner with 2 345 Excavator 4 HR $ 255.00 $ 1,020.00 Repair and Forge Road around the top of the Clay Liner for Access to Sub 3 Drain with 345 Excavator 8 HR $ 255.00 $ 2,040.00 4 Sub Drain Pipe Clean-up-Labor 8 HR $ 30.00 $ 240.00 5 Sub Drain Pipe Clean-up-624 Loader 8 HR $ 145.00 $ 1,160.00 Total C.O.R.#8 $ 11,567.00 Not Valid Until Signed by the Owner and Contractor The original Contract Sum was $ 4,749,222.39 Net Change by previously authorized Change Orders $ (429,811.66) The Contract Sum prior to this ChangeRequest was $ 4,319,410.73 The Contract Sum will be increased/decreased by this Change Request in the amount of(to be handled with Force Account Dollars) $The new Contract Sum including this Change Order will be $ 4,319,410.73 The Contract Time will be Increased by TBD (does not Include weather days for winter conditions) The date of Substantial Completion as of the date of this Change Order therefore is TBD All change orders will be reviewed in an accumulated manner for both time and cost impact as they relate to the ongoing impacts on the project.Accumulated time and cost Impacts will then be forwarded under a separate change order. Weld County Colorado Hail-Irwin Construction Division 1111 H Street,P.O.Box 758 301 Centennial Drive Greeley,CO 80632-0758 Milliken,CO 80543 Mr.Clay Kimmi,P.E. Andy Laycock By: BY: Date: Date: -- i y VI > < K �O�K , vy X itKnzg z�mOCymlitt'a)Wlmm _t Nro L a30 C�a°0VU Srt91 °6 pyyy 72 `. m. 0 ,gym; 2�AO�D vs ,,,mz • i Oi0 KS;mi°° "vl'nm mnn ps3 aiv a°m„tg a° iv ' ) £ ;RIm NC N.yg T of r - 2 m g1r a AP„, pgo_,F. -. F am vin z . .! •° H 0,, o 1 °0a mm ill ii)lo...,.wrn ( g iI "r:f: jece .t.,s_ a W. 1,a A .ti�„•�`'::ti -_�� •:. 4•......r •a it \ E ei„..:11,i tr I \ T ---------------,----., ,. \\• r x 8 �� 1. . ?_4 A • ktl \l 1444,_-_,:i14.:4;\ ) aK3 Leo 1Aii. '4• \ ,' [+ j— %s_. Lam+.. ^.: I. t 't - \ \,:.,4t ` L �6 I / . F Z » 41 N ,p. I Page 16 of 22 M:1CIay1GravelPits\Hokestra\Slurry Wall Design\Bid Documents\Hokestra Pit Slurry Wall Change Order Recommendation.doc I "in'Inman*1M a ----.2-. •>.l +wit ud lBxa+o wn•nax 4•nn>w.x = i , -, t y( o s e I 5 H F)_� l ) [ S .4 ss'll..F i I5 5 t SBit x kt .• + ® t 15855 D4 146 r r �tt 8E8i38 p80Q jl ! �A 88.86 g 8 A@@8'A (.. JAssiAas BCB�B , Y } FBxxcixl: ,j .k pCBIIBPH Ii Aj a 1.B.BS -,t Tr— S l -1 i _. �3 n '- n 5�6 f 5 t - -t -' �}, �"1 a B i e B 'Ax y p � 5 tlxk Epl➢tk. S •,,,, D8 Dt HDH� 41�tE 5p�p H$I 91l: i3 r - �,\ c f 7 B 1 arrr yrry, / / lei rA t \ • '- , Vrl ` 'i, 1 r� S • 11 i •iA 7 ' , J 1 1 'rl il ,, t tit �w ��-ll 1V -.f f ,sip..-` VA \ i.r 1 -, to Y , \ Y / `4 1 ,1 3, \ us** s* ,:k \ \ 1y \ 1 y 1\ ? ' S a) IC" 1 1 i I \ h la '. Page 17 of 22 M:\Clay 1GravelPits\Hokestra\Slurry Wall Design\SId Documents\Hokestra Pit Slurry Wall Change Order Recommendation.doc 3 NOM.. ..•..-._,., li .... tam"�® I 34i N 00100 ON Q3M � �� 1 r § I o r i e Oh 1 i 5 t9, i liAµl l.:.,4',,!1,1 P h b[ r !It SIE sl,l !V�isl f ! Vr pp° ,i `r {iV hill ii le Ig f€iy IIq ,, a r!il' @ib ii I ii i1 e Pii i i, > ➢� ri s�° 9i 4 r l FSr;IIN { t y11 o'a (() a� E st IlibI;II 1r H li6olill! 1ki ( P°iL eii°li v31 lig h Hil i§ s i ll ldbi =. . . , _ M 44;Y Ili ° I lI II II Ill 1 II I. 4I I N i II II l:p t' I Ed Ed i 1 11 0 I � g I ill 11 it I ; m II,: I I i ,1fingE li I i L . _ I 1. j1 . I iii 1 K_..._. : . .. . .._ _.... .. .. 1 1 Page 18 of 22 M:\Clay\GravelPits\Hokestra\Slurry Wall Design\Bid Oocuments\Hokeetre Pit Slurry Wall Change Order Recommendation.doc 1 ,i I I114 .. I , 'I f' WE ; I ; I' i k i I kI I I Iii I II• �. ID 'fi' . fI ; r ii q• �....... .....