Loading...
HomeMy WebLinkAbout20143587.tiff t: LAND USE APPLICATION r SUMMARY SHEET r Planner: C. Gathman Hearing Date: November 4, 2014 Case Number: USR14-0053 Applicant: Equus Farms, LLC Address: 37139 U.S. Highway 34, Kersey, CO 80644 Request: A Site Specific Development Plan and Use by Special Review Permit for a Mineral Resource Development Facility including an Oil and Gas Support and Service Facility (Water Depot) in the A(Agricultural)Zone District. Legal NE4W2 of Section 2, T3N, R62W of the 6th P.M., Weld County, CO Description: Location: East of and adjacent to County Road 386 and approximately 2.25 miles south of State Highway 34. Size of Parcel: +/- 397.39 acres Parcel No. 121902100004 The criteria for review of this Special Review Permit is listed in Section 23-2-220 of the Weld County Code. The Department of Planning Services' staff has received referral responses with comments from the following agencies: Weld County Department of Planning Services-Engineer, referral dated September 18, 2014 Weld County Department of Planning Services-Floodplain, referral dated September 25, 2014 • Weld County Department of Building Inspection, referral dated October 6, 2014 • Weld County Department of Public Health and Environment, referral dated September 12, 2014 • Colorado Division of Water Resources, referral dated September 4, 2014 • Colorado Department of Transportation, electronic mail referral dated September 29, 2014 The Department of Planning Services' staff has received referral responses without comments from the following agencies: Weld County Zoning Compliance, referral dated August 22, 2014 The Department of Planning Services' staff has not received responses from the following agencies: ➢ Southeast Weld Fire Protection District ➢ Weld County Sheriff's Office ➢ Southeast Weld Soil Conservation District • Colorado Parks and Wildlife USR14-0053, Equus Farms, LLC, Page 1 of 9 SPECIAL REVIEW PERMIT ADMINISTRATIVE REVIEW tAt � c93'v Planner: C. Gathman Hearing Date: November 4, 2014 Case Number: USR14-0053 Applicant: Equus Farms, LLC Address: 37139 U.S. Highway 34, Kersey, CO 80644 Request: A Site Specific Development Plan and Use by Special Review Permit for a Mineral Resource Development Facility including an Oil and Gas Support and Service Facility(Water Depot) in the A(Agricultural)Zone District. Legal NE4W2 of Section 2, T3N, R62W of the 6th P.M., Weld County, CO Description: Location: East of and adjacent to County Road 386 and approximately 2.25 miles south of State Highway 34. Size of Parcel: +/- 397.39 acres Parcel No. 121902100004 Case Summary: The applicants are proposing a water depot facility with six (6) valve stations. Each valve station will have a portable 22,000-gallon storage tank. The facility will be an unmanned facility and will be operated 24 hours a day, 7 days a week. The application estimates that up to 40 trips per day will be coming to the site. The application indicates that traffic is expected to come from the north (from Highway 34) and no traffic is expected to come from the south (from Interstate 76). The USR facility will be operated on a 10.8 acre area within a parcel of approximately 400 acres in size. DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-260 of the Weld County Code. 2. It is the opinion of the Department of Planning Services' staff that the applicant has shown compliance with Section 23-2-220 of the Weld County Code as follows: A. Section 23-2-220.A.1 -- The proposed use is consistent with Chapter 22 and any other applicable code provisions or ordinance in effect. Section 22-2-20 I. A. Goal 9 states "Reduce potential conflicts between varying land uses in the conversion of traditional agricultural lands to other land uses." The site is located within a rural area. The nearest residence (on property owned by the applicant) is located approximately 1/2 mile to the south of the site. Noise standards are proposed to mitigate impacts on surrounding Agricultural zoned land. Section 22-2-20 I. 5.A.Policy 9.5. states "Applications for a change of land use in the agricultural areas should be reviewed in accordance with all potential impacts to surrounding properties and referral agencies." USR14-0053, Equus Farms, LLC, Page 2 of 9 The proposed application has been reviewed for all potential impacts to surrounding properties and referral agencies. The application indicates that lighting will have motion sensors and will be downcast and noise standards are proposed to mitigate impacts on surrounding Agricultural zoned land. Section 22-2-80 C. I.Goal 3. Consider how transportation infrastructure is affected by the impacts of new or expanding industrial developments." An offsite improvements and road maintenance agreement is required for this proposed use to address impacts (dust control, road damage, and road improvement triggers) on adjacent county roads used by trucks hauling water. B. Section 23-2-220.A.2 -- The proposed use is consistent