'� �.� LAND USE APPLICATION J� SUMMARY SHEET T Y -' -r Planner: C. Gathman Case Number: MUSR14-0030 Applicant: Heartland Biogas LLC Authorized Tim Naylor, AGPROfessionals Agent: Request: A Minor Amendment to a Site Specific Development Plan and Use by Special Review Permit No. USR-1704 (solid waste disposal site and facility including Class composting, an animal waste recycling or processing facility (an anaerobic digester- based renewable energy plant (gas)) along with a concrete batch plant to be used for construction of the facility) for the addition of a Digester Process System and a 70-foot flare in the A (Agricultural) Zone District Legal Being a part of the SE4 of Section 25, T4N, R65W of the 6th P.M., Weld County, CO Description: Location: West of and adjacent to County Road 49; north of and adjacent to County Road 40 Size of Parcel: +/- 115.91 acres Parcel No. 105525400011 POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS The criteria for review of this Special Review Permit are listed in Section 23-2-220 of the Weld County Code. The Department of Planning Services' staff has received referral responses with comments from the following agencies: y Weld County Department of Planning Services-Engineer, referral dated February 5, 2015 9 Weld County Department of Public Health and Environment, referral dated February 12, 2015 A Weld County Code Compliance, referral dated December 12, 2014 The Department of Planning Services' staff has received referral responses without comments from the following agencies: ➢ Colorado Parks and Wildlife, referral dated January 12, 2015 9 Central Weld County Water District, December 15, 2014 The Department of Planning Services' staff has not received responses from the following agencies: > Emergency Management Office > Department of Public Works—Access Permit ➢ Colorado Department of Public Health and Environment ➢ La Salle Fire Protection District ➢ Southeast Weld Soil Conservation District MUSR14-0030 Page 1 of 12 ➢ Weld County Building Department M USR 14-0030 Page 2 of 12 trt SPECIAL REVIEW PERMIT ADMINISTRATIVE REVIEW 1 � ._ CUN r Planner: C. Gathman Case Number: MUSR14-0030 Applicant: Heartland Biogas, LLC Authorized Tim Naylor—AGPROfessionals Agent: Request: A Minor Amendment to a Site Specific Development Plan and Use by Special Review Permit No. USR-1704 (solid waste disposal site and facility including Class I composting, an animal waste recycling or processing facility (an anaerobic digester-based renewable energy plant (gas)) along with a concrete batch plant to be used for construction of the facility) for the addition of a Digester Process System and a 70-foot flare in the A (Agricultural) Zone District Legal Being a part of the SE4 of Section 25, T4N, Ri351/1/of the 6th P.M., Weld County, CO Description: Location: West of and adjacent to County Road 49; north of and adjacent to County Road 40 Size of Parcel: +/- 115.91 acres Parcel No.105525400011 THE DEPARTMENT OF PLANNING SERVICES' DIRECTOR APPROVES THIS APPLICATION FOR THE FOLLOWING REASONS: 1. The proposed change(s) will be compatible with existing and allowed uses in the surrounding area and be in harmony with the neighborhood. The proposed digester processing system will not increase traffic to the existing Heartland Renewable Energy Plant. The application indicates that traffic to the site will be reduced by approximately 10%. Only four (4) employees (2 employees per shift will be associated with this use. Per the application materials, the flare will be used only periodically (during maintenance or when the facility or when the valve for sale of gas is shut). Additionally, the flare allows 100% of the gases produced by Heartland to be combusted should an emergency situation occur. 2. The proposed change(s) is consistent with the County Comprehensive Plan pursuant to Chapter 22 of the Weld County Code. Section 22-2-20 B.3 A.Policy 2.3. states: "Encourage development of agriculture and agriculturally related businesses and industries in underdeveloped areas where existing resources can support a higher level of economic activity. Agricultural businesses and industries include those related to ranching, confined animal production, farming, greenhouse industries, landscape production and agri-tainment or agri-tourism uses." The proposed digester system will reduce traffic to the site and enhance the ability of the Heartland facility to process agricultural and other wastes. 3. The proposed change(s) will not result in a substantial adverse impact on the other property in the vicinity of the subject property. MUSR14-0030 Page 3 of 12 The proposed digester and flare are located approximately 1/3-1/2 mile to the east and northwest of the nearest single family residences. No letters or phone calls have been received from surrounding property owners in regards to this application. The site is already developed and the digester will reduce traffic to the site and the flare will only be operated when necessary. 4. The recommendations of the referral agencies have been considered. The attached Development Standards and Conditions of Approval address the requirements of the referral agencies. 5. Not deemed to be a major change. A Pre-Application (PRE12-0179) meeting was held on August 7, 2014. In discussions with the Weld County Department of Planning Services, the Weld County Public Department of Public Health and Environment, the Weld County Department of Public Works, and the Weld County Building Department it was determined that the proposed modifications are consistent with the existing permit and minor in nature. 6. Must be consistent with the original development standards. Many of the original development standards are still applicable and will be listed on the MUSR map. Some of the development standards have been updated to match existing policies and standards that have been revised since USR-1704 was originally approved in July of 2010. This approval is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Department of Planning Services' staff recommendation for approval is conditional upon the following: 1. Prior to recording the plat: A. An Improvements Agreement and Road Maintenance Agreement is required for offsite improvements at this site. Road maintenance including dust control, damage repair, specified haul routes and future triggers for improvements will be included. (Department of Planning Services—Engineer) B The applicant shall complete a Nonexclusive License Agreement for the upgrade and maintenance of Weld County Right-of-Way. (Department of Planning Services— Engineer) C. The map shall be amended to delineate the following: 1) All sheets of the plat shall be labeled MUSR14-0030. 2) The attached Development Standards. 3) The map shall be prepared per Section 23-2-260.D of the Weld County Code. 4) County Road 40 is unmaintained section line right of way. The applicant shall verify and delineate on the map the existing right-of-way and the documents creating the right-of- way. All setbacks shall be measured from the edge of right-of-way. This road is not maintained by Weld County. (Department of Planning Services—Engineer) 5) Show the approved access on the plat and label with the approved access permit number. (Department of Planning Services—Engineer) 6) Show the approved non-exclusive license agreement on the Plat and label it with the recorded reception number and date (rec#xxxxxxxxx, date). (Department of Planning Services— Engineer) MUSR14-0030 Page 4 of 12 7) The applicant shall indicate specifically on the plat any right of way and/or easements and indicate whether they are dedicated, private, or deeded and label with recorded document, book and page and/or reception number to provide adequate access to the parcel. (Department of Planning Services— Engineer) 8) Show and label standard tracking control onto publically maintained roadways on the map. (Department of Planning Services— Engineer) 9) Show and label the drainage flow arrows, turning radii, and parking and circulation on the map. (Department of Planning Services— Engineer) 10) Add the following signature blocks: a) CERTIFICATE OF APPROVAL BY THE DEPARTMENT OF PLANNING SERVICES -ADMINISTRATIVE REVIEW This minor amendment plat is accepted and approved by the Department of Planning Services for filing. State of Colorado ) Director, Department of Planning Services ss. County of Weld ) The foregoing certification was acknowledged before me this day of , 20 My commission expires _ Witness my hand and Seal. Notary Public b) PROPERTY OWNER'S CERTIFICATION The undersigned major property owner(s) do hereby agree to the Minor Amendment of the Site Specific Development Plan and Use by Special Review Standards as described hereon this day of , 20 Signature Printed Name 2. Upon completion of Condition of Approval #1 above, the applicant shall submit one (1) paper copy or one (1) electronic copy (.pdf) of the plat for preliminary approval to the Weld County Department of Planning Services. Upon approval of the plat the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section 23-2- 260.D of the Weld County Code. The Mylar plat and additional requirements shall be submitted within sixty (60) days from the date the administrative review was signed or date of the Board of County Commissioners Resolution, The applicant shall be responsible for paying the recording fee. MUSR14-0030 Page 5 of 12 3. In accordance with Weld County Code Ordinance 2006-7 approved June 1, 2006, should the plat not be recorded within the required sixty (60) days from the date the administrative review was signed or date of the Board of County Commissioners Resolution a $50.00 recording continuance charge shall added for each additional 3 month period. 4. The Department of Planning Services respectfully requests a digital copy of this Use by Special Review, as appropriate. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are ArcView shapefiles or ArcGIS Personal GeoDataBase (MDB). The preferred format for Images is .tif (Group 4). (Group 6 is not acceptable). This digital file may be sent to maos(d,co.weld co us 5. The Use by Special Review activity shall not occur, nor shall any building or electrical permits be issued on the property, until the Use by Special Review plat is ready to be recorded in the office of the Weld County Clerk and Recorder. 6. Prior to Construction: A. If more than 1 acre is to be disturbed for construction of non pipeline items such as structures, parking lots, laydown yards etc..., a Weld County grading permit will be required prior to the start of construction. (Department of Planning Services— Engineer) B. A Right-of-Way Use Permit is required for any work in the Weld County Right-of-Way. Contact Weld County Public Works at 970-304-6496 ext. 3764. (Department of Planning Services— Engineer) C. A Transport Permit is required for any oversize and/or over weight vehicles. Contact Weld County Public Works at 970-304-6496 ext. 3764. (Department of Planning Services — Engineer) 7. Prior to Release of Building Permits: A. Heartland Renewable Energy (HRE) shall submit to the Division and Weld County for review and approval, a Construction Quality Assurance and Quality Control Plan ("CQA/QC Plan"), technical specifications, and construction drawings. The documents shall be submitted at least sixty (60) calendar days prior to commencement of construction. (Department of Public Health & Environment) B. The facility shall demonstrate that they have filed Air Pollutant Emission Notices (APEN) for all emissions points, including the filing of an APEN as an odorous source, and obtained all required Construction Permits from the Colorado Dept. of Public Health and Environment's Air Pollution Control Division, as required by Colorado Air Quality Control Commissions Regulation Number 3. Evidence of such shall be submitted in writing to the Weld County Department of Public Health and Environment. (Department of Public Health & Environment) 8. Prior to Operation: A. Following construction, Heartland Renewable Energy shall submit to Weld County and the CDPHE, Hazardous Materials and Waste Management Division, for review and approval a construction certification report, which includes construction record drawings, deviations from the approved plan, and results of all testing and documentation requirements set forth in the CQA/QC Plan. The construction certification report shall be submitted at least sixty (60) days prior to acceptance of feedstock. (Department of Public Health & Environment) B. Accepted construction drawings and construction of the offsite roadway improvements are required prior to operation. (Department of Planning Services — Engineer) C. Construction of the approved access and/or tracking control improvements is required prior to operation. (Department of Planning Services— Engineer) MUSR14-0030 Page 6 of 12 By /C-r— ' r Date: z- lz_s- Tom Parko Planning Director MUSR14-0030 Page 7of12 SITE SPECIFIC DEVELOPMENT PLAN USE BY SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS MUSR14-0030 1. A Minor Amendment to a Site Specific Development Plan and Use by Special Review Permit No. USR-1704 (solid waste disposal site and facility including Class I composting, an animal waste recycling or processing facility (an anaerobic digester-based renewable energy plant (gas)) along with a concrete batch plant to be used for construction of the facility) for the addition of a Digester Process System and a 70-foot flare in the A (Agricultural) Zone District, subject to the Development Standards stated hereon. 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. 3. Pursuant to Chapter 15, Articles I and II of the Weld County Code, if noxious weeds exist on the property or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling the noxious weeds. (Department of Public Works) 4. The maximum number of employees employed at the site shall be thirty(30), per shift. (Department of Planning Services) 5. The hours of operation will be 24 hours a day 7 days a week. Hauling will occur primarily during daylight hours. (Department of Planning Services) 6. The property owner or operator shall comply with the applicable sections of the regulations pertaining to the Solid Waste Disposal Sites and Facilities Act (6 CCR 1007-2) and be constructed, operated, and monitored as detailed in the application materials and conditions detailed in the Design & Operations Plan approval letter, dated April 7 2010, from the Colorado Department of Public Health and Environment (CDPHE) in conjunction with the application materials and conditions detailed in the Digester Processing System Engineering Design and Operation Plan Addendum approval letter, dated December 18 2014, from the CDPHE. (Department of Public Health and Environment) 7. Following construction, HRE shall submit to the Division and Weld County for review and approval a construction certification report, which includes construction record drawings, deviations from the approved plan, and results of all testing and documentation requirements set forth in the CQA/QC Plan. The construction certification report shall be submitted at least sixty (60) days prior to acceptance of feedstock. (Department of Public Health & Environment) 8. Volume records shall be maintained, which include waste material received, wastes processed, solid waste shipped for disposal, material shipped for sale or disposal, and the amounts of biogas produced or flared including tail gas destructed. An annual report shall be submitted to the Weld County Department of Public Health & Environment and the Colorado Department of Public Health and Environment (CDPHE) Hazardous Materials and Waste Management Division by May first of each year. (Department of Public Health & Environment) 9. The facility shall receive and process only those materials that are described in the approved Design and Operations Plan. The Weld County Department of Planning, WCDPHE, and CDPHE shall be notified in writing of any additional materials proposed for processing. Written approval from both CDPHE and WCDPHE to proceed with processing shall be obtained prior to acceptance. (Department of Public Health & Environment) MUSR14-0030 Page 8 of 12 10. The property owner or facility operator shall notify the Weld County Department of Public Health & Environment, Department of Planning Services and the Colorado Department of Public Health and Environment in the event of any deviations from or proposed changes to the facilities Design & Operations Plan. (Department of Public Health & Environment) 11. The Colorado Department of Public Health & Environment, Weld County Department of Public Health & Environment and the public shall be provided with notification in the event of temporary or permanent closure. Upon closure, the facility shall follow the closure plan portion of their approved Design & Operations Plan. (Department of Public Health & Environment) 12. The facility shall comply with the approved Groundwater Monitoring Plan. Changes in approved feedstock may require revisions to the groundwater testing requirements and constituents analyzed. Groundwater Monitoring Reports will be submitted to the CDPHE and WCDPHE no later than March 1 following the reportable year. (Department of Public Health and Environment) 13. The facility shall be constructed, maintained and operated to ensure that contamination of soil and groundwater does not occur. (Department of Public Health and Environment) 14. All below-ground structures shall be double-lined and equipped with a leak detection system, unless otherwise approved in writing by both the CDPHE and Weld County Department of Public Health and Environment. Records of the leak detection system's operation, maintenance and observations shall be kept and made available upon request. (Department of Public Health and Environment) 15. Above ground waste receiving, storage, and processing tanks shall have impermeable secondary containment. The volume retained by the secondary containment shall be at least 110% of the volume of the largest tank inside the containment. (Department of Public Health & Environment) 16. Fugitive dust and fugitive particulate emissions shall be controlled on this site. The facility shall comply with their approved particulate emissions control plan. (Department of Public Health & Environment) 17. The facility shall operate in compliance with applicable Colorado Air Quality Control Regulations and comply with any permits issued by the Air Pollution Control Division. (Department of Public Health & Environment) 18. Exhaust removal systems shall be installed when necessary for enclosed areas and dust producing processes and equipment. Visible stack emissions from exhaust removal, material processing, and any combustion source shall not exceed 20% opacity (measured in accordance with EPA Reference Method 9). There shall be no visible emissions from any building openings (measured in accordance with EPA Reference Method 22). (Department of Public Health & Environment) 21. In accordance with the Colorado Air Quality Control Commissions Regulation Number 2, odor detected off site shall not exceed the level of seven-to-one (7:1) dilution threshold. (Department of Public Health & Environment) 22. Adequate drinking, handwashing and toilet facilities shall be provided for employees and patrons of the facility, at all times. Where 2 or less full time (40 hour week) employees are located on site, or where 4 or less part time (20 hour week) employees located on site portable toilets and bottled water are acceptable. As employees or contractors are on site for less than 2 consecutive hours a day portable toilets and bottled water are acceptable. Records of maintenance and proper disposal for portable toilets shall be retained on a quarterly basis and available for review by the Weld County Department of Public Health and Environment. Portable toilets shall be serviced by a cleaner licensed in Weld County and shall contain hand sanitizers. (Department of Public Health and Environment) MU SR14-0030 Page 9 of 12 23. Sewage disposal for the facility shall be by septic system. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to On-site Wastewater Treatment Systems (OWTS), (Department of Public Health and Environment) 24, Process wastewater (such as floor drain wastes) and laboratory wastewater shall not be disposed of through the facility's OWTS. These wastes shall be collected and disposed of in accordance with all local, state and federal rules and regulations and in accordance with the approved Waste Management Plan, (Department of Public Health and Environment) 25. The facility shall comply with the Colorado Dept. of Labor and Employment Division of Oil and Public Safety's Storage Tank Regulations (7 CCR 1101-14). Secondary containment shall also be required for any container holding fuel or oil with a volume greater than 50 gallons. The volume retained by the secondary containment shall be at least 110% of the volume of the largest tank inside the containment. Alternative protective measures may be allowed for regulated tanks, provided they comply with the storage tank regulations. A copy of any Spill Prevention, Control and Countermeasure Plans shall be provided to the Weld County Department of Public Health and Environment. (Department of Public Health & Environment) 26. There shall be no discharge of process wastewater or collected stormwater off property, except those discharges allowed by the Colorado Dept. of Public Health & Environment's Water Quality Control Division and/or a Colorado Discharge Permit System (COPS) discharge permit. (Department of Public Health & Environment) 27. The applicant shall obtain stormwater discharge permit coverage for construction activities from the CDPHE Water Quality Control Division. (Department of Public Health & Environment) 28. The facility shall be operated and maintained in a manner to prevent nuisance conditions from the attraction, breeding and emergence of birds, rodents, insects and other vectors. Additional control measures shall be implemented at the request of the Weld County Department of Public Health & Environment (Department of Public Health & Environment) 29, The facility shall adhere to the maximum permissible noise levels allowed in the Light Industrial Zone as delineated in Section 14-9-30 of the Weld County Code. (Department of Public Health & Environment) 30. Waste materials, not specifically addressed by other development standards, shall be handled, stored, and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. (Department of Public Health & Environment) 31. No permanent disposal of wastes shall be permitted at this site except those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30 20 100.5, C.R.S., as amended, and any and all wastes being composted in accordance with the approved Engineering Design and Operations Plan. (Department of Public Health and Environment) 32. All hazardous chemicals must be handled in a safe manner in accordance with product labeling and in a manner that minimizes the release of hazardous air pollutants and volatile organic compounds. All chemicals must be stored securely and in accordance with manufacturers' recommendations. (Department of Public Health and Environment) 33. Composting Operations will not extend past CD boundaries of the property. (Department of Public Health and Environment) 34. The operation shall comply with all applicable rules and regulations of State and Federal agencies and the Weld County Code. (Department of Public Health and Environment) 35. Should noxious weeds exist on the property, or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling the noxious weeds, pursuant to Chapter 15, Articles I and II, of the Weld County Code. (Department of Planning Services— Engineer) MUSR14-0030 Page 10 of 12 36. The historical flow patterns and runoff amounts will be maintained on the site. (Department of Planning Services—Engineer) 37. Weld County is not responsible for the maintenance of onsite drainage related features. (Department of Planning Services— Engineer) 38. There shall be no parking or staging of vehicles on County roads. On-site parking shall be utilized. (Department of Planning Services— Engineer) 39. The right-of-way or easement shall be graded and drained to provide an all-weather access. (Department of Planning Services— Engineer) 40. Sources of light shall be shielded so that light rays will not shine directly onto adjacent properties where such would cause a nuisance or interfere with the use on the adjacent properties in accordance with the plan. Neither the direct, nor reflected, light from any light source may create a traffic hazard to operators of motor vehicles on public or private streets. No colored lights may be used which may be confused with, or construed as, traffic control devices. (Department of Planning Services) 41. Building permits maybe required, per Section 29-3-10 of the Weld County Code. Currently the following has been adopted by Weld County: 2012 International Codes; 2006 International Energy Code; 2011 National Electrical Code; A building permit application must be completed and two complete sets of engineered plans bearing the wet stamp of a Colorado registered architect or engineer must be submitted for review. A geotechnical engineering report performed by a registered State of Colorado engineer shall be required or an open hole inspection. (Department of Building Inspection) 42. The property owner or operator shall be responsible for complying with the Design and Operation Standards of Chapter 23 of the Weld County Code. 43. Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations. 44. The Use by Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards, as shown or stated, shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. 45. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. 