• I. I `I.'( • • I ll I . I : (i) • 3'a i,,E:14.,, r.ii. . 1 I IH li ',It ; 1. ...7.. -! = . - .... . /:-. ,1 ..' ;ry....a 111 • � 1 i • i I I d Pil . .l._.._... . I I I rH i I •••-• 'britiol.• .I iii -1- ii.. _.w _.___..Iu1 11`;�yd ``t ; i1t i,74:i� y�tt`�� �riaPiti 1; ! 3'.'',1:l��t¢£i1if �' I N e}^...',r %,, ii ill � �1:!1 j tii �.; ja.:14�!I; isle i d i' ` , i s f,f(tkv { Lv'tE's, a £'j 1 4=1i � ,_j�^,�i?J`�r' itI�r3�t�.S ifi 3?i' z a- =,,,,i,\;-:.• W � 1 s„ ' it a I ,d;3,i Iir�III Nil I d .� i '.,yeli*** o , ill 1 '1 1 '10 f,, 111110:} ii;!Ils i 1 I' I1iS}t i :a S ' it g+ I+ I, iii!!E ciit!a Ill 1 I i ! r10KESTPA r — ........ Q y waD worm.crxoRAoo ,' At MAW CM�{1*EL RAN AND PROFILE ,,,, .....,..,....1.4"1!- P ., Y11T4p Page 19 of 22 M:1CIaylGravelPitsWokestra\Slurry Wall Design\Bid Documents\Hokestra Pit Slurry Wall Change Order Recommendation.doc • • f 4, I'Ll - ? —.3 11 I - T i ll ' i 1 ':I ,I } i , i! 1. Y • Y " i {. .1 a t , f' t Y t II 1 I i , ot t-,63:[' 4 i• aa II ale ! , ilfr ,,,..„_, • , . i iii.i -:;.--...„ ,. • ..... ., 1 ,,,, , , }, E, , , , , ,--,-- ., , ...1 i 1 1— I. _� I it I 1�t1 .t l it 19 ili 1 •; • It i II. I ;_ { i i:� I i IM— :�� a 4 .rill • - x; fpr s i•erillisi tr a IF IIII ps i Di - lid -hid: yF�p�, g S Jit It saal Ik f / }t;x:14iiii t i�es 05 . 1 �i, �i. l 101)11r'J ill; - , iII i; 1 .; i.. x NI NOKESfRA WELD COUNT,COLORADO — MAIN CHANNEL PLAN AND PROFILE ,r. I I__ Page 20 at 22 M:1CIaylGravelPtts'HokestralSlurry Wall Design\Bid Documents\Hokestra Pit Slurry Wall Change Order Recommendation.doc II . . i , v.. i II D - 1 . -----1 LIMN 1p LIMN .. t r I i I ..1.• !! ;.r-' , i i i ! i i II . ,..I. ti 1 1 I f �1 • {• ... .. ...L .._....._...__.......-.....t y • I „j e t i z.1 li CD 1. i I 6,1;) iir ill VEt f.; i'. I Iii1 . iii.til . .. \P?'=a li ,e,„,--2. ....„ .....Jr. _ ,,_....., TT, i, , i F H ill ii- Iii 1 i i k, � ,„-- , _ AE...._... ..__.a. _. :,:i;.„ !` ft ;i a 3 'd �f "` f i ;;j1 i 4 �ei. r i.^ i 4 ,at xNik! ; 1, aI e i , lrl; all !'FP.� 3?i xi d t.1 "!� [ a • a ll R r IIOI E5TNA .•.,.... �+ WOLO COUNTY. LOfUW 1 ..# L MAIN&WELD COUNTY PLAN Alm PROFILE .,,�. ....r ro.WATEB.vryh.�»•••=11-2•!--- a •�^ } Page 21 of 22 M:CIay\GravelPits\Hokestra\Slurry Wall Design\Bid Documents\Hokestra Pit Slurry Wall Change Order Recommendation.doe N N ''T6 9D ,, -f,,—k- a4 mp 9C OOm� yy„,-,r, y V SA ZN_i prnaccI ilZl9 Nyy 1s�{ f y Qba�a ai Km $- oN5 Egg g g, o a r 1 ?ga laA 511 22.88 m O KO K2ON N �' .,..� t i lit aT 1fb , I, cc tom! ea .. '4 , : - :, y \\, 4, I 1• r ll}i )' r .L 9 J1��:7•7 ii I " 34 T-- '` .l ^x'.q` • ,-0 N. 1.� ,og . '. _. � •i. ''11'.1 ,.` ;!,9 t IIIJ 1 \ - ., , ,.. ', a \.Ali Z , 1 1 1 e.,,',4.p 9. I r z'� �E") g _ __"' • l Z I Ilit('' � t ' ,.. f i tli: � .. ...{ �Et� i {�f t y G — -_71sr $ _z 4: N eq Page 22 of 22 M:\Clay\GravelPits\Hokestra\Slurry Wall Design\ id Documents\Hokestra Pit Slurry Wall Change Order Recommendation.doc 1861 MEMORANDUM TO: Clerk to the Board DATE: October 26, 2012 G .,OB_N -l' FROM: Clay Kimmi, P.E., CFM, Public Works SUBJECT: Bid Number B1200123, Hokestra Gravel Pit Clay Liner-Slurry Wall Design Build Contract Award Enclosed are three signed original agreements for the Hokestra Gravel Pit Clay Liner-Slurry Wall Design Build Contract with Hall-Irwin Corporation. The contract is in the amount of $4,749,222.39. The Bid Number