with the intent of the A (Agricultural)Zone District. Section 23-3-40.A of the Weld County Code allows Mineral Resource Development Facilities including Oil and Gas Support and Service facilities (water depots) as a Use by Special Review in the A(Agricultural)Zone District. C. Section 23-2-220.A.3 -- The uses which will be permitted will be compatible with the existing surrounding land uses. The site is located within a rural area. The nearest residence (on property owned by the applicant) is located approximately % mile to the south of the site. The application indicates that lighting will have motion sensors and will be downcast. Additionally, noise standards are proposed and a road maintenance and improvements agreement is required to address impacts to adjacent county roads from trucks hauling to and from the site. D. Section 23-2-220.A.4 -- The uses which will be permitted will be compatible with future development of the surrounding area as permitted by the existing zoning and with the future development as projected by Chapter 22 of the Weld County Code and any other applicable code provisions or ordinances in effect, or the adopted Master Plans of affected municipalities. The site is not located within a three (3) mile referral area of any municipality, nor is it located within any existing Intergovernmental Agreement Area (IGA) of a municipality. E. Section 23-2-220.A.5 -- The application complies with Chapter 23, Article V, of the Weld County Code. The existing site is within the County-Wide Road Impact Fee Area and the Capital Expansion Impact Fee area. Building Permits issued on the lot will be required to adhere to the fee structure of the County-Wide Road Impact Fee Program. Building Permits issued on the proposed lot will be required to adhere to the fee structure of the County Facility Fee and Drainage Impact Fee Programs. F. Section 23-2-220.A.6 -- The applicant has demonstrated a diligent effort to conserve prime agricultural land in the locational decision for the proposed use. The proposed facility is located on approximately 10.8 acres "Other" per the 1979 Soil Conservation Service Important Farmlands of Weld County Map. USR14-0053, Equus Farms, LLC, Page 3 of 9 G. Section 23-2-220.A.7 — There is adequate provisions for the protection of the health, safety, and welfare of the inhabitants of the neighborhood and County. The Design Standards (Section 23-2-240, Weld County Code), Operation Standards (Section 23-2-250, Weld County Code), Conditions of Approval and Development Standards can ensure that there are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and County. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Department of Planning Services' staff recommendation for approval is conditional upon the following: 1. Prior to recording the plat: A. An Offsite Improvements and Road Maintenance Agreement is required for this site. Road maintenance including dust control, damage repair, and triggers for improvements will be included. (Department of Planning Services-Engineer) B. The applicant shall submit a Floodplain Development Permit (FHDP) for all development activities located within the special flood hazard area. The FEMA definition of development is any man-made change to improved or unimproved real estate, including by not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation, drilling operations, or storage of equipment and materials. (Department of Planning Services) C. The plat shall be amended to delineate the following: 1. All sheets of the plat shall be labeled USR14-0053 (Department of Planning Services) 2. The attached Development Standards. (Department of Planning Services) 3. The plat shall be prepared in accordance with Section 23-2-260.D of the Weld County Code. (Department of Planning Services) 4. The applicant shall delineate the trash collection areas. Section 23-3-350.H of the Weld County Code addresses the issue of trash collection areas. Areas used for storage or trash collection shall be screened from adjacent properties and public rights-of-way. These areas shall be designed and used in a manner that will prevent trash from being scattered by wind or animals. (Department of Planning Services) 5. County Road 386 is designated on the Weld County Road Classification Plan as a gravel collector road, which requires 80 feet of right-of-way at full build out. There is presently 60 feet of right-of-way. An additional 10 feet shall be delineated on the plat as future right-of-way. All setbacks shall be measured from the edge of future right- of-way. The applicant shall verify the existing right-of-way and the documents creating the right-of-way and this information shall be noted on the plat. This road is maintained by Weld County. (Department of Planning Services-Engineer) 6. Show standard double cattle guard back to back for tracking control across entire entrance. (Department of Planning Services-Engineer) 7. Show the approved access on the