HomeMy WebLinkAbout20150199.tiff ,
r
�° Federal Emergency Management Agency
c...
h. Washington, D.C. 20472
eqND sx(' January 7,2015
CERTIFIED MAIL IN REPLY REFER TO:
RETURN RECEIPT REQUESTED Case No.: 14-08-0841R
Community Name: Weld County,CO
The Honorable Barbara Kirkmeyer Community No.: 080266
Chair,Weld County Board of Commissioners
P.O. Box 758
Greeley,CO 80632
Dear Ms.Kirkmeyer
We are providing our comments with the enclosed Conditional Letter of Map Revision(CLOMR)on a proposed
project within your community that,if constructed as proposed,could revise the effective Flood Insurance Study
report,Flood Insurance Rate Map,Flood Boundary and Floodway Map for your community.
If you have any questions regarding the floodplain management regulations for your community,the National Flood
Insurance Program(NFIP)in general,or technical questions regarding this CLOMR,please contact the Director,
Mitigation Division of the Federal Emergency Management Agency(FEMA)Regional Office in Denver,Colorado,at
(303)235-4830,or the FEMA Map Information eXchange(FMIX)toll free at 1-877-336-2627(1-877-FEMA MAP).
Additional information about the NFIP is available on our website at http://www.fema.gov/nfip.
Sincerely,
Luis Rodriguez,P.E.,Chief
Engineering Management Branch
Federal Insurance and Mitigation Administration
List of Enclosures:
Conditional Letter of Map Revision Comment Document
cc: Mr.Clay Kimmi,P.E.,CFM
Senior Engineer
Weld County
Mr. Kenneth C. Robinson,P.E.,CFM
Senior Engineer
Atkins
tOmww4t C L fA CC: PC-Plod 1 949 2015-0199
Page 1 of 5 tissue Date:January 7,2015 ICase No.: 14-08-0841R I CLOMR-APP
olART4,�>,
f \A-j,
a
Federal Emergency Management Agency U'3F ,r Washington, D.C. 20472
'' q< ND 660."
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT
COMMUNITY INFORMATION PROPOSED PROJECT DESCRIPTION BASIS OF CONDITIONAL REQUEST
Weld Count yo
FLOODWAY
Cou e HYDRAULIC ANALYSIS
Colorad
(Unincorporated Areas) NEW TOPOGRAPHIC DATA
COMMUNITY
COMMUNITY NO.: 080266
APPROXIMATE LATITUDE 8 LONGITUDE: 40.408,-104.616
IDENTIFIER Weld County Road 49 Extension(South Platte River) SOURCE: USGS QUADRANGLE DATUM: NAD 83
AFFECTED MAP PANELS
TYPE: FIRM' NO.: 0802660637C DATE: September 28,1982 'FIRM-Flood Insurance Rate Map
FBFM-Flood Boundary and Fbodway Map
TYPE: FIRM' NO.: 08026606450 DATE: September 28,1982
TYPE: FBFM" NO.: 0802660007 DATE: September 28,1990
TYPE:FBFM" NO.: 080266 0010 DATE: September 28,1990
FLOODING SOURCE(S)AND REACH DESCRIPTION
South Platte River-from approximately 1,200 feet downstream to approximately 5,560 feet upstream of Weld County Road
PROPOSED PROJECT DESCRIPTION
Flooding Source Proposed Project Location of Proposed Project
South Platte River New Bridge At Weld County Road 49
SUMMARY OF IMPACTS TO FLOOD HAZARD DATA
Flooding Source Effective Flooding Proposed Flooding Increases Decreases
South Platte River Floodway Fbodway Yes Yes
BFEs' BFEs None Yes
Zone Al-A30 Zone AE Yes Yes
•BFEs-Base(1-percent-annual-chance)Flood Elevations
COMMENT
This document provides the Federal Emergency Management Agency's(FEMA's)comment regarding a request for a CLOMR for the project described above. This
document is not a final determination;it only provides our comment on the proposed project in relation to the flood hazard information shown on the effective
National Flood Insurance Program(NFIP)map. We reviewed the submitted data and the data used to prepare the effective flood hazard information for your
•
community and determined that the proposed project meets the minimum floodplain management criteria of the NFIP. Your community is responsible for approving
all floodplain development and for ensuring that all permits required by Federal or State/Commonwealth law have been received. State/Commonwealth,county,
and community officials,based on their knowledge of local conditions and in the interest of safety,may set higher standards for construction in the Special Flood
Hazard Area(SEHA),the area subject to inundation by the base flood. If the State/Commonwealth,county,or community has adopted more restrictive or
comprehensive floodplain management criteria,these criteria take precedence over the minimum NFIP criteria.