is B1200123. The Weld County Board of County Commissioners accepted the Hall-Irwin Bid on October 22, 2012. Hall Irwin Corporation signed the Notice of Award on October 23, 2012. Also for the record is a copy of the Certificate of Liability Insurance, Performance Bond, Labor and Materials Payment Bond for Hall-Irwin Corporation. Please place on the BOCC agenda for October 29, 2012. After the contract is signed, please return one original to me so that I can forward it to Hall-Irwin with a notice to proceed. Original: Clerk to the Board pc: Hokestra Project File • • �`}�,��,- 1f . ,_ 1 ,+ ,)`, O? 244 � _( ( (� ((- Page 1 oft /C' <R9; M'.\Clay\Grovel Pits\Geisert`\Slurry WahRequest for Sid\Geisert Slu:r;Wall Contract Memo to B0CC dot. AGREEMENT Hokestra Gravel Pit Clay Liner-Slurry Wall Design-Build Contract THIS AGREEMENT,made this ol��--- day of edieier ,2012,by and between Weld County,Colorado,hereinafter called"Owner"and Hall-Irwin Corporation doing business as(an individual,) or(a partnership,)or(a corporation)hereinafter called"Contractor". WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned: 1. The Contractor will commence and complete the following:Hokestra Gravel Pit Clay Liner-Slurry Wall Design-Build Contract described in the Invitation for Bids,Bid No.B 1200123. 2. The Contractor will furnish all of the material,supplies,tools,equipment,labor and other services necessary for the construction and completion of the Project described herein. 3. The Contractor will commence the work required by the Contract Documents within ten(10)calendar days after the date of the Notice to Proceed and will complete the Hokestra Gravel Pit Clay Liner-Slurry Wall Design-Build Contract by January 31,2014 unless the period for completion is extended otherwise by the Contract Documents. 4. The Contractor agrees to perform all of the Work described in the Contract Documents and comply with the terms therein for the sum of$4,749,222.39. 5. The Contractor clarifications on the bid are listed below. a. Hall-Irwin's slope protection for Cell 2 includes the Applegate design for the north embankment along the St. Vrain River. It is anticipated that the design for the slope protection of the remaining slopes will be a different detail to be determined during the design phase of the project. b. During the sub-drain design,the access of the sub-drain will be coordinated with the Last Chance Ditch and the homeowner. However, any potential costs for easement access with the Last Chance Ditch or the landowner will be a cost to Weld County not the Contractor. c. Itemized proposal cost break-out can be provided to Weld County for future use. d. Hall-Irwin Corporation will handle points of refusal at sections of very hard bedrock by scraping the material vigorously(with excavator bucket)to a 6"depth over 10 lineal foot intervals of trench for 30 minutes to create a key.We will also notify QA personnel,consult with Weld County,log location and extent of refusal. e. Hall-Irwin shall augment any water used during the construction phase with a temporary substitute water supply plan provided and maintained by Hall-Irwin. A copy of the approved Substitute Supply Plan shall be provided to Weld County Public Works project manager. E The pump house construction includes an electrical feed that is expected to come from the electrical service at the Southwest Service Center. 