plat and label with the approved access permit number(will be provided). (Department of Planning Services-Engineer) USR14-0053, Equus Farms, LLC, Page 4 of 9 8. The applicant shall label the approved water quality feature on the plat as "Water Quality Feature, No Build/Storage Area", and label the required volume (Department of Planning Services-Engineer) 9. Show and label the floodplain and floodway (if applicable) boundaries on the plat. Label the floodplain boundaries with the FEMA Flood Zone and FEMA Map Panel Number. (Department of Planning Services-Floodplain) 2. Upon completion of Condition of Approval #1 above, the applicant shall submit three (3) paper copies or one (1) electronic copy (.pdf) of the plat for preliminary approval to the Weld County Department of Planning Services. Upon approval of the plat the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by the Department of Planning Services. The plat shall be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. The Mylar plat and additional requirements shall be submitted within one hundred twenty (120) days from the date of the Board of County Commissioners Resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 3. In accordance with Weld County Code Ordinance #2012-3, approved April 30, 2012, should the plat not be recorded within the required one hundred twenty (120) days from the date of the Board of County Commissioners Resolution, a $50.00 recording continuance charge shall added for each additional three (3) month period. (Department of Planning Services) 4. The Department of Planning Services respectfully requests a digital copy of this Use by Special Review, as appropriate. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are ArcView shapefiles or ArcGIS Personal GeoDataBase (MDB).. The preferred format for Images is .tif (Group 4). (Group 6 is not acceptable). This digital file may be sent to maps@co.weld.co.us. (Department of Planning Services) 5. Prior to Construction: A. If more than 1 acre is to be disturbed, a Weld County grading permit will be required prior to the start of construction. (Department of Planning Services-Engineer) B. In the event that 1 or more acres are disturbed, the applicant shall obtain a stormwater discharge permit from the Water Quality Control Division of the Colorado Department of Public Health and Environment. (Department of Planning Services-Engineer) C. Right of way permit is required for any work within the public right of way. (Department of Public Works) D. Special transport permit is required for any over size or over weight vehicles. (Department of Public Works) 6. Prior to Operation: ,4D. Accepted construction drawings and construction of the offsitc roadway improvements arc required prior to operation. (Department of Public Works) 67. The Use by Special Review activity shall not occur, nor shall any building or electrical permits be issued on the property, until the Use by Special Review plat is ready to be recorded in the office of the Weld County Clerk and Recorder or the applicant has been approved for an early release agreement. (Department of Planning Services) USR14-0053, Equus Farms, LLC, Page 5 of 9 SITE SPECIFIC DEVELOPMENT PLAN USE BY SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS Equus Farms, LLC USR14-0053 1. A Site Specific Development Plan and Use by Special Review Permit, USR14-0053, for a Mineral Resource Development Facility including an Oil and Gas Support and Service Facility(Water Depot) in the A(Agricultural)Zone District, subject to the Development Standards stated hereon. (Department of Planning Services) 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. (Department of Planning Services) 3. The hours of operation are 24-hours a day, 365 days a year, as stated by the applicant(s). (Department of Planning Services) 4. The signage on the site shall be maintained in accordance with Chapter 23, Article IV and Appendices 23-C, 23-D and 23-E of the Weld County Code. (Department of Planning Services) 5. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, Section 30-20-100.5, C.R.S.) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health and Environment) 6. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, Section 30-20-100.5, C.R.S. (Department of Public Health and Environment) 7. Waste materials shall be handled, stored, and disposed of in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. The applicant shall operate in accordance with the approved Waste Handling Plan, at all times. (Department of Public Health and Environment) 8. Fugitive dust and fugitive particulate emissions shall be controlled on this site. The facility shall be operated in accordance with the approved Dust Abatement Plan, at all times. (Department of Public Health and Environment) 9. This facility shall adhere to the maximum permissible noise levels allowed in the Non-Specified Zone District, as delineated in Section 14-9-30 of the Weld County Code. (Department