46. WELD COUNTY'S RIGHT TO FARM: Weld County is one of the most productive agricultural counties in the United States, typically ranking in the top ten counties in the country in total market value of agricultural products sold. The rural areas of Weld County may be open and spacious, but they are intensively used for agriculture. Persons moving into a rural area must recognize and accept there are drawbacks, including conflicts with long-standing agricultural practices and a lower level of services than in town. Along with the drawbacks come the incentives which attract urban dwellers to relocate to rural areas: open views, spaciousness, wildlife, lack of city noise and congestion, and the rural atmosphere and way of life. Without neighboring farms, those features which attract urban dwellers to rural Weld County would quickly be gone forever. MUSR14-0030 Page 11 of 12 Agricultural users of the land should not be expected to change their long-established agricultural practices to accommodate the intrusions of urban users into a rural area. Well-run agricultural activities will generate off-site impacts, including noise from tractors and equipment; slow-moving farm vehicles on rural roads; dust from animal pens, field work, harvest and gravel roads; odor from animal confinement, silage and manure; smoke from ditch burning; flies and mosquitoes; hunting and trapping activities; shooting sports, legal hazing of nuisance wildlife; and the use of pesticides and fertilizers in the fields, including the use of aerial spraying. It is common practice for agricultural producers to utilize an accumulation of agricultural machinery and supplies to assist in their agricultural operations. A concentration of miscellaneous agricultural materials often produces a visual disparity between rural and urban areas of the County. Section 35-3.5- 102, C.R.S., provides that an agricultural operation shall not be found to be a public or private nuisance if the agricultural operation alleged to be a nuisance employs methods or practices that are commonly or reasonably associated with agricultural production. Water has been, and continues to be, the lifeline for the agricultural community. It is unrealistic to assume that ditches and reservoirs may simply be moved "out of the way" of residential development. When moving to the County, property owners and residents must realize they cannot take water from irrigation ditches, lakes, or other structures, unless they have an adjudicated right to the water. Weld County covers a land area of approximately four thousand (4,000) square miles in size (twice the size of the State of Delaware) with more than three thousand seven hundred (3,700) miles of state and County roads outside of municipalities. The sheer magnitude of the area to be served stretches available resources. Law enforcement is based on responses to complaints more than on patrols of the County, and the distances which must be traveled may delay all emergency responses, including law enforcement, ambulance, and fire. Fire protection is usually provided by volunteers who must leave their jobs and families to respond to emergencies. County gravel roads, no matter how often they are bladed, will not provide the same kind of surface expected from a paved road. Snow removal priorities mean that roads from subdivisions to arterials may not be cleared for several days after a major snowstorm. Services in rural areas, in many cases, will not be equivalent to municipal services. Rural dwellers must, by necessity, be more self-sufficient than urban dwellers. People are exposed to different hazards in the County than in an urban or suburban setting. Farm equipment and oil field equipment, ponds and irrigation ditches, electrical power for pumps and center pivot operations, high speed traffic, sand burs, puncture vines, territorial farm dogs and livestock, and open burning present real threats. Controlling children's activities is important, not only for their safety, but also for the protection of the farmer's livelihood. MUSR14-0034 Page 12 of 12 iQ4Ao. DEPARTMENT OF PLANNING SERVICES 1555 N 17th AVE GREELEY, CO 80631 WEBSITE: www.co.weld.co.us E-MAIL: cgathman@co.weld.co.us ' PHONE: (970) 353-6100, Ext. 3537 G FAX: (970) 304-6498 December 12, 2014 NAYLOR TIM 3050 67TH AVE STE 200 GREELEY, CO 80634 Subject: MUSR14-0030 - A Minor Amendment to a Site Specific Development Plan and Use by Special Review Permit No. USR-1704 (solid waste disposal site and facility including Class I composting, an animal waste recycling or processing facility (an anaerobic digester-based renewable energy plant (gas)) along with a concrete batch plant to be used for construction of the facility) for the addition of a Digestor Process System and a 70-foot flare in the A(Agricultural) Zone District. On parcel(s) of land described as: PART SE4 SECTION 25, T4N OF THE 6TH P.M., WELD COUNTY, COLORADO. Dear Applicants: Your application and related materials for the request described above are complete and in order at this time. I will schedule a meeting with you at the end of the review period to discuss the referral comments received by our office. If you have any questions concerning this matter, please call. Respectfully, Digitally signed by Kristine Ranslem Reason:I am the author of this document 'U �"� Date:2014.12.12 09:06:09-07'00' Chris Gathman Planner From: Michelle Martin To: Chins Gathman Subject: FW: Heartland Direction Date: Tuesday,January 27,2015 8:38:32 PM Hi Chris, Please make sure we put this email in accela. Michelle Martin Planning Manager 1555 N 17th Ave Greeley, CO 80631 mmartin@co.weld.co.us PHONE: (970) 353-6100 x 3540 FAX: (970) 304-6498 • Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication.Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Janet Lundquist Sent: Tuesday, January 27, 2015 7:20 PM To: 'Tim Naylor; Don Dunker; Jay McDonald; Tom Parko Jr.; 'Tom Haren'; Richard Hastings; Bob Choate; 'John Pearson'; 'Ralph Daley'; 'Ronald Davies'; Chris Gathman; Michelle Martin; 'bob.turner@edf-re.com'; Elizabeth Relford Subject: Heartland Direction Hi All, Thank you for meeting with Staff on Thursday January 22nd. The Board of County Commissioners met with Public Works and Planning staff on Monday morning and unanimously directed staff to work with the applicant on the following items: 1. The applicant proposed access point, which is approximately 1,400 feet north of CR 40 on CR 49 will be closed. The closure will occur after the new access at CR 40 is completed. 2. The permanent access to the applicant's facility on CR 49 will be at CR 40. 3. The applicant will be responsible for the construction of the road from their facility to the intersection of CR 49 at CR 40.The estimated distance is 2,000 feet.The estimated cost to construct a new roadway equivalent to applicants existing roadway, is $128,380. 4. The applicant submitted a cost estimate of $864,000 for the turn lane improvements to be constructed with asphalt pavement. The $128,380 will be subtracted from the $864,000 estimate. Thus, the applicant will submit to Weld County$735,630 for intersection improvements at CR 40 and 49 as the permanent access point. 5. Applicant and Public Works staff will cooperate on creating a revised improvements agreement which will be submitted to the Board of County Commissioners for approval within 30 days. Please respond to this email, so we know you have received it. We look forward to resolving the above items and bringing the Heartland project to a close. If you have any additional questions please feel free to contact Elizabeth Relford or myself. Janet Lundquist Traffic Engineer Weld County Public Works Dept. P.O. Box 758, Greeley, CO 80632 Tele-970.356.4000 ext 3726 Fax- 970.304.6497 l Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication.Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. �. AGPROfessjonals ■ 1)1:\'L:1_C)L'L.RS OF A(:,1t1(::1 1..:11 RI_ January 30, 2015 Weld County Board of County Commissioners 1150 O Street Greeley, CO 80632 Dear Commissioners: There have been discussions with regards to the road improvements for the Heartland Biogas, LLC (HBG) facility located on Weld County Road 49 (CR49) directly north of Weld County Road 40 (CR40), specifically the requirements to construct acceleration and deceleration lanes on CR49 at the existing access. There have also been discussions about installing the needed improvements to the intersection of CR 40 and abandoning the approved access on CR 49 and moving the facility access to CR 40 west of CR 49. HBG is agreeable to the concept of the relocation of the approved access and the required road improvements to CR 40 at an equitable exchange comparable to the construction costs of the turn lanes at CR 49. HBG requests forty five (45) days to evaluate and review the construction requirements, easements and limitations of both CR 40 and the internal access road and all associated logistics and cost thereof. HBG will request additional bids for the construction of the original turn lanes to reflect current market conditions as well as costs for the internal road relocation and CR 40 improvements. In order to fully evaluate the engineering requirements of the intersection of CR 40 and the expansion of CR 40, HBG request the county's intersection and road design plans be provided to HBG's design engineer. HBG will not release the authorization to proceed with the above described review and evaluation until HBG is provided a response of basic agreement with this proposal by Weld County. In summary, the only remaining item would be agreement on exact costs and not access points and relocation. Please fl iree'to contact me if you have any questions with regards to the HBG proposal. r Sinncerely;' /; ------. ,Tom aren z'/' CEO Cc: Ralph Daley, EDF ENGINEERING, PLANNING, CONSULTING & REAL ESTATE 3050 671h Avenue• Suite 200•Greeley,CO 80634 970.535.9318/office• 970.535.9854/fax• wu w atzpros.conn From: Janet Lundquist To: Chris Gathman; Elizabeth Relford Cc: Michelle Martin Subject: RE: Heartland MUSR comments(DRAFT) - Let me know if you need anything added Date: Tuesday,February 24,2015 11:04:16 AM Hi Chris, I think you have us covered with the note about getting an approved access permit and the improvements agreement.To date we have not heard anything further from AgPro regarding the access on CR 40 or the current IA, but they told us they needed 45 days to respond. I bet these comments may act as a catalyst.Just as a note their access permit AP13-00111 expired 10/3/2013 and is not valid if they attempt to use that access number on any of the plans. They did apply for a new access permit at the old location but I have put a hold on that application. Janet Lundquist Traffic Engineer Weld County Public Works Dept. P.O. Box 758, Greeley, CO 80632 Tele-970.356.4000 ext 3726 Fax- 970.304.6497 . ,: Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication.Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Chris Gathman Sent: Tuesday, February 24, 2015 10:16 AM To: Elizabeth Relford; Janet Lundquist Subject: Heartland MUSR comments (DRAFT) - Let me know if you need anything added Dear Elizabeth and Janet, Attached are the draft Heartland USR comments. I think we have the access covered as the access location and permit number will need to be shown on the plat before they can finalize and record along with improvements agreement. If you see anything else needed let me know. FYI: I will be out of the office beginning this Thursday 2/26 and will be returning Monday 3/9. If you respond after that please copy Michelle Martin and Wayne Howard. Thanks! Chris Gathman Planner III Weld County Department of Planning Services 1555 N. 17th Avenue, Greeley CO. 80631 Ph: (970)353-6100 ext. 3537 Fax: (970)304-6498 ��•. -*te Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication.Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. MINOR AMENDMENT TO SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW (USR) APPLICATION FOR PLANNING DEPARTMENT USE DATE RECEIVED: RECEIPT#/AMOUNT# 1$ CASE#ASSIGNED: APPLICATION RECEIVED BY PLANNER ASSIGNED: Parcel Number 1 0 5 5 . 2 5 . 4 _ 0 0 _ 0 1 1 (12 digit number-found on Tax I.D.information,obtainable at the Weld County Assessor's Office,or www.co.weld.co,us) Legal Description PT SEA 25-4-85 , Section 25 , Township 04 North, Range 65 West Zone District; AG , Total Acreage: 115.9+/- , Flood Plain: No , Geological Hazard: No , Airport Overlay District: No FEE OWNER(S) OF THE PROPERTY: Name: Heartland Biogas, LLC Work Phone# 703-905-8110 Home Phone# 703-887-2010 Email rafph daley[eDedf-re.com Address: 15445 Innovation Drive Address: City/State/Zip Code San Diego, CA 92128 Name: Al Organics(Lessee) Work Phone# 970-454-3492 Home Phone# 303-710-9121 Email bobvostLalorganics.com Address 16350 WCR 76 _ Address: City/State/Zip Code Eaton, CO 80615 APPLICANT OR AUTHORIZED AGENT (See Betow:Authorization must accompany applications signed byAufhorizedAgent) Name:AGPROfessionals(Tim Naylor) Work Phone# 970-535-9318 Home Phone# Email tnaylor ,agpros.corn Address; 3050 67th Avenue, Suite 200 Address: City/State/Zip Code Greeley, CO 80634 - -- — - - PROPOSED AMENDMENT: Proposing to amend USR-1704 to allow for the addition of the Digester Proccess System(DPS)at the Heartland Biogas (HBO)facility. The DPS will receive source separated food waste material These incoming substrates will be documented, .particle sized reduced,hydrated and blended as needed prior to transferring to the l-IBG facility digester system (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my(our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be include indicating trait thait he signatory has to legal authority to sign for the corporation. Signature: OVi er or crth9rized Agent Date Signature: Owner or Authorized Agent Date 1, { AGPRO DEVELOPERS OF AGRIGfessio ULFURLnals September 11,2014 To Whom It May Concern: A-1 Organics is contracted with AGPROfessionals to process work related to all land use and permitting processes.AGPROfessionals is authorized to represent and request the release of all records necessary on the behalf of A-1 Organics. Sincerely, , JJJJJJ r j//0±;b_V Bob Yost, A-1 Org Hies Date ENGINEERING, PLANNING, CONSULTING & REAL ESTATE 3050 67`h Avenue•Suite 200•Greeley,CO 80634 970.535.9318(ofce• 970.535.98541 fax• www.agpros.com MINOR AMENDMENT TO A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW (USR) QUESTIONNAIRE Al Organics/Heartland Biogas, LLC 1. Explain, in detail, the proposed amendment to the property. Heartland Biogas, LLC (HBG) is requesting a minor amendment to USR-1704 to allow the addition of the Digester Process System (DPS) at the HBG site. The DPS will receive source separated food waste material as described in the Colorado Department of Public Health and Environment Approved Engineered Design and Operations Plan (EDOP), Waste Characterization Plan and be processed for the HBG facility digester. Locating the DPS at the HBG site will reduce truck traffic by approximately 10%by eliminating the added water if emulsified off site. Trucks containing food waste from the northeast Colorado vicinity will enter the facility, off load at the DPS receiving area, and leave. These incoming Substrates will be documented,particle sized reduced, hydrated, and blended as needed prior to transferring to HBG facility digester system. The DPS EDOP will be included in the HBG EDOP as an addendum and submitted to the Colorado Department of Public Health and Environment, Solid Waste Division for review and approval as part of the Use by Special Review (USR)process. The CDPHE solid waste department has reviewed the preliminary facility design and provided a letter stating that the amendment to the approved EDOP is not considered a substantial change to the provisions of the Certificate of Designation, the letter is included in the USR application. The HGB project has a flare that will be used if the PSA system is undergoing maintenance or if the valve for the sale of gas is shut so no gas will go to the common carrier pipeline. In the worst case, raw biogas will be sent to the flare for destruction. These flares provide for the combustion of 100%of the biogas being produced by the HGB facility should an emergency situation occur (such as a fault in the interstate gas pipeline that precludes injection of HGB's product gas). 2. Explain how this proposal is consistent with the intent of the Weld County Code, Chapter 22 (Comprehensive Plan). Sec. 22-2-20. Agriculture Goals and Policies A. 5. A.Policy 1.5. Support and entice agriculturally related businesses and processing facilities. The proposed use is consistent with the Weld County Comprehensive Plan through the encouragement of agriculture and agriculturally related businesses. The DPS is to be operated as part of a permitted agricultural business related animal waste material Minor Amendment to USR Al Organics/Heartland Biogas,LLC Page 2 of 3 recycling. The DPS will provide substrate as part of the input into the digester for the Heartland Biogas facility. 3. What types of uses surround the site? Explain how the proposed use is consistent and compatible with surrounding land uses. Agricultural uses that surround this site are primarily dairy farms,feedlots, crop farming, hay production, cattle grazing, and rural residential. This proposal is compatible with the surrounding agricultural uses and the Weld County Comprehensive Plan as apart of the approved USR. 4. Describe, in detail, the following: a. Number of people will use this site? Approximately two (2) employees will be using this site per shift. b. Number of employees proposed to be employed at this site? It is proposed that there will be four (4)full-time employees employed at this site. c. Hours of operation? The facility may operate seven days per week, twenty-four hours per day. Three (3) Eight (8) hour shifts, or as required. d. Type and number of structures to be erected(built) on this site? Applicant is proposing one (1) clearspan building and bio separator facility tanks and equipment. e. What type and number of animals, if any, will be on this site? No animals will be at this site. f. Kind of vehicles (type, size, weight) that will access this site and how often? Typical vehicles accessing this site include employee, end dump trucks, tandems, and side dump trucks, ranging from 40,000-80,000 gvw. g. Who will provide fire protection to the site? The LaSalle Fire Protection District provides fire protection. Minor Amendment to USR Al Organics/Heartland Biogas,LLC Page 3 of 3 h. What is the water source on the property? (Both domestic and irrigation) Central Weld County Water District i. Sewage disposal system on the property? (Existing and proposed). No septic systems are proposed on the DPS site. Portable toilets will be used until a septic system is necessary. j. If storage or warehousing is proposed, what type of items will be stored? There will be no storage of waste on this site. All incoming material will be in the process stream with the Biogas facility. k. Explain how the storm water drainage will be handled on the site. Storm water drains to the existing drainage system. 1. Explain where storage and/or stockpile of wastes will occur on this site. There is no storage of waste at this site. Any employee waste will be collected and removed by a local trash service, such as Waste Management or similar provider. 5. Please list all proposed on-site and off-site improvements associated with the use and a timeline of when you will have each one of the improvements completed. There are no proposed off-site improvements associated with the project. A specific schedule for the construction of the proposed modular office trailer and clearspan building have been completed, however, construction may start as soon as the Permit is completed and applicable building permits have been acquired WELD COUNTY ACCESS PERMIT 000& Weld County Public Works Dept. (V„ Phone: (970) 304-6496 1111 H Street After Hours: (970) 356-4000 P.O. Box 758 .mss. Emergency Services: (970) 304-6500 x 2700 Greeley, CO 80632 S Inspection: (970) 304-6480 Permit Number: AP13-00111 Issuance of this permit binds applicant and its contractors to all requirements,provisions,and ordinances of Weld County,Colorado. Project Name: Expiration date: 10/03/2013 Applicant Information: Property Owner Information: Name: Tim Naylor Name: Company: AGPROfessionals LLC Company: Phone: 970-535-9318 Phone: Email: tnaylor@agpros.com Email: Location: Proposed Use: Access is on WCR: 49 Temporary: Nearest Intersection WCR: 40 &WCR: 49 Single Residential: Distance From Intersection: 920 Industrial: Number of Existing Accesses: 2 Small Commercial: Planning Process: USR Oil&Gas. Large Commercial: Road Surface Type&Construction Information: Subdivision: Road Surface: Asphalt Field (Agricultural Culvert Size&Type: Oniy)/Exempt: Start Date: 05/01/2013 Finish Date: 04/01/2014 Materials to Construct Access'. gravel/asphalt Required Attached Documents Submitted: Access Pictures: Traffic Control Plan: Certificate of Insurance: Yes A copy of this permit must be on site at all times during construction hours Daily work hours are Monday through Friday DAYLIGHT to 1/2 HOUR BEFORE DARK(applies to weekends if approved) Approved MUTCD traffic control/warning devices are required before work begins and must remain until completion of work Special Requirements or Comments Please utilize the existng access point or close the existing access point for a new access point location. Approved by: -7 Janet Carter, Weld County Public Works Date: 5/6/2013 ilatz7f/' Print Date-Time: 5/6/2013 4.42:20PM Report ID. PW00008v002 Page 1 of 1 AGPROfessionals 1)E\•F.i.O1.1.1R,;(]F,-1(rRIC[iL11..R}_ 12/8/2014 A-1 Organics- Heartland Biogas Drainage Letter The proposed site design for A-1 Organics Digester Process System (DPS) is consistent with and does not significantly change the drainage of the Heartland Biogas Site. Therefore, a storm water quality pond is not required for this development as the improved area lies within the existing Heartland Biogas drainage area. The grading has been designed to allow for runoff consistent with the approved Heartland Biogas drainage and, other than the spill containment areas, act in accordance with the Heartland Biogas drainage plan. The A-1 Organic proposed area is almost entirely located within the previously described low perm pad location on the Heartland plan, so the area will be significantly more permeable than the low perm pad. Per the items described above, there should not be additional drainage submittals required for the introduction of the DPS site to the Heartland drainage area. r)f_ / d ,(O% 11 1 ��� e° \J F•� ze.o��e �N "✓ Chad TeVelde Civil Engineer ENGINEERING, PLANNING, CONSULTING & REAL ESTATE 3050 67th Avenue• Suite 200 •Greeley. CO 80634 AGPROfessionals Heartland Biogas, LLC Al Organics Nuisance Management Plan ! k.`„, Flt% f 9e "s ri ntml Existing gravel and/or road base will be used at the entrance and on internal roadways to control dust onsite. Should it be necessary to mitigate for excessive dust, a water tanker truck or portable sprinkling system may be used for moisture control on roadways. There will be no storage of wastes on this site. All materials will be in the production stream, recycled or collected in dumpsters and sent to the landfill. All materials not collected in dumpsters will be stored inside. Any wastes produced from employees will be contained in a dumpster and hauled off regularly by a sanitation service such as Waste Management, (877) 832-0410. 1 Noise generated by the proposed use will remain within the limits as established in Section 12- 12-101, C.R.S. The nuisance potential is measured from a property line at a distance of twenty-five feet. ENGINEERING, PLANNING, CONSULTING & REAL ESTATE 3050 67th Avenue• Suite 200•Greeley, CO 80634 970.535.9318 /office■ 970.535.9854/fax. www.agpros.com AGPROfessjona1s Heartland Biogas, LLC Al Organics Traffic Narrative Traffic Narrative: The traffic generated by the Al Organics Digester Process System (DPS) was included in the original Heartland Renewable Energy Traffic Impact Study dated April 12, 2010 as part of the product stream to the facility. The installation of the DPS at the Heartland Biogas site will reduce the amount of traffic for the substrate feedstock by approximately 10%by reducing the amount of water transported. Vehicles associated with the Heartland Biogas facility will continue to use the current approved haul route until the warranted off-site improvements are completed. The off-site improvements associated with the Heartland Biogas facility turn lanes have been addressed by separate cover through Heartland Biogas. ENGINEERING, PLANNING, CONSULTING & REAL ESTATE 3050 67th Avenue•Suite 200 •Greeley,CO 80634 970.535.9318 /office• 970.535.98541 fax• www.agpros.com Traffic Impact Study HEARTLAND RENEWABLE ENERGY SHELTON SITE Weld County, Colorado Prepared For: AGPROfessionais 4350 Highway 66 Longrnoni. CO 80504 Prepared By: Eugene G. Coppola PE. PTOE ",� "`'"` P. O. Box 63002,' P4�yh5TE •°�f'� Littleton, CO 80163 J °a� ec°. r 303-792-2450 L i 3M o t� spill 12. 2010 ` �I9Pa�,°o[a'GnALa Table of Contents I. INTRODUCTION 1 II. CURRENT CONDITIONS 3 A). Current Road Network 3 B). Current Traffic Conditions 3 C). Surrounding Land Uses 6 III. SITE ASSUMPTIONS 6 IV. FUTURE CONDITIONS 8 A). Background Traffic 8 B). Total Traffic 8 C). Roadway System 15 VI. TRAFFIC IMPACTS 15 A). Short Term 15 B). Long Term 17 VII. CONCLUSIONS 18 List of Figures Figure 1 Vicinity Map 2 Figure 2 Current Roadway Geometry 4 Figure 3 Current Traffic 5 Figure 4 Concept Plan 9 Figure 5 Site Traffic 10 Figure 6 Short-Term Background Traffic 11 Figure 7 Long-Term Background Traffic 12 Figure 8 Short-Term Total Traffic 13 Figure 9 Long-Term Total Traffic 14 Figure 10 Short-Term Roadway Geometry 16 I. INTRODUCTION Heartland Renewable Energy, LLC (Heartland) is proposing to design, permit, build and operate an anaerobic digester-based renewable energy plant for the primary purpose of producing pipeline grade natural gas from cattle manure and other organic waste streams. This traffic impact study updates the April 10, 2009 traffic impact study for this project. It reflects an access change, provides anticipated construction traffic, and addresses County comments of the earlier study. Heartland is located along the west side of Weld County Road 49 (CR 49) at Weld County Road 40 (CR 40). Access will be provided by a driveway to CR 49 north of CR 40. A vicinity map is presented in Figure 1. Key work tasks undertaken as part of this effort are described below, U Obtain current traffic and roadway data in the immediate area of the site. • Determine site generated traffic and distribute this traffic to the nearby street system. O Estimate traffic for future roadway conditions. • Evaluate traffic operations with the proposed facilities fully operational un- der future conditions. O Identify areas of potential deficiencies. 9 Recommend measures to mitigate the impact of site generated traffic and other deficiencies as appropriate. CCunl,y, Rail 44 -- ^_�4. -.---44 � L 1 --___��ourit Roaad44 f�, I -- Til 7. ,T' 43' C F C_ CO CO w0J R0 4 '4,2 A 1 (J L L47 49 73' - C R-38 °c 1- 38to 1 ro cr 011[0 Rod 35 ;3° c n v ro P X 1 - U .4- ii O10 \ U UI �'34 0 mi 1 2 3 * SITE c,...,,p,.--T-!.-.a-1 7;19.95.-":0-2-i Li 2resc:T Co'yzrauon a ndr]•.1s s_p:'.e's Al rl0t'!A'."e7.9.1 rOtG itaWN 5FL•L3J.^.C.0,,,0rEe:31 enal rap:- 3 z•, d c'ecl c^d_la 20:;3 NSVTE C A'.r:phts re-sane:, a^The Data'5- as C'Oa^ .ada des o:.That a a. 'e^u' pc—r-pc^ ss,c C-n!•cm :d-an aU.a,, •.as - `rp - . rte•Ma es!y the Pu0En:',R-5T.1 C Ca naaa a.agee-:s>✓cnter far Oalar 0 MALTE0 ar d N0.l EC ON S0A i2 are-, -7_sra s of NAUT 7 "7.7a.:.7,3 Te•a At la„Near A?. — .. earls rese rved Tc,c A!