March 27, 2015
To: Board of County Commissioners
From: Toby Taylor
Subject: Centennial Generator Change Order#2; Bid #B1400094
During the Centennial Generator installation, the electrical contractor ran into issues and corrected
them as they were discovered. This resulted in additional work for both the electrician and the general
contractor to meet the cutover window, thus generating a change order for the amount of$4,743. This
is the second change order request for this project. The first change order request was made on June 6,
2014. It was denied as a better cost effective solution was developed.
The work for Change Order 2 in the amount of$4,743.00 needed to be done to meet the time
limitations of installation on the weekend as to not disrupt the operation of the data center for the
County. Therefore, Buildings and Grounds is recommending approval of this change order.
If you have any questions, please contact me at extension 2023.
Sincerely,
Toby Taylor
Director
aoi�-I`-19C` I
3-30-2O,6 �; 6&(r-1,/
$G a�i�
01 /0
•'
Document t' ���
Request for Change Order
PROJECT: Name and address) CHANGE ORDER NUMBER
Centennial Data Center Generator DATE: 23-Ma,-15
915 10th Street
Greeley CO 80631 ARCHITECT'S PROJECT NUMBER
CONTRACTOR: (Name and address)
Classic Contractors.Inc CONTRACT DATE 6-Jun-14
P.O.Box 2n8
8
Loveland.CO 80539 CONTRACT FOR: Centennial Data Center Generator
We are requesting the following changes to the Work:
(Include all changes an the work below. use additional sheets rf required)
Added electrical changes per Southpaw Electric $4743.00
The original(Contract Sum) (Guaranteed Maximum Price)was 5 182587.00
The net change by previously authorized Change Orders s o 00
The Contract Sum(Guaranteed Maximum Price)prior to this Change Order was 5 182567 00
The Contract Sum(Maximum Price)will be increased)decreased/unchanged
by this Change Order in the amount of s 4743.00
The new(contract Sum)(guaranteed Maximum Price)including this Change Order will be S 187330.00
LIST SCHEDULE IMPACT BELOW IF ANY
Weld County Commissioners
MJ,4 Classic Contractors,Inc Board
ARCHIT CT(Firm name) CONTRACTOR(Finn name) OWNER(Frmi name)
PO Bo ',798 Loveland,CO805: 1150 0 Street, Greeley, CO 80632
ADDRESS ADDR J `� ADDRES
r / J/ " J I n • A.
BY(Signature) (Sig lure)e) r BY(Signature) JLJ /
Karl Schmidt Barbara Kirkmeyer, Chair
;Typed Name) ('Wed Name) Typed Name)
MAR 3 0 2015
23-Mar-15
DATE DATE DATE
02o/ / 6,/fo
CLASSIC CONTRACTORS,INC. EST Date:March 23,2015
P.O.Box 2798 Description: Centennial Generator CO 2 Misc.electrical changes per attached Invoice 7017 from Southpaw Electric
Loveland,CO. 80539
PO
LABOR HOURS RATE TOTAL
Mgr/Est Salary 0 hrs. $ 45.00 $ -
Foreman Regular time 0 hrs. $ 35.00 $ -
Overtime 0 hrs. $ 52.50 $ -
Carpenter Regular time 0 hrs. $ 33.00 $ -
Overtime 0 hrs. $ 49.50 $ -
Laborer Regular time 0 hrs. $ 2300 $ -
Overtime 0 hrs. $ 34.50 $ -
Subtotal $Vacation Pay 4 17% $ -
Small tools 5.00% $ -
Payroll taxes,Worker's Comp, 39.40% $TOTAL LABOR $
MATERIAL&EQUIPMENT Qty Price AMOUNT
$O 00 $ -
$0.00 $
$0.00 $
$0.00 $ -
$0.00 $ -
TOTAL MATERIAL&EQUIPMENT $ -
SUBCONTRACTORS AMOUNT
Southpaw Electric $ 3,605 00
TOTAL SUBCONTRACTORS $ 3,605.00
MISCELLANEOUS AMOUNT
TOTAL MISCELLANEOUS $ -
SUBTOTAL $ 3,605 00
INSURANCE 1.25% $ 45.06
GENERAL CONDITIONS 10.00% $ 360.50
SUBTOTAL $ 4,010.56
MANAGEMENT FEE 0.00% $ -
SUBTOTAL $ 4,010.56
OVERHEAD&PROFIT 1500% $ 601.58
SUBTOTAL $ 4,612 15
BOND 2.84% $ 130.98
TOTAL CHANGE ORDER $ 4.743.13
SCHEDULE IMPACT'.Add to schedule 1 Days if approved with days.
O\ NER/REPRESENT TIVE SIGNATURE: CLASSIC CONTRACTORS,INC.'.
Date. MARS al Date:
w 1 DEPARTMENT OF BUILDINGS AND GROUNDS
PHONE: (970) 304-6531
FAX: (970) 304-6532
WEBSITE: www.co.weld.co.us
G al) NTY
1105 H STREET
P.O. BOX 758
GREELEY, COLORADO 80632
May 22, 2014
To: Board of County Commissioners
From: Toby Taylor
Subject: Centennial Center Data Center Generator; Bid#81400094
As advertised, this bid is to install a generator for the Centennial Center Data Center. The low bid
received was from Classic Contractors Inc. for $182,587.00 and meets specifications. Therefore,
Buildings &Grounds is recommending the bid be awarded Classic Contractors Inc.
If you have any questions, please contact me at extension 2023.
Sincerely,
Toby Taylor
Director
aoi y- "/YO
WELD COUNTY PURCHASING
1150 O Street Room #107, Greeley CO 80631
16 E-mail: mwalters@co.weld.co.us
E-mail: r
l'O1;
Phone: (970) 356-4000, E t 4222 or 4223
IJ' r,' Fax: (970) 336-7226
vLriG O_U I
DATE OF BID: MAY 15T", 2014
REQUEST FOR: CENTENNICAL DATA CENTER GENERATOR
DEPARTMENT: BUILDINGS & GROUNDS DEPT
BID NO: #B1400094
PRESENT DATE: MAY 19T" 2014
APPROVAL DATE: JUNE 2ND, 2014
COMPLETION
VENDOR TOTAL COST DATE
CLASSIC CONTRACTORS INC $182,587.00 09/05/2014
P O BOX 2798
LOVELAND CO 80528
BLUE LINE BLDGING SERVICES INC $205,879.00 13 weeks
3225 BLAKE ST#13 from NTP
DENVER CO 80205
ECKSTINE ELECTRIC CO $237,358.00 10/10/2014
13739 WCR 25 'A
PLATTEVILLE CO 80651
*TOBY TAYLOR/BLDGS & GROUNDS IS REVIEWING THE BIDS AT THIS TIME.