6. The term"Contract Documents"means and includes the following: (A) Invitation for Bids (B) Instructions to Bidders (C) Bid Proposal (D) Acknowledgement of Bid Documents (E) Receipt of Addenda (F) Bid Bond (G) W-9 (H) Statement of Qualifications and Subcontractors (I) Anti-Collusion Affidavit (J) Bid Schedule (K) Notice of Award (L) Agreement (M) Insurance Requirements (N) Performance Bond (O) Labor and Materials Payment Bond (P) Notice to Proceed (Q) Change Order (R) Certificate of Substantial Completion (S) Lien Waiver (T) Final Lien Waiver (U) Notice of Acceptance (V) Appendix (W) Addenda (X) No. 1,dated September 14,2012 (Y) No.2,dated September 24,2012 7. The Owner will pay to the Contractor in the manner and at such times as set forth by the Contract Documents, or otherwise agreed upon in writing. 8. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors,and assigns. 9. Contract Appropriations: The Owner hereby states and affirms that the amount of money appropriated for this Contract is equal to or in excess of the Contract amount. No change order to this Contract requiring additional compensable work to be performed,which work causes the aggregate amount payable under the Contract to exceed the amount appropriated for the original Contract shall be issued by the Owner unless the Owner assures the Contractor,in writing,that lawful appropriations to cover the costs of the additional work has been made or unless such work is covered under a remedy-granting provision contained in the Contract. IN WITNESS WHEREOF,the parties hereto have executed,or caused to be executed by their duly authorized officials, this Agreement in three(3)copies each of which shall be deemed an original on the date first above written. ORDERED BY: ACCEPTED BY: THE BOARD OF WELD COUNTY COMMISSIONERS CONTRACTOR BY < - BY NAME Sean P.Conway NAME i9 (Please Typ ) TITLE Chair TITLE e CT.. Date 1 • 1 �-� ADDRESS 3 O1 GIN Th q,,.,,w t at. � iN, /11.1/.ha. (N go Sill tee (SEAL) (SEAL) r, ATTEST: ''_.,,. '' ATTEST: Weld County Clerk to thh�e(/gpard BY /Ul loll ilJt r 11 4,(1 Mi BY %e.7 A7c-eoK Deputy Cler the Board (Please Type) TITLE fMJ(e r Me/pc 8) g2 • HALIR-1 OP ID:ADR I4 OR0` CERTIFICATE OF LIABILITY INSURANCE DATE10/24DNYYY) 1 o/zan z THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the pollcy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s). PRODUCER Phone:303.996-7801 uhiNtecT CRS/Surescape Ins.Services PH°� E4:303-996-7800 /FAX Fax: 6600 E.Hampden Ave. wc.No,Ext: (A/c,No): Denver,CO 80224 E-MAIL ADDRESS: Erik E.Ulibani INSURER(S)AFFORDING COVERAGE NAIL INSURER A:The Travelers Companies INSURED Hall-Irwin Corporation INSURER B:Pinnacol Assurance 301 Centennial Drive INSURER C: Milliken,CO 80543 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, INSR TYPE OF INSURANCE ASR VINCI POLICY NUMBER (MMIDDNYYY)!(MMDDNYYY) LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 A X COMMERCIAL GENERAL LIABILITY X DTCO7212M7431ND11 12/31111 12/31112 pREMISESIENa occurrDrnce) $ 300,000 CLAIMS-MADE 1 X I OCCUR MED EXP(Any one person) $ 5,000 1 PERSONAL&ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS.COMP/OP AGG $ 2,000,000 7 POLICY X jECT LOC $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT 1,000,000 (Ea accident 8 A X ANY AUTO DT8107212M743TIL11 12131/11 12/31/12 BODILY INJURY(Per person) S ALL OWNED SCHEDULED I BODILY INJURY(Per accident) $ AUTOS _ AUTOS PROPERTY DAMAGE $ X HIRED AUTOS X NONOS AUTOS WNED (Per accident) $. X UMBRELLA LWB i X OCCUR EACH OCCURRENCE $ 5,000,00C A EXCESS IA ` CLAIMS-MADE DTSMCUP7212M74311L11 12131/11 12/31/12 AGGREGATE $ 5,000,00C DED X RETENTIONS 10,000 ! $ WORKERS COMPENSATION i X WC STATU. 