-as ana Tait AI!as Nan':Arne�!:-s,a,-...Irxdema�-5 C1 Te'''e;a'.as Is:CL 2.709 by Applied Oe' 'a,h aSys!er'r A'r.;rls reser:e,i i Fgure 1 VICINITY MAP 2 II. CURRENT CONDITIONS A). Current Road Network CR 49 is a major north — south roadway extending from 1-76 to U.S. 34. It is a two lane roadway with a posted speed limit of 65 MPH. The site is located in the north- west corner of the CR 49 — CR 40 (extended) intersection. CR 40 to the east of CR 49 is an unpaved two lane roadway which is under stop sign control at CR 49. Cur- rent roadway geometry is shown on Figure 2. B). Current Traffic Conditions Traffic counts were undertaken in conjunction with this study. Traffic was counted at the CR 49 - CR 40 intersection between the hours of 7:00 AM and 9:00 AM and between the hours of 4:00 PM and 6:00 PM framing the typical highway morning and afternoon peak hours. The high continuous peak hour within the two hour count times represents the morning and afternoon peak hours. Traffic during these peak hours is shown on Figure 3 with count sheets provided in Appendix A. The County has indi- cated that the traffic counts seem low, but further discussion determined that they are within normal fluctuations. Capacity analyses were conducted at the CR 49 — CR 40 intersection using current traffic demands and the existing roadway geometry. Current operating levels of service are shown below. CURRENT OPERATIONS — - _ Movement/ Level of Service Intersection Control Direction l AM PM --. _ SB LT 7 A A WB LR B B 3 O I A � I �SyaP CR 40 Figure 2 4 CURRENT ROADWAY GEOMETRY J H) rn .4- 0 N t0 fn r� C:11/122 CR4© e Iv V co a f LEGEND Aki/PM Peak Hour Figure 3 CURRENT TRAFFIC 5 ` J For definition purposes, acceptable levels of service (LOS) are defined as LOS 'D' or better with critical side street traffic movements allowed to operate LOS 'E' during peak times. As shown, acceptable operations are currently being experienced. Capacity worksheets are provided in Appendix B. C). Surrounding Land Uses The site is currently vacant and is surrounded by rural and agricultural land uses. III. SITE ASSUMPTIONS Heartland Renewable Energy, LLC is proposing to design, permit, build and operate an anaerobic digester-based renewable energy plant for the primary purpose of producing pipeline grade natural gas from cattle manure and other organic waste streams. This renewable energy gas production plant will use proprietary anaerobic digester technology that converts organic waste (cattle manure, food wastes, livestock processing, etc.) into a methane-rich gas which will be scrubbed of impurities and then injected into a natural gas pipeline. The plant will use technology in which an organic feed stock is placed in an air tight vessel where naturally occurring microbes digest the feedstock and create methane and carbon dioxide which is captured and processed. In addition to generating a needed domestic energy source, the gas production plant will have other significant benefits including: 6 t Producing a high grade compost which can be used in agriculture, land recla- mation, landscaping, golf courses, gardening, greenhouses, erosion preven- tion and mitigation; e Capturing carbon dioxide which is a "greenhouse gas" for use in medical ap- plications, welding, refrigeration and other uses. • By using cattle manure, food wastes and other organic wastes as feed stocks, the digester facility will help preclude release of pollutants to the environment and, in particular, will preclude the emission of significant amounts of nitrous oxide A temporary batch plant will be located on-site during construction. Some 30 - 40 truckloads per day of aggregate, cement, etc. are expected, with 10 - 15 worker vehicles. Construction will be complete prior to the start of routine operations. Since construction traffic will be temporary and significantly less than normal operating traffic, it is not considered critical Routine site activity is expected to start in 2010 at about 50% and increase to full production about 6 months later. Given the short time between start up and full production, the site is assumed at full production at the onset of operations. Heart- land will operate this facility 24 hours per day with three work shifts each having 6 — 8 employees. Shift times are expected to be from 7:00 AM — 3:00 PM, 3:00 PM — 11:00 PM and from 11:00 PM - 7:00 AM. At full operation, the facility will generate some 70 — 90 trucks per day with relatively equal distribution over the 24 hour work- day. Site visitors will be minimal with only 1 - 2 visitors per day. Peak site traffic will occur during shift changes. During these times 20 site trips are expected with a trip representing either an inbound or outbound traffic movement. Daily site traffic is expected to be 205 trips. The site will be served by a driveway along the west side of CR 49. It will be located about 900 feet north of CR 40 and will have with one lane in each direction. The 7 driveway will be paved as required by County standards. A field review of sight distance at the site driveway location was conducted. It was determined that with the driveway located on the roadway crest, about 900 feet north of CR 40, sufficient sight distance will be easily available. A concept plan for the Heartland site is provided on Figure 4. Site traffic is expected to arrive and depart the site equally to/from the north and south on CR 49. Anticipated site traffic shown on Figure 5. IV. FUTURE CONDITIONS A). Background Traffic Background traffic was developed using straight-line growth based on County growth factors contained in the Upper Front Range Regional Transportation Plan. Background peak hour traffic is shown on Figures 6 and 7 for the short-term (201 0) and long-term (2029) time frames, respectively. B). Total Traffic Total traffic (the combination of site traffic and background traffic) was developed for each future evaluation year. This information is shown on Figure 8 for the short-term and on Figure 9 for the long-term. 8 — I 1 - - hi?( ,{G 6)'.a l L(£1 it;i5 X61 i nom, mY.o tr3.rou,.-n,'r 54 '05 6()]Z-JU]cuJ(')u S Yt•,�i l{()At vrtc.aj tIIHxaix...�'.1 r.,nuvrnI.v au a uir+ ,_ r.d a�rsv�iraasoaax =I flsl! 11 a j, (?2i f1'j` t!_�: l ADS-AN-A RIaielt Ralf GKV-L.2[V--3N fI; {:III. _ I II i I, 4 ; s ! i : i r >,. . g l _ - - i :a Q I a.) I—ci_ i 1 ' i i E i----',--- i I I 1 I _ .r 7' _�.__ .. --' .�_`tj _.t fir._.=.= -J =, . ; �_-> mil` - ...air fkA - - 5 �' _ - ,�il'', { ii 1�� i fi i !j fl t r ,a `- �I l- • 1 ! ! [ If_I -a;q-•12:!--!z rC;: •• >-L t s J i, '1,� III� •f4 jk•II! CC �. pI: IL. 1 y O ( 'i ] I I7, :V tii ' -`-1.14- :: P I rte-- ry 3 -c i r � `i...]' � t ) f ELY' rE . \. lit-f 1L.,. • 5 , 1 �! y5.tf�t:,. .:„.:;,:-: , , „.....,k.-,, ,..,`-� #1 r _ .--=•. ---7,-_-_,...„„,_ _ _"▪ - _ mac- fI , "'ms-s_ - `~�. .L_. t t I l 9 o) O M co AJ Access 2/2 3/3 —/4 v., [2/2I 3/3 ; N LEGEND AM/PM Peak Hour Figure 5 xlx =Trucks, y/y = Cars SITE TRIPS 10 m LX U us A C.3 c`5 o C° r� CO Li) z N/N - N/N CR 40 A o z ti Z m LEGEND Atv/Ptt1 Peak Hour N = Nominal NOTE Rounded to nearest 5 vehicles. Figure 6 SHORT-TERM BACKGROUND TRAFFIC 11 U A 4r) C) Q Q F N L�J z r) z k--- N!5 I� -- N/5 CR40 Q A `o N LEGEND: AIM/PM Peak Hour N = Nominal NOTE: Rounded to neauest 5 vehicles Figure 7 LONG-TERM BACKGROUND TRAFFIC 12 a) [L' Lo U CO of r Access - 5/5 111 5/5 -,Q LO o uJ [f7 CO 4 Z z NIN I I, � N/N CR 40 w I r� in Z o LEGEND: Am/Pm Peak Hour N = Nominal NOTE Rounded to nearest 5 vehicles. Figure B SHORT-TERM TOTAL TRAFFIC 3 O r � • —— • _ 1 Ra 1 rn U in c� Access 4 A 5/5 lc 5/5 u, 0) cl ti N z LN o z ` N/5 v '- N/5 CR40 u7 �) a- � () Z N LEGEND- rk.lvl/ M Peak Hour N = Nominal NOTE: Rounded to nearest 5 vehicles. Figure 9 LONG-TERM TOTAL TRAFFIC 14 -�. C). Roadway System Short-term and long-term roadway features were estimated using known major im- provements (roadway widening, etc) along CR 49. Since no major improvements are anticipated, the existing roadway geometry was assumed through the long term. VI.TRAFFIC IMPACTS In order to assess operating conditions with the Heartland facility fully operational, highway capacity analyses were conducted at the site access intersection. Short- and long-term conditions were evaluated. At the onset of these undertakings, peak hour traffic was reviewed at each intersec- tion to identify the need for new auxiliary lanes or an upgrade in traffic controls. Findings for each time frame are documented in the following sections. A). Short Term A review of peak traffic was conducted to determine the need for auxiliary lanes at the CR 49 — site access intersection. CDOT's State Highway Access Code auxiliary lane criteria for R-B roadways and the existing 65 MPH speed limit were used in this assessment. It was determined that site traffic will not be high enough to warrant any auxiliary lanes at this intersection. Consequently, the short-term roadway geometry shown on Figure 10 is appropriate. This reflects existing conditions supplemented by the site driveway. Short-term operating conditions were evaluated at the driveway using highway capacity analysis procedures. Resultant 2010 levels of service with the Heartland facility fully operational are shown below. 15 rn ct 4/I SITE Access `5'°P 4 A 110'; --CR 40 Figure 10 SHORT-TERM ROADWAY GEOMETRY16 l SHORT-TERM OPERATIONS WITH HEARTLAND • Movement/ Level of Service ' Intersection Control j Direction AM ! PM I CR 49 — Access Stop NB LT A A EB LR B B As shown, very acceptable operations are expected with the facility fully operational. Capacity worksheets are presented in Appendix C. B). Long Term A review of long-term peak hour traffic determined that no new turn lanes will be warranted at the CR 49 -- site access intersection with Heartland fully functional. Consequently, the short-term roadway geometry was retained through the long-term. Long-term total peak hour traffic was loaded onto the short-term roadway geometry to reflect conditions in 2029. Resultant operating levels of service are shown below. LONG-TERM OPERATIONS WITH HEARTLAND Movement/ Level of Service Intersection Control Direction AM PM CR 49 — Access Stop NB LT 1- A A l EBLR As indicated above, the site access intersection will operate very acceptably in the long-term. Capacity worksheets are available in Appendix D 17 VII.CO NCLUSICNS Based upon the above documented investigations and analyses, the following can be concluded. • At full operation, the Heartland project will generate a minor amount of traf- fic with only 20 peak hour trips and 205 trips per day. These trips can be easily managed. • No improvements are needed to serve this development. • Site traffic can be accommodated by the existing roadway geometry at the CR 49 — site access intersection. c With this development level of service 'B' or better is expected for all peak hour traffic movements at the CR 49 — site access intersection through the long term. Accordingly, very acceptable operations are expected for the fo- reseeable future. Long term conditions will, in fact, closely replicate current conditions. • Sufficient intersection sight distance is expected at the planned site access location to CR 49. O The Heartland development is viable from a traffic engineering perspective. In summary, the existing roadway geometry supplemented by the site access to the west of CR 49 will facilitate acceptable operations for the foreseeable future. 18 APPENDIX A to b f--- V' O ti CO O 0) CO CO C.") N 0) CO U) N p Q ti N- CO f+ CO LO CD 'd' CO 0 CD CO CD CO CD N— CD ILO co O U — c (1) U D O r 0 0 CO O M C1f r .- ,— in N r CD r N sT To i CAS CU 0 0 • L) d C O O .y cu . co try cn Ili D o r CD CD M CD M N r— CV r r O N r O r N Ct • 0L o I N- ccn "0 CC 0 0 Q D op O N O O O 7— O ,— Q Q O O N 0 0-, o a o O fA a 0 to �_ N m 0 N JCD 7-- O O O O .— N r r O 0 r r 0 ,— N N C75 F C LLI O_ J .r E u m 1 O O O C O O O O O Co 0 0 0 0 0 0 0 O p). -/ L = Li C o o - .a o 0 0 o An to o O C/ .a a o .p . Cs w vi in co e7 C) V CO f- N- `n CO CV h 1,-- CO o CO v t•-• co CO rsi `IS IL... r+ CO r. LO u) u� �t CO CO CO CO (C) r--- m �r) En o IX IllgC rte M T CO LO C C7 C3) AO C1 J O O LO M CrNj t70 Ln .. A D L.O M M N M N M N r p N M N M C, M N M r 0 Q SD [Y O o D C`'J C'7 0) OD C'7 CD Cr) r- M C7 Cr) OD - O O: C'7 '.' r lf3 C') CrJ N C7 N N N r N C') N C") M N CV C') w w ..-_, D 0 V) J CD .-- O CD N o r CD r^ O CD CD O r N 0 r II J 00 .mow CV N Cn N CJ NF.- (0 M CO f-. CO U) CO CO "S' N M C0D 00 D N 'd N N M N N F- r 6C CO'S7 `a M Q rt c4 r p ui .i:i re CD O CD 0 O G' — O C7 CV C D r O r 0 C) r CV O. J▪ C' N D ,An or) N N L.1) N 0) N CO CO T Li) 1X3 cf U) f� �t N N CO Q O ro r� CV v (N -t N Cr) N N _ N- m f CO �- � N it o OD CT If o x v o z a Q C3 m G C7 o r - . . . in W • r-a'. Cu N O z a ... o a) coLnau, oinou, o 400400L, ou, W J = -,c O r" M tt C r Met O O t-- M CI' O r M ct Cr; i"' m 0 0 0 0 0 i.0 0 0 O 0 0 CD 0 0 0 0 0 r d W N- 4 I 1 _ _ APPENDIX B Two-Way Stop Control Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst GC Intersection CR 49- CR 40 Agency/Co. Jurisdiction ��'�� Date Performed f Y 2009 Analysis Year l'EXJST LT TOT Analysis Time Period AIM PM \._1J Project Description East/West Street: CR 40 North/South Street: CR 49 Intersection Orientation: North-South Study Period (hrs): 0.25 [Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 0 131 1 1 153 0 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR _ 0 131 1 1 153 0 Percent Heavy Vehicles 0 -- -- 30 -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT - Upstream Signal _ �0 0 = Minor Street � Westbound .r Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 1 0 0 0 0 0 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 ' 1.00 1.00 Hourly Flow Rate, HFR 1 0 0 0 0 0 ' Percent Heavy Vehicles 30 0 30 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB Se Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR v(vph) I I C (m) (vph) 1297 648 vic 0.00 0.00 95% queue length 0.00 0.00 Control Delay 7.8 10.6 LOS A B Approach Delay -- -- 10.6 Approach LOS -- B RiLThts Reserved iC.5.`f.-i cup ,Ohl : il3t'nn�: i.` oZ Vioi,.ia Ali i,:g131sRcsrnej Vci•rm= i. V'rr..1071 4 if file:/C:''.Users',Hone\AppDataTocal'il enip\u2k97Cb.tnip 79'20p9 Two-Wad Stop Control Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst GC Intersection CR 49- CR 40 Agency/Co. Jurisdiction Date Performed 4/9/,2909 Analysis Year CT LT TOT Analysis Time Period AMIPM) Project Description \,../ EastNVest Street CR 40 North/South Street: CR 49 Intersection Orientation: North-South Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound ' Southbound Movement 1 2 3 4 5 8 L T R L I R Volume 0 164 2 1 131 0 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 164 2 1 131 0 Percent Heavy Vehicles 0 -- -- 30 -- -- Median Type Undivided RT Channelized 0 Lanes 0 1 0 0 1 Li-0 Configuration TR LT Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 s 12 L T R L T R plume 2 0 2 _ 0 0 0 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HER 2 0 2 0 0 0 Percent Heavy Vehicles 30 0 30 0 1 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length,and Level of Service pproach NB SB Westbound Eastbound _ Movement 1 4 7 v 8 9 10 11 12 Lane Configuration LT LR v (vph) 1 4 C (m) (vph) 1259 714 vie. 0.00 0.01 95% queue length 0.00 v 0.02 Control Delay 7.9 i0 1 LOS A S pproach Delay -- _. 10.1 pproach LOS -- -- B Rights Reserved fi i;_1,._,,T.T1 C'om[Oil 'u^3 1.ris en{-,of Fi,'ls!,, '•.EI:Ri,ly;frts7!,e-' Vc!, A;a V;' �`e[.,wt;-i l i lilc://C:AL'sersvGenev-AppDatayIocalvTempAu2k97C8.tmp 4/9/2009 APPENDIX C l'al.c. i of. I TWO.WAY STOP CONTROL. SUMMARY Genera_ l Information Site Information Analyst GC Intersection 49 - ACCESS Agency/Co. Jurisdiction ."5{`1.x Date Performed /2010 Analysis Year V L TOTAL Analysis Time Period tAM 1Ur PK HR `. Project Description East/West Street, SITE ACCESS North/South Street CR 49 Intersection Orientation: North-South Study Period (hrs)_ 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 i L T R L T R Volume 5 135 0 _ 0 160 5 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 _ 1.00 W Hourly Flow Rate, HFR 5 135 0 0 __ _ 160 5 Percent Heavy Vehicles 40 -- - -- 0 -- -- Median Type _ Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 , 0 Minor Street Westbound Eastbound Movement — 7 8 9 10 11 12 L T R L T R Volume 0 0 0 5 0 _ 5 Peak-Hour Factor. PHF 1.00 1.00 1.00 - 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 5 0 5 _ Percent Heavy Vehicles 0 0 0 40 n 0 40 Percent Grade (%) 0 0 Flared Approach N Y - Storage ---- - - .0 0 .�.. , RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR _ W v (vph) 5 10 C (m) (vph) 1213 690 v/c 0.00 0.01 95% queue length 0.01 0.04 Control Delay 8.0 10 3 LOS A B Approach Delay - -- 10.3 Approach LOS -- _ -- B Rights Reserved Nc,52000''1 COT.vT!Ch, ` _ ?r',iir !,inufrrii. Ail ki_!1!;REs.'rs.ni 1c-:,«0:,-: ',i \cr,ion 4 1 4::1 1 '201 it TWO-WAY STOP CONTROL SUMMARY General Information Site Information - ^ Analyst GC intersection 49 - ACCESS Agency/Co Jurisdiction `�--'N Date Performed 4/1112010 Analysis Year ST LT TOTAL) Analysis Time Period Af PM)PK HR � Project Description East/West Street: SITE ACCESS North/South Street: CR 49 Intersection Orientation: North-South ,Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 _ 6 L T R L T R Volume 5 170 0 0 135 5 Peak-Hour Factor, PHF 1.00 1.00 1.00 1-00 1.00 1.00 Hourly Flow Rate, HFR 5 170 0 0 _ 135 5 Percent Heavy Vehicles 40 -- -- 0 -- -- - Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 . Configuration LT TR Upstream Signal 0 0 I J Minor Street Westbound Eastbound Movement _ 7 8 9 10 11 12 L T R L T R Volume 0 0 0 5 0 5 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 5 0 5 Percent Heavy Vehicles 0 0 0 -_ 40 0 40 J Percent Grade (%) 0 0 Flared Approach N Y Storage -m. 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR v (vph) 5 10 C (m) (vph) 1240 694 v/c 0.00 0.01 95% queue length 0.01 0.04 Control Delay 7.9 10• .3 LOS A 8 Approach Delay -- -- 10 3 Approach LOS -- -- B ---`___I Rights Reserved ri7.S:,:,0 ](( (...L,;-.:,,,,..: .'.l ;l .11 fa'.' Of H 1-y-..,i I.:1,11-..,R.,,2I',.a VC:_uon i dI 4/1 1'20I I) APPENDIX D Page 1 01 1 TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst GC Intersection 49 -ACCESS Agency/Co. Jurisdiction 7'1 Date Performed /- 1/2010 Analysis Year S LT TOT Analysis Time Period M PM PK HR Project Description _ East/West Street SITE ACCESS North/South Street. CR 49 Intersection Orientation: North-South Study Period (his): 0.25 ehicle Volumes and Adjustments Major Street Northbound _ Southbound - Movement 1 2 3 4 5 6 L T R L T R olume 5 270 0 0 315 5 - Peak-Hour Factor, PHF 1.00 _ 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 270 0 0 315 5 Percent Heavy Vehicles 40 -- -- 0 -- -- Median Type Undivided _ RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR _ Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 0 0 0 5 0 5 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 5 0 5 Percent Heavy Vehicles 0 0 0 40 0 40 Percent Grade (%) 0 0 Flared Approach N Y Storage 0 0 RT Channelized 0 0 T Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR v (vph) 5 10 C (m) (vph) 1054 498 v/c 0.00 0.02 95% queue length 0.01 0.06 Control Delay 8.4 12.4 LOS A B I • Approach Delay __ -- 12.4 pproach LOS -- -- B Rights Reserved mcs2(,rlr 't Coy],rTill, 2(,U3 r:ai1 crsfri 01 11(111& AM I: h's Resern ed Vcr ion= i t V'nLs:nn 4 Li 4 1 1/2010 Pane I of I TWO-WAY STOP CONTROL SUMMARY General Information Site Information _ Analyst GC Intersection 49-ACCESS Agency/Co. Jurisdiction Date Performed 4/11/2010 Analysis Year STOLT]�OTA Analysis Time Period AM PM)PK HR �� Project Description East/West Street: SITE ACCESS North/South Street. CR 49 Intersection Orientation: North-South Study Period (hrs): 0.25 ehiele Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R plume 5 _ 345 0 0 270 5 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1 00 Hourly Flow Rate, HFR 5 345 0 0 270 5 Percent Heavy Vehicles 40 -- _ -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 • Configuration LT TR W lJ stream Signal 0 0 _ _— Minor Street Westbound 1 _ Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 0 _ 0 0 5 0 5 Peak-Hour Factor, PHF 1.00 1.00 1.00 9.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 5 0 5 Percent Heavy Vehicles 0 0 0 40 0 40 Percent Grade (%) 0 0 Flared Approach N Y Storage 0 i _____ 0 RT Channelized _ 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT _ _ LR v (vph) 5 10 C (m) (vph) 1098 497 v/c 0.00 0.02 95% queue length 0.01 0 06 Control Delay 8.3 12.4 LOS A B Approach Delay -- -- 12.4 Approach LOS -- -- B ----v — Ri{r]its Reserved HcS'riooT i Cor rr_JO 20,::3Ilr,+ersit C,r Florida_All Riuitts Reserved veli.or,.7 Ii CnliHr 4 1 I 4,111/2010 AGPRO} fessionals DEVELOPERS OF AGRICULTURE EDOP Addendum Weld County Minor Amendment Application Prepared for Heartland Biogas, LLC Digester Processing System Engineering, Design and Operation Plan Addendum Developed in accordance with Colorado Solid Waste Regulations, 6CCR 1007-2 Sections 9, 11 and 14 For A-1 Organics SE 1/4 of Section 25 T4N R65 W Operated by A-I Organics at Heartland Renewable Energy, LLC AGPROfessionals Prepared by AGPROfessionals 3050 67t1 Avenue, Suite 200 Greeley, CO 80634 (970) 535-9318 November 18, 2014 A-I Ornanics—Digester Processing System Design and Operations Plan Table of Contents Table of Contents 2 Engineer's Certifications 5 Executive Summary 6 Abbreviations and Definitions 7 1. Introduction 9 A. Owner/Operator 9 B. Operating Capacity 9 C. Construction Timescale 9 2. Physical Property 10 A. Land Details 10 1. Legal Description--No Change 10 2. General Site Plan 10 B. Water Detail 10 1. Surface Water—No Change 10 2. Subsurface, Subsidence & Water 10 3. Surface Water& Groundwater Protection—No Change 12 3. Process 12 A. General Anaerobic Digestion—No Change 12 B. Inputs 12 1. Type 1, 2 and 3 Feedstock No Change 12 2. General Feedstock Design No Change 12 3. Inputs: Digester Feedstocks, Additives and Sources—No Change 12 4. Feedstock Nutrient Analysis Data—No Change 12 5. Design Feedstock Nutrient Specification —No Change 12 6. Feedstock Reception and Handling—No Change 12 7. Sampling—No Change 12 8. General Substrate Processing 12 9. Feedstock Receiving 13 10. General Tank Design 14 Tanks 14 C. Feedstock Handling, Storage, Tanks and Flows —No Change 15 1. Feedstock Unloading—No Change 15 2. Truck Washing—No Change 15 3. Tanks—No Change 15 D. Summary of Operational Systems—No Change 15 1. Water Treatment System: No Change 15 2. Solids Dewatering System: - No Change 15 3. Gas Processing System: - No Change 15 4. Equipment Building: - No Change 15 4. Outputs 15 A. Solids Materials No Change 15 B. Liquid Materials 15 1. Covered Lagoon—No Change 15 2. Organic Substrates 15 C. Biogas Generation —No Change 15 AGPROlessionals 2 A-I.Organics—Digester Processing System Design and Operations Plan 1. Biogas Characteristics— No Change 15 2. Biogas Handling and Conditioning—No Change 15 D. Byproducts—No Change 15 1. Sulfur—No Change 15 2. Carbon Dioxide No Change 15 3. Process Heating—No Change 15 E. Materials Storage—No Change 16 1. Gas—No Change 16 2. Soil Amendment— No Change 16 5. Other Permits / Agencies 16 A. Weld County Special Use Permit#1704 and Certificate of Designation Granted July 21, 2010 16 B. Water Quality—No Change 16 C. Air Quality Permits—DPS to be Incorporated into Heartland Minor Source Air Permit 16 1. Expected Air Permit Type: Minor Source Air Permit 16 Colorado Department of Agriculture—No Change 16 D. 16 6. General Operation 17 A. Employees/Staffing 17 1. Employee Training 17 2. Staffing 17 B. Civil Engineering 18 C. Instrumentation and Controls—No Changes 18 D. Maintenance 18 E. Back-up Systems, Safety and Emergency Response Plans 19 1. Dump Flares—No Changes 19 2. Electrical System Safety Designs 19 3. Fire—No Change 19 4. Other 19 5. Emergency Contact Information 19 6. Contingency 20 7. Documentation, Records & Reporting 20 A. Recordkeeping 20 B. Reporting 20 8. Nuisance Control & Environmental Management 20 A. Dust 20 B. Odor 20 C. Windblown Materials & Debris 21 D. Pest Control 21 9. Temporary Shutdown and Permanent Closure 21 A. Shutdown 21 B. Operational Maintenance & Temporary Closure 21 C. Temporary Closure 21 1. Removal of Residual Materials from Facility 22 2. Removal of Residual Materials from Digesters and Storage Tanks—No Change 22 AGPROfessionals — _ 3 A-i Organics—Digester Processing System _ Design and Operations Plan 3. Removal of Compost Debris from Surface Soils in Windrow Areas—No Change 22 4. Stormwater Pond, Reject Storage Ponds, Effluent Storage Ponds and Dilution Water Pond — No Change 22 D. Permanent Closure 22 1. Stormwater Pond, Reject Storage Ponds, Effluent Storage Ponds and Dilution Water Pond No Change 22 2. Re-Seeding of Disturbed Surface Area—No Change 22 3. Removal of the Digester Processing System 22 4. Post Closure Care—No Change 22 List of HRE EDOP Appendices—No Change 23 List of A-l. Organics DPS EDOP Addendum Appendices 23 AGPROfessionais 4 Al Organics—Digester Processing System Design and Operations Plan Engineer's Certifications 1 hereby certify that all portions of the site investigations and preliminary drainage design of the Digester Processing System have been performed under the supervision of, reviewed by, or performed by this Professional Engineer, licensed to practice in the State of Colorado. To the best of my professional knowledge,judgment and belief, these plans meet the provisions of 6 CCR 1007-2 Sections 11 and 14, Weld County stoiiii drainage criteria, and the Weld County Use by Special Review and Site Plan Review Preliminary Drainage Report Outline. „,0._9' , i 0 I'�a, •• •..a. �1.. e.