Loading...
HomeMy WebLinkAbout20153343.tiff Exhibit F Evidence of Adequate Water Supply Potable water will be provided during construction by the contractor and DCP. After construction, the site will be unmanned, and no potable water is deemed necessary for the site. In the event of a fire, water or chemical fire retardants would be transported to the site by the Galeton Fire Department. Bottled water will be provided during construction by: • Deep Rock Water Company 2633 California St. Denver, CO 80205 Phone: 800-231-1693 Exhibit G Evidence of Adequate Sewage Disposal Temporary sewage disposal units will be provided by the contractor during construction. After construction, the site will be unmanned. However, a portable toilet will be provided for use by DCP employees visiting the site. Sewage disposal will be handled by: • S&B Porta-Bowl Services 3263 Oakland St., Aurora, CO 80010 Phone: 970-339-5252 Hello