0TH- AND EMPLOYERS'LIABILITY TORY LIMITS ER YI" B ANY PROPRIETOR/PARTNER/EXECUTIVE 4021105 01/01/12 01/01/13 EL EACH ACCIDENT $ 500,00( OFFICER/MEMBER EXCLUDED, NIA 500,00( (Mandatory In NH) E DISEASE-EA EMPLOYEE $ It yes,describe under DESCRIPTION OF OPERATIONS below EL DISEASE-POLICY LIMIT $ 500,00( A Rented Equipment IQT860990X1144T1L12 01/01/12 01/01/13 Limit: 500,00( DESCRIPTION OF OPERATIONS I LOCATIONS I VEHCLES (Attach ACORD 101,Additional Remarks Schedule,If more apace le required) RE: Hokestra Gravel Pit Clay Liner-Slurry Wall Project. Weld County, Colorado is included as additional insured on the General Liability with respect to ongoing operations of the named insured for the certificate holder as required by written contract. All policy terms, conditions and exclusions apply. CERTIFICATE HOLDER CANCELLATION WELDCOU SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Weld County 1111 H Steret AUTHORIZED REPRESENTATIVE Greeley,CO 80632 g gut,: I ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010/05) The ACORD name and logo are registered marks of ACORD PERFORMANCE BOND Bond No. 21086835 Hokestra Gravel Pit Clay Liner-Slurry Wall Design-Build Contract KNOW ALL MEN BY THE PRESENTS;that HALL-IRWIN CORPORATION (Name of Contractor) 301 Centennial Drive (Address of Contractor) Milliken, Colorado 80543 , hereinafter called Contractor, and a(Corporation, S f 14[tdi;fdiotra l) THE GUARANTEE COMPANY OF NORTH AMERICA USA (Name of Surety) One Towne Square, Suite 1470, Southfield, Michigan 48076 (Address of Surety) hereinafter called Surety, are held and firmly bound unto Weld County,Colorado (Name of Owner) I I I I H Street; P. O. Box 758,Greeley. Colorado 80632 (Address of Owner) hereinafter called Owner, in the penal sum of FOUR MILLION SEVEN HUNDRED FORTY*Doi lays,($4,749,222.391, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns,jointly and severally firmly by these presents. THE CONDITION OF THIS OBLIGATION is such that whereas, the Contractor entered into a certain Contract with the Owner, dated the...W-11 day of e tilt'Gcr , 2012, a copy of which is hereto attached and made a part hereof for the construction of. Hokestra Gravel Pit Clay Liner-Slurry Wall Design-Build Contract described in the Invitation for Bids,Bid No. 81200123 NOW THEREFORE, if the Contractor shall well, truly and faithfully perform its duties, all of the undertakings, covenants, terms,conditions, and agreements of said contract during the original term thereof, and any extensions thereof which may be granted by the Owner, with or without notice to the Surety and during the one year guaranty period,and if he shall satisfy all claims and demands incurred under such contract, and shall fully indemnify and save harmless the Owner from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and expense which the Owner may incur in making good any default, then this obligation shall be void; otherwise to remain in force and effect. PROVIDED, FURTHER,that the said Surety for value received hereby stipulates and agrees that no change,extension of time, alteration or addition to the terms of the contract or to the Work to be performed thereunder of the Specifications accompanying the same shall in any way affect its obligation on this Bond,and it does hereby