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)toll
free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,847 South Pickett Street,Alexandria,VA 22304. Additional Information about
the NFIP is available on the FEMA website at http:/Avww.fema.gov/nfip.
-4-.4;4-z.: ':4,--.' _
Luis Rodriguez,P.E.,Chief
Engineering Management Branch
Federal Insurance and Mitigation Administration 142877 PT202.BXR.14080841R.BG 104
Page 2 of 5 Ilssue Date:January 7,2015 ICase No.: 14-08-0841R I CLOMR-APP
rvpt,CART,jyF�.a
ay.tfiriLai ON, Federal Emergency Management Agency
Washington, D.C. 20472
'*.RND st
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
COMMUNITY INFORMATION
To determine the changes in flood hazards that will be caused by the proposed project,we compared the hydraulic modeling reflecting the proposed
project(referred to as the proposed conditions model)to the hydraulic modeling used to prepare the Flood Insurance Study(FIS)(referred to as the
effective model). If the effective model does not provide enough detail to evaluate the effects of the proposed project,an existing conditions model
must be developed to provide this detail. This existing conditions model is then compared to the effective model and the proposed conditions model to
differentiate the increases or decreases in flood hazards caused by more detailed modeling from the increases or decreases in flood hazards that will be
caused by the proposed project.
The table below shows the changes in the BFEs:
BEE Comparison Table
Flooding Source:South Platte River BFE Change(feet) Location of maximum change
Existing vs. Maximum increase None N/A
Effective Maximum decrease 1.6 Approximately 1,290 feet upstream of Weld County Road
Proposed vs. Maximum increase None N/A
Existing Maximum decrease 0.2 Approximately 580 feet upstream of Weld County Road
Proposed vs. Maximum increase None N/A
Effective Maximum decrease 1.6 Approximately 1,290 feet upstream of Weld County Road
NFIP regulations Subparagraph 60.3(6)(7)requires communities to ensure that the flood-carrying capacity within the altered or relocated portion of
any watercourse is maintained. This provision is incorporated into your community's existing floodplain management ordinances;therefore,
responsibility for maintenance of the altered or relocated watercourse,including any related appurtenances such as bridges,culverts,and other drainage
structures,rests with your community. We may request that your community submit a description and schedule of maintenance activities necessary to
ensure this requirement.
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)
loll free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,847 South Pickett Street,Alexandria,VA 22304. Additional
Information about the NFIP is available on the FEMA website at http://www.fema.gov/ntlp.
..
Luis Rodriguez,P.E.,Chief
Engineering Management Branch
Federal Insurance and Mitigation Administration 142877 PT202.BKR.14080841R.BG 104
Page 3 of 5 Ilssue Date:January 7,2015 (case No.: 14-08-0841 R I CLOMR-APP
r"ciT,YAR r/1;4',
Federal Emergency Management Agency
px ,,r;It is g Y g Y
°r�Ft�'vf'S�c�e= Washington, D.C. 20472
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
COMMUNITY INFORMATION (CONTINUED)
DATA REQUIRED FOR FOLLOW-UP LOMR
Upon completion of the project,your community must submit the data listed below and request that we make a final determination on
revising the effective FIRM,FBFM,and FIS report. If the project is built as proposed and the data below are received,a revision to the
FIRM,FBFM,and FIS report would be warranted.
•Form 1,entitled"Overview&Concurrence Form." Detailed application and certification forms must be used for requesting final
revisions to the maps. Therefore,when the map revision request for the area covered by this letter is submitted,Form I must be included.
If as-built conditions differ from the proposed plans,please submit new forms,which may be accessed at
http://www.fema.gov/plan/prevent/fhm/dlmt-2.shtm,or annotated copies of the previously submitted forms showing the revised
information.
•Hydraulic analyses,for as-built conditions,of the base flood;the 10-percent,2-percent,and 0.2-percent-annual-chance floods;and the
regulatory floodway,together with a topographic work map showing the revised floodplain and floodway boundary delineations.Please
ensure that the revised information ties in with the current effective information at the downstream and upstream ends of the revised
reach.
