Loading...
HomeMy WebLinkAbout20153472.tiff Form No. OFFICE OF THE STATE ENGINEER GWS-25 COLORADO DIVISION OF WATER RESOURCES 818 Centennial Bldg., 1313 Sherman St.. Denver,Colorado 80203 (303)866-3581 1425 WELL PERMIT NUMBER 297778 - __ DIV. 1 WD 1 DES. BASIN MD APPLICANT APPROVED WELL LOCATION WELD COUNTY SW 1/4 NW 1/4 Section 17 FLOYD R & KALA D COLE Township 9 N Range 66 W Sixth P M. C/O INGRAM DRILLING INC DISTANCES FROM SECTION LINES PO BOX 342 Ft. from Section Line ESTES PARK, CO 80517- Ft. from Section Line (970) 586-4542 UTM COORDINATES (Meters,Zone:13,NAD83) PERMIT TO CONSTRUCT A WELL Fasting: Northing: ISSUANCE OF THIS PERMIT DOES NOT CONFER A WATER RIGHT CONDITIONS OF APPROVAL 1) This well shall be used in such a way as to cause no material injury to existing water rights. The issuance of this permit does not ensure that no injury will occur to another vested water right or preclude another owner of a vested water right from seeking relief in a civil court action. 2) The construction of this well shall be in compliance with the Water Well Construction Rules 2 CCR 402-2, unless approval of a variance has been granted by the State Board of Examiners of Water Well Construction and Pump Installation Contractors in accordance with Rule 18. 3) Approved pursuant to CRS 37-92-602(3)(b)(II)(A) as the only well on a tract of land of 40.00 acres described as the SW 1/4 of the NW 1/4, Sec. 17,Twp. 9 N, Rng.66 W, Sixth P.M.,Weld County. 4) The use of ground water from this well is limited to fire protection,ordinary household purposes inside not more than three (3)single family dwellings,the watering of poultry,domestic animals and livestock on a farm or ranch and the irrigation of not more than one(1)acre of home gardens and lawns. 5) The pumping rate of this well shall not exceed 15 GPM. 6) The return flow from the use of this well must be through an individual waste water disposal system of the non-evaporative type where the water is returned to the same stream system in which the well is located. 7) Pursuant to Rule 6.2.3 of the Water Well Construction Rules,the well construction contractor shall submit the as-built well location on work reports required by Rule 17.3 within 60 days of completion of the well. The measured location must be accurate to 200 feet of the actual location. The location information must include a GPS location(UTM coordinates) pursuant to the Division of Water Resources'guidelines. NOTE:This permit will expire on the expiration date unless the well is constructed by that date.A Well Construction and Test Report(GWS-31) must be submitted to the Division of Water Resources to verify the well has been constructed.An extension of the expiration date may be available.Contact the DWR for additional information or refer to the extension request form (GWS-64) available at: http://www.water.state.co.us APPROVED SMJ LAIJ2k % l State Engineer By Receipt No. 3669813 DATE ISSUED 06-15-2015 EXPIRATIt'N �' E 06-15-2017 Hello