waive notice of any such change,extension of time, alteration or addition to the terms of the contract or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. *NINE THOUSAND TWO HUNDRED TWENTY TWO AND 39/100 PERFORMANCE BOND Hokestra Gravel Pit Clay Liner-Slurry Wall Design-Build Contract IN WITNESS WHEREOF, this instrument is executed in five(5)counterparts,each one of which shall be deemed an original, this day of 2012. ATTEST: HALL-IRWIN CORPORATION By . ' �`~''�� By (Contractor)Secretary (SEAL) Not Applicable 301 Centennial Drive (Witness as to Contractor) (Address) 301 Centennial Drive Milliken, Colorado 80543 (Address) Milliken, Colorado 80543 ATTEST: Not Applicable THE GUARANTEE COMPANY OF NORTH AMERICA USA (Surety) Secretary (SEAL) By . By C'/A' i4 y1J./ftl i�r Witness as t0 ety David J. inger Attorney-in-Fact Cynthia M. Burnett 7800 South Elati Street, Suite 100 7800 South Elati Street, Suite 100 (Address) (Address) Littleton, Colorado 80120 Littleton, Colorado 80120 NOTE: Date of Bond must not be prior to date of Contract. If Contractor is Partnership,all partners should execute Bond. IMPORTANT: Surety companies executing Bonds must appear on the Treasury Department's most current list(Circular 570 as amended)and be authorized to transact business in the State where the Project is located. • LABOR & MATERIALS PAYMENT BOND Bond No. 21086835 Hokestra Gravel Pit Clay Liner-Slurry Wall Design-Build Contract KNOW ALL MEN BY THE PRESENTS; that HALL-IRWIN CORPORATION (Name of Contractor) 301 Centennial Drive (Address of Contractor) Milliken, Colorado 80543 _ , hereinafter called Contractor,and a(Corporation, Raztleaxktp n2x tat) THE GUARANTEE COMPANY OF NORTH AMERICA USA (Name of Surety) One Towne Square, Suite 1470, Southfield, Michigan 48076 (Address of Surety) hereinafter called surety, are held and firmly bound unto Weld County,Colorado (Name of Owner) 1 1 11 H Street, P.O. Box 758, Greeley,Colorado 80632 (Address of Owner) hereinafter called Owner, in the penal sum of FOUR MILLION SEVEN HUNDRED FORTY NINE THOUSAND TWO HUNDRED TWENTY TWO AND 39/100 Dollars,($ 4, 749,222.39 in lawful money of the United States of America, for the payment of which sum well and truly to be made,we bind ourselves, successors and assigns,jointly and severally firmly by these presents. THE CONDITION OF THIS OBLIGATION is such that whereas, the Contractor entered into a certain Contract with the Owner, dated the , g --� day of teleh'e(' , 2012,a copy of which is hereto attached and made a part hereof for the construction of Hokestra Gravel Pit Clay Liner-Slurry Wall Design-Build Contract described in the Invitation for Bids, Bid No. 81200123 NOW, THEREFORE, if the Contractor shall promptly make payment to all persons, finns, Subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such contract,and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such Work,and all insurance premiums on said Work, and for all labor, performed in such Work whether by Subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED,FURTHER,that the said Surety for value received hereby stipulates and agrees that no change,extension oftime, alteration or addition to the terms of the contract or to the Work to be performed thereunder of the Specifications accompanying the same shall in any way affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the Work or to the Specifications. PROVIDED FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. LABOR & MATERIALS PAYMENT BOND Hokestra Gravel Pit Clay Liner-Slurry Wall Design-Build Contract IN WITNESS WHEREOF,this instrument is executed in five(5)counterparts,each one of which shall be deemed an original, this day of .2012. HALL-IRWIN CORPORA ION / s^ ATTEST: ....0eo`lrtract BK By . (Contractor)Secretary .