• �f ,� •. ley. ,v j9 ')..;L. NAL ENG\`' to Chad TeVelde, PE AGPROfessionals AGPROfessionats _ 5 A-1 Organics—Digester Processing System Design and Operations Plan Executive Summary Heartland Biogas, LLC ("Heartland" or "HBG") owns and will operate an anaerobic digester facility located in southeast Weld County, Colorado. Anaerobic digestion of organic wastes in a controlled environment yields environmentally sound products for beneficial reuse. This facility will use agricultural wastes which include cattle manure from animal feeding operations and other organic residuals ("substrate"). A-1 Organics will own and operate the Digester Processing System (DPS) that will receive digester substrates for additional processing prior to delivery to the Heartland Biogas (HBG) facility digester system. These incoming substrates will be documented, particle size reduced, hydrated, blended as needed, and transferred to the HBG digester system under agreement. This A-1 Organics Digester Processing System Engineered Design and Operation Plan (EDOP) was prepared as an addendum to the Heartland Biogas, LLC Engineering, Engineered Design and Operation Plan. The sections that are applicable to the DPS facility have been included in this EDOP addendum. If the section was not changed from the Heartland EDOP it is noted as "No Change" at the section header. AGPROfessionals 6 A-I Organics—Digester Processing System _ Design and Operations Plan Abbreviations and Definitions Abbreviations and definitions used in this document are: Abbreviations ALR — Action Leakage Rate ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers BOD — Biological Oxygen Demand cP —Specific Heat Capacity CCTV Closed Circuit Television CDPHE Colorado Department of Public Health and Environment CH4—Methane gas CIG - Colorado Interstate Gas COD - Chemical Oxygen Demand CQA -Construction Quality Assurance CQAE- Construction Quality Assurance Engineer CQA/QC Plan-Construction Quality Assurance/ Quality Control Plan CSTR-Continuously Stirred Tank Reactors D & O Design and Operations DAF - Dissolved Air Flotation DPS — Digester Processing System EPC - Engineering, Procurement, and Construction F —Fahrenheit FOG — Fats, Oil, and Grease FPS —Feet Per Second GPD —Gallons Per Day GPAD Gallons Per Acre Per Day HBG Heartland Biogas HHV High Heat Value HMI— Human Machine Interface HRE —Heartland Renewable Energy HRT - Hydraulic Retention Time HVAC - Heating, Ventilation and Air Conditioning LHV — Low Heat Value LPG - Liquefied Petroleum Gas MCC--Motor Control Center MMBTU Million British Thermal Units MW - Monitoring Well NEMA - National Electrical Manufacturers Association NG —Natural Gas NRCS -Natural Resources Conservation Service PBD- Project Basis of Design PE— Professional Engineer PFD — Process Flow Diagram PLC — Programmable Logic Controller RNG — Renewable Natural Gas SCADA - Supervisory Control and Data Acquisition AGPROfessiona Is 7 A-I Organics—Digester Processing System _ Desie.n and Operations Plan SCFD - Standard Cubic Foot of Dry Gas STP-- Standard Temperature and Pressure TSS — Total Suspended Solids USR — Use by Special Review VS - Volatile Solids WC - Water Column Inches Definitions 1 ft3 of natural gas or fully conditioned biogas = 1,000 BTU STP for biogas Standard Temperature and Pressure for biogas is at 14.7 psia and 68°F (1 atm (1.05 bar or 101.325 kPA) and 20 Celsius) Substrate(s): Food waste and or plant waste from a food processing facility and or other organic materials approved for use in renewable energy production within the HBG digester system. AGPROfessionals 8 A-I Or anics r Dieter Processing System __ Design and Operations Plan 1 . Introduction This EDOP addendum has been prepared pursuant to the Colorado Regulations Pertaining to Solid Waste Disposal Sites and Facilities 6-CCR 1007-2 (Regulations), Section 14 for Class I Composting Facilities, Section 8 pertaining to Recycling Facilities, Section 11 for Waste-to- Energy Facilities, and Section 9 for Waste Impoundments for review and approval by the Colorado Department of Public Health and Environment (CDPHE) and Weld County Department of Public Health and Environment (WCDPHE). The intent of this EDOP is to protect the environment and citizens of Colorado by documenting the design, control, and management measures to prevent ground and surface water impacts, prevent nuisance conditions, and properly decommission the site in the event of facility closure. A-1 Organics is proposing a Digester Processing System (DPS) that will receive digester substrates. These incoming substrates will be documented, particle size reduced, hydrated, and blended as needed prior to transferring to Heartland Biogas (HBG) facility digester system or other off-site facility. The system is designed in accordance with all relevant federal, state and local requirements including, but not limited to, the requirements of the State of Colorado, Weld County, health laws, standards, rules and regulations of CDPHE's Hazardous Materials and Waste Management Division, Water Quality Control Division, and Air Pollution Control Division. The system shall comply with local building codes, fire codes, safety codes, and in accordance with applicable engineering and construction codes and standards. A. Owner/Operator Owner/Operator: A-1 Organics Project Developer: A-I Organics 16350 Weld County Road 76 Eaton, Colorado 80615 970-454-3492 Contact: Bob Yost, Vice President and Chief Technical Officer, A-1 Organics B. Operating Capacity The System is expected to operate Monday through Saturday from 5:00 to 21:00 hours. Hours of operation may be expanded as needed to properly service and/or reflect HBG hours of operation. A Process Flow Diagram (PFD) is given (See Appendix 1). C Construction Timescale Construction is expected to begin by November 1, 2014. AGPROfessionals _ 9 A-I Organics— Divester Processing System Design and Operations Plan 2. Physical Property A. Land Details 1. Legal Description - No Change 2. General Site Plan a) Access The DPS is located on the south-central portion of the facility along the HBG project entrance road(Appendix 2). b) Signage - No Change c) Security - No Change d) Construction - No Change B. Water Detail 1. Surface Water - No Change 2. Subsurface, Subsidence &Water a) Site Groundwater Well Permit - No Change b) Groundwater Surrounding Wells Location - No Change c) Groundwater Levels - No Change d) Subsurface Investigation i. Boring locations A geotechnical site exploration was conducted by Soilogic in October 2014 for the DPS site (See Appendix 3). Two borings were advanced to a depth of 30 feet beneath the proposed DPS location. Reportedly, groundwater was not encountered in the B-2 boring. Groundwater was encountered in the B-1 boring at a depth of approximately 29 feet below ground surface (bgs). Twenty-four hours following drilling, static water level in the B-1 boring was measured at 27.5 feet bgs. See Appendix 3 referenced above for maps of the boring locations and detailed findings. This site is located in the Beebe Draw tributary of the South Platte Basin above the Laramie-Fox Hills Alluvial Aquifer. This confined aquifer occurs primarily in the lower sandstone units of the Laramie Formation and the upper sandstone and siltstone units of the underlying Fox Hills AGPROfessionals _ _� In A-1 Organics-Digester Processing System - Design and Operations Plan sandstone. The geological formations of this aquifer are primarily composed of Cretaceous and Tertiary sandstone, conglomerate and shale. The thickness of the aquifer ranges from zero at the boundary to between 200-300 feet in the central part of the basin. The Laramie Fox Hills Aquifer is underlain by nearly impermeable Pierre shale and on top consists of fine, to very fine, grained sandstone or siltstone imbedded in the shale. Groundwater within the Laramie-Fox Hills Aquifer tends to contain small amounts of dissolved solids with concentration ranges from 200 to 2,000 milligrams per liter. Some gases, such as hydrogen sulfide and methane exist within the aquifer. The edges of the aquifer tend to have hard water, consisting of a sodium bicarbonate or sulfate. Depth to alluvial groundwater within the aquifer generally ranges up to 250 feet. The preliminary geotechnical report (Appendix L) did not indicate any groundwater within 25 feet of the existing grade surface. Subsequent drilling identified alluvial water at a depth of 42 feet in the center of the site. Several nearby wells indicate depth to groundwater ranges from 70- 200 feet bgs. if. Site Soils A Soils Report from the Natural Resources Conservation Service is provided to describe types of soils and engineering properties of the soils on the site (See Appendix G). Approximately three to six inches of topsoil and vegetation were encountered at the surface during drilling. Beneath that was light brown to brown silty sand and sandy lean clay. The three main strata were classified as a fine silty sand, then sandstone to clayey sand in places, with a elaystone layer existing between 25-50 feet. The silty sand was generally medium dense to dense with occasional loose zones and showed low swell and low to moderate settlement potential with an increase in moisture content at current moisture and density conditions. The sandy lean clay/clayey sand conglomerate was generally very stiff to hard in terms of consistency and/or medium dense to dense in terms of relative density and showed low swell potential and low to moderate consolidation potential at in-situ conditions. The silty sand and sandy lean clay/clayey sand conglomerate extended to the bottom of borings B-3, B-4, B-5 and B-8 at a depth of approximately 25 feet bgs. At boring locations B-1, B-2, B-6, B-7, B-9, B-10, B-11, the silty sand and sandy lean clay/clayey sand conglomerate extended to depths ranging from approximately 18 to 29 feet bgs and was underlain by brown/grey/rust claystone which varied to siltstone/sandstone in places. The claystone with siltstone/sandstone was medium to very hard and showed low to high swell potential at in-situ moisture and density conditions. Borings B-1, B-2, B-6, B-7, 13-9, B-10, B-11, were terminated at depths ranging from approximately 25 to 45 feet bgs in the claystone with siltstone/sandstone bedrock. Natural Resource Conservation Service's (NRCS) soil report classified these soils as Valent sand and Vona loamy sand. Run-off potential from this site is considered to be low because the soils are classified as well drained to excessively drained (See Appendix G). AG P kOfessionals A-1 Organics- Digester Processing System - Design and Operations Plan 3. Surface Water & Groundwater Protection — No Change a) Run-on, Run-off- No Change b) Wastewater Ponds - No Change c) Secondary Containment In-process materials located in both the low solids liquid storage tanks and the 227,800 gallon substrate storage tank have secondary containment. The tanks will be placed on top of and surrounded by 60 mil HDPE liner protected by an earthen blanket. A containment wall designed for 110% containment of the largest tank will be constructed surrounding the tank battery(See Appendix 4). The tanks and containment area will be visually inspected for leaks monthly. See attached drawings for tank cross section details (Appendix 5). In the event of a catastrophic tank failure, waste will be removed from the secondary containment as soon as possible, not to exceed 48 hours. Clean-up will follow the procedures detailed in the contingency plan. Substrate processing pit design has secondary containment comprised of a sprayed on rubber like membrane on the interior walls of the concrete pit. The membrane will be inspected for integrity on a monthly basis, and the concrete in ground structures will be designed to hold water without coating. 3. Process A. General Anaerobic Digestion - No Change B. Inputs 1. Type 1, 2 and 3 Feedstock - No Change 2. General Feedstock Design - No Change 3. Inputs: Digester Feedstocks, Additives and Sources - No Change 4. Feedstock Nutrient Analysis Data - No Change 5. Design Feedstock Nutrient Specification - No Change 6. Feedstock Reception and Handling- No Change 7. Sampling- No Change 8. General Substrate Processing The digester processing system receives digester substrates requiring additional processing and or blending prior to delivery to the HBG Digester System. The incoming substrates are AGPROfessionals 12 A-] Organics—Digester Processing System Design and Operations Plan inspected, recorded, reduced, hydrated, and then blended as needed. The product is then transferred to the HBG biogas digesters. The DPS anticipates having the capacity to process and transfer up to 350,000 gallons per day of various digester substrates. The DPS will consist of three (3) 30,000 gallon (+-) in-ground concrete processing tanks identified as: Tiger de-packaging tank (Tiger), DODA and Non-DODA (Appendix 6). Each concrete tank will have a mixing and/or transfer pump (Appendix 7). The Tiger tank receives de-packaged substrates produced by the Tiger unit, the DODA tank will receive source separated substrates requiring further processing through the DODA bio-separator. The Non-DODA tank will receive substrates that do not require processing through the Tiger and/or DODA, but may require additional particle size reduction and/or blending prior to delivery to the HBG digester system. Substrates in the tanks will be similar to but exclusive to the substrates described above. Incoming substrates will be transferred to the unloading pad and directed to the appropriate processing vault via the press grate and the cascading transfer augers. Additionally, the DODA and Non-DODA tank will have a secondary drop location to provide contingent unloading options. The Tiger and DODA are employed to remove packaging and other incidental materials such as plastics from the substrates prior to delivery of the substrates to the HBG system. Separated packaging and other materials removed by the Tiger and/or DODA will be recycled and or disposed of at an appropriate landfill facility. The substrates produced by the Tiger will be transferred to the tank for additional processing and blending. The DODA Bio-separator and Tiger machine will be located in a 73-foot by 70-foot coverall building, on a sloped concrete pad surrounded by small curbs to prevent any unwanted spread of product. Concrete pad will drain back to the concrete tanks. There will be as many as six (6) tanks that can store fresh water, south pond water, centrifuge water, and/or other low solid substrate liquids required for hydration and blending requirements. The on-site 227,800 gallon vertical steel tank will store processed substrate material until transferred to the HBG digester system. 9. Feedstock Receiving Digester substrates will be placed on or near the press plate located on the concrete receiving pad. Operational procedures shall be to push the materials through the press plate with machinery into the cascading augers. The cascading augers provide for initial particle size reduction and slicing prior to delivery to the transfer auger. The transfer auger moves material to the appropriate processing tank. Alternatively, substrates can be directly placed into the desired processing tank via a secondary drop. Low solid substrates that are used for hydration can be unloaded directly into the appropriate tank. Packaged materials targeted for de-packaging by the Tiger will be temporarily stored in a designated area in the coverall building until processed. As appropriate, hydration water or low solid substrates may be added at the transfer auger or directly into the processing tank. A mixing pump will assist to mix and slurry the material. As tanks become full, a valve is operated, and the mixing pump transfers prepared substrates to the digester system. AGPROfessionals 13 A-1 Organics—Digester Processing System Design and Operations Plan 10. General Tank Design Tanks Table 3.8. Facility Tank Inventory Total Stored Tank Volume Material No. Quant. Size per Type Tank (gal) Substrate Processing 16' L x 16' W Tanks (Tiger, 1 to 3 3 x l6'H 30,000 Concrete pits DODA, and Non-DODA) Water/low Bolted or welded steel, glass solids lined, steel roof and floor with Substrate 1 to 6 6 32,000 concrete underlay, or other as Storage Tanks approved. Paunch and or prepared Bolted or welded steel, epoxy Substrate 1 1 227,800 lined, steel roof and floor with Tank concrete foundation i. Substrate Processing Tank Cleaning Each substrate processing tank will require, as identified by inspection, a hot water wash down to remove build-up of material on the interior of the tank and mixer blades. Tanks shall be visually inspected for integrity during wash-downs. ii. Water and Paunch/Processed Substrate Tank Leak Detection Water storage tanks and substrate storage tank leak detection will be provided by visual inspection. If liquid is present in the containment area and is deemed to be possible substrate per visual inspection, it will be sampled to verify substrate is present. Documentation of these inspections will be placed in the system's operations records. The system operator shall provide written notification to the CDPHE within seven days of substrate liquid in the leak detection system. If this sampled liquid is found to be substrate liquid, a report summarizing the management of the liquid from the leak detection system, including volume of liquid removed, analytical test results, and liquid disposition, shall be drafted. The report will also include repairs performed on the leaking tank. The report shall be provided to the CDPHE within thirty days of receiving analytical results or completion of repairs. AGPROlessionals 14 A-i Organics--Digester Processing System Design and Operations Plan C. Feedstock Handling, Storage, Tanks and Flows - No Change 1. Feedstock Unloading- No Change 2. Truck Washing - No Change 3. Tanks - No Change D. Summary of Operational Systems - No Change 1. Water Treatment System: No Change 2. Solids Dewatering System: - No Change 3. Gas Processing System: - No Change 4. Equipment Building: - No Change 4. Outputs A. Solids Materials - No Change B. Liquid Materials 1. Covered Lagoon - No Change 2. Organic Substrates The DPS provides additional processing of substrates approved for receipt, digestion, and renewable energy production defined within the approved HBG EDOP. Processed substrates may also be shipped to an alternative A-1 facility approved to receive the substrates, as necessary. C. Biogas Generation - No Change 1. Biogas Characteristics - No Change 2. Biogas Handling and Conditioning- No Change D. Byproducts - No Change 1. Sulfur - No Change 2. Carbon Dioxide - No Change 3. Process Heating - No Change AGPROlessionals _ - 15 A-I Organics—Digester Processing System Design and Operations Plan E. Materials Storage - No Change 1. Gas - No Change 2. Soil Amendment - No Change 5. Other Permits / Agencies A. Weld County Special Use Permit#1704 and Certificate of Designation Granted July 21, 2010 • Special Use Permit#1704 will be amended to incorporate the additional operation of the Digester Processing System. The addition of the DPS should not affect or require amending of the Certificate of Designation.l as it is consistent with the approved use (Appendix 8). • All required local permitting will be provided for along with any conditions outlined in the above USR not satisfied prior to system construction and/or system start-up. B. Water Quality - No Change C. Air Quality Permits - DPS to be Incorporated into Heartland Minor Source Air Permit 1. Expected Air Permit Type: Minor Source Air Permit The DPS is to be incorporated into the Heartland Minor Source Air Permit. Colorado regulations note that an air emissions source is minor if it can be proved that emissions of criteria air pollutants will be less than 100 tons per year(http://www.eea-inc.com/rrdb/DGRegProject/ States/Newsite/COrevised.html#emission). A description of the DPS system is to be submitted to the CDPHE; no new sources of air emissions are expected to be added to the Minor Source Air Permit that is associated with the facility, with the exception of the possibility of additional particulate matter(TSP, 10 and 2.5) from the disturbance of land in the construction of the DPS. D. Colorado Department of Agriculture - No Change 1 " The Colorado Department of Public Health and Environment, Hazardous Materials and Waste Management Division (the "Division")views the addition of the DPS is an operational issue, and not a substantial change to the provisions of the Certificate of Designation (CD). Therefore, the Division does not consider changes to the Heartland CD as being necessary." CDPHE correspondence to Weld County dated October 8, 2014. AGPROlessionals 16 A-1 Or!anics- Digester Processing System _ Design and Operations Plan 6. General Operation A. Employees/Staffing 1. Employee Training All DPS personnel shall acknowledge their review and understanding of the EDOP and shall duly follow the requirements set forth therein. DPS personnel shall meet all respective safety training requirements as established by A-1 Organics, the facility operating company Heartland Biogas, LLC, and the Occupational Safety and Health Administration. All staff shall be required to pass drug screening, background check, and have a valid driver's license with a good driving history. Staff shall be required to have training and required licensing before operating any equipment at the DPS facility. DPS personnel shall be required to participate in routine safety training related to facility operation and materials handling. 2. Staffing Daily activities shall consist of: • Receiving and processing of substrates, • Maintenance and repair of all equipment, • Shipping of by-products, and • Record keeping/monitoring of operations. Activities on the site may occur up to 24 hours per day, 7 days per week (Monday through Sunday). The estimated staffing levels are as follows: Table 6.1. Staffing Requirements Personnel Day Night DPS Operator 2 2 Following is the description of staff responsibilities. Number of DPS employees onsite daily could be two (allowances are made for day-off schedules). DPS Operator Responsibilities The operator shall assure orderly and safe transfer of substrate material from haulers to the processing system and/or containment vessels. The operator shall also monitor loading of trucks/containers with separated materials for recycling or disposal. Assistance by the operator to provide general maintenance duties at facility. These duties may include washing down and cleaning equipment, providing grounds maintenance, collecting samples for testing and calibrating equipment, and general cleaning and monitoring. AGPROfessionals 7 7 A-i Organics=Digester Processing System Design and Operations Plan Minimum Requirements: High school diploma with skills and technical knowledge attained by specialized courses and/or on-the-job training in the operation of specialized equipment. Training and certification related to operation of specialized equipment may be required. B. Civil Engineering The DPS includes a building housing the support equipment, an office, and a storage area. The building shall be engineered to meet local building codes. Facility roads shall be compacted gravel suitable for the anticipated truck traffic. Designs shall provide for the efficient and safe movement of vehicles and pedestrians on the site. On-site parking for employees and visitors will be provided in a gravel parking area. Vehicular pathways shall be provided to promote one way traffic flows. Substrate truck traffic areas will be segregated from light vehicle traffic flows, and clearly marked to prevent operation of a vehicle outside the designed roadways. The substrate unloading area shall be constructed of concrete with positive drainage to direct rainfall run-off into the substrate processing tanks. The concrete areas shall be designed for the proposed uses stated in this operation plan. Above ground storage tanks shall have secondary spill containment. The containment area volume shall be equal to or greater than 110% of the largest tank volume plus the rain volume from a 25yr-24hr storm at that location. The non-paved areas shall have ground cover suitable for the local climate. The designed ground cover shall not require irrigation and provide a level of dust control. The site shall be graded to provide drainage away from the buildings and process areas. C. Instrumentation and Controls - No Changes D. Maintenance Maintenance tasks, under normal operating conditions, shall be limited to preventative maintenance and light repairs, carried out by the maintenance team. Major repair work will be carried out by contractors if and when required. Major maintenance activities are not expected to be done more than once a year. The DPS is designed and constructed to be easily maintainable with suitable access to all system items that require operator and maintenance access, such as isolation valves, pumps, motors, filters, and other items requiring regular replacement. Clear access ways for forklifts, portable cranes, and other lifting/carrying equipment shall be provided. Lifting beams with hoists may be located above heavy equipment, such as pumps, blowers, and compressors not easily accessed by forklifts or portable cranes. AGPROfessionals _ _ I g A-I Organics—Digester Processing System Design and Operations Plan E. Back-up Systems, Safety and Emergency Response Plans 1. Dump Flares - No Changes 2. Electrical System Safety Designs Electrical area classification shall be per the latest edition of the National Fire Protection Association (NFPA) 820 Standard for Fire Protection in Wastewater Treatment and Collection Facilities and other applicable building codes. Electrical power shall be obtained from the local electrical utility. The electrical systems are expected to be based upon 480V, 3-phase and 120V, single phase. Motors shall have a minimum 1.15 safety factor. Equipment shall have Totally Enclosed Fan Cooled (TEFC) unless required by the local building code (or other safety code) to have higher rating, (e.g. explosion-proof). The balance of the system shall employ standard power plant equipment including the water supply and treatment system, the domestic wastewater handling system, uninterruptible power supplies, lighting, fire protection, security, communications, workshop, storage, and instrumentation. All system infrastructure shall be designed to satisfy relevant codes and standards. 3. Fire - No Change 4. Other Additional emergency response procedures shall be designed and implemented prior to system start-up. Procedures and personnel shall be in place to address mitigation of all emergencies and implement control measures. 5. Emergency Contact Information Emergency contact phone numbers provided on the site include: • System operator(To be determined after start-up) • Facility manager(To be determined after start-up) • Facility owner: Heartland Biogas, LLC: Ron Davies contact: 215-510-7421 • System owner: A-1 Organics: Ted Matthews contact: 970-454-3492 • Local emergency responders: 911 Fire: 970-284-6336 Ambulance: (970) 353-5700 Police: (970) 284-5541 • Utility companies affiliated with the digester Poudre Valley Rural Electric Association: 800-432-1012 Central Weld County Water: 970-352-1284 Colorado Interstate Gas: 877-712-2288 AGPROfessionals 19 A-1 Organics Digester Processing SyTstern Design and Operations Plan 6. Contingency The Facility Contingency Plan is included in Appendix W. The system shall also incorporate features to minimize or mitigate noise, odor, dust, litter, and pests. Spill containment and fire protection systems shall be incorporated to ensure that operation of the DPS is safe and to minimize the potential impact on the local environment and plant operators. 7. Documentation, Records & Reporting A. Recordkeeping The following records for the DPS, at a minimum, shall be maintained: 1. Type and amount of substrates received, processed, and transferred to the HBG digester 2. Amount of by-products moved off-site 3. Operational monitoring data 4. Financial Assurance 5. Design and Operation Plan (current) 6. Facility personnel training 7. Maintenance plans/schedules 8. Records supporting the mechanism to preclude acceptance of any hazardous or unacceptable wastes 9. Leak detection reports (if applicable) B. Reporting These records shall be maintained at A-1 Organics headquarters office. DPS records will be provided to HBG for their use in annual regulatory reporting requirements of the amended D&O. Leak detection reporting will be provided to HBG for their use in annual regulatory reporting requirements. 8. Nuisance Control & Environmental Management A. Dust Should nuisance dust conditions arise, dust suppression methods shall be implemented to provide some control of nuisance conditions. If nuisance dust generation persists, it shall be mitigated by improving surfaces for vehicle use and/or reduction of non-vegetative areas. Application of water may be a short term method of control. B. Odor In addition to the Odor Management Plan provided as Appendix X, contingency plans for the implementation of a bio-filter system shall be included for the substrate processing tanks associated with the DPS if shown to require mitigation. AGPROfessionals 20 A-I Organics—Digester Processing System _ Design and Operatics Plan C. Windblown Materials & Debris Debris separation equipment (DODA Bio-separator and Tiger) shall be located in the building. The HBG site is fully enclosed with fencing, which should prevent windblown material or debris from leaving the site. If there is accumulation of debris along the site perimeter, it shall be collected and properly disposed of. D. Pest Control Pest control on the facility is managed by utilizing best management practices to minimize habitat and reduce available food supply. Standing water, weeds and grass, manure or compost stockpiles are all prime habitat for pest reproduction and protection. These areas shall be reduced or eliminated where practical and as needed. Baits and chemical treatments, although a last line of defense, shall be considered. Selective placement of traps and baits may periodically be used to help manage any rodent or fly populations. Regular cleaning of processing areas should help reduce pest food sources. 