of Public Health and Environment) 10. Adequate drinking, hand washing and toilet facilities shall be provided for employees and patrons of the facility, at all times. As employees or contractors are on site for less than 2 consecutive hours a day portable toilets and bottled water are acceptable. Records of maintenance and proper disposal for portable toilets shall be retained on a quarterly basis and available for review by the Weld County Department of Public Health and Environment. Portable toilets shall be serviced by a cleaner licensed in Weld County and shall contain hand sanitizers (Department of Public Health and Environment) 11. The fresh water storage and loading system shall be operated in a manner to minimize spills. Fresh water spills should be captured in above-ground containment areas for reuse or allowed to infiltrate. There shall be no discharge from this process to surface waters or through the facility's stormwater management system, in accordance with the Rules and Regulations of the Colorado Water Quality Control Commission, and the Environmental Protection Agency. (Department of Public Health and Environment) USR14-0053, Equus Farms, LLC, Page 6 of 9 12. The operation shall comply with all applicable rules and regulations of State and Federal agencies and the Weld County Code. (Department of Public Health and Environment) 13. Sources of light shall be shielded so that light rays will not shine directly onto adjacent properties where such would cause a nuisance or interfere with the use on the adjacent properties in accordance with the plan. Neither the direct, nor reflected, light from any light source may create a traffic hazard to operators of motor vehicles on public or private streets. No colored lights may be used which may be confused with, or construed as, traffic control devices. (Department of Planning Services) 14. The signage/lighting on the site shall be maintained. (Department of Planning Services) 15. Should noxious weeds exist on the property, or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling the noxious weeds, pursuant to Chapter 15, Articles I and II, of the Weld County Code. (Department of Planning Services- Engineer) 16. The historical flow patterns and runoff amounts will be maintained on the site. (Department of Planning Services-Engineer) 17. Weld County is not responsible for the maintenance of onsite drainage related features. (Department of Planning Services-Engineer) 18. There shall be no parking or staging of vehicles on County roads. On-site parking shall be utilized. (Department of Planning Services-Engineer) 19. All construction or improvements occurring in the floodplain or floodway as delineated on Federal Emergency Management Agency (FEMA) FIRM Community Panel Map # 080266-0800C dated September 28, 1982. The property owner shall comply with all applicable Weld County requirements, Colorado Water Conservation Board requirements as described in Rules and Regulations for Regulatory Floodplains in Colorado, and FEMA regulations and requirements as described in 44 CFR parts 59, 60, and 65. (Department of Planning Services-Floodplain) 20. Floodplain development permits will be required for development activities located within the special flood hazard area. The FEMA definition of development is any man-made change to improved or unimproved real estate, including by not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation, drilling operations, or storage of equipment and materials. (Department of Planning Services-Floodplain) 21. FEMA's floodplain boundaries may be updated at any time by FEMA. Prior to the start of any development activities, the owner should contact Weld County to determine if the floodplain boundaries have been modified. (Department of Planning Services-Floodplain) 22. Building permits may be required, per Section 29-3-10 of the Weld County Code. Currently, the following have been adopted by Weld County: 2012 International Codes, 2006 International Energy Code, and 2011 National Electrical Code. A Building Permit Application must be completed and two (2) complete sets of engineered plans bearing the wet stamp of a Colorado registered architect or engineer must be submitted for review. A Geotechnical Engineering Report performed by a Colorado registered engineer shall be required or an Open Hole Inspection. (Department of Building Inspection) 23. The property owner or operator shall be responsible for complying with the Design and Operation Standards of Chapter 23 of the Weld County Code. 24. Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations. USR14-0053, Equus Farms, LLC, Page 7 of 9 25. The Use by Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards, as shown or stated, shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. 26. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. 