(SEAL.) Not Applicable 301 Centennial Drive (Witness as to Contractor) (Address) 301 Centennial Drive Milliken, Colorado 80543 (Address) Milliken, Colorado 80543 ATTEST: Not Applicable THE GUARANTEE COMPANY OF NORTH AMERICA USA (Surety)Secretary (SEAL) By By 4zi Witrtess as to Surety D id J. He r Attorney-in-Fact Cynthia M. Burnett 7800 South Elati Street, Suite 100 7800 South Elati Street, Suite 100 (Address) (Address) Littleton, Colorado 80120 Littleton, Colorado 80120 NOTE: Date of Bond must not be prior to date of Contract. If Contractor is Partnership,all partners should execute Bond. IMPORTANT: Surety companies executing Bonds must appear on the Treasury Department's most current list(Circular 570 as amended)and be authorized to transact business in the State where the Project is located. . tliCGf_4R,t nt THE GUARANTEE COMPANY OF NORTH AMERICA USA (OMFAM OF nnar>i.(HFSIG Southfield. Michigan POWER OF ATTORNEY KNOW ALL BY THESE PRESENTS:That THE GUARANTEE COMPANY OF NORTH AMERICA USA,a corporation organized and existing under the laws of the State of Michigan.having its principal office in Southfield,Michigan.does hereby constitute and appoint Douglas J. Rothey, Cynthia M. Burnett, Erik Uliharri Surescape Insurance Services, LLC its true and lawful attorney(s)-in-fact to execute,seal and deliver for and on its behalf as surety.any and all bonds and undertakings,contracts of indemnity and other writings obligatory in the nature thereof,which are or may be allowed. required or permitted by law,statute,rule,regulation,contract or otherwise The execution of such instrument(s) in pursuance of these presents, shall be as binding upon THE GUARANTEE COMPANY OF NORTH AMERICA USA as fully and amply. to all intents and purposes, as if the same had been duly executed and acknowledged by its regularly elected officers at the principal office The Power of Attorney is executed and may be certified so,and may be revoked,pursuant to and by authority of Article IX. Section 9.03 of the By-Laws adopted by the Board of Directors of THE GUARANTEE COMPANY OF NORTH AMERICA USA at a meeting held on the 31"day of December,2003. The President.or any Vice President.acting with any Secretary or Assistant Secretary,shall have power and authority: 1. To appoint Attorney(s)-in-fact,and to authorize them to execute on behalf of the Company,and attach the Seal of the Company thereto, bonds and undertakings,contracts of indemnity and other writings obligatory in the nature thereof;and 2. To revoke,at any time,any such Attorney-in-fact and revoke the authority given,except as provided below 3. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner— Department of Highways of the Commonwealth of Kentucky at least thirty(30)days prior to the modification or revocation Further,this Power of Attorney is signed and seated by facsimile pursuant to resolution of the Board of Directors of the Company adopted at a meeting duly called and held on the 31'°day of December 2003,of which the following is a true excerpt: RESOLVED that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any Power of Attorney or certification