Loading...
HomeMy WebLinkAbout20141490.tiff .6` DEPARTMENT OF BUILDINGS AND GROUNDS 1 PHONE: (970) 304-6531 ./ El J\ FAX: (970) 304-6532 ��+__ . J WEBSITE: www.co.weld.cows U N-T Y � 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 March 27, 2015 To: Board of County Commissioners From: Toby Taylor Subject: Centennial Generator Change Order#2; Bid #B1400094 During the Centennial Generator installation, the electrical contractor ran into issues and corrected them as they were discovered. This resulted in additional work for both the electrician and the general contractor to meet the cutover window, thus generating a change order for the amount of$4,743. This is the second change order request for this project. The first change order request was made on June 6, 2014. It was denied as a better cost effective solution was developed. The work for Change Order 2 in the amount of$4,743.00 needed to be done to meet the time limitations of installation on the weekend as to not disrupt the operation of the data center for the County. Therefore, Buildings and Grounds is recommending approval of this change order. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director aoi�-I`-19C` I 3-30-2O,6 �; 6&(r-1,/ $G a�i� 01 /0 •' Document t' ��� Request for Change Order PROJECT: Name and address) CHANGE ORDER NUMBER Centennial Data Center Generator DATE: 23-Ma,-15 915 10th Street Greeley CO 80631 ARCHITECT'S PROJECT NUMBER CONTRACTOR: (Name and address) Classic Contractors.Inc CONTRACT DATE 6-Jun-14 P.O.Box 2n8 8 Loveland.CO 80539 CONTRACT FOR: Centennial Data Center Generator We are requesting the following changes to the Work: (Include all changes an the work below. use additional sheets rf required) Added electrical changes per Southpaw Electric $4743.00 The original(Contract Sum) (Guaranteed Maximum Price)was 5 182587.00 The net change by previously authorized Change Orders s o 00 The Contract Sum(Guaranteed Maximum Price)prior to this Change Order was 5 182567 00 The Contract Sum(Maximum Price)will be increased)decreased/unchanged by this Change Order in the amount of s 4743.00 The new(contract Sum)(guaranteed Maximum Price)including this Change Order will be S 187330.00 LIST SCHEDULE IMPACT BELOW IF ANY Weld County Commissioners MJ,4 Classic Contractors,Inc Board ARCHIT CT(Firm name) CONTRACTOR(Finn name) OWNER(Frmi name) PO Bo ',798 Loveland,CO805: 1150 0 Street, Greeley, CO 80632 ADDRESS ADDR J `� ADDRES r / J/ " J I n • A. BY(Signature) (Sig lure)e) r BY(Signature) JLJ / Karl Schmidt Barbara Kirkmeyer, Chair ;Typed Name) ('Wed Name) Typed Name) MAR 3 0 2015 23-Mar-15 DATE DATE DATE 02o/ / 6,/fo CLASSIC CONTRACTORS,INC. EST Date:March 23,2015 P.O.Box 2798 Description: Centennial Generator CO 2 Misc.electrical changes per attached Invoice 7017 from Southpaw Electric Loveland,CO. 80539 PO LABOR HOURS RATE TOTAL Mgr/Est Salary 0 hrs. $ 45.00 $ - Foreman Regular time 0 hrs. $ 35.00 $ - Overtime 0 hrs. $ 52.50 $ - Carpenter Regular time 0 hrs. $ 33.00 $ - Overtime 0 hrs. $ 49.50 $ - Laborer Regular time 0 hrs. $ 2300 $ - Overtime 0 hrs. $ 34.50 $ - Subtotal $Vacation Pay 4 17% $ - Small tools 5.00% $ - Payroll taxes,Worker's Comp, 39.40% $TOTAL LABOR $ MATERIAL&EQUIPMENT Qty Price AMOUNT $O 00 $ - $0.00 $ $0.00 $ $0.00 $ - $0.00 $ - TOTAL MATERIAL&EQUIPMENT $ - SUBCONTRACTORS AMOUNT Southpaw Electric $ 3,605 00 TOTAL SUBCONTRACTORS $ 3,605.00 MISCELLANEOUS AMOUNT TOTAL MISCELLANEOUS $ - SUBTOTAL $ 3,605 00 INSURANCE 1.25% $ 45.06 GENERAL CONDITIONS 10.00% $ 360.50 SUBTOTAL $ 4,010.56 MANAGEMENT FEE 0.00% $ - SUBTOTAL $ 4,010.56 OVERHEAD&PROFIT 1500% $ 601.58 SUBTOTAL $ 4,612 15 BOND 2.84% $ 130.98 TOTAL CHANGE ORDER $ 4.743.13 SCHEDULE IMPACT'.Add to schedule 1 Days if approved with days. O\ NER/REPRESENT TIVE SIGNATURE: CLASSIC CONTRACTORS,INC.'. Date. MARS al Date: w 1 DEPARTMENT OF BUILDINGS AND GROUNDS PHONE: (970) 304-6531 FAX: (970) 304-6532 WEBSITE: www.co.weld.co.us G al) NTY 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 May 22, 2014 To: Board of County Commissioners From: Toby Taylor Subject: Centennial Center Data Center Generator; Bid#81400094 As advertised, this bid is to install a generator for the Centennial Center Data Center. The low bid received was from Classic Contractors Inc. for $182,587.00 and meets specifications. Therefore, Buildings &Grounds is recommending the bid be awarded Classic Contractors Inc. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director aoi y- "/YO WELD COUNTY PURCHASING 1150 O Street Room #107, Greeley CO 80631 16 E-mail: mwalters@co.weld.co.us E-mail: r l'O1; Phone: (970) 356-4000, E t 4222 or 4223 IJ' r,' Fax: (970) 336-7226 vLriG O_U I DATE OF BID: MAY 15T", 2014 REQUEST FOR: CENTENNICAL DATA CENTER GENERATOR DEPARTMENT: BUILDINGS & GROUNDS DEPT BID NO: #B1400094 PRESENT DATE: MAY 19T" 2014 APPROVAL DATE: JUNE 2ND, 2014 COMPLETION VENDOR TOTAL COST DATE CLASSIC CONTRACTORS INC $182,587.00 09/05/2014 P O BOX 2798 LOVELAND CO 80528 BLUE LINE BLDGING SERVICES INC $205,879.00 13 weeks 3225 BLAKE ST#13 from NTP DENVER CO 80205 ECKSTINE ELECTRIC CO $237,358.00 10/10/2014 13739 WCR 25 'A PLATTEVILLE CO 80651 *TOBY TAYLOR/BLDGS & GROUNDS IS REVIEWING THE BIDS AT THIS TIME. 2014-1490 ooi‘ Hello