9. Temporary Shutdown and Permanent Closure A. Shutdown During a planned shutdown, prepared substrate material shall be shipped to an alternative A-1 facility approved to receive the substrates until the DPS is ready to receive material again. This process should be planned to ensure there are no nuisance or environmental concerns. B. Operational Maintenance & Temporary Closure During a planned shutdown, prepared substrate material shall be shipped to an alternative A-1 facility approved to receive the substrates until the DPS is ready to receive material again. This process should be planned to ensure there are no nuisance or environmental concerns. C. Temporary Closure In the event of poor economic or market conditions, it may be necessary for the DPS to suspend operation of the facility. At such time that operations are suspended, the Closure Plan shall be implemented. If operations are suspended for more than 180 days, HBG and A-1 Organics shall notify CDPHE and Weld County and begin the implementation of the Closure Plan in accordance with 6 CCR 1007-2 Sec. 14.8.2 to maintain safe environmental conditions. HBG and A-1 Organics shall provide CDPHE and Weld County written notification within fourteen (14) calendar days of commencing the implementation of the Closure Plan in accordance with 6 CCR 1007-2 Sec. 14.8.4. HBG and A-1 Organics shall provide CDPHE and Weld County written notification within thirty(30) calendar days documenting that all of the requirements and conditions of the Closure Plan have been achieved in accordance with 6 CCR 1007-2 Sec. 14.8.5. Following the closure of the facility, a notation shall be recorded on the property deed notifying any potential purchaser that the property has been used as a composting facility in accordance with 6 CCR 1007-2 Sec. 14.8.6. AGPROfessionals _ 21 A-1 Organics—Digester Processing Sutem Design and Qperations Plan The following closure tasks shall be completed within ninety(90) days unless an extension is granted by CDPHE and Weld County. An extension request may be necessary if the closure takes more than ninety(90) days. HBG and A-1 Organics shall complete all necessary measures to prevent threats to human health and the environment in accordance with the final approved closure plan and any changes to that plan prior to closure. 1. Removal of Residual Materials from Facility Residual materials are not expected as substrate shall be completely used in the digestion process. 2. Removal of Residual Materials from Digesters and Storage Tanks - No Change 3. Removal of Compost Debris from Surface Soils in Windrow Areas - No Change 4. Stormwater Pond, Reject Storage Ponds, Effluent Storage Ponds and Dilution Water Pond - No Change D. Permanent Closure At the end of the five (5) year temporary shut-down, the DPS shall be permanently closed. The following procedures shall be followed to complete the permanent closure. A Financial Assurance Plan is provided to detail closure costs and associated closure plan (See Appendix 9). 1. Stormwater Pond, Reject Storage Ponds, Effluent Storage Ponds and Dilution Water Pond - No Change 2. Re-Seeding of Disturbed Surface Area - No Change 3. Removal of the Digester Processing System At the end of the temporary shutdown, if permanent facility closure is eminent, the DPS shall be thoroughly cleaned via high pressure water wash and chemical decontaminating agents. The DPS may remain onsite for sale and utilization by a future business or relocated offsite. 4. Post Closure Care - No Change AG PROfessionals 22 List of HRE EDOP Appendices —No Change Appendix A: Process Flow Diagram Appendix B: Legal Description Appendix C: Vicinity Map Appendix D: Proposed Site Layout Appendix E: Existing Site Map Appendix F: Easement Map Appendix G: Custom Soils Report Appendix H: Flood Plain Map Appendix 1: Well Map and Well Registrations Appendix J: Monitoring Well Installations Appendix K: Groundwater Monitoring Plan Appendix L: Preliminary Geotechnical Report Appendix M: Preliminary Drainage Report Appendix N: Secondary Containment Calculations Appendix O: HDR Process Flow Diagrams and Cross Sections Appendix P: List of Acceptable Feedstock Substrates Appendix Q: Waste Characterization Plan Appendix R: Sampling Appendix S: Material/Tanks Sizing Summary Appendix T: Equipment Summary Appendix U: Sample Results Appendix V: Fire Protection Appendix W: Contingency Plan Appendix X: Odor Management Plan Appendix Y: Financial Assurance Appendix Z: Ground Water Potentiometric Maps Appendix AA: Action Leakage Rate Calculations Appendix AB: Commercial Small Capacity Well Permit Appendix AC: Flexible Wall Permeability Test Appendix AD: Appendix AD HDPE Pipe Sizing Calculations Appendix AE: Waiver Request and CDPHE Approval Letter List of A-1 Organics DPS EDOP Addendum Appendices Appendix 1: Process Flow Diagram Appendix 2: Proposed Site Layout Appendix 3: Preliminary Geotechnical Report Appendix 4: Secondary Containment Calculations Appendix 5: Cross Sections Appendix 6: DPS Tank Summary Appendix 7: DPS Equipment Summary Appendix 8: Letter from CDPHE to Weld County, October 8, 2014 Appendix 9: Financial Assurance A-1 Organics—Dhgester Processing System Design and Operations Plan A-1 Organics DPS EDOP ADDENDUM APPENDIX 1 Process Flow Diagram AGPROfessionals was ti CCQ 8 r gE a I � c Li a) � � � a � Q,.C O b O O (1 oa (-3 ',5- o0 W o (0 � (Ocn Q o a l=1 a o 0 N U a • • • L c L. 11 o a c aal a O a U d O k� a o a°c -x (1)U ° -, o I soh ) m O,..:34--' a°6 �� .— Unzoti � 4� c) c:-.,a. AAI fi .-_• -1 • — i 1 3. �� b I C Q. P.,'U Q,71 E-.}..(.1 �� ti0 I 11 A i cu Ui u d 0 I +> d UI i m4 o> VI A-1 Organics—Digester Processing System Design and Operations Plan A-1 Organics DPS EDOP ADDENDUM APPENDIX 2 Proposed Site Layout AGPROfessionaIs ',p pm �5}•io�. llti, .nlIn£Ci;11-14 . , q I'S h�r :S{o�I * ' NIV Td ...-11 IS . lie ,I,,,,,,:,.,IC}2[d`)v■■ (vc-ic3als.)INA.-.)fl()l() r 7„ �" II i ' I:II ti I .'siti • F. III I yI II I ; I •3�• I^ I SI i. I .I'I G I I I—i ' I — Z —'— — — — — —. _ .. �, g"-III, r I'iI. II I. I I. - _ F• II .I,,I , _ la I• Imo_— I I - I .4 a ' f1 i ) i . I • i ri I s , ,:e . .. J N I • E: __. _ _ _____ A-1 Organics—Digester Processing System Design and Operations Plan A-1 Organics DPS EDOP ADDENDUM APPENDIX 3 Preliminary Geotechnical Report AGPROfess,onals SO LOGIC October 20, 2014 (Revised October 22, 2014) AGPROfessionals, LLC 3050 671h Avenue, Suite 200 Greeley, Colorado 80634 Attn: Mr. Tim Naylor Re: Geotechnical Subsurface Exploration Report Digester Processing System @ Heartland Renewable Energy (19179 County Road 49) LaSalle, Weld County, Colorado Soilogic Project # 14-1208 Mr. Naylor: Soilogic, Inc. (Soilogic) personnel have completed the geotechnical subsurface exploration you requested for the proposed Digester Processing System(DPS) facility to be constructed at the Heartland Renewable Energy site in Weld County, Colorado. The results of our subsurface exploration and pertinent geotechnical engineering recommendations are included with this report. We understand this project involves the construction of several above and below grade water tanks and associated pumping works and support improvements including a concrete pad and office structure at the Heartland Renewable Energy facility, located at 19179 County Road 49 in LaSalle, Weld County, Colorado. The main storage tank (200,000 gallons) is expected to be approximately 36 feet in diameter and approximately 25 feet in height. We understand a ring-wall foundation is the preferred method for support of the 200,000 gallon tank. Several smaller and more lightly loaded rectangular storage tanks are anticipated including several buried 16-foot cubical tanks and 32,000 gallon rectangular tanks with approximate plan dimensions of 12 feet by 40 feet and approximately 6 feet in height. Foundation loads for the 200,000 gallon tank are expected to be light to moderate with the tank bottom exerting approximately 2000 psf on the supporting soils. Foundation loads for the remaining area improvements are expected to be light with rectangular tanks exerting approximately 500 psf on the supporting soils and other structure loads estimated at continuous wall loads less than 3 kips per lineal foot and individual column loads less than 50 kips. Small grade changes are anticipated to develop finish site grades in the DPS area Soilogic, Inc. 3050 67th Avenue, Suite 200•Greeley, CO 80634•(970) 535-6144 P.Q. Box 1121 • Hayden, CO 81639• (970) 276-2087 Geotechnical Subsurface Exploration Report Digester Processing System (DPS) (a Heartland Renewable Energy (19179 County Road 49) LaSalle, Weld County. Colorado Soilogic# 141208 2 The purpose of our exploration was to describe the subsurface conditions encountered in the completed site borings and develop the test data necessary to provide recommendations concerning design and construction of storage tank and associated support equipment foundations and support of a concrete pad and exterior flatwork. The conclusions and recommendations outlined in this report are based on results of the completed field and laboratory testing and our experience with subsurface conditions in this area. SITE DESCRIPTION The DPS area is situated on the south-central portion of the Heartland Renewable Energy site, located at 19179 County Road 49 in LaSalle, Weld County, Colorado. At the time of our site exploration, the proposed construction area had been stripped of topsoil and vegetation and was relatively flat, with the maximum difference in ground surface elevation across the proposed construction area estimated to be less than 2 feet. Evidence of prior building construction was not observed in the proposed construction area by Soilogic personnel at the time of our site exploration. EXPLORATION AND TESTING PROCEDURES To develop subsurface information in the area of the proposed DPS improvements, two (2) soil borings were advanced to depths ranging from approximately 25 to 30 feet below present site grades within the proposed improvement area. The approximate locations of proposed site improvements were premarked in the field by surveyors. The boring locations were established in the field by Soilogic personnel based on the premarked areas. A diagram indicating the approximate boring locations is included with this report. A graphic log of each of the auger borings is also included. The test holes were advanced using 4-inch diameter continuous flight auger powered by a truck-mounted CME-55 drill rig. Samples of the subsurface materials were obtained at regular intervals using California barrel sampling procedures in general accordance with ASTM specification D-1586. As part of the D-1586 sampling procedure, the standard sampling barrel is driven into the substrata using a 140 pound hammer falling a distance Geotechnical Subsurface Exploration Report Digester Processing System(DPS) 4.Heartland Renewable Energy (19179 County Road 49) LaSalle,Weld County, Colorado Soilogic#14-1208 3 of 30 inches. The number of blows required to advance the samplers a distance of 12 inches is recorded and helpful in estimating the consistency, relative density or hardness of the soils or bedrock encountered. In the California barrel sampling procedure, lesser disturbed samples are obtained in removable brass liners. Samples of the subsurface materials obtained in the field were sealed and returned to the laboratory for further evaluation, classification and testing. The samples collected were tested in the laboratory to measure natural moisture content and visually classified in accordance with the Unified Soil Classification System(USCS). The USCS group symbols are indicated on the attached boring logs. An outline of the USCS classification system is included with this report. Classification of bedrock was completed through visual and tactual observation of disturbed samples. Other bedrock types could be revealed through petrographic analysis. As part of the completed laboratory testing, a calibrated hand penetrometer (CHP) was used to estimate the unconfined compressive strength of essentially cohesive specimens. The CHP also provides a more reliable estimate of soil consistency than tactual observation alone. Dry density, -200 wash and swelllconsolidation tests were completed on selected samples to help establish specific soil characteristics. The percent passing the#200 size sieve (-200 wash test) is used to determine the percentage of fine grained soils (clay and silt) in a sample. Swell/consolidation tests are performed to evaluate soil volume change potential with variation in moisture content. The results of the completed laboratory tests are outlined on the attached boring logs and swelllconsolidation summary sheets. SUBSURFACE CONDITIONS The subsurface materials encountered in the completed site borings can be summarized as follows. Light brown to brown silty sand was encountered at the surface at the boring locations. The silty sand was medium dense in terms of relative density, exhibited low swell potential at in-situ moisture and density conditions and extended to a depth of approximately 14 feet below ground surface at the location of boring B-1. At boring location B-2, the silty sand extended to a depth of approximately 6 feet below ground surface and was underlain by brown to reddish brown/olive sandy lean clay. The lean clay was very stiff in terms of consistency, exhibited low swell potential at current Geotechnical Subsurface Exploration Report Digester Processing System(DPS) @ Heartland Renewable Energy (19179 County Road 49) LaSal le,Weld County, Colorado Soilogic# 14-1208 4 moisture and density conditions and extended to a depth of approximately 14 feet below ground surface. The silty sand and sandy lean clay soils were underlain by grey/olive/brown siltstone/sandstone bedrock with occasional claystone interbeds. The siltstone/sandstone varied from hard to very hard in hardness, exhibited low swell potential at in-situ moisture and density conditions and extended to the bottom of both borings at depths ranging from approximately 25 to 30 feet below ground surface. The stratigraphy indicated on the included boring logs represents the approximate location of changes in soil and bedrock types. Actual changes may be more gradual than those indicated. At the time of drilling, groundwater was encountered at boring location B-1 at a depth of approximately 29 feet below ground surface. Groundwater was not encountered at boring location B-2 at that time. When checked approximately 4 days after drilling, groundwater was measured at a depth of approximately 27'/ feet below ground surface at boring location B-1. Boring B-2 had dry caved at a depth of approximately 21 feet below ground surface at that time. Groundwater levels will vary seasonally and over time based on weather conditions, site development, irrigation practices and other hydrologic conditions. Perched groundwater conditions may also be encountered at times throughout the year. Perched water is commonly encountered in soils overlying less permeable soil layers and/or bedrock. The location and amount of perched water can also vary over time. ANALYSIS AND RECOMMENDATIONS Site Development Any existing topsoil and vegetation should be removed from all proposed fill and improvement areas. After stripping and completing all cuts and prior to placement of any fill or flatwork improvements, we recommend the exposed subgrade soils be scarified to a depth of 9 inches, adjusted in moisture content and compacted to at least 95% of the material's standard Proctor maximum dry density. The moisture content of the scarified soils should be adjusted to be within the range of ±2% of standard Proctor optimum Geotechnical Subsurface Exploration Report Digester Processing System(DPS) (a)Heartland Renewable Energy (19179 County Road 49) LaSalle, Weld County, Colorado Soilogic 4 14-1208 5 moisture content at the time of compaction. Fill soils required to develop the site should consist of approved, low volume change (LVC) soils free from organic matter, debris and other objectionable materials. The site silty sand and sandy lean clay could be used as fill in this area. Suitable fill and backfill soils should be placed in loose lifts not to exceed 9 inches thick, adjusted in moisture content and compacted as recommended for the scarified soils above. Care should be taken to avoid disturbing reconditioned subgrades and site fill soils prior to placement of foundation and flatwork concrete. Soils which are allowed to dry out or become wet and softened or disturbed by the construction activities should be removed and replaced or reworked in place prior to concrete placement. Foundations Based on the materials encountered in the completed site borings and results of laboratory testing, it is our opinion the proposed 200,000 gallon storage tank could be supported on a ring-wall foundation and other more lightly loaded tanks and support structures could be supported by continuous spread footing and isolated pad foundations bearing on natural, undisturbed silty sand, sandy lean clay or siltstone/sandstone bedrock with low volume change potential. Each site structure should be supported on like materials in order to reduce the potential for excessive differential movement. If differential foundation bearing conditions are observed at the time of construction, extending footing foundations to bear on similar soils/bedrock at greater depth or development of a uniform thickness of overexcavation/backfill beneath spread footing foundations would be required. We recommend staged loading of the 200,000 gallon tank be completed upon initial filling to allow for monitoring of total and differential foundation settlement. For design of the 200,000 gallon storage tank ring-wall spread footing foundation and other more lightly-loaded tank and structure foundations bearing on natural, undisturbed, medium dense silty sand and/or very stiff sandy lean clay with low volume change potential, we recommend using a maximum net allowable soil bearing pressure of 2,000 psf. Geotechnical Subsurface Exploration Report Digester Processing System(DPS)(0 Heartland Renewable Energy (19179 County Road 49) LaSalle,Weld County, Colorado Soilogic# 14-1208 6 Exterior footings should bear a minimum of 30 inches below finished adjacent exterior grade to provide frost protection. We recommend formed strip footings have a minimum width of 12 inches and isolated pad foundations have a minimum width of 24 inches in order to facilitate construction and reduce the potential for development of eccentrically loaded footings. Actual footing widths should be designed by a structural engineer. For design of footing foundations and foundation walls to resist lateral movement, a passive equivalent fluid pressure value of 250 pcf could be used. The top 30 inches of subgrade could be considered a surcharge load but should not be used in the passive resistance calculations. A coefficient of friction of 0.45 could be used between foundation and floor slab concrete and the bearing soils to resist sliding. The recommended passive equivalent fluid pressure value and coefficient of friction do not include a factor of safety. We estimate settlement of the 200,000 gallon storage tank designed and constructed as outlined above and resulting from the assumed structural loads would be 2'/2 inches or less. If this amount of settlement must be reduced, overexcavation/backfill procedures or other alternative deep foundation systems could be employed. Removal of the upper 5- feet of silty sand and replacement with select granular fill compacted to at least 100% of the material's standard Proctor maximum dry density and within+2% of standard Proctor optimum moisture content would be expected to reduce the anticipated settlement of the 200,000 gallon storage tank to 13/ inch or less. We estimate settlement of the 32,000 gallon above-ground storage tanks and other lightly-loaded spread footing foundations designed and constructed as outlined above and resulting from the assumed structural loads would be less than 1 inch. We estimate settlement of the buried storage tanks resulting from the assumed structural loads would be 1/2 inch or less. Differential settlement would be expected to be more limited, approaching 75% of the total settlement estimated above. If water from any source is allowed to infiltrate the foundation bearing soils, additional movement of foundations could occur. Seismicity Based on our review of the International Building Code (2003), a soil profile type C could be used for the site strata. Based on our review of United States Geologic Survey Geotechnical Subsurface Exploration Report Digester Processing System(DPS) Heartland Renewable Energy (19179 County Road 49) LaSalle,Weld County, Colorado Soilogic#14-1208 7 (USGS) mapped information, design spectral response acceleration values of SDs = .193 (19.3%) and SDI = .087 (8.7%) could be used. Concrete Pad and Exterior Flatwork The concrete pad and exterior flatwork could be supported directly on the reconditioned natural site soils and/or properly placed and compacted fill soils developed as outlined in the "Site Development" portion of this report. A modulus of subgrade reaction (k) value of 150 pci could be used for design of slabs supported on the native silty sand and sandy lean clay soils. Disturbed subgrades or subgrade materials that have been allowed to dry out or become wet and softened should be removed and replaced or reconditioned in place prior to pad and exterior flatwork construction. Drainage Positive drainage is imperative for satisfactory long-term performance of the proposed site improvements. We recommend positive drainage be developed away from the structures during construction and maintained throughout the life of the site improvements, with twelve (12) inches of fall in the first 10 feet away from the tanks and associated site improvements. Shallower slopes could be considered in hardscape areas. In the event that some settlement of the backfill soils occurs adjacent to the tanks, the original grade and associated positive drainage outlined above should be immediately restored. We recommend irrigation systems (if any) be placed a minimum of 5 feet away from the perimeter of the site structures and be designed to discharge away from all site improvements. Water which is allowed to pond adjacent to site improvements can result in unsatisfactory performance of those improvements over time. Geotechnical Subsurface Exploration Report Digester Processing System(DPS)4 Heartland Renewable Energy (19179 County Road 49) LaSalle, Weld County, Colorado Soilogic# 14-1208 8 LIMITATIONS This report was prepared based upon the data obtained from the completed site exploration, laboratory testing, engineering analysis and any other information discussed. The completed borings provide an indication of subsurface conditions at the boring locations only. Variations in subsurface conditions can occur in relatively short distances away from the borings. This report does not reflect any variations which may occur across the site or away from the borings. If variations in the subsurface conditions anticipated become evident, the geotechnical engineer should be notified immediately so that further evaluation and supplemental recommendations can be provided. The scope of services for this project does not include either specifically or by implication any biological or environmental assessment of the site or identification or prevention of pollutants or hazardous materials or conditions. Other studies should be completed if concerns over the potential of such contamination or pollution exist. The geotechnical engineer should be retained to review the plans and specifications so that comments can he made regarding the interpretation and implementation of our geotechnical recommendations in the design and specifications. The geotechnical engineer should also be retained to provide testing and observation services during construction to help determine that the design requirements are fulfilled. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with the generally accepted standard of care for the profession. No warranties express or implied, are made. The conclusions and recommendations contained in this report should not be considered valid in the event that any changes in the nature, design or location of the project as outlined in this report are planned, unless those changes are reviewed and the conclusions of this report modified and verified in writing by the geotechnical engineer. Geotechnical Subsurface Exploration Report Digester Processing System(DPS) Heartland Renewable Energy (19179 County Road 49) LaSalle,Weld County Colorado Soilogic# 14-1208 9 We appreciate the opportunity to be of service to you on this project. If you have any questions concerning the enclosed information or if we can be of further assistance to you in any way, please do not hesitate to contact us. Very Truly Yours, Soilogic, Inc. Reviewed by: �" Z4 0 REG/s _O30 REGisr or q- • . ail, A rr O • 3•r ;�; .,a•• 44271 •• Q' crs••••..••••' \ /ONAL1•Ea Wolf von Ca owitz, P.E. Darrel J. DiCarlo Principal Engineer Senior Project Engineer QCT❑BER 2014 B❑RING LLCATICN DIAGRAM SDLDEICPR❑JECT #I4-1 08 r _a 1L1 r Y� Y 3 3 E r I + t 1\1--T NOT TO SCALE D❑DA FACILITY @ HEARTLAND WELD COUNTY, C❑L❑RAD❑ DODA FACILITY @ HEARTLAND WELD COUNTY,COLORADO Project# 14-1208 SD LOGIC October 2014 LOG OF BORING B-1 — Sheet 111 Drillirq Rig: CME 55 Water Depth Information Start Date 10/9/2014 Auger Type: 4"CFA During Drilling 29' Finish Date 10/9/2014 Hammer Type: Manual After Drilling 29' Surface Elev. Field Personnel: BMc 4 Days After Drilling 27.5' Estimated Swell %Passing y SOIL DESCRIPTION Depth E "N" MC DD q„ %Swell @ Pressure Atterberg Limits #200 Sieve 7 (ft) cn (%) (pef) (psf) 500 psf (psf) LL PI (% SM SILTY SAND 2 Ight brown to brown medium dense 3 4 5 CS 18 5.5 99.0 9000+ None <500 F 7 8 9 10 CS 46 6.4 100.1 9000+ 0.1% 600 11 12 13 14 15 CS 5016 6.6 122.9 9000+ - 16 SILTSTONEISANDSTONE • greylrustheddish brown 17 very hard 18 19 26 CS 50(5 15.9 115.1 9000+ 21 22 23 24 25 26 27 28 25 BOTTOM OF BORING @ 30' 30 CS 5012 NR - - - DODA FACILITY @ HEARTLAND WELD COUNTY,COLORADO Project# 14-1208 October SO LOGIC 2014 LOG OF BORING B-2 Sheet 1/1 Drilling Rig: CME 55 Water Depth Information Start Date 10/9/2014 Auger Type: 4"CFA During Drilling None Finish Date 10/9/2014 Hammer Type: Manual After Drilling None Surface Elev. Field Personnel: BMc 4 Days After Drilling Dry to 21' y `m Estimated Swell %Passing SOIL DESCRIPTION Depth E "N" MC OD q %Swell @ Pressure Atterberg Limits #200 Sieve (ft) r' (%) (Pcf) (Psf) 500 psf (psf) LL PI (%) SM SILTY SAND 2 ligh1 brown 1a brown - medium dense 3 4 5 CS 21 4.4 101.6 9000+ 40.9% 6 7 CL SANDY LEAN CLAY brownlreddish brown/ollvelrust B very stiff 9 10 CS 32 14.6 117.2 9000+ 0.3% 1000 11 12 13 14 15 CS 5017 20.2 102.6 9000+ Nano @ 1,ono 41000 16 S ILTSTONEISANDSTONE greylmst.reddishbrown 17 hard to very hard - 10 19 20 CS 5014 46.7 112.3 9000+ 21 22 23 24 25 CS 5015 17.5 110.5 9000+BOTTOM OF BORING 25' - 26 27 28 29 30 DODA FACILITY @ HEARTLAND WELD COUNTY, COLORADO Project# 14-1208 October 2014 SWELL/CONSOLIDATION TEST SUMMARY 12 10 I ' I I m 4 I I i I I 1 II 2 _ I I ill ' C I ct O , I c . -e , , , I ; I I , I _10 -- -12 -------♦ - 10 100 1000 10000 100000 Applied Load (psf) Sample ID: B-1 @ 4' Sample Description: Light Brown Silty Sand (SM) Initial Moisture 3.5% Liquid Limit - Final Moisture 21.2% Plasticity Index - % Swell @ 500 psf None °/0 Passing#200 - Swell Pressure <500 psf Dry Density 98.0 pcf SO LOGIC DODA FACILITY @ HEARTLAND WELD COUNTY, COLORADO Project# 14-1208 October 2014 SWELL/CONSOLIDATION TEST SUMMARY 12 1 i 10 8 —.._. — ! ; !