thereof authorizing the execution and delivery of any bond, undertaking,contracts of indemnity and other writings obligatory in the nature thereof, and such signature and seal when so used shall have the same force and effect as though manually affixed. IN WITNESS WHEREOF, THE GUARANTEE COMPANY OF NORTH AMERICA USA has caused this instrument to be signed and its corporate seal to be affixed by its authorized officer,this 18th day per c of January.2011 THE GUARANTEE COMPANY OF NORTH AMERICA USA 4b9,k ENS%AM STATE OF MICHIGAN Stephen C. Ruschak,Vice President Randall Musselman,Secretary County of Oakland On this 18th day of January, 2011 before me came the individuals who executed the preceding instrument, to me personally known. and being by me duly sworn,said that each is the herein described and authorized officer of The Guarantee Company of North America USA;that the seal affixed to saic instrument is the Corporate Seal of said Company; that the Corporate Seal and each signature were duly affixed by order of the Board of Directors o said Company. Cynthia A. Take' IN WITNESS WHEREOF, I have hereunto set my hand at The Guarantee Notary Public. State of Michigan Company of North America USA offices the day and year above written. County of Oakland ° My Commission Expires February 27, 2012 Acting in Oakland County• I.Randall Musselman,Secretary of THE GUARANTEE COMPANY OF NORTH AMERICA USA.do hereby certify that the above and foregoing is a trut and correct copy of a Power of Attorney executed by THE GUARANTEE COMPANY OF NORTH AMERICA USA,which is still in full force and effect. IN WITNESS WHEREOF. I have thereunto set my hand and attached the seal of said Company this day of 1WeJ Randall Musselman, Secretary y�q� AMENG ritt4-- MEMORANDUM V Iwily C. TO: Rose Everett, Purchasing DATE: October 18, 2012 FROM: Clay Kimmi, P.E., CFM, Public Works COLORADO SUBJECT: Bid Number B1200123, Hokestra Gravel Pit Clay Liner- Slurry Wall Design-Build Contract The above mentioned bid closed on October 4, 2012. A total of two bids (Hall Irwin and Magnus Pacific) were received by the bid closing. The two bids were for$4,749,222.39 (Hall Irwin) and $7,135,128.44 (Magnus Pacific). The difference between the two bids was $2,385,906.05. The low bid was submitted by Hall Irwin. All the bid packages submitted contained the required bid documents. After review of the bid documents, Weld County Public Works recommends that the contract be awarded to the lowest bidder, Hall Irwin Corporation, in the amount not to exceed $4,749,222.39. Email&Original: Rose Everett,Purchasing pc: Hokestra Pit File cc: Dave Bauer,Public Works Page 1 oft 3 / \Cla \Gray I Pits\HokesiralSlurry Wall Design\Bid DocumenlsWokeslra Pit Slurry Wall Bid Recommendation.doc .y,1/ �� fc f h vjv?G/ Xv �gbi r WELD COUNTY PURCHASING 1150 O Street Room 107, Greeley CO 80631 LP' E-Mail: mwalters(@co.weld.co.us E-mail: reverettco.weld.co.us I� 11°-__.uN1Y«rpU Phone: (970) 356-4000, Ext 4222 or 4223 Fax: (970) 336-7226 DATE OF BID: October 4`h, 2012 REQUEST FOR: HOKESTRA GRAVEL PIT CLAY LINER SLURRY WALL DESIGN DEPARTMENT: PUBLIC WORKS DEPT BID NO: #61200123 PRESENT DATE: October 8`h , 2012 APPROVAL DATE: OCTOBER 22ND, 2012 TOTAL AMOUNT VENDOR HALL IRWIN CORPORATION $ 4,749,222.39 301 Centennial Drive Milliken CO 80543 MAGNUS PACIFIC CORPORATION $ 7,135,128.44 100 West Oak Street Suite 301 Denton TX 76201 *Bid is being reviewed by dept at this time. 2012-2836 Hello