27. WELD COUNTY'S RIGHT TO FARM: Weld County is one of the most productive agricultural counties in the United States, typically ranking in the top ten counties in the country in total market value of agricultural products sold. The rural areas of Weld County may be open and spacious, but they are intensively used for agriculture. Persons moving into a rural area must recognize and accept there are drawbacks, including conflicts with long-standing agricultural practices and a lower level of services than in town. Along with the drawbacks come the incentives which attract urban dwellers to relocate to rural areas: open views, spaciousness, wildlife, lack of city noise and congestion, and the rural atmosphere and way of life. Without neighboring farms, those features which attract urban dwellers to rural Weld County would quickly be gone forever. Agricultural users of the land should not be expected to change their long-established agricultural practices to accommodate the intrusions of urban users into a rural area. Well-run agricultural activities will generate off-site impacts, including noise from tractors and equipment; slow-moving farm vehicles on rural roads; dust from animal pens, field work, harvest and gravel roads; odor from animal confinement, silage and manure; smoke from ditch burning; flies and mosquitoes; hunting and trapping activities; shooting sports, legal hazing of nuisance wildlife; and the use of pesticides and fertilizers in the fields, including the use of aerial spraying. It is common practice for agricultural producers to utilize an accumulation of agricultural machinery and supplies to assist in their agricultural operations. A concentration of miscellaneous agricultural materials often produces a visual disparity between rural and urban areas of the County. Section 35-3.5-102, C.R.S., provides that an agricultural operation shall not be found to be a public or private nuisance if the agricultural operation alleged to be a nuisance employs methods or practices that are commonly or reasonably associated with agricultural production. Water has been, and continues to be, the lifeline for the agricultural community. It is unrealistic to assume that ditches and reservoirs may simply be moved "out of the way" of residential development. When moving to the County, property owners and residents must realize they cannot take water from irrigation ditches, lakes, or other structures, unless they have an adjudicated right to the water. Weld County covers a land area of approximately four thousand (4,000) square miles in size (twice the size of the State of Delaware) with more than three thousand seven hundred (3,700) miles of state and county roads outside of municipalities. The sheer magnitude of the area to be served stretches available resources. Law enforcement is based on responses to complaints more than on patrols of the County, and the distances which must be traveled may delay all emergency responses, including law enforcement, ambulance, and fire. Fire protection is usually provided by volunteers who must leave their jobs and families to respond to emergencies. County gravel roads, no matter how often they are bladed, will not provide the same kind of surface expected from a paved road. Snow removal priorities mean that roads from subdivisions to arterials may not be cleared for several days after a major snowstorm. Services in rural areas, in many cases, will not be equivalent to municipal services. Rural dwellers must, by necessity, be more self-sufficient than urban dwellers. USR14-0053, Equus Farms, LLC, Page 8 of 9 People are exposed to different hazards in the County than in an urban or suburban setting. Farm equipment and oil field equipment, ponds and irrigation ditches, electrical power for pumps and center pivot operations, high speed traffic, sandburs, puncture vines, territorial farm dogs and livestock, and open burning present real threats. Controlling children's activities is important, not only for their safety, but also for the protection of the farmer's livelihood. USR14-0053, Equus Farms, LLC, Page 9 of 9 MEMORANDUM TO: Chris Gathman DATE: August 25, 2014 • U2LA c cU T FROM: Diana Aungst, CFM SUBJECT: USR14-0053, Equus Farms, LLC PROJECT: A Site Specific Development Plan and Use by Special Review Permit for a Mineral Resource Development Facility including an Oil and Gas Support and Service Facility (water depot) in the A (Agricultural)Zone District.. PARCEL: 1219-0210-0004 COMMENT: The Lost Creek flood plain runs through the parcel n/s direction. There is significant land to the east and west outside of the regulated flood plain. If the business is conducted outside of the regulated floodplain no floodplain permit will be required. This floodplain is zoned A. CONDITION OF APPROVAL: The applicant shall submit a Floodplain Development Permit (FHDP) for all development activities located within the special flood hazard area. The FEMA definition of development is any man-made change to improved or unimproved real estate, including by