—__ i I CO I se , 4 1 r- I, I I i I -2 — I I Water E x^idiq$d 4 ,I o I I I I W 70 -s c I a -8 1 '_ _10 I I I -12 10 100 1000 10000 100000 Applied Load (psf) Sample ID: B-1 @ 9` Sample Description: Light Brown Silty Sand (SM) Initial Moisture 6.4% Liquid Limit - Final Moisture 19.8% Plasticity Index - %Swell @ 500 psf 0.1% % Passing#200 - Swell Pressure 600 psf Dry Density 100.1 pcf SO LOGIC DODA FACILITY @ HEARTLAND WELD COUNTY, COLORADO Project# 14-1208 October 2014 SWELL/CONSOLIDATION TEST SUMMARY 12 - — I I I H °' 6 I I (OI ' I I I I e i I I I 2 - -- i I I I I I I I i I 0 ---6-- y i i I I I i I stsrAc�8� I I o to m I I I ; I I C I I ' -10 1 I I I I I I _32 10 100 1000 10000 100000 Applied Load (psf) Sample ID: B-2 @ 9' Sample Description: Reddish Brown Sandy Lean Clay(CL) Initial Moisture 14.6% Liquid Limit - Final Moisture 15.7% Plasticity Index - % Swell @ 500 psf 0.3% % Passing#200 Swell Pressure 1000 psf Dry Density 117.2 pcf SO LOGIC DODA FACILITY @ HEARTLAND WELD COUNTY, COLORADO Project# 14-1208 October 2014 SWELL/CONSOLIDATION TEST SUMMARY 12 III -- I I. 19 I -- I I -� III I I I I I —I I I I is s � ��p I ae 4 1IIIIII I --, 2 I !.T I i I I I I I I I I I I I Water Adder 4 ---. I ---- , ' • _ 4 I 4as I II Z. -6 i I I I—. ,- = I I Cm, I I _ __ x 8 I I. I I I I I -12 - I I -- - - _. I . i 10 190 1000 10009 100000 Applied Load (psf) Sample lD: B-2 @ 14' Sample Description: Grey/Olive/Brown Siltstone/Sandstone Initial Moisture 20.2% Liquid Limit - Final Moisture 24.5% Plasticity Index % Swell @ 500 psf None °/(1. Passing#200 - Swell Pressure <500 psf Dry Density 102.6 pcf SO LOGIC UNIFIED SOIL CLASSIFICATION SYSTEM Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests" Soil Classification Group Symbol Group Name' Coarse Grained Soils Gravels Clean Gravels Cu z 4 and 1 a Cc s 3E GW Well graded gravel` More than 50%retained More than 50%of coarse Less than 5%fines` Cu‹4 and/or 1 >Cc>3' GP Poorly graded gravel` fraction retained on on No.200 sieve No 4 sieve Gravels with Fines More Fines classify as ML or MH GM Silty gravelr'" than 12%fines` Fines classify as CL or CH GC Clayey gravel'" Sands Clean Sands Cu z 6 and 1:5 Cc s 3E SW Well graded sand' 50%or more of coarse Less than 5%fines° Cu<6 and/or 1 7 Cc>3' SP Poorly graded sand' fraction passes No.4 sieve Sands with Fines Fines classify as ML or MH SM Silty sand"' More than 12%f9nes' Fines classify as CL or CH SC Clayey sand"' Fine-Grained Soils Silts and Clays Inorganic PI n 7 and plots on or above"A'lined CL Lean clay"" 50%or more passes the Liquid limit less than 50 PI<4 or plots below"A"lined ML Silt"" No.200 sieve Organic Liquid limit-oven <0.75 OL Organic clay''''''' dried Liquid limit-not Organic sill"' dried Sills and Clays Inorganic PI plots on or above"A"line CH Fat clay' Liquid limit 50 or more PI plots below"A'•line MH Elastic silt' Organic Liquid limit-overt dried clay' clay <0.75 OH Liquid limit-not dried Organic silt"`"° Highly organic soils Primarily organic matter,dark in color,and organic odor PT Peat "Based on the material passing the 3-in.(75-mm)sieve "If fines are organic,add'with organic fines"to group name. 9 If field sample contained cobbles or boulders,or both,add"with cobbles ' If soil contains a 15%gravel,add"with gravel"to group name. or boulders,or both'to group name. 'I€Atterberg limits plot in shaded area,soil is a CL-ML,silty clay >Gravels with 5 to 12%fines require dual symbols: GW-GM well graded "If soil contains 15 to 29%plus No.200,add"with sand"or"with gravel with silt,GW-GC well graded gravel with clay,GP-GM poorly gravel,"whichever is predominant. graded gravel with sill,GP-GC poorly graded gravel with clay. If soil contains a 30%plus No.200 predominantly sand,add D Sands with 5 to 12%fines require dual symbols: SW-SM well graded "sandy"to group name. sand with silt,SW-SC well graded sand with clay,SP-SM poorly graded sand with silt,SP-SC poorly graded sand with clay If soil contains a 30%plus No.200,predominantly gravel,add "gravelly"to group name. D3a}z "PI z 4 and plots on or above"A"line. ECU=Dso1D o Cc= DID X DD0 °PI 4 or plots below"A"line. F If soil contains a 15%sand,add"with sand"to group name. 'PI plots on or above"A"l€ne. °If fines classify as CL-ML,use dual symbol GC-GM,or SC-SM. °PI plots below"A"line. 60 I i i zi i i For classification of fine-grained soils and fine-grained fraction • 50 of coarse-grained soils •>�?, ' . e Equation of"A"-line �� `` . O 0.. Horizontal at P1=4 to LL=25.5. X 40 — then PI=0.73(LL-20) O� pEquation of"U"-line oot Z Vertical at LL=16 to P1=7, G • >- 30 then PI-0.9(LL-8) • h I/ o`OV u3 20 - -- c a MH or OH 10 A 4 i.-- �t ML or OL 0 i . - - - - 0 10 16 20 30 40 50 60 70 80 90 100 110 LIQUID LIMIT(LL) GENERAL NOTES DRILLING&SAMPLING SYMBOLS: SS: Split Spoon-1%"I.D., 2"O.D., unless otherwise noted HS: Hollow Stem Auger ST: Thin-Walled Tube—2.5"O.D., unless otherwise noted PA: Power Auger RS: Ring Sampler-2.42"I.D., 3"O.D., unless otherwise noted HA: Hand Auger CS: California Barrel- 1.92"I.D., 2.5"O.D., unless otherwise noted RB: Rock Bit BS: Bulk Sample or Auger Sample WB: Wash Boring or Mud Rotary The number of blows required to advance a standard 2-inch Q.D. split-spoon sampler(SS)the last 12 inches of the total 18-inch penetration with a 140-pound hammer falling 30 inches is considered the "Standard Penetration" or "N-value". For 2.5" O.D. California Barrel samplers (CB) the penetration value is reported as the number of blows required to advance the sampler 12 inches using a 140-pound hammer falling 30 inches, reported as "blows per inch," and is not considered equivalent to the "Standard Penetration"or"N-value". WATER LEVEL MEASUREMENT SYMBOLS: WL: Water Level WS: While Sampling WCI: Wet Cave in WD: While Drilling DCI: Dry Cave in BCR: Before Casing Removal AB: After Boring ACR: After Casing Removal Water levels indicated on the boring logs are the levels measured in the borings at the times indicated. Groundwater levels at other times and other locations across the site could vary. In pervious soils, the indicated levels may reflect the location of groundwater. In low permeability soils,the accurate determination of groundwater levels may not be possible with only short-term observations. DESCRIPTIVE SOIL CLASSIFICATION: Soil classification is based on the Unified Classification System. Coarse Grained Soils have more than 50%of their dry weight retained on a#200 sieve; their principal descriptors are: boulders, cobbles,gravel or sand. Fine Grained Soils have less than 50%of their dry weight retained on a#200 sieve;they are principally described as clays if they are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined on the basis of their in-place relative density and fine-grained soils on the basis of their consistency. FINE-GRAINED SOILS COARSE-GRAINED SOILS BEDROCK n31 u L1 La) Relative 0.131 .� Blows/Ft. Blows/Ft. Consistency Blows/Ft. Blows/Ft. Density Blows/Ft. Blows/Ft. Consistency < 3 0-2 Very Soft 0-5 <3 Very Loose <24 <20 Weathered 3-5 3-4 Soft 6-14 4-9 Loose 24-35 20-29 Firm 6-10 5-8 Medium Stiff 15-46 10-29 Medium Dense 36-60 30-49 Medium Hard 11-18 9-15 Stiff 47-79 30-50 Dense 61-96 50-79 Hard 19-36 16-30 Very Stiff >79 >50 Very Dense >96 >79 Very Hard > 36 > 30 Hard RELATIVE PROPORTIONS OF SAND AND GRAIN SIZE TERMINOLOGY GRAVEL Descriptive Terms of Percent of Major Component Other Constituents Dry Weight of Sample Particle Size Trace < 15 Boulders Over 12 in. (300mm) With 15—29 Cobbles 12 in.to 3 in. (300mm to 75 mm) Modifier >30 Gravel 3 in.to#4 sieve(75mm to 4.75 mm) Sand #4 to#200 sieve(4.75mm to 0.075mm) Silt or Clay Passing#200 Sieve(0.075mm) RELATIVE PROPORTIONS OF FINES PLASTICITY DESCRIPTION Descriptive Terms of Percent of Other Constituents Dry Weight Term Plasticity Index Trace <5 Non-plastic 0 With 5—12 Low 1-10 Modifiers > 12 Medium 11-30 High 30+ v SDLoGIc A-1 Organics—Digester Processing System Design and Operations Plan A-1 Organics DPS EDOP ADDENDUM APPENDIX 4 Secondary Containment Calculations AGPROfessiona Is O 0 km / csi E | % 0co 0 CO ni 0 w E\ 7 to § y ]i ) co r o o ) k\ § G a ) m } / 3 / � E - � � � / Cu < -c ± co y{ \ N \ CO 0 ) km 2 m ] k - . \ N- to ) k r _ C \ � f \ a / cr) to )ja n C o LL o co 'a a) 3 _ § tee\ / Cu ,- > 9 N \ / / f N 022 _ - C \> a NN 0 111 §_ ) 2 3 ) / 3 Cu 0 (0 .c © / / u { ct ) f ] { - $ ( - \) CC \\ � k k� k § E A-1 Organics---Digester Processing System Design and Operations Plan A-1 Organics DPS EDOP ADDENDUM APPENDIX 5 Cross Sections AGPROfessionals ileiled MOO inH< a5:_0-,.:J•Ni saro:w "MIKE r4`+fiti (yy ���a 1 R0�-nuti - �,�4q�-'�O�fl6 - - . -. _ • '#'_ Jrti:I,I,SAS f)NISS:.7(171ci 2J 11.5�.')J(1 = I. .1LB [.,a,,.-FC)2i�T`7 raj IVuOU1)SAINVf)?I() IMF • • • • • • • • . y, • I • ! II . • • • • • • • • { 4....e.ra Yrt'J ;5w'a,-s55[{l.nl"CI•It.I CO ski 1{}Lcsl -- ---- _,{, I.. .III., I awlW v,..., t,QIN IV)'":10.,.1-1117[P:M , .,:11I.,51 .Ii y1h.r11 1 • �'-- !!'' Tye +l-/�) (7S 1[}VJ.:1If1} (} 11 _ - �!$ L4•II�II.5.iF L.`,}5r■■ LV'4Jl�V) 3IN O>IV 1V. r r II --£;---- Q -'.i' II Ll.'•II l: /1 II I r } L • fl I . 'n r I; • 5 I, . 3 • 5 1 Y I Y' '. - - a ' I r c: • - 19 N e . %ra 4iI11 G%In Ii II-II 1r/1 �:-.11.11- . .. 11� - ] - I" 1111 ...I I!I" _ �e 1 ' • - � I _. T fir, r I, • • L!, . I 1111 f ' 1 f ) - 1 • y k-1,e S ”1,;el • : 1<] • :E[ i` } 4.1,•11 r • • tI f5 L 1 I!I .. d' I 4 Y ' • - .. i-' --I} z - eea - - y'[1 X15. � i -i.1 . A-1 Organics—Digester Processing System Design and Operations Plan A-1 Organics DPS EDOP ADDENDUM APPENDIX 6 DPS Tank Summary AGPROfessiona Is L:' & _ to oa ) 0 2 a Cr) a a 0 / ■ F 0 R R $ 7 _ e t G 7 z m O1 § C \ co co Z \ C 0 to c0 Cl) 0 0 ] z z z z z C 2 \ 7 O 16% k I / o ca / 0 2 k k k g \ p o \ k k 0 t $ A C > O S / '� 7 15 / / 0 0 1 co k ch R » O o k C) % k & G \ 0 2 o 2 2 g S ` > g CD m g = 4 u-iI- 2 % d $ / to < eo o. o. m I I I 1 N b e & a ,- ,- = i _ x x x e -0a \ $ 4 4 # (N / \ f $ $ x 00 2 x x x w K 0 0.▪ / / / G « f $ \ \ / r , ) z co0 _v — a r 0 w cr / a Ll - . \ 0 7 se / \ / 2 T. k \ C � k = to C R e / 2 a E 4 \ 3 R \ / 2 / G z p 4 2 2 o c O = E - 2 z CO [ 4 E A-1 Organics—Digester Processing System Design and Operations Plan A-1 Organics DPS EDOP ADDENDUM APPENDIX 7 DPS Equipment Summary AGPROfessiona Is Al Organics "Digester Processing System" Weld County, Colorado Equipment Summary 1. FEED STOCK RECEIVING AND TRANSFER Type Manufacturer Model Purpose Input Output _ Doda in Vaughn V6UR Mix and transfer Food waste Homogenous ground tank mix of solids pump and water Dada in Doda ME 200 Chop and pump Food waste Homogenous ground tank food waste mix of solids chopper and water pump Non-Doda in Vaughn V6UR Mix and transfer Slaughter Homogenous ground tank waste and mix of solids pump food waste and water Tiger in Vaughn V6UR Mix and transfer Food waste Homogeneous ground tank mix of solids pump and water Receiving pad Astro Mfg. Custom built Slice and transfer Various Homogenous counter digester feed mix of solids rotating auger stocks and water Top of in Astro Mfg. Custom built Slice and transfer Various Homogenous ground tank digester feed mix of solids transfer auger stocks and water Top of in TBD TBD Reduce particle Various Homogenous ground tank size digester feed mix of solids in line stocks and water macerator 200,000 Hayward XR3-8 Transfer Various Various gallon steel Gordon digester feed digester feed tank pump stocks stocks 200,000 Suma TBD Mixing Various Various gallon steel digester feed digester feed tank mixers stocks stocks In ground TBD TBD Process food Un processed Homogenous Dada tank waste food waste mix of solids _ and water In ground TBD TBD Process food Un processed Homogenous Non-Doda wastes and non food and non mix of solids tank food waste food wastes and water In ground TBD TBD Process food Un processed Homogenous Tiger tank wastes food wastes mix of solids and water Agitators TBD TBD Homogenize/blend Paunch Processed paunch manure manure slurry paunch manure Coverall Building Bio separator Doda B1O00809E Packaging Various food Various food removal and wastes wastes with no transfer packaging Tiger Ecoverse HS 640 De-packaging Various food Various food Industries wastes wastes with no packaging Transfer auger Astro Custom built Transfer to Various food Various food Tiger tank waste _ waste High voltage TBD TBD Electrical N/A N/A switch gear circuit breakers to control, protect and isolate electrical equipment Control system TBD TBD Equipment to Operating Output signals monitor parameters- to SCADA functionality of e.g. flows tank system DPS processing levels systems Air Compressor TBD TBD Mechanical Air Air device that increases the air pressure by reducing its volume Boiler TBD TBD Provides hot Natural Gas Hot water water for clean up and feed stock dilution A-1 Organics--Digester Processing System Design and Operations Plan A-1 Organics DPS EDOP ADDENDUM APPENDIX 8 Letter from CDPHE to Weld County October 8, 2014 AGPROfessionais COLORADO Department of Public Health Er Environment Dedicated to protecting and improving the health and environment of the people of Colorado October 8, 2014 Ms. Heather Barbare Weld County Department of Health a Environment 1555 N 17th Avenue Greeley, CO 80631 Re: Certificate of Designation for Heartland Biogas LLC, Weld County, Colorado File: sw/wld/hre/1.1 Dear Ms. Barbare: The Heartland Biogas LLC (Heartland) project is in the process of amending their approved Engineering Design and Operations Plan to incorporate the addition of a Digester Processing System (DPS). The Colorado Department of Public Health and Environment, Hazardous Materials and Waste Management Division (the"Division") views the addition of the DPS is an operational issue, and not a substantial change to the provisions of the Certificate of Designation (CD). Therefore, the Division does not consider changes to the Heartland CD as being necessary. Should you have any questions regarding this letter, i may be reached by phone at 303-692-3384 or email at larry.bruskin@state.co.us. Sincerely, Lawrence J. Bruskin, P.E. Solid Waste Permitting Unit Solid Waste E Materials Management Program Hazardous Materials Et Waste Management Division ec: Tim Naylor, AgPro Curt Stovall, HMWMD 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303 692 2000 vnvw.colorado.gov/cdphe Alk cif"; John W. Hickenlooper. Governor I Larry Wolk, MD, MSP11, Executive Director and Chief Medical Officer CO A-1 Organics—Digester Processing System Design and Operations Plan A-I Organics DPS EDOP ADDENDUM APPENDIX 9 Financial Assurance AGPROfessionals Financial Assurance Developed in accordance with Colorado Solid Waste Regulations, 6CCR 1007-2 Sections 1.8 For A-1 Organics DPS SE 1/4 of Section 25 T4N R65W Operated by A-1 Organics at Heartland Renewable Energy, LLC AG III PRO Prepared by AGPROfessionals 3050 67`" Avenue, #200 Greeley, CO 80634 (970) 535-9318 November 19, 2014 A-1 Organics DPS Financial Assurance November 19, 2014 Page 2 of 4 This document outlines the estimated cost for closure, permanent closure and post-closure care of the A-1 Organics Digester Processing System (A-1) facility and was conducted in accordance with Colorado Department of Public Health and Environment (CDPHE) 6CCR 1007-2 Sections 1.8,14.8, and 14.9. In the event of poor economic or market conditions it may be necessary for A-1 to suspend operation of the facility. At such time that operations are suspended, the Closure Plan shall be implemented. In the event that it becomes necessary to suspend operation of the facility including the discontinued receipt, processing and sale of materials for more than 180 days, or otherwise approved by CDPHE, A-i shall notify CDPHE and Weld County and begin the implementation of the Closure Plan in accordance with 6 CCR 1007-2 Sec. 14.8.2 to maintain safe environmental conditions. A-1 shall provide CDPHE and Weld County written notification within fourteen(14) calendar days of commencing the implementation of the Closure Plan in accordance with 6 CCR 1007-2 Sec. 14.8.4. A-1 shall provide CDPHE and Weld County written notification within thirty(30)calendar days documenting that all of the requirements and conditions of the Closure Plan have been achieved in accordance with 6 CCR 1007-2 Sec. 14.8.5. Following the closure of the facility a notation shall be recorded on the property deed notifying any potential purchaser that the property has been used as a composting facility in accordance with 6 CCR 1007-2 Sec. 14.8.6. The following closure tasks shall be completed within ninety(90) days unless an extension is granted by CDPHE and Weld County. This extension request would be necessary if the closure will take more than ninety(90) days for A-1 to complete all necessary measures to prevent threats to human health and the environment. Closure: Removal of Residual Materials from Digesters and Storage Tanks All stored raw materials and substrate will be used in the on-site digestion process to completion. However, the DPS is not dependent on the digester system to operate and would continue operations if the digester facility were to shut down. Processed material would be shipped to an alternative A-1 facility approved to receive the substrates until the on-site digester is ready to receive material again. Permanent Closure: After all digester processing activities have been completed, each process vessel shall be cleaned of any environmental hazards. The cleaning process will include washing the walls, floors, and any mechanical apparatus within the vessel with a high pressure water system or a high volume water system, and the residual wash water will be pumped to the effluent storage pond. At the end of the five (5) year temporary shut-down the facility shall be permanently closed. The following procedures will be followed to complete the permanent closure. A-1 Organics DAS Financial Assurance November 19,2014 Page 3 of 4 Storage Tanks At the end of this five year period, if permanent facility closure is eminent, all tanks, including the Tiger, DODA and Non-DODA tanks and substrate storage tanks, may remain intact and available for sale and use by another business. Post Closure: Following permanent closure of the DPS, A-1 shall conduct post-closure care in accordance with 6 CCR 1007-2 Sec. 14.9.1 by monitoring the site. In conjunction with the post-closure care, A-1 will maintain the facility to meet the Weld County Use by Special Review #1704 Development Standards including building and facility maintenance, weed control and facility security. Following permanent closure of the facility, Heartland Biogas (HBG)will conduct post-closure care in accordance with 6 CCR 1007-2 Sec. 14.9.1 and EDOP by monitoring the site. HBG will inspect and maintain the ground cover and vegetation indicated in their Closure Plan and will submit an annual report to CDPHE and Weld County detailing post-closure care activities during the prior year. In conjunction with the post-closure care, HBG will maintain the facility to meet the Use by Special Review and Weld County development standards, including building and facility maintenance, weed control and facility security. The post-closure care and maintenance period will be for a minimum of five (5) years unless HBG, after consultation with CDPHE, demonstrates that the reduced period is sufficient to protect human health and the environment in accordance with 6 CCR 1007-2 Sec. 14.9.2. A-1 Organics DPS Financial Assurance November 19, 2014 Page 4 of 4 Estimated Costs for Closure Plan Permanent and Post-Closure Costs Task Unit Cost #of Units Total Cost Tiger,DODA,NON-DODA, Project $11,000 1 $11,000 200,000-gallon Paunch process tank and water storage(3-6)tank cleaning' sludge wash down and removal into holding ponds 5 Year Subtotal $11,000 10 Year Grand Total $11,000 This financial analysis shall he updated every 5 years or as needed,in accordance with the Design and Operation Plan. Estimate-Top Gun Pressure Washing dated November 18, 2014 500 West 67th Street ESTIMATE Loveland, CO 80538 PI►�, �o�l Phone 970-203-1110 or Date Estimate# 800-234-5685 Fax 970-203-9911 11/18/2014 17565 Name/Address AGPROfessionals 3050 67th Avenue,Suite 200 Greeley,CO 80634 Email Phone# Fax# cskelton@agpros.com 720-552-I 129 Description Total Attention:Chris Skelton From:Stephanie White Requested Hot/High Pressure&Detail Cleaning of the Digester Processing System. 11,000.00 We Estimate this Job to Cost Between$11,000.00-$13,000.00 Environmental Waste Disposal Fee for Waste Water Reclaimed and Disposed into Sanitary System 45.00 Any additional cleaning is$95.00 per hour/man/machine&cleaner is$12.00 to$30.00 per gallon NOTE: This estimate is valid for 30 days. All work will be completed in a workmanlike manner and according to the above specifications. Alterations to and deviations from the above specifications involving extra costs to Top Gun will be made only upon a mutually executed written change order and will entail additional charges. Top Gun's obligation to perform shall be excused by labor and supply shortages,accidents,severely adverse weather,power outages,acts of God,and all other circumstances beyond Top Gun's reasonable controi. ACCEPTANCE OF ESTIMATE: By signing below,I agree that the above prices,specifications,and conditions are satisfactory and accepted. Top Gun must be paid within 30 days of substantial completion of work. Past due amounts will accrue interest at the rate of one and one-half percent(1.5%)per month until paid in full. I agree to pay all costs Top Gun incurs to collect amounts due and interest. NOTE: Same Day Cancellations are subject to a 50%Cancellation Fee unless due to acts of nature. ACCEPTANCE OF WORK: I acknowledge that Top Gun,as an independent contractor,does not maintain and has no responsibility for the condition of the work site. I also acknowledge that Top Gun's services involve inherent risks that can create hazards to persons and property,including but not limited to ice,frozen and slick surfaces,standing water,flying debris(e.g.rocks),exposure to hazardous chemicals,paint removal,and damage to nearby vehicles and other personal property ("Inherent Risks"). I agree that I shall indemnify,defend,and hold Top Gun,its directors,officers,shareholders,and employees,harmless from ail claims,damages, costs fees iincludine reasonable attorney's fees) exnenses and other liabilities arising from the rendition of the work site and/or any one or more Inherent Risks AUTHORIZED CUSTOMER SIGNATURE/DATE P.''.1166-A1169-A-1 ORGANICS'.64-DODA-HEARTLAND'DWG'.HEARTLAND DODA USE 11-11-14 DWG DATE OF PLOT: November 12 2614 A B C D E usE By SPECIAL REVIEW USR- 17O4 7 O 4 HEARTLAND BIOGAS , LLC . PART OF THE SOUTHEAST 1/4 OF SECTION 25, TOWNSHIP 4 NORTH, RANGE 65 WEST, OF THE 6TH P.M., 1 COUNTY OF WELD, COLORADO 1 31 II III I131 II II il MO ITO ING WLL #1 I II AI " -ABINIIIN.-_ .110IPPallilli&S\K NIEMEN11, I. II,'' N U y \ iiIV! ITA Q l 2 :RM ATE•/L:NG RM R O 2 .RAZE P.7 X 1'TH) BO ND'•__-----j 371 X 1,67' X 1'' 1 I I -I I 1 ih04+t yl I 20 'U 0 -.G.W II II I NORTH LAGOON / - I II I , B `\ / l Ill \\ '04 I'1,11,:ilOk\: II J E 1 III NL I 'I GAS 3 Ig OIL G' - J + WELL �:.0 :....,,,. _ ......._.„....„4. �. C,171. .-.NTL1— ki ____ Elh.. \ ; aISTUCTUE -,c__±-1 -lk_I----- -1---1—'---'s '' —lpi OgrIkli I —— 1 / !, rtirpcii ' WELD COUNTY ONITORINGiiik i -.� gllg I g I -/ ROAD 49 COVERED ANAEROBIC x D ri it irj- . --- I LAGOON 385'x270' 1 g 1 d cr 0 w PIPE OUTLET 1 1 $ I' a CI- Q .0111111, 1 lilt_lilh �, __—_ COVERED LAGOONiii________ 200' B .R 276' X0390' X 18' qy .I PE INLET 1 N 31� i�� II 1I M _ b L _I 1 ri ..... I PROPERTYI VII I I I z , , \ 107 SOUTH LAGOON •••••- / \\ 3 STO"MWA ER/W''TEWATER In:1W ����� g Igr ^ .41 SToRAG§ PONI (BOUT � BUS BUILDING �� I ,11 EXISTING ACCESS WOMIA. Mg* IIII If 523' 1 86.' X 1 - 1 pill i ROPERTYlt 1 AGREEMENTi„,,, INE I m OPERATIONS BUILDING INSA 1 hill �' -- !��@104- rI � DIGESTER ISLOND -- i.' rl." • 4. '\'\I c' I ltS' / TALC ENli 1 DIGESTER DIGESTER ®O � �v RALC INE111. 2 jil III U 1 TANK TANK 4 \ g l - ;p' \\ ONTR.,I � MANUREPIT, AD � ��� � sroP1��i 111 Y � •{ EFFLUENT PIT CENTRAL ����� ki . VoDIGESTER DIGESTER ;___ _____ z� �� // 1 1\. i . TANKTANKili~ Hil TRUCKSCALE ��DIGESTERDIGESTERFlik- TANK TANK NUMI:: FIRLA K 1 o 1 :2FiGIT 11,N 4 I1111� I / OAD / b 4 4 k%6 RUNLE i '� MONI .RING Ciiii\: / c>. iiyilvil ,[,10;(l. dip WE #4I1 •• . •, , • ' .` / Err III , o IIIII g —� —\ 1 ' - -1 -L68 w� �\ a 1 �. 1 liii 411 oWz lit .I , CENTRIFUGE BUILDING NIC 111 I I I \ \ w g (DONE BY OTHERS) \ O (\ \ �I 11111 I DICE-TAR /■ �� y PROC:5'. 1 I I I I SY,T.-M 1' 1 ki 1 11 1 4 lifil 11 .� i iIII 4 /✓ I1 I or#kli I III 1 1 1 1 1 0' :U F:RIll / i � 40 I / .2 ® 40 tillI11I I\\\, . e f A I i gi i g I ..° - M1 8 2.0' \ / �- 111 1 �ZI EXISTING ACCESS 4 I I ii i ,_ \ \ M NITm•® WF . - 1 v, 1 I' �;I 7\1\ 4 ._.\\_,, Iv 11 111, 11 G's—' 1 I 1 g as : 11171N, , , _�— a, • jWELLH1 II /1"/ ,,,,,, IIIIIID. ! ET 1 1 DP, 8„ GAS INE N ILI & FFER ' , Ill ' "WCR 40 DCP 8 GAS LINE \ / " i. \ / I / N. ,' 0 200 400 5 SITE PLAN � Iml— — 5 SCALE: 1" = 200' z O � wQ mow_ LEGEND POLE LIGHT DETAILLU in PROPERTY LINE Barn lights will be contained within the ■ ■ — USR BOUNDARY buildings. All other lighting on site shall G, GA= GAS LINE adhere to the lighting requirements EXISTING ROAD outlined in Section 23-3-250.B.6 of the EXISTING BUILDING Weld County Code. (Blocked or --P EXISTING ACCESS Shielded to shine primarily onto site Lo O O EXISTING GAS WELL and not onto adjacent properties.) oO- a EXISTING GAS EQUIPMENT 300.00' EXISTING GAS SETBACK l,\\ I Q EXISTING SETBACK/EASEMENT CC PROPOSED CONCRETE PROPOSED FENCE D PROPOSED POND b`� 1 z - O 6 IC / _r_ o n 6 O w o 7 IMPROVED GRAVEL SURFACE I CONTINUES TO SITE 200,000 A GALLON CONCRETE TANK RECEIVING Z RIGHT OF WAY PAD o O oI RECEIVING a z FUTURE R\W APRON N EL _`` SECONDARY 0 CONTAINMENT SITE ACCESS DETAIL AREA SCALE: 1:100 -- IIIIIIIIIIIIIIIIIIIIIIIIIIIIII'lil SUBSTRATE 3i TANKS WATER :IIIIIIIII''' CERTIFICATE OF APPROVAL BY THE DEPARTMENT OF PLANNING STORAGE -- I; IIIIII'l''lllll,; SERVICES - ADMINISTRATIVE REVIEW TANKS ijilllllllllllllh I'I'I�I'III'III lr 'I l hIIIIII'I�h'I� II'I�h'IHI I �'7 7 1111111I�11!1111i1IIIIIIIII fi'_e / This minor amendment plat is accepted and approved by the Department of Planning Services for filing. IIIIIIuuIIIIII,hlr1illll,,,IIiI �_ ffltllllll,l'I,I,III,II CONTROL ,�;IIIIIIII I II lllli ROOM I tllniniairlll��'i HIIIIII State of Colorado ) Director, Department of Planning Services li IIII; CC Lu IA:I I— cm Coundy of Weld ) o , aCCLL o U O The foregoing certification was acknowledged before me this day of , 20 I- I III I EQUIPMENTLU My commission expires �0 j Witness my hand and Seal. OPERATIONS Notary Public BUILDING WCR 4O T PROPERTY OWNER'S CERTIFICATION 8 The undersigned major properly owners do hereby agree to the Site Specific Development Plan and 8 U Use by Special Review Development Standards as described hereon this day of , 20 Print Name Print Name DIGESTER PROCESS SYSTEM CLOSE UP PROPOSED LEFT TURN LANE SCALE: 1:30 SCALE: 1:100 A B C D E SHEET: BYSPECIAL REVIEW USR- 1 4AGPROfessionals DATE: Novemher122014 USE / 0 SCALE:FILE: heartland doda usr 11-11-14 iJSi ..