•An annotated copy of the FIRM,at the scale of the effective FIRM,that shows the revised floodplain and floodway boundary
delineations shown on the submitted work map and how they tie into the floodplain and floodway boundary delineations shown on the
current effective FIRM at the downstream and upstream ends of the revised reach
•As-built plans,certified by a registered professional engineer,of all proposed project elements
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)toll
free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,847 South Pickett Street,Alexandria,VA 22304. Additional Information about
the NFIP is available on the FEMA website at http://www.fema.gov/nip.
Luis Rodriguez,P.E.,Chief
Engineering Management Branch
Federal Insurance and Mitigation Administration 142877 PT202.BKR.14080841R.BG 104
Page 4 of 5 'Issue Date:January 7,2015 'Case No.: 14-08-0841R I CLOMR-APP
5' 1,
a�( � Federal Emergency Management Agency
Vir j
1 Washington, D.C. 20472
'ee NDSE0 .�.
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
COMMUNITY INFORMATION (CONTINUED)
•A copy of the public notice distributed by your community,stating its intent to revise the regulatory floodway,or a signed statement by
your community that it has notified all affected property owners and affected adjacent jurisdictions
•Documentation of the notification to property owners who will be affected by any widening/shifting of the base floodplain and/or any
BFE increases along South Platte River
•A letter stating that your community will adopt and enforce the modified regulatory floodway,OR,if the State/Commonwealth has
jurisdiction over either the regulatory floodway or its adoption by your community,a copy of your community's letter to the appropriate
State/Commonwealth agency notifying it of the modification to the regulatory floodway and a copy of the letter from that agency stating
its approval of the modification
•FEMA's fee schedule for reviewing and processing requests for conditional and final modifications to published flood information and
maps may be accessed at http://www.fema.gov/plan/prevent/fhm/frm_fees.shtm. The fee at the time of the map revision submittal must
be received before we can begin processing the request. Payment of this fee can be made through a check or money order,made payable
in U.S.funds to the National Flood Insurance Program,or by credit card(Visa or MasterCard only). Please forward the payment,along
with the revision application,to the following address:
LOMC Clearinghouse
847 South Pickett Street
Alexandria,VA 22304
After receiving appropriate documentation to show that the project has been completed,FEMA will initiate a revision to the FIRM,
FBFM,and FIS report. Because the flood hazard information(i.e.,base flood elevations,base flood depths, SFHAs,zone designations,
and/or regulatory floodways)will change as a result of the project,a 90-day appeal period will be initiated for the revision,during which
community officials and interested persons may appeal the revised flood hazard information based on scientific or technical data.
This comment is based on the flood data presently available.-If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)toll
free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,847 South Pickett Street,Alexandria,VA 22304. Additional Information about
the NFIP is available on the FEMA website at http://www.fema.gov/nfip.
{
Luis Rodriguez,P.E.,Chief
Engineering Management Branch
Federal Insurance and Mitigation Administration 142877 PT202.BKR.14080841R.BG 104
Page 5 of 5 tissue Date:January 7,2015 (Case No.: 14-08-0841R I CLOMR-APP
.4e-A344,,.,
''y. r;
i Federal Emergency Management Agency
. ''''' --el, 1 D.C. 20472
'-c-two stc:77
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
COMMUNITY INFORMATION (CONTINUED)
COMMUNITY REMINDERS
We have designated a Consultation Coordination Officer(CCO)to assist your community. The CCO will be the primary liaison between
your community and FEMA. For information regarding your CCO,please contact:
Ms.Jeanine D.Petterson
Director,Mitigation Division
Federal Emergency Management Agency,Region VIII
Denver Federal Center,Building 710
P.O.Box 25267
Denver,CO 80225-0267
(303)235-4830
A preliminary study is being conducted for Weld County,Colorado and Incorporated Areas. Preliminary copies of the revised FIRM and
FIS report were submitted to your community for review on May 31,2013,and may become effective before the Letter of Map Revision
(LOMR)request following this CLOMR is submitted. In addition,the upstream end of this CLOMR for the South Platte River overlaps
another approved CLOMR(Case No. 14-08-1088R),and that LOMR may be issued and become effective prior to the LOMR requiest
following this CLOMR.Please ensure that the data submitted for the LOMR ties into the data effective at the time of the submittal.
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)toll
free at 1-877-336-2627(1-677-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,847 South Pickett Street,Alexandria,VA 22304. Additional Information about
the NFIP is available on the FEMA website at http://w.w✓.fema.gov/nip.
•
Luis Rodriguez,P.E.,Chief
Engineering Management Branch
Federal Insurance and Mitigation Administration 142877 PT202.BKR.14080841R.BG 104
Hello