not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation, drilling operations, or storage of equipment and materials. (Department of Planning Services) DEVELOPMENT STANDARDS: 1. All construction or improvements occurring in the floodplain or floodway as delineated on Federal Emergency Management Agency (FEMA) FIRM Community Panel Map # 080266-0800C dated September 28, 1982. The property owner shall comply with all applicable Weld County requirements, Colorado Water Conservation Board requirements as described in Rules and Regulations for Regulatory Floodplains in Colorado, and FEMA regulations and requirements as described in 44 CFR pads 59, 60, and 65. (Department of Planning Services) 2. Floodplain development permits will be required for development activities located within the special flood hazard area. The FEMA definition of development is any man-made change to improved or unimproved real estate, including by not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation, drilling operations, or storage of equipment and materials. (Department of Planning Services) 3. FEMA's floodplain boundaries may be updated at any time by FEMA. Prior to the start of any development activities, the owner should contact Weld County to determine if the floodplain boundaries have been modified. (Department of Planning Services) 4. Show the floodplain and floodway (if applicable) boundaries on the map. Label the floodplain boundaries with the FEMA Flood Zone and FEMA Map Panel Number or appropriate study. (Department of Planning Services) H N DEPARTMENT OF PLANNING SERVICES a $6i 1555 N 17th AVE GREELEY, CO 80631 WEBSITE: www.co.weld.co.us E-MAIL: cgathman@co.weld.co.us �f PHONE: (970) 353-6100, Ext. 3537 C v i FAX: (970)304-6498 r October 13, 2014 JOHNSON MIKE 37139 U.S. HIGHWAY 34 KERSEY, CO 80644 Subject: USR14-0053 - A Site Specific Development Plan and Use by Special Review Permit for a Mineral Resource Development Facility including an Oil and Gas Support and Service Facility (water depot) in the A(Agricultural)Zone District. On oarcel(s)of land described as: NE4W2 SECTION 2, T3N, R62W of the 6th P.M., Weld County, Colorado. Dear Applicants: I have scheduled a meeting with the Weld County Planning Commission on November 4, 2014, at 1:30 p.m. A subsequent hearing with the Board of County Commissioners will be held on November 26, 2014 at 10:00 a.m. Both hearings will be held in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members or Board of County Commissioners may have. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant needs to provide the Weld County Planning Department with written certification indicating the above requirement has been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission and will be included in the staff report one week prior to the scheduled Planning Commission hearing. You may view the staff report at www.weldcountyplanningcases.orq If you have any questions concerning this matter, please call. Respectfully, oh Digitally signed ioioef Fans m Fuson:I am the author of thisdocument Date:2014.10.1314:47:23-06'00' Chris Gathman Planner N DEPARTMENT OF PLANNING SERVICES 1555 N 17th AVE j ' r ^ GREELEY, CO 80631 WEBSITE: www.co.weld.co.us E-MAIL: cgathman@co.weld.co.us PHONE: (970)353-6100, Ext. 3537 S' ? FAX: (970)304-6498 August 22, 2014 Johnson Mike 37139 U.S. Highway 34 Kersey, CO 80644 Subject: USR14-0053 - A Site Specific Development Plan and Use by Special Review Permit for a Mineral Resource Development Facility including an Oil and Gas Support and Service Facility (water depot) in the A(Agricultural)Zone District. On parcel(s)of land described as: NE4W2 SECTION 2, T3N, R62W of the 6th P.M., Weld County, Colorado. Dear Applicants: Your application and related materials for the request described above are complete and in order at this time. I will schedule a meeting with you at the end of the review period to discuss the referral comments received by our office. If you have any questions concerning this matter, please call. Respectfully, Digitally signed hiioef Fhisdocu �/v� nslem Fbason:lam the author of thisdocument ' - -- Date:2014.08.2210:09:43-06'00' Chris Gathman Planner FIELD CHECK inspection dates: 10/24/2014 APPLICANT: Equus Farms, LLC CASE #: USR14-0053 REQUEST: A Site Specific Development Plan and Use by Special Review Permit for a Mineral Resource Development Facility including an Oil and Gas Support and Service Facility(Water Depot)in the A(Agricultural)Zone District. LEGAL: NE4 and W2 of Section 2, T3N, R62W of the 6th P.M., Weld County, CO LOCATION: East of and adjacent to County Road 386 and approximately 2.25 miles south of State Highway 34. PARCEL ID #s: 121902100004 ACRES: +/- 397.39 acres (USR Site: +/- 10.8 acres) Zoning Land Use N A N Farmground E A E Farmground S A S Farmground/Residence and Outbuildings W A W rangeland COMMENTS: Proposed facility will be located in a non-irrigated area adjacent to two existing sprinkler pivots. Chris Gathman - Planner III Hello