- HEARTLAND BIOGAS , LLC . DEVELOPERS OF AGRICULTURE 9 SIZE: ANSI D(zax36) PART OF THE SOUTHEAST 1/4 OF SECTION 25, TOWNSHIP 4 NORTH, RANGE 3050 67th Avenue, Suite 200, Greeley, CO 80634 UNITS: ENGLISH PAGE: 1 of 2 65 WEST, OF THE 6TH P.M., COUNTY OF WELD, COLORADO (970) 535-9318 - fax: (970) 535-9854 C whatbefore below. . DRAWN 7v REVISED: P:11100-A11109-A-1 ORGAN ICSO4-DODA-H EARTLAN DID WG11109-04-HEARTLAND DODA USR 11-11-14 DWG DATE OF PLOT. Jul 30 2015 A B C D E AMENDED _AI,,,,,, HEARTLAND BIOGAS , LLC . PART OF THE SOUTHEAST 1/4 OF SECTION 25, TOWNSHIP 4 NORTH, RANGE 65 WEST OF THE 6TH P.M., 1 COUNTY OF WELD, COLORADO 1 Add: Minor Amendment to MONITORING WELL #1 I g e \ j A PROPERTY g \ LINE I I \ \(BERM \ I 2 STORMWATER/LDNG TERM USR 2 STORAGE POND (NORTH) \ BOUNDARY I 371' X667' X12' g x1 J ` g 200' BUFFER �N�l 200' BUFFER I �_3—,` g 150' BUFFER 7' / I/ /' N S / �_ �' vv / // / \)150' BUFFER g // // A\ \\ PIPE ���fff...///���fff���///```"` ! / CAS 1 1 INLET / 1 y 1 - \ 1 i i GAS �y g EXITING OIL/GAS ROAD 1 / WELL I I WELL II - Ts _ „\ wk, a.s—w—ac -a�-as-wa- / 1 / f I I / / ll ��, \V � ' /� ' I AV A \ // // WELD COUNTY MONITORING \N 74y ig \N ,�4p,' , ,� ROAD 49 WELL #2 Aliru��I�� y I — -1-%'A I , �i PIPE OUTLET ¢ 4 u .\ ^°`d I' I COVERED LAGOON g 1 200'cE LVER 276' X 390' X 18' I q PIPE INLET I E STORMWATER/WASTEWATER I I 1- - _ g X / $, \ 3 STORAGE POND (SOUTH) I r EXISTING ACCESS TO BE 3 523' X 862' X 12' BIOGAS OPERATIONS AREA N BANK 1 PROPERTY I I (BUS BUILDING 50' BUFF R ABANDONED UPON LINE ��� 3 1 COMPLETION OF NEW .tea II � 0 _ \ 00' BUFF�R i + I v"a PROPOSED ACCESS // o' ■ t \\ 3 ��� —, em RUN OFF 0 0 r.'i■ ' v.----7-,:y..` \ I �ws�ti.'�ws�ws�w°�a. �j _----- \ _ Lo, INLET ..�I, 1 1 �_L-ws I/ MONITORING — — -- _ L—a..� :- / WELL #5 4 BYPASS) ir-.---r �- I. •711- f I ... ..-"°'--- V V I �� '€I / FLARE I , • ! 3 ~/ PAVEMEN /�, LL / DIGESTER DIGESTER O O 1� 1\ NELSL I f 1 A\ TRACKI I / Iii I TANK TANK , •� A // //f / A CONTRE. A STOP S I Y `� / / g 1—� —SIGN— ��H U D ' J DIGESTER DIGESTER 'I \ — — / g // o ¢g i 3 TANK TANK I i 1 / / IEl 13 1 • // \ 11 DIGESTER DIGESTER I TANK TANK — EXISTING �� ENTRANCE Ipgs " —III. CULVERT ROAD z / 'I RUN OFF MONITORING g i� 7 i 6 INLET I I ® WELL #4 - ,---7--- ' , \ \ ii.- ----)II I - I / / A GE 1 1 II I II ! / C EL 1 1 3 ' �� • I l 1 SUBDIVISION EXEMPTION / A A / /1/ 1 I \ L 3 105 25-4 SUBX15-0023 / / A\ \I 4 G I I 4 W ig / // 3 Show drainage i III O - 2 g flow arrows GAS V i / WELL f / �_� 1 ® and vehicle / / 150' BUFFER III ' .°-a,m W D 1 circulation on \\ �, // /1 III 31 I map „N:\ , xl 200' BUFFER I I 1 3 200' RLIFFER I I I o Label as Digestor II FINISHED PRODUCT — -FINISHED PRODUCT ,.,__ ____------_jProcess System o STORAGE AREA '� 1 I �, STORAGE AREA J II 3 ��1� � o / / 13 1 0 \ // //MONITORING WELL #3 Nv F\ It„, It' II 9 r) / / V A 8 / I N i III1 _ 1 1 IU 'c x w.-ar 200' SETBACK +/ ff�-�- J � J�l� �LQF �'� ��`°"�°'"J��w ly GAS WELL I I g I / TANK BAT. I 1\ 1\ / 1 N 200' BUFFER /\\ // / $ / 1 DCP 8" GAS LINE 60' RADIUS PROPER Y 4p PROPOSED ACCESSLINE I SECTION LINE so' BUFFER g �I, J ��L. ROW) -�. w�T . w,— -a. ws Indicate Access of —.— of — — _ �__= L�mr_, - �� t _ - _ _ _ W W W _ Permit: AP15-0030 N / WCR 40 DCP 8" GAS LINE ,5,,,-.n 5, .n �J \ , I 0 200 400 5 SITE PLAN -- 5 Indicate SCALE: 1" =200` documentation (Book & Page) for County Road 40 Right-of-Way LEGEND POLE LIGHT DETAIL PROP. LINE/USR BOUNDARY I Barn lights will be contained within the --- GAS LINE buildings. All other lighting on site shall 90 EXISTING ROAD adhere to the lighting requirements .00 I I EXISTING BUILDING outlined in Section 23-3-250.B.6 of the 300.00' EXISTING ACCESS Weld County Code. (Blocked or \ I .3 et EXISTING GAS WELL Shielded to shine primarily onto site o EXISTING GAS EQUIPMENT and not onto adjacent properties.) EXISTING GAS SETBACK 1 / EXISTING SETBACK/EASEMENT WELD COUNTY ROAD 40 _ PROPOSED CONCRETE to a PROPOSED FENCE 6 o Cr ) PROPOSED POND 6 MPROVED ASPHALT CD W o GRAVEL SURFACE I I I I CONTINUES TO SITE 2 I NA AN A RIGHT OF WAY FUTURE R\W 200,000 GALLON CONCRETE l l TANK RECEIVING O PAD SITE ACCESS DETAIL RECEIVING SCALE: 1" = 100' . / APRON SECONDARY CONTAINMENT 0 '-_°__11111111111 1111 II II III II IIII AREA CERTIFICATE OF APPROVAL BY THE DEPARTMENT OF PLANNING SERVICES - ADMINISTRATIVE REVIEW -`e_a.T SUBSTRATE This minor amendment plat is accepted and approved by the Department of Planning Services for filing. „' TANKS 7 WATER STORAGE e TANKS • '° State of Colorado ) Director, Department of Planning Services -- )ss. Coundy of Weld ) , 1 yl I : 1 ; J CONTROL The foregoing certification was acknowledged before me this day of , 20 : :;1 ____ ROOM ' . ,1 0 X10 My commission expires Witness my hand and Seal. EQUIPMENT Notary Public OPERATIONS BUILDING PROPERTY OWNER'S CERTIFICATION 8 8 The undersigned major properly owner(s do hereby agree to the Site Specific Development Plan and Use by Special Review Development Standards as described hereon this ____ day of , 20 Print Name Print Name DIGESTER PROCESS SYSTEM CLOSE UP SCALE: 1:30 A B C D E SHEET: HATE: July 29,2015 USE BY spREmEwmusR14-0030 ■■ SCALE: AS SHOWN AGPROfessionals FILE: 1109-04-heartland doda C usr heart) 14 SIZtsR. 1HEARTLAND B IO GA S LLC . DEVELOPERS OF AGRICULTURE FILE: ArsID�z4x3s) PART OF THE SOUTHEAST 1/4 OF SECTION 25 TOWNSHIP 4 NORTH, RANGE 3050 67th Avenue, Suite 200, Greeley, CO 80634 UNITS. ENGLISH , 65 WEST, OF THE 6TH P.M., COUNTY OF WELD, COLORADO _ _ BY: Know what's below DRAWN PAGE: 1 OF 2 (970) 535 9318 - ax. (970) 535 9854 Call before you dig. REVISED: P:11100-A11109-A-1 ORGANICS 04-DODA-HE ART LANDIDWG',1109-04-HEARTLAND DODA USR 11-11-14 DWG DATE OF PLOT Jul 30 2015 A B C D E AMENDED USE BY SPECIAL REVIEW MUSR14 - 0030 HEARTLAND BIOGAS LLC . PART OF THE SOUTHEAST 1/4 OF SECTION 25, TOWNSHIP 4 NORTH, RANGE 65 WEST OF THE 6TH P.M., 1 COUNTY OF WELD, COLORADO SITE SPECIFIC DEVELOPMENT PLAN SERVICES-ENGI N ER) USE BY SPECIAL REVIEW PERMIT 40. SOURCES CF LIG-IT SHALL BE SHIELDED SO THAT LIGHT RAYS W LL NOT SHINE DIRECTLY ONTO ADJACENT PROPERTIES W-ERE SUCH Wain DEVELOPAIENf STABS CASE A NUISANCE CR INTERFERE WITH TF-E USE CN THE ADJACENT PROPERTIES IN DANCE WITH THE PLAN. NEITI-ER THE DIRECT, NOR MUSR14-0030 REFLECTED, LIGHT FROM ANY LIGHT SOURCE MAY CREATE A TRAFFIC HAZARD TO OPERATORS OF MOTOR VEHICLES ON PUBLIC OR PRIVATE STREETS. 1.A MI NCRAIVEN\DMENT TO A SITE SPECIFIC DEVELOPMENT RAN AND USE BY SPECIAL REVIEW PERMIT NO. USR-1704 (SOLID WASTE DISPOSAL SITE AND NO COLORED LIGHTS MAY BE USED WHICH MAY BE CONFUSED WITH, OR CONSTRUED AS, TRAFFIC CONTROL DEVICES. (DEPARTMENT CF PLANNING FACILITY INCLUDING CLASS I Ca/POSTING, AN ANIMAL WASTE RECYCLING CR PROCESSING FACILITY (AN ANAEROBIC DIGESTER-BASED RENEWABLE SERVICES) ENERGY PLANT(CAS))ALONG WITH ACOfNDRETE BATCH PLANT TO BE USED FCR CONSTRUCTION CF 11-E FACILITY) FCR 11-E ADDITION OF A DIGESTER 41. BUILDING PERMITS MAYBE REQUIRED, PER SECTION 29-3-10 CF TF-E WELD COUNTY CODE. CURRENTLY THE FOLLOWING HAS BEEN ADOPTED BY PRESS SYSTEM AI\D A 70-FOOT FLARE I N TF E A(AGRICULTURAL)ZONE DI STRI C, SUBJECT TO Tl-E DEVEECPf11EJNT STANDARDS STATED HEREON. WELD COUNTY 2012 INTERNATIONAL CODES; 2006 INTERNATIONAL ENERGY CODE; 2011 NATIONAL ELECTRICAL CODE; A BUILDING PERMIT AFPLI CATI CN 2.APPROVAL OF THIS PLAN MAY CREATE AVESTED PROPERTY RIGHT PURSUANT TO SECTION 23-8-10 CF THE WELD COUNTY CCDE. MUST BE COMPLETED AND TWO COMPLETE SETS CF ENGINEERED FLANS BEARING THE WET STAMP OF A COLORADO REGISTERED ARCHITECT CR ENGINEER MUST BE SUBMITTED FOR REVIEW. AGEOTEC1-LAICAL ENGINEERING REPORT PERFORMED BY A REGISTERED STATE CF COLORADO ENGINEER 3.PURSUANT TO CHAPTER 15, ARTICLES I AI\D I I OF THE WEED COUNTY CODE, IF NOXIOUS WEEDS EXIST CN THE PROPERTY CR BECOME ESTABLISF-ED AS SELL REQUIRED GRAN OPEN HOLE INSPECTION. (DEPARTMENT CF BUILDING INSPECTION) A RESULT CF THE PROPOSED DEVELOPMENT, THE APPLICANT/LANDOWNER SHALL BE RESPONSIBLE FOR CONTROLLING THE NOXIOUS WEEDS. 42. 1-E PROPERTY OWNER OR OPERATOR SHALL BE RESPONSIBLE FOR COMPLYING WITH 1-E DESIGN AND OPERATION STANDARDS CF CHAPTER 23 (DEPARTMENT CF PUBLIC VICRKS) CF TF-E WELD COUNTY CODE. 43. NECESSARY PERSONNEL FROM THE WELD COUNTY DEPARTIVENTS CF PLANNING SERVICES, PUBLIC \AUKS, AND PUBLIC FEALTH AND 4.11-E MAXI NUM NUMBER CF EMPLOYEES EMPLOYED AT THE SITE SHALL BE THIRTY(30), PER SHIFT. (DEPARTMENT CF PLANING SERVICES) ENVI RONVENT SHALL BE GRANTED ACCESS CNTO TI-E PROPERTY AT ANY REASONABLE TINE IN ORDER TO ENSURE-11-E ACTIVITIES CARRIED OUT CN 2 THE PROPERTY COIVPLY WITH THE CONDITIONS CF APPROVAL AND DEVELOPMENT STANDARDS STATED F-EREIN AND ALL APPLICABLE WELD COUNTY 2 5.11-E HOURS OF OPERATION WILL BE 24 HOURS A DAY 7 DAYS AWEEK. HAULING WLL OCCUR PRIMARILY DURING DAYLIGHT HOURS. (DEPARTMENT CF REGULATIONS. PLAIN'NG SERVICES) 44. TF-E USE BY SPECIAL REVIEW AREA SHALL BE LIMITED TO THE PLANS SHCdMN F ERECN AI\D GOVERNED BY THE FOREGOING STANDARDS AI\D ALL 6.11-E PROPERTY OJV\ER CR OPERATOR SHALL COIVPLY WITH THE APPLICABLE SECTIONS CF THE REGULATIONS PERTAINING TO THE SOLID WASTE APPLICABLE WELD COUNTY REGULATIONS. SUBSTANTIAL CHANGES FROM THE PLANS CR DEVELOPMENT STANDARDS, AS SHOWN CR STATED, SHALL DISPOSAL SITES AND FACILITIES ACT(6 CCR 1007-2)AND BE CONSTRUCTED, OPERATED, AND MONITORED AS DETAILED IN THE APPLICATION MATERIALS REQUIRE TF-E APPROVAL CF AN ANENNDVEJNTT OF TF-E PERMIT BY TF-E WELD COUNTY BOARD OF COUNTY COMMISSIONERS BEFORE SUCH CHANGES ES AND CONDITIONS DETAILED IN THE DESIGN & OPERATIONS PLAN APPROVAL LETTER, DATED APRIL 7 2010, FROM THE COLORADO DEPARM/F_NT CF FRS THE PLANS CR DEVELOPMENT STANDARDS ARE PERMITTED. ANY OTHER CAS SHALL BE FILED IN THE OFFICE CF THE DEPARTMENT OF PUBLIC FEALTH AND ENVIRCNVENT (CDRF-E) IN CONJUNCTION WITH THE APPLICATION MATERIALS AND CONDITIONS DETAILED IN THE DIGESTER PLAfNINNGSERVICES. PROCESSING SYSTEM ENGINEERING DESIGN AND OPERATION FLAN ADDEI\DUVI APPROVAL LETTER, DATED DECEMBER 18 2014, FROM TI-E CDR-E. 45. THE PROPERTY OW\ER CR OPERATOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL CF THE FOREGOING DEVELOPMENT STANDARDS. (DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT) NONCOMPLIANCE WITH ANY OF TF-E FOREGOING DEVELOPMENT STANDARDS MAY BE REASON FCR REVOCATION CF THE PERMIT BY THE BOARD OF COUNTY COMMISSIONERS. 7.FUJI: IUING CONSTRUCTION, F-RE SHALL SUBMIT TO THE DIVISION AND VELD COUNTY FCR REVIEW AND APPROVAL A CCNNlSTRUGT'CN CERTIFICATION 46. VIED CCUNITYS RIGHT TO FARM: VELD COUNTY IS CNNE OF THE MIDST PRODUCTIVE AGRICULTURAL COUNTIES IN 1-E UNITED STATES, REPORT, WHICH INCLUDES CONSTRUCTION RECORD DRAW NGS, DEVIATICN\S FROM THE APPROVED PLAN, AND RESULTS CF ALL TESTING AND TYPICALLY RANKING IN THE TOP TEN COUNTIES IN THE COUNTRY IN TOTAL MARKET VALUE CF AGRICULTURAL PRODUCTS SOLD. THE RURAL AREAS CF DOCUMENTATION REQUIREMENTS SET FORTH IN THE C /QC PLAN. THE CONSTRUCTION CERTIFICATION REPORT SHALL BE SUBMITTED AT LEAST WELD COUNTY MAY BE OPEN AND SPACIOUS, BUT THEY ARE INTENSIVELY USED FOR AGRICULTURE. PERSCXNS MOVING INTO A RURAL AREA MUST SIXTY(60)DAYS PRIOR TOACCEPTANCE OF FEEDSTOCK. (DEPARTMENT OF PUBLIC FEALTH&ENVIRCNVENT) RECOC'IIZE AND ACCEPT THERE ARE DRAWBACKS, INCLUDING CONFLICTS WITH LCNG-STAf\DING AGRICULTURAL PRACTICES AND A LOVER LEVEL CF SERVICES THAN IN TOJ\N. ALONG WITH THE DRA\\B CKS COVE THE INCENTIVES W IC H ATTRACT URBAN DWELLERS TO RELOCATE TO RURAL AREAS: CPEN VIEWS, SPACIOUSNESS, WILDLIFE, LACK CF CITY NOSE AND CONGESTION, AND THE RURAL ATTVDSPFERE AI\D MY CF LIFE. WITHOUT 8.VOLUME RECORDS SHALL BE M41 NTAI NNE_D, WHICH INCLUDE WASTE MATERIAL RECEIVED, WASTES PROCESSED, SCUD WASTE SHIPPED FOR DISPOSAL, I\EIG-BORI NC FARMS,THOSE FEATLEES WHICH H ATTRACT URBAN DWELLERS TO RURAL VELD COUNTY WOULD QUICKLY BE GONE FOREVER. MATERIAL SHIPPED FCR SALE OR DISPOSAL, AND THE MOUNTS CF BIOGAS PRODUCED CR FLARED INCLUDING TAIL GAS DESTRUCTED. AN ANNUAL REPORT SHALL BE SUBMITTED TO THE WELD COUNTY DEPARTMENT OF PUBLIC F-EALTH&ENVIRCNVENT AND THE COLORADO DEPARTMENT CF PUBLIC 3 FEALTH AND ENVIRCNVENT (CDPHE) F AZARDCUS MATERIALS AND WAS-TE MANAGE7vEINT DIVISION BY MAY FIRST CF EACH YEAR. (DEPARTMENT OF AGRICULTURAL USERS CF THE LAND SHOULD NOT BE EXPECTED TO CHANGE THEIR LONG-ESTABLISHED AGRICULTURAL PRACTICES TO ACCOMMODATE 3 PUBLIC FEALTH&ENVIRCNVENT) THE INTRUSIONS OF URBAN USERS INTO A RURAL AREA. WELL-RUN AGRICULTURAL ACTIVITIES WILL GENERATE CFF-SITE IMPACTS, INCLUDING NOISE 9.11-E FACILITY SHALL RECEIVE AND PROCESS CNLY THOSE MATERIALS THAT ARE DESCRIBED IN THE APPROVED DESIGN AND OPERATIONS PLAN. THE FROM TRACTORS AND EQUIPMENT; SLOVI�NICTVI NG FARM VEHICLES CN RURAL ROAD; DUST FRCJIVI ALAI NAL PENS, FIELD WORK, HARVEST AND GRAVEL WELD COUNTY DEPARTIVE]VT OF PLANNING WC�,DPHE AND CDPF E SHALL BE NOTIFIED IN WRITING OF ANY ADDITIONAL MATERIALS PROPPED FOR ROADS; � FR�ANIMAL COr\FINEME\fT, SILAGE AND MANURE; SMCKE FROM DITCH BURNING; FLIES AND MJSQUITCES; F-U'1TING AND TRAPPING PROCESSING. VI�RITTEN APPROVAL FROM BOTH CDPF-E AND WCDPF-E TO PROCEED WITH PROCESSING SHALL BE OBTAINED PRIOR TO ACCEPTANCE. SHOOTING SPORTS, LEGAL HAZING OF NUISANCE WILDLIFE; AND 11-E USE OF PESTICIDES AND FERTILIZERS IN THE FIELD, INCLUDING 11-E (DEPARTMENT OF PUBLIC HEALTH&ENVIRONMENT) USE CF AERIAL SPRAYING. IT IS COMMON PRACTICE FOR AGRICULTURAL PRODUCERS TO UTILIZE AN ACCUMULATION OF AGRICULTURAL MACHINERY AND SUPPLIES TO ASSIST IN THEIR AGRICULTURAL OPERATIONS. A C ONC FJ\ITRATION OF MISCELLANEOUS AGRICULTURAL MATERIALS OFF EN PRODUCES A VISUAL DISPARITY BETWEEN RURAL/NJ URBAN AREAS OF TF-E COUNTY. SECTION 35-3.5-102, C.R.S., PROVIDES THAT AN AGRICULTURAL OPERATION 10.11-E PROPERTY OWNER OR FACILITY OPERATOR SHALL NOTIFY THE WELD COUNTY DEPARM/F_NT CF PUBLIC F-EALTH & ENVIRONMENT, SHALL NOT BE FOUND TO BE A PUBLIC OR PRIVATE NUISANCE IF THE AGRICULTURAL OPERATION ALLEGED TO BE A NUISANCE EMPLOYS METHODS OR DEPARTIENT CF PLANNING SERVICES AND THE COLORADO DEPARM/F_NT CF RELIC F-EALTH AND ENVIRONVENT IN THE EVENT CF ANY DEVIATICNS PRACTICESTF-AT ARE COMVICNLYOR REASONABLY ASSOCIATED WITH AGRICULTURAL FRCDUCTICN. FRQV'OR PROPOSED CHANGES TO THE FACILITIES DESIGN&OPERATIONS PLAN. (DEPARTMENT CF PUBLIC F-EALTH&ENVIRCNVENT) 11.TF-E COLORADO DEPARTMENT OF PUBLIC FEALTH & ENVIRONMENT, WELD COUNTY DEPARTMENT OF PUBLIC FEALTH & ENVIRCNVENT AND THE WATER HAS BEEN, AND CONTINUES TO BE, THE LIFELINE FCR TF-E AGRICULTURAL COMMUNITY. IT IS UNREALISTIC TO ASSUME THAT DITC FES AND PUBLIC SHALL BE PROVIDED WITH NOTIFICATION IN THE EVENT CF TEMPORARY OR PERMANENT CLCSURE. UPON CLOSURE, THE FACILITY SHALL RESERVOIRS MAY SIMPLY BE MIDVED "CUT CF TF-E VIAY" OF RESIDENTIAL DEVEECPMENT. VIA-EN MOVING TO THE COUNTY, PROPERTY OMERS AND FOLLOWT1-E CLOSURE PLAN PORTION CF TF-EIRAPPROVED DESIGN&CPERATICNS PLAN. (DEPARTMENT CF PUBLIC F-EALTH&ENVIRONMENT) RESIDENTS MUST REALIZE THEY CANNOT TAKE WATER FROM IRRIGATION DITCHES, LAZES, CR 011-ER STRUCTURES, UNLESS 11-EY PAVE AN 12.11-EFACILITY SHALL COMPLY WITH THE APPROVED GROUNDWATER MONITORING PLAN. CHANGES IN APPROVED FEEDSTOCK MAY REQUIRE ADJUDICATED RIGHT TOTI-EWATER. REVISIONS TO TF-E GROUNDWATER TESTING REQUIREMENTS /NJ CONSTITUENTS ANALYZED. GROUNDWATER MONITORING REPORTS WILL BE SUBMITTED TO THE CDPF-E AND VICDPF-E NO LATER THAN MARCH 1 FOLLOWING TF-E REPORTABLE YEAR. (DEPARTMENT OF PUBLIC FEALTH AND V E n COUNTY COVERS A LAND AREA OF APPROXIMATELY FOUR THOUSAND (4,000) SQUARE MILES IN SIZE (TWICE TF-E SIZE OF THE STATE CF ENVIRONMENT) DELAWARE) WITH MORE THAN THREE THOUSAND SEVEN HUNDRED (3,700) MILES OF STATE AND COUNTY ROADS OUTSIDE CF MUNICIPALITIES. TF-E 13.11-E FACILITY SHALL BE CONSTRUCTED, MAINTAINED AND OPERATED TO ENSURE TEAT CONTAMINATION CF SOIL AND GRCUN TER DOES NOTSFEER '�ITUDE CF 11-E AREA TO BE SERVED STREfCFfS AVAILABLE RESOURCES. LAW EN=ORCENENT IS BASED ON RESPONSES TO C�NPLAINTS 4 OCCUR. (DEPARTMENT OF PUBLIC FEALTH AND ENVI RONVEM) MORE THAN CN PATROLS CF TF-E COUNTY, AND THE DISTANCES VIAHIC -1 MUST BE TRAVELED NAY DELAY ALL EMERGENCY RESPONSES, INCLUDING LAW 4 ENFORCEMENT, ANBULANC , AND FIRE. FIRE PROTECTION IS USUALLY PROVIDED BY VOLUNTEERS W-IO MUST LEAVE THEIR JOBS AND FAMI LIES TO 14.ALL BELOW-GROUND STRUCTURES SHALL BE DOUBLE-LINED AND EQUIPPED WITH A LEAK DETECTION SYSTEM, UNLESS OTT-ERNI SE APPROVED IN RESPOND TO EMERGENCIES. COUNTY GRAVEL ROADS, NO MATTER HOW OFTEN 11-EY ARE BLADED, WILL NOT PROVIDE TF-E SANE KIND OF SURFACE WRITING BY BOTH THE CDPF-E AND WEED COUNTY DEPARTMENT CF PUBLIC FEALTH/NJ ENVIRCNVENT. RECORDS OF THE LEAK DETECTION SYSTEMS EXPECTED FROM A PAVED ROAD. SNOW DIAL PRIORITIES MEAN 11-AT ROADS FROM SUBDIVISIONS TO ARTERIALS MAY NOT BE CLEARED FCR OPERATION, MAINTENANCE AND OBSERVATICNS SHALL BE KEPT AND MADE AVAILABLE UPON REQUEST. (DEPARTMENT OF PUBLIC FEALTH AND SEVERAL DAYS AFTER MAJOR SNOWSTORM. SERVICES IN RURAL AREAS, IN MANY CASES, W LL NOT BE EQUIVALENT TO MUNICIPAL SERVICES. RURAL ENVIRCNVENT) DUELLERS MUST, BY NECESSITY, BE MORE SELF-SUFFICIENT THAN URBAN DWELLERS. 15.ABOVE GROUND WASTE RECEIVING, STORAGE, AND PROCESSING TANS SHALL HAVE IMPERMEABLE SECONDARY CONTAINMENT. THE VOLUME PEOPLE ARE 'EXPOSED TO DIFFERENT HAZARDS IN TF-E COUNTY THAN IN AN URBAN CR SUBURBAN SETTING. FARM EQUIPMENT AI\D OIL FIELD RETAINED BY THE SECCNDARY CCNTAI NVENT SHALL BE AT LEAST 110% CF TF-E VOLUME CF TF-E LARGEST TANK INSIDE TF-E CCNTAI NVENT. EQUIPMENT, PODS AND IRRIGATION DITC I-ES, ELECTRICAL PCAIVER FOR PUMPS AND CENTER PIVOT OPERATIONS, HIGH SPEED TRAFFIC, SAND BURS, (DEPARTMENT CF PUBLIC HEALTH&ENVIRONMENT) PUNCTURE VINES, TERRITORIAL FARM DOGS AND LIVESTOCK, AND CPEN BURNING PRESENT REAL THREATS. CONTROLLING C HILDRENS ACTIVITIES IS IMPORTANT, NOT ONLY FOR 11-El R SAFETY, BUT ALSO FOR TF-E PROTECTION CF THE EARNERS LIVELIHOOD. 16.FUGITIVE DUST AND FUGITIVE PARTICULATE EMISSIONS SHALL BE CONTROLLED CN THIS SITE. THE FACILITY SHALL COMPLY WITH THEIR APPROVED PARTICULATE EMISSIONS CCNTRCL PLAN. (DEPARTMENT CF PUBLIC F-EALTH&ENVIRONMENT) 17.TF-E FACILITY SHALL OPERATE IN COMPLIANCE WITH APPLICABLE COLORADO AIR QUALITY CONTROL REGULATIONS AND COMPLY WITH ANY PERMITS ISSUED BY THE AIR POLLUTION CCNTRCL DIVISION. (DEPARTMENT CF PUBLIC F-EALTH&ENVIRONMENT) 18.EXFAUST REMOVAL SYSTEMS SHALL BE INSTALLED WHEN NECESSARY FCR ENCLOSED AREAS AND DUST PRODUCING PROCESSES AND EQUIPMENT. VISIBLE STACK EMISSIONS FROM EXHAUST REMOVAL, MATERIAL PROCESSING, AND ANY COMBUSTION SOURCE SHALL NOT EXCEED 20% 5 OPACITY (MEASURED IN DANCE WITH EPA REFERENCE METHOD 9). THERE SHALL BE NO VISIBLE EMISSIC S FROM ANY BUILDING OPENINGS 5 (MEASURED IN ONCE WITH EPA REFERENCE METHOD 22). (DEPARTMENT OF RELIC HEALTH&ENVIRONMENT) 21.IN ACCORDANCE WITH TF-E COLORADO AIR QUALITY CONTROL CCMVIISSICNNS REGULATION NUMBER 2, ODOR DETECTED OFF SITE SHALL NOT EXCEED THE LEVEL CF SEVEN-TO-ONE(7:1)DILUlTION THRESHOLD. (DEPARTMENT CF PUBLIC FEALTH&ENVIRONVEM) 22.ADEQI.ATE DRINKING, HANDWASHING AND TOILET FACILITIES SHALL BE PROVIDED FOR EMPLOYEES AND PATRONS CF THE FACILITY, AT ALL - TIIVES. WHERE 2 OR LESS FULL TINE (40 HOUR WEEK) EMPLOYEES ARE LOCATED CN SITE, OR WHERE 4 OR LESS PART TINE (20 HOUR WEEK) WCR-42 EMPLOYEES LOCATED ON SITE PORTABLE TOILETS AND BOTTLED MATER ARE ACCEPTABLE. AS EMPLOYEES CR CONTRACTORS ARE CN SITE FCR LESS THAN 2 CONSECUTIVE HOURS A DAY PORTABLE TOILETS AND BOTTLED MATER ARE ACCEPTABLE. RECCRE}S OF MAINTENANCE AND PROPER DISPOSAL FCR PORTABLE TOILETS SHALL BE RETAINED ON A QUARTERLY BASIS AND AVAILABLE FCR REVIEW BY TF-E WEED COUNTY DEPARTMENT OF PUBLIC FEALTH AND ENVIRCNVENT. PORTABLE TOILETS SHALL BE SERVICED BY A CLEANER LICENSED IN VELD COUNTY AND SHALL CONTAIN HAND SHELTON LAND STEWART SANITIZERS. (DEPARTMENT OF PUBLIC FEALTH AND ENV'RONVENT) & CATTLE LTD KATHERINE 23.SEWAGE DISPOSAL FOR THE FACILITY SHALL BE BY SEPTIC SYSTEM. ANY SEPTIC SYSTEM LOCATED ON THE PROPERTY MUST COMPLY WITH ALL FARM ACCESS PROVISIONS OF 11-E WELD COUNTY CODE, PERTAINING TO C -SITE WASTEWATER TREATMENT SYSTEMS (OWTS). (DEPARTMENT OF PUBLIC FEALTH (GATED) AND ENVIRCNVENT) 24.PROCESS WASTEWATER (SUCH AS FLOOR DRAIN WASTES) AND LABORATCRY WASTEWATER SHALL NOT BE DISPOSED OF 11-ROUGH THE FACILITY'S OWTS. THESE WASTES SHALL BE COLLECTED AND DISPOSED CF IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL RULES AND REGULATIONS AND I N ACCORDANCE WITH THE APPROVED WASTE MANNAGEA/ENT PLAN. (DEPARTMENT CF PUBLIC I-EALTH AND ENVIRONVE\fT) S H ELTO N LAND BROSNAHAN &CATTLE LTD JOHN FLIPPIN STEVEN a BROSNAHAN a 6 25.TI-E FACILITY SHALL COMPLY PT WITH TI-E COLORADO DE . OF LABOR AND EMPLOYMENT DIVISION OF OIL AND PUBLIC SAFETY'S STORAGE TANK JOHN 6 REGULATIONS (7 CCR 1101-14). SECONDARY CONTAI NVENT SHALL ALSO BE REQUIRED FOR ANY CONTAINER HOLDING FUEL OR OIL WITH A VOLUME r\ z GREATER THAN 50 GALLONS. THE VOLUIVE RETAINED BY TF-E SECONDARY CONTAINMENT SHALL BE AT LEAST 110%CF THE VCLUIVE CF TF-E LARGEST FLIPPIN w Q • TANK INSIDE THE CONTAINMENT. ALTERNATIVE PROTECTIVE IVEASURES MAY BE ALLOVIIED FCR REGULATED TANKS, PROM DED THEY COMPLY WITH THE ce STANLEY B ROS NA HAN STORAGE TANK REGULATIONS. A COPY OF ANY SPILL PREVENTION, CONTROL AN RE PLANS SHALL BE PROVIDED TO THE WELD BROSNAHAN JOHN COUNTY DEPARR;f1VENT CF PUBLIC F-EALTH AND ENVIRCNVENT. (DEPARTMENT CF PUBLIC FEALTH&ENVIRONMENT) JOHN C ■ -40 ELC 26.11-ERE SHALL BE NO DISCHARGE CF PRCCESS WASTEWATER CR C01 LECIED STORMNATER OFF PROPERTY, EXCEPT THOSE DISCHARGES PROPOSED SITE ROAD ACCESS gM_ ALLOWED BY THE COLORADO DEPT. OF PUBLIC FEALTH & ENVIRONMENT'S WATER QUALITY CONTROL DIVISION AN YCR A COLORADO DISCHARGE WALTERS FROM WCR 49 PERMIT SYSTEM(COPS)DISCHARGE PERMIT. (DEPARTMENT CF PUBLIC F-EALTH&ENVIRCNVENT) RICHARD 27.11-E APPLICANT SHALL OBTAIN STORMATER DISCHARGE PERMIT COVEIRAGE FOR CONSTRUCTION ACTIVITIES FROM TI-E CDPF-E WATER QUALITY CONTROL DIVISION. (DEPARTMENT CF PUBLIC FEALTH&ENVIRONMENT) N WELCH SHARON M 28.TF-E FACILITY SHALL BE OPERATED AND MAINTAINED IN A MANNER TO PREVENT NUISANCE CONDITIONS FROM TF-E ATTRACTION, BREEDING AND HOYLAN EMERGENCE OF BIRDS, RODENTS, INSECTS AND OT RS F ER VECTORS. ADDITIONAL CONTROL MEASURES SHALL BE IMFLOVEVTED AT THE REQUEST CF THE KENNET l =IJ WEED COUNTY DEPARTMENT OF PUBLIC HEALTH&ENVIRONMENT(DEPARTMENT CF PUBLIC F-EALTH&ENVIR NVENT) VICINITY MAP 29.TI-E FACILITY SHALL ADF-ERE TO-11-E MAXIMUM PERMISSIBLE NOISE LEVELS ALLOWED IN TI-E LIGHT INDUSTRIAL ZONE AS DELINEATED IN SECTION SCALE: 1' = 2000' 7 14-9-30 OF THE WELD COUNTY CODE. (DEPARM/F_NT CF PUBLIC F-EALTH&ENV'RONMENT) 7 30.WASTE MATERIALS, NOT SPECIFICALLY ADDRESSED BY O11-ER DEVELOPMENT STANDARDS, SHALL BE HANDLED, STORED, AND DISPOSED IN A �MANEryRRTHHAT CONTROLS FUGITIVE DUST, BLOWING DEBRIS, PNJ 011-ER POTENTIAL NUISANCE CONDITIONS. (DEPARTIENT CF PUBLIC FEALTH & 74 4- 72 Weld County,Colorado,Southern Part(CO61 ► ENVIRONMENT)IRO NI V CI V T) 73 69 Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI , , o,to 31.NO PERMANENT DISPOSAL CF WASTES SHALL BE PERMITTED AT THIS SITE EXCEPT THOSE WASTES SPECIFICALLY EXCLUDED FROM THE 73 3� "Pe�t5laPe1°a°,.3t°G DEFI NITICN OF A SOLI D WASTE IN THE SOLID WASTES DISPOSAL SITES AND FACILITIES ACT, 30 20 100.5, C.R.S., AS AMENDED, AND ANY AND ALL WASTES Olney sop es my sand Ito 3 percent 75 1°;° BEING COMPOSTED IN ACCORDANCE WITH THE APPROVED ENGINEERING DESIGN AND CPERATIONS PLAN. (DEPARTMENT CF PUBLIC F-EALTH AND 47 Olney tine sandy loam.,to 3 C.a 0,% Ef , E 7fl G ,IRry _ percent slopes w�VV�V I!1 69 Valent sand,DR,3 percent 20.9 2.8% 7 slopes 32.ALL HAZARDOUS C-EMICALS MUST BE HANDLED IN A SAFE MANNER IN ACCORDANCE WITH PRODUCT LABELING AND IN A MANNER TEAT MINIMIZES 70 Valentsand,3 t9 percent 4(13.6 547% THE RELEASE CF HAZARDOUS AIR POLLUTANTS AND VOLATILE ORGANIC COMPOUNDS. ALL CHEMICALS MUST BE STCFED SECURELY AND IN apes P AIVC',E WITH MANUFACTURERS' RECCMVENDATIONS. (DEPARTMENT CF PUBLIC FEALTH AND ENV'ROM/EM) 72 72 Vona loamy sand,D t°3 percent 252.7 34 3,0 slopes 73 Vona i°arny sand,3 to 5 percent 312 42% 33.CCIVPOSTI NNG OPERATIONS W LL NOT EXTEND PAST CD BOUNDARIES OF THE PROPERTY. (DEPARTMENT OF RELIC F-EALTH AND ENVIRCNVENT) 3lopes 74 V°na laarny sand 5 to 9 percent 143 2.I i 34.TF-E OPERATION SHALL COMPLY WITH ALL APPLICABLE RULES AND REGULATIONS OF STATE AND FEDERAL AGENCIES AND TF-E VELD COUNTY 70 slopes CCDE. (DEPA TT T OF PUBLIC FEALTH AA D CAA/IF i R ern r ) Totals for Area of Interest 737.2 100.0 3I.SF[ UD L1Cr/^NOXIOUS l WEEDS h EEDSE ISCON AND VJ CJ V V PROPERTY, 1 Em ,, �OR BECOIVE ESTABLISHED AS A RESULT CF TI-E FROPCSED DEVELOPMENT, TI-E 70 I�IIJ V VCCLhJ 6 APPLICANT/LANDOWNER SHALL BE RESPCNSIBLE FOR CONTROLLING THE NOXIOUS WEEDS, PURSUANT TO CHAPTER 15, ARTICLES I AND II, CF THE 72 8 WELD COUNTY CODE. (DEPARTMENT CF PLANNING SERVICES-ENGINEER) 8 36.TF-E HISTORICAL FLOW PATTERNS AND RUNOFF AMOUNTS W LL BE WI NTAI NED ON THE SITE. (DEPARTMENT OF PLANNING SERVICES-ENGINEER) 37.WELD COUNTY IS NOT RESPONSIBLE FOR 11-E MAINTENANCE CF ONSITE DRAINAGE RELATED FEATURES. (DEPARTMENT CF PLANNING SERVICES - SO I LS MAP ENGINEER) SCALE: 1° = N.T.S. 38.11-ERE SHALL BE NO PARKING CR STAGING CF VEHICLES CN COUNTY ROADS. ON-SITE PARKING SHALL BE UTILIZED. (DEPARTMENT CF PLANNING SERVICES-ENGI NEER) 39. - CF PLANNING A B Can be removed C D E SHEET: DATE: July 29,2015 USE BY SPECIAL PEVI ■■ SCALE: AS SHOWN v 1 fe s s i O rl a 1 s FILE: l 109-04-heartland doda I. usr 1 l-1 l-l4 USR-2 HEARTLAND B JO(i-i\.S LLC . DEVELOPERS OF AGRICULTURE SIZE: ANSI D(24x3b) PART OF THE SOUTHEAST 1/4 OF SECTION 25, TOWNSHIP 4 NORTH, RANGE 3050 67th Avenue, Suite 200, Greeley, CO 80634 UNITS: ENGLISH 65 WEST, OF THE 6TH P.M., COUNTY OF WELD, COLORADO - _ Know what's below. DRAWN PAGE: 2 OF 2 (970) 535 9318 - ax. 970 535 9854 Call before you dig. REVISED: 3957241 08/16/2013 03:12 PM Total Pages:2 Rec Fee: $16.00 Doc Fee: $85.00 Steve Moreno-Clerk and Recorder, Weld County, CO p WARRANTY DEED p THIS DEED,Made this 7 Z.L day of „,,u ,20l3, , between Shelton Land and Cattle,Ltd.,a Colorado corporation -of the County of Weld ,State of Colorado,grantors)and Heartland Biogas,LLC,a Delaware limited liability company whose legal address is:15445 Innovation Drive,San Diego,CA 92128 of the County of San Diego ,State of California,grantor(s): WITNESSETH,That the grantors),for and in consideration of the sum of Eight Hundred Fifty Thousand and Thirty (5850,430.00) DOLLARS, the receipt and sufficiency of which is hereby acknowledged,has granted,bargained,sold and conveyed,and by these presents do grant,bargain,sell,convey,and confirm,unto the grantee,its heirs and assigns forever,all the real property,together with improvements, if any,situate,lying end being in the County of Weld ,State of Colorado, described as follows: See attached Exhibit"A" also known by street and number as: Agricultural Land. Grantor reserves and maintains ownership of any and all mineral,oil,and gas interests associated with the Property,without right of surface entry or access,except in accordance with the provisions of a binding surface use agreement or agreements. TOGETHER with all and singular the hereditaments and appurtenances thereto belonging,or in anywise appertaining,and the reversions and reversions,remainder and remainders,rents,issues and profits thereof,and all the estate,right,title,interest,claim and demand whatsoever of the grantor(s),either in law or equity,of in and to the above bargained premises,with the hereditaments and appurtenances. TO HAVE AND TO HOLD the said premises above bargained and described with the appurtenances,unto the grantees) its heirs and assigns forever. And the grantor(s),for its heirs and personal representatives,does covenant,grant, bargain,and agree to and with the grantee(s), its heirs and assigns,that at the time of the enscai ing and delivery of these presents, .veil seined of the premises above conveyed, has good,sure,perfect,absolute and indefeasible estate of inheritance, in law,in fee simple,and has good right,full power and authority to grant,bargain,sell and convey the same in manner and form as aforesaid,and that the same are free and clear from all former and other grants,bargains,sales,liens,taxes,assessments,encumbrances,and restrictions of whatever kind or nature soever,except: See attached Exhibit"B" The grantor(s)shall and will WARRANT AND FOREVER DEFEND the above-bargained premises in the quiet and peaceable possession of the grantee(s), its heirs and assigns,against all and every person or persona lawfully claiming the whole or any part thereof. IN WITNESS WHEREOF,the grantor(s)has executed this deed on the date set forth above. SHELTON LAND AND CATTLE,LTD.,a Colorado corporation By: `n- L� `'� Its: 5 @ n STATE OF COLORADO ss. County of The foregoing instrument was acknowledged before me this day of t 201 by { o, �.Stta�r t a.,_ Puce sitat4cr,1 dAd c!LID' u 6-.ar;4/10 c ,t,�.ion My commission expires *aloof Lt Witness my hand and official seal. Notary Public "If in Denver,insert"City and". 