Loading...
HomeMy WebLinkAbout20153124.tiff MEMORANDUM i86i it �, TO: ::::: 1:: Services DATE: � N ? Y FROM: Wayne Howard, P.E., Development Engineer SUBJECT: USR14-0071/Buffalo Wallow Tower The Weld County Engineering Development Review has reviewed this proposal. Staff comments made during this phase of the process may not be all-inclusive, as other concerns or issues may arise during the remaining application process. Issues of concern must be resolved with the appropriate departments. Our comments and requirements are as follows: COMMENTS: Parcel(s): 02 87310 00 004 Approximate Access Location: On CR 112 approx. 1790 ft west of CR 111 measured on section line. An access permit has been approved for the access to the sites (AP14-00297). This area IS NOT in a Geologic Hazard Area. Traffic: Traffic will consist of an unmanned facility with site visit once per month. Drainage: No drainage requirements due to insignificant impacts. Other PW Permits: A Right-of-Way Use Permit is required for any work in the Weld County Right-of-Way. Contact Weld County Public Works at 970-304-6496 ext. 3764. A Transport Permit is required for any oversize and/or over weight vehicles. Contact Weld County Public Works at 970-304-6496 ext. 3764. CONDITIONS OF APPROVAL: The Map shall be amended to delineate the following: A. CR 112 and CR 111 are gravel local roads which requires a 60-foot right-of-way at full build out. The roads are maintained by Weld County. Pursuant to the definition of SETBACK in the Weld County Zoning (23-1-90), the required setback is measured from the right-of-way line. B. The applicant shall indicate specifically on the plat any easements and indicate whether they are dedicated, private, or deeded and label with recorded document and/or reception number. C. Show the approved access on the plat and label with the approved access permit number (AP14-00297). Prior to Construction: C:\Users\tjuanicorena\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.lE5\TSXUHSKU\USR14-0071 Whiting Buffalo Tower.docx A. If more than 1 acre is to be disturbed, a weld county grading permit will be required prior to the start of construction. Contact the planning department for application information. ADD THE FOLLOWING NOTES TO THE PLAT: 1. Should noxious weeds exist on the property, or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling the noxious weeds, pursuant to Chapter 15, Articles I and II, of the Weld County Code. 2. The historical flow patterns and runoff amounts will be maintained on the site. C:\Users\tjuanicorena\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.lE5\TSXUHSKU\USR14-0071 Whiting Buffalo Tower.docx MEMORANDUM LITE UA TO: Diana Aungst, Planning Services N T T—V FROM: Lauren Light, Environmental Health G SUBJECT: USR14-0071 Timbro Ranch & Cattle Co., LLC, C/O Whiting Oil and Gas Corporation DATE: 9/25/2015 Environmental Health Services has reviewed this proposal for a 160 foot tall telecommunications tower in the A (Agricultural) Zone District. As no employees will be located at the site, permanent water and sewer is not required. Bottled water, portable toilets and hand washing units can be utilized during construction. We have no objections to the proposal; however, we recommend that the following requirements be incorporated into the permit as development standards: 1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S.) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5. 3. Waste materials shall be handled, stored, and disposed of in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. 4. Adequate drinking (bottled water), toilet facilities (portable toilets) and hand washing units shall be provided during construction of the facility. 5. The operation shall comply with all applicable rules and regulations of State and Federal agencies and the Weld County Code. • T Department of Planning Services 1555 N 17th Ave Greeley, CO 80631 COUNTY (970) 353-6100 Weld County Referral Date: December 18,2014 Applicant: Timbro Ranch & Cattle Co., LLC,c/o Whiting Oil and Gas Corporation Project: A Site Specific Development Plan and Use by Special Review Permit for a 160-foot tall Telecommunications Tower in the A (Agricultural)Zone District. Case Number: USR14-0071 Parcel Number: 028731000004-R0219786 After reviewing the application and documents submitted the Building Department has the following comments: A building and electrical permit will be required, per Section 29-3-10 of the Weld County Code, for any new structures ,additions or renovation to any structures. A building permit application must be completed and two complete sets of engineered plans Buildings and structures shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2012 International Building Code; 2012 International Mechanical Code; 2012 International Plumbing Code:; 2012 International Fuel Gas Code; 2006 International Energy Code; 2011 National Electrical Code; 2009 ANSI 117.1 Accessibility Code and Chapter 29 of the Weld County Code. All building permit requirements can be found on the Weld County web-site. www.co.weld.co.us/Building Inspection/Commercial Permits Frank Piacentino Department of Building Inspection Hello