3957241 08/16/2913 03:12 PM Page 2 of 2 LEGAL DESCRIPTION HEARTLAND PURCHASE PARCEL TO SECTION LINE: A PARCEL OF LAND LYING IN THE SOUTHEAST 1/4 OF SECTION 25,TOWNSHIP 4 NORTH, RANGE 65 WEST,OF THE 6TH P.M..COUNTY OF WELD,STATE OF COLORADO BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BASIS OF BEARING:CONSIDERING THE SOUTH LINE OF THE SOUTHEAST 1/4 OF SECTION 25,TOWNSHIP 4 NORTH,RANGE 65 WEST,OF THE 6TH.P.M.,TO BEAR SOUTH 89°53'33"WEST AND WITH ALL OTHER BEARINGS CONTAINED HEREIN RELATIVE THERETO: COMMENCING AT THE SOUTHEAST SECTION CORNER OF SECTION 25,TOWNSHIP 4 NORTH,RANGE 65 WEST SAID POINT BEING THE POINT OF BEGINNING; THENCE ALONG THE SOUTH LINE OF THE SOUTHEAST 1/4 OF SAID SECTION 25 S 899'53'33"W FOR A DISTANCE OF 2615.26 FEET TO THE SOUTH ONE QUARTER CORNER OF SAID SECTION 25; THENCE ALONG THE NORTH-SOUTH MIDSECTION LINE OF SAID SECTION 25.N 00'00'59"E FOR A DISTANCE OF 2652.88 FEET TO THE CENTER ONE-QUARTER CORNER OF SAID SECTION 25; THENCE ALONG SAID NORTH LINE OF SAID SOUTHEAST 114 OF SECTION 25, S 89°48'44"E FOR A DISTANCE OF 1322.03 FEET; THENCE DEPARTING SAID NORTH LINE,S 00°06'17"W FOR A DISTANCE OF 1712.39 FEET; THENCE N 89°02'3$"E FOR A DISTANCE OF 153.50 FEET TO A POINT OF CURVATURE; THENCE ON A CURVE TO THE LEFT,HAVING A RADIUS OF 443.63,A CENTRAL ANGLE OF 38°45'26",FOR AN ARC DISTANCE OF 300.09 FEET,THE CHORD OF WHICH BEARS N 69°39'28"E FOR A DISTANCE OF 294.40; THENCE N 50°16'16"E FOR A DISTANCE OF 393.43 FEET TO A POINT OF CURVATURE; THENCE ALONG A CURVE TO THE RIGHT HAVING A RADIUS OF 496.07,A CENTRAL ANGLE OF 41°39'36',FOR AN ARC LENGTH OF 360.69 FEET,THE CHORD OF WHICH BEARS N 70°06'07"E FOR A DISTANCE OF 352.60 FEET; THENCE N 89°55'57"E FOR A DISTANCE OF 235.53 FEET TO A POINT ON THE EAST LINE OF SAID SOUTHEAST 1/4; THENCE ALONG SAID EAST LINE S 00°11'36"W FOR A DISTANCE OF 1407.99 FEET TO THE POINT OF BEGINNING. CONTAINING A CALCULATED AREA OF 115.83 ACRES SUBJECT TO COUNTY ROAD RIGHT-OF-WAY Submit by Email Weld County Referral December 12, 2014 The Weld County Department of Planning Services has received the following item for review: Applicant: Heartland Biogas LLC Case Number: MUSR14-0030 Please Reply By: January 09, 2015 Planner: Chris Gathman Project: A Minor Amendment to a Site Specific Development Plan and Use by Special Review Permit No. USR-1704 (solid waste disposal site and facility including Class I composting, an animal waste recycling or processing facility (an anaerobic digester-based renewable energy plant (gas)) along with a concrete batch plant to be used for construction of the facility) for the addition of a Digestor Process System and a 70-foot flare in the A(Agricultural) Zone District. Location: West of and adjacent to CR 49; north of and adjacent to CR 40 Parcel Number: 105525400011-R6784556 Legal: PART SE4 SECTION 25, T4N, R65W of the 6th P.M., Weld County, Colorado. The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. ITWe have reviewed the request and find that it does/does not comply with our Comprehensive Plan because: I" We have reviewed the request and find no conflicts with our interests. See attached letter. Signature Jeff Behncke, Greeley South DWM Date 01/12/2015 Agency Colorado Parks and Wildlife Weld County Planning Dept. 1555 N 17th Ave,Greeley,CO.80631 (970)353-6100 ext.3540 (970)304-6498 fax MEMORANDUM I. T$ #� - To: Chris Gathman, Planner December 12, 2014 From: Bethany Pascoe, Zoning Compliance Officer Subject: MUSR14-0030 Referral Upon review of my case files and computer, no active zoning violations were noted; however, I did find an active Building Violation (BCV13-00059) was noted. Please speak with Pamela Bland, Building Compliance Officer or Frank Piacentino, Building Official. SL1iVICL,TL AWN ORK.INTLGRI I .QUALITY 1$�1, MEMORANDUM TO: Chris Gathman, Planning Services DATE: 1/9/15 FROM: Wayne Howard, P.E., Development Review Engineer C__p U_N Yi SUBJECT: MUSR14-0030 - Heartland The Weld County Department of Planning Services-Engineering has reviewed this proposal. Staff comments made during this phase of the application process may not be all-inclusive, as other issues may arise during the remaining application process. COMMENTS: General Project Information/Location: A Minor Amendment to a Site Specific Development Plan and Use by Special Review Permit No. USR- 1704 (solid waste disposal site and facility including Class I composting, an animal waste recycling or processing facility (an anaerobic digester-based renewable energy plant (gas)) along with a concrete batch plant to be used for construction of the facility) for the addition of a Digestor Process System and a 70-foot flare in the A(Agricultural) Zone District. This project is west of and adjacent to CR 49 and is north of CR 40. Parcel number 105525400011. Access is currently from CR 49 but is in the process of possibly changing to access from CR 40. Roads: CR 49 is an arterial roadway maintained by Weld County. CR 40 is a section line road not maintained by Weld County. The latest counts on CR 49 were taken on 4/5/13 and counted 5609 vpd with 47%trucks. Traffic: The traffic study, dated April 10, 2010, provided with the initial site submittal for USR-1704 estimated 205 trips per day (trip represents either inbound or outbound movement) The applicant has submitted a updated traffic narrative states that the project will reduce the amount of traffic by 10% by reducing the amount of water transported. Access: An access permit has been approved for the access to the existing site (AP13-00111). PW is currently working with the applicant on possibly modifying the location of this access and the new access coming from CR 40. A new access number may be provided. The existing I&M Agreement is being modified to determine the outstanding items such as access location and auxiliary lanes required by the applicant off CR 49. Tracking control is required to prevent tracking from the site onto the County Roadway. o Standard tracking control for accesses onto paved roads includes either 300 feet of pavement onsite OR 100 feet of pavement plus double cattle guards. Other PW Permits: A Right-of-Way Use Permit is required for any work in the Weld County Right-of-Way. Contact Weld County Public Works at 970-304-6496 ext. 3764. A Transport Permit is required for any oversize and/or over weight vehicles. Contact Weld County Public Works at 970-304-6496 ext. 3764. General Site Plan Requirements: i.e (IA, RMA, City Town Agreement, etc..., offsite auxiliary lanes) -Improvements Agreement: o The existing agreement will need to be updated with PW. -Geologic hazard Area: This site IS NOT in a Geologic Hazard Area. The Colorado Geologic Society will be a referral agency. A geologic hazard permit may be required. -Floodplain: The project site IS NOT within a known floodplain. A floodplain permit may be required. Contact Diana Aungst with the Department of Planning Services. Drainage Study: A drainage report shall has been be completed by a Colorado Registered Professional Engineer and adhere to the drainage related sections of the Weld County Code. The applicant has supplied a signed and stamped letter from a professional engineer stating that the original drainage report this project will have no impacts with the original site plan and drainage from this project will be incorporated by the on- site drainage features with no negative impacts. The applicants will be required to maintain historic drainage flows and run-off amounts on the property. Grading Permit A Weld County Grading Permit will be required if disturbing more than 1 acre. Contact the Planning Department for more information. A Construction Stormwater Permit is also required with the State for disturbing more than 1 acre. Contact: Colorado Department of Public Health and Environment, Water Quality Control Division, Rik Gay, 303- 692-3575. CONDITIONS OF APPROVAL: Prior to recording the plat: A. An Improvements Agreement and Road Maintenance Agreement is required for offsite improvements at this site. Road maintenance including dust control, damage repair, specified haul routes and future triggers for improvements will be included. B. The applicant shall complete a Nonexclusive License Agreement for the upgrade and maintenance of Weld County Right-of-Way. The map shall be amended to delineate the following: A. County Road 40 is unmaintained section line right of way. The applicant shall verify and delineate on the map the existing right-of-way and the documents creating the right-of-way. All setbacks shall be measured from the edge of right-of-way. This road is not maintained by Weld County. B. Show the approved non-exclusive license agreement on the Plat and label it with the recorded reception number and date (rec#xxxxxxxxx, date). C. Show the approved access(es) on the plat and label with the approved access permit number. D. The applicant shall indicate specifically on the plat any right of way and/or easements and indicate whether they are dedicated, private, or deeded and label with recorded document, book and page and/or reception number to provide adequate access to the parcel. E. Show and label standard tracking control onto publically maintained roadways on the map. F. Show and label the drainage flow arrows, turning radii, and parking and circulation on the map. Prior to Construction: A. If more than 1 acre is to be disturbed, a Weld County grading permit will be required prior to the start of construction. Contact the Planning Department for application information. B. If more than 1 acre is to be disturbed for construction of non pipeline items such as structures, parking lots, laydown yards etc..., a Weld County grading permit will be required prior to the start of construction. C. A Right-of-Way Use Permit is required for any work in the Weld County Right-of-Way. Contact Weld County Public Works at 970-304-6496 ext. 3764. D. A Transport Permit is required for any oversize and/or over weight vehicles. Contact Weld County Public Works at 970-304-6496 ext. 3764. Prior to Operation: A. Accepted construction drawings and construction of the offsite roadway improvements are required prior to operation. B. Construction of the approved access and/or tracking control improvements is required prior to operation. DEVELOPMENT STANDARDS (NOTES ON THE PLAT) 1. Should noxious weeds exist on the property, or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling the noxious weeds, pursuant to Chapter 15, Articles I and II, of the Weld County Code. 2. The historical flow patterns and runoff amounts will be maintained on the site. 3. Weld County is not responsible for the maintenance of onsite drainage related features. 4. There shall be no parking or staging of vehicles on County roads. On-site parking shall be utilized. 5. The right-of-way or easement shall be graded and drained to provide an all-weather access. 1861' MEMORANDUM TO: CHRIS GATHMAN, PLANNING SERVICES C Q_� N FROM: HEATHER BARBARE, ENVIRONMENTAL HEALTH SUBJECT: MUSR14-0030, HEARTLAND DATE:FEBUARY 12, 2015 Environmental Health Services has reviewed this proposal for amendment to USR 1704 to allow for the addition of a Digester Process System at the Heartland Biogas facility. Records provided indicate the main Heartland site is served by an existing septic system, is serviced by North County Water District, and has a commercial small capacity well permit (#290148) for employee/sanitary use. The applicant is also proposing to utilize portable toilets and bottled water. The following section is from Environmental Health Services, Weld County Department of Public Health & Environment, Septic Policies. 2.2.K Use of portable toilets and bottled water (revised 5/8/12) Purpose: To define when portable toilets and commercially bottled water are allowed. Policy: Bottled water from a commercial source and portable toilets are allowed in the following circumstances: 1 . Temporary or seasonal uses that are utilized 6 months or less per year (for example recreational facilities, firework stands, farmers markets ) 2. Gravel mines 3. 10 or less customers or visitors per day and/or one of the following: 4. 2 or less full time (40 hour week) employees located on site 5. 4 or less part time (20 hour week) employees located on site 6. employees or contractors that are on site for less than 2 consecutive hours a day Note: Records of maintenance and proper disposal for portable toilets shall be retained on a quarterly basis and available for review by the Weld County Department of Public Health and Environment. Portable toilets shall be serviced by a cleaner licensed in Weld County and shall contain hand sanitizers. An Engineering Design and Operations Plan (EDOP) and Addendum to the EDOP (Digester Processing System Engineering Design and Operation Plan Addendum) was submitted and the CDPHE conducted a "technical review" of the EDOP and EDOP Addendum. The EDOP was approved by the CDPHE in a letter dated April 7, 2010 and the EDOP addendum was approved by the CDPHE in a letter, dated December 18 2015. The applicant submitted a Nuisance Management Plan as part of the application. The Nuisance Management Plan included a dust abatement plan, waste management plan, and a noise abatement plan. We have no objections to the proposal; however, we do recommend that the following conditions be part of any approval. We recommend USR 1704 Condition of Approval 1.l and USR 1704 Condition of Approval 1 .J be incorporated into the permit as requirements that must be met prior to release of building permits. We recommend USR 1704 Condition of Approval 6.A be incorporated into the permit as requirements that must be met prior to operation. We recommend USR 1704 Development Standards 6 through 11 and USR 1704 Development 13 through 30 remain incorporated into the permit with the following changes: 1 . USR 1704 development standard 6 should be changed to: "The property owner or operator shall comply with the applicable sections of the regulations pertaining to the Solid Waste Disposal Sites and Facilities Act (6 CCR 1007-2) and be constructed, operated, and monitored as detailed in the application materials and conditions detailed in the Design & Operations Plan approval letter, dated April 7 2010, from the Colorado Department of Public Health and Environment (CDPHE) in conjunction with the application materials and conditions detailed in the Digester Processing System Engineering Design and Operation Plan Addendum approval letter, dated December 18 2014, from the CDPHE." 2. USR 1704 development standard 9 should be changed to: "The facility shall receive and process only those materials that are described in the approved Design and Operations Plan. The Weld County Department of Planning, WCDPHE, and CDPHE shall be notified in writing of any additional materials proposed for processing. Written approval from both CDPHE and WCDPHE to proceed with processing shall be obtained prior to acceptance." 3. USR 1704 development standard 13 should be changed to: The facility shall comply with the approved Groundwater Monitoring Plan. Changes in approved 2 feedstock may require revisions to the groundwater testing requirements and constituents analyzed. Groundwater Monitoring Reports will be submitted to the CDPHE and WCDPHE no later than March 1 following the reportable year. 4. USR 1704 development standard 15 should be changed to: All below-ground structures shall be double-lined and equipped with a leak detection system, unless otherwise approved in writing by both the CDPHE and Weld County Department of Public Health and Environment. Records of the leak detection system's operation, maintenance and observations shall be kept and made available upon request. 5. USR 1704 development standard 21 should be changed to: Adequate drinking, handwashing and toilet facilities shall be provided for employees and patrons of the facility, at all times. Where 2 or less full time (40 hour week) employees are located on site, or where 4 or less part time (20 hour week) employees located on site portable toilets and bottled water are acceptable. As employees or contractors are on site for less than 2 consecutive hours a day portable toilets and bottled water are acceptable. Records of maintenance and proper disposal for portable toilets shall be retained on a quarterly basis and available for review by the Weld County Department of Public Health and Environment. Portable toilets shall be serviced by a cleaner licensed in Weld County and shall contain hand sanitizers. 6. USR 1704 development standard 22 should be changed to: Sewage disposal for the facility shall be by septic system. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to On-site Wastewater Treatment Systems (OWTS). 7. USR 1704 development standard 23 should be changed to: Process wastewater (such as floor drain wastes) and laboratory wastewater shall not be disposed of through the facility's OWTS. These wastes shall be collected and disposed of in accordance with all local, state and federal rules and regulations and in accordance with the approved Waste Management Plan. 8. USR 1704 development standard 30 should be changed to: The operation shall comply with all applicable rules and regulations of State and Federal agencies and the Weld County Code. We recommend USR 1704 Development Standard 12 be removed. We recommend that the following additional requirements be incorporated into the permit as development standards: 1 . No permanent disposal of wastes shall be permitted at this site except those wastes specifically excluded from the definition of a solid waste in the Solid 3 Wastes Disposal Sites and Facilities Act, 30 20 100.5, C.R.S., as amended, and any and all wastes being composted in accordance with the approved Engineering Design and Operations Plan. 2. All hazardous chemicals must be handled in a safe manner in accordance with product labeling and in a manner that minimizes the release of hazardous air pollutants and volatile organic compounds. All chemicals must be stored securely and in accordance with manufacturers' recommendations. 3. Composting Operations will not extend past CD boundaries of the property. 4 arWil CENTRAL WELD COUNTY WATER DISTRICT December 15, 2014 Chris Gathman Weld County Department of Planning Services Dear Mr. Gathman, Thank you for referring project MUSR14-0030 to Central Weld County Water District for review. This property is within Central Weld County Water District boundaries and is petitioned into Northern Colorado Water Conservancy District boundaries. There is currently a Central Weld tap at this location, Tap #3091. Central Weld has no issues with the pending amendment to the USR& adding facilities as long as the facilities are all on the same legal description that the Central Weld Tap serves. If you should need anything further,please contact the District. Thank you, Jodi Reed Central Weld County Water District 970-352-1284 Jodi(i..cwcwd.com 2235 2nd Avenue • Greeley, Colorado 80631 • Phone (970) 352-1284 • Fax (970) 353-5865 Stan Linker, District Manager Application Review Notification Card Application Review Notification Card ,0s $b, This is to notify you that the project listed on the This is to notify you that the project listed on the other side of this card is within five-hundred ���,�ti other side of this card is within five-hundredlot (500) feet of your property. You will be notified (500) feet of your property. You will be notified of any future meetings regarding the proposed °`� T t of any future meetings regarding the proposed g g g p p � g g g p p project on this property. project on this property. If you would like more information regarding this proposal and the If you would like more information regarding this proposal and the conditions that must be met, the file is public information and is conditions that must be met, the file is public information and is available for review at our office. You may also view the file online available for review at our office. You may also view the file online at https://accela-aca.co.weld.co.uslcitizenaccess/ by inserting the at https://accela-aca.co.weld.co.uslcitizenaccess/ by inserting the case number. Comments or objections related to the request should case number. Comments or objections related to the request should be submitted in writing to the Weld County Department of Planning be submitted in writing to the Weld County Department of Planning Services, 1555 N 17th Ave, Greeley, CO 80631 Services, 1555 N 17th Ave, Greeley, CO 80631 Application Review Notification Card Application Review Notification Card ,0s $b, This is to notify you that the project listed on the This is to notify you that the project listed on the other side of this card is within five-hundred ���,�ti other side of this card is within five-hundred Veit (500) feet of your property. You will be notified (500) feet of your property. You will be notified ° `T t of any future meetings regarding the proposed °`� T t of any future meetings regarding the proposed g g g p p � g g g p p project on this property. project on this property. If you would like more information regarding this proposal and the If you would like more information regarding this proposal and the conditions that must be met, the file is public information and is conditions that must be met, the file is public information and is available for review at our office. You may also view the file online available for review at our office. You may also view the file online at https://accela-aca.co.weld.co.uslcitizenaccess/ by inserting the at https://accela-aca.co.weld.co.uslcitizenaccess/ by inserting the case number. Comments or objections related to the request should case number. Comments or objections related to the request should be submitted in writing to the Weld County Department of Planning be submitted in writing to the Weld County Department of Planning Services, 1555 N 17th Ave, Greeley, CO 80631 Services, 1555 N 17th Ave, Greeley, CO 80631 Case#: MUSR14-0030 Case#: MUSR14-0030 Name: Heartland Biogas LLC Name: Heartland Biogas LLC Proposed Project: Minor Amendment to Proposed Project: Minor Amendment to USR-1704 for the addition of a digestor USR-1704 for the addition of a digestor process system and a 70-foot flare in the process system and a 70-foot flare in the Agricultural Zone District. Agricultural Zone District. Location: West of and adjacent to CR 49; Location: West of and adjacent to CR 49; north of and adjacent to CR 40 north of and adjacent to CR 40 Planner: Chris Gathman Planning Planner: Chris Gathman Weld County Planning Services ^ - Weld County Services 1555 N 17th Ave 1555 N 17th Ave Greeley CO 80631 Greeley CO 80631 I -I (970)353-6100 ext. 3540 _ 4" (970)353-6100 ext. 3540 f f Case#: MUSR14-0030 Case#: MUSR14-0030 Name: Heartland Biogas LLC Name: Heartland Biogas LLC Proposed Project: Minor Amendment to Proposed Project: Minor Amendment to USR-1704 for the addition of a digestor USR-1704 for the addition of a digestor process system and a 70-foot flare in the process system and a 70-foot flare in the Agricultural Zone District. Agricultural Zone District. Location: West of and adjacent to CR 49; Location: West of and adjacent to CR 49; north of and adjacent to CR 40 north of and adjacent to CR 40 Planner: Chris Gathman Planning Planner: Chris Gathman Weld County Planning Services :\.,,,a,_--- Weld County Services :\.,,,a,_--- 1555 N 17th Ave 1555 N 17th Ave Greeley CO 80631 Greeley CO 80631 I -I (970)353-6100 ext. 3540 _ 4" (970)353-6100 ext. 3540 f f . . SURROUNDING PROPERTY OWNERS MUSR14-0030 NAME ADDRESS CITY, STATE ZIP JOHN BROSNAHAN 45066 FM 187 VANDERPOOL TX 78885 STATE OF COLORADO 600 GRANT ST STE 640 DENVER CO 80203 SHELTON LAND & CATTLE LTD PO BOX 65 ROGGEN CO 80652 RICHARD WALTERS 18850 CR 49 LASALLE CO 80645 CERTIFICATE OF MAILING I hereby certify that I have placed a true and correct copy of the surrounding property owners in accordance with the notification requirements of Weld County in Case Number MUSR14-0030 in the United States Mail, postage prepaid First Class Mail by letter as addressed on the attached list this 12th day of November, 2014. Dated the 12th day of November, 2014 Digitally signed by Kristine Ranslem Date: 2014.12.12 08:49:06 -07'00' Kristine Ranslem Recording Secretary for Planning Commission WELD COUNTY COLORADO LAND RECORDS AFFIDAVIT OF INTERESTED LAND OWNERS SURFACE ESTATE THE UNDERSIGNED, States that to the best of his or her knowledge the attached list is a true and accurate list of the names, addresses, and the corresponding Parcel Identification Number assigned by the Weld County Assessor of the owners of the property(the surface estate)within 500 feet of the property being considered. This list was compiled utilizing the records of the Weld County Assessor available on the Weld County Internet Mapping site, http://wvvvv.co.weld.co.us, and has not been modified from the original. The list compiled for the records of the Weld County Assessor was assembled within thirty days of the applications submission ate. S. nature 71/f/v Date Property Owners Within 500 ft. of Parcel# 105525400011 Account Parcel Owner Mailing Address R4285186 105330000018 BROSNAHAN JOHN W 45066 FM 187 VANDERPOOL TX 788858518 R0201188 105330000028 BROSNAHAN JOHN W 45066 FM 187 VANDERPOOL TX 788858518 R4374986 105536000005 COLORADO STATE OF 600 GRANT ST STE 640 DENVER CO 802033527 R6784556 105525400011 HEARTLAND BIOGAS LLC 15445 INNOVATION DR SAN DIEGO CA 921283432 M4365686 105525000008 SHELTON DAIRY CORP PO BOX 65 ROGGEN CO 806520065 R4364786 105525000008 SHELTON LAND& CATTLE PO BOX 65 LTD ROGGEN CO 806520065 R6784555 105525300010 SHELTON LAND AND PO BOX 65 CATTLE LTD ROGGEN CO 806520065 R6784554 105525400009 SHELTON LAND AND PO BOX 65 CATTLE LTD ROGGEN CO 806520065 R8751900 105331000012 WALTERS KATHY J R8751900 105331000012 WALTERS RICHARD A 18850 COUNTY ROAD 49 LASALLE CO 80645 AGPROfessiona1S (TIERS ` 'C /AGM(' t JUKE Water Supply Weld County Minor Amendment Application Prepared for Heartland Biogas, LLC Bottled water will be provided for the DPS facility. There is a Central Weld County Water District tap on site as part of the Heartland Biogas facility. AGpRof ssionais V f- LOP [ S 0 r zf, r .i URV Sewage Weld County Minor Amendment Application Prepared for Heartland Biogas, LLC Portable toilets will be used until a septic system is necessary for the DPS facility.
Hello