HomeMy WebLinkAbout750630.tiff - e PLATTE RIVE POWER AUTHORITY"' 3030 SOUTH COLLEGE AVENUE • FORT COLLINS,COLORADO 80521 Board of Directors June 10, 1975 Telephone: (303)493-5520 Stanley R. Case Cable: "PLATTRIVER" Robert L. Dekker Don W. Hataway Jerry Trotter General Manager Albert J. Hamilton Mr. Richard D. MacRavey, Director Larimer-Weld Regional Council of Governments 201 East 4th Street Loveland, Colorado 80537 Dear Mr. MacRavey: This is in further response to your letter of June 5, 1975 advising Platte River of the desire of the Larimer-Weld COG Governing Board to hold public hearings on the Loveland-Longmont transmission line route at its July 2, 1975 meeting. As I mentioned in our telephone conversations, Platte River is deeply involved in studying an alternative I-25 route, as generally proposed by some of the landowners and tenants in the Loveland-Longmont area and brought to our attention at Platte River's public hearing on April 3, 1975. For the reasons discussed in this letter we will need adequate time to prepare a thorough evaluation of the I-25 proposal . Accordingly, we would like to appear at your September 3, 1975 meeting, instead of the July meeting, since many of the essential engineering and consulting studies which are in progress will not be completed until sometime in August. . Briefly, Platte River must complete the following studies before mean- ingful results can be discussed with the Larimer-Weld COG: (1) New aerial photographs covering the entire corridor from U.S. 287 to I-25, between Loveland and Longmont must be carefully examined, and maps to a scale of 1 inch = 1000 feet must be prepared in order to ana- lyze the suggested route alternatives and to lay out a specific route for an I-25 alternative that is practicable from a construction standpoint. The I-25 alternative has been generally described in statements made at the April 3 hearing, but if the alternative is to be meaningful it must be worked out specifically with the Highway Department and property owners along I-25. (2) Upon completion of a specific I-25 alternative route, it will be necessary to estimate the costs of construction, ownership, operation and maintenance for such a route and for alternative routes. FG CC/6 -I 750630 PLATTE -2- ---,Mr. Richard D. MacRavey RIVER June 10, 1975 POWER AUTHORITY (3) For both the preferred route and the I-25 alternative, it will be necessary for Platte River's agricultural consultant to make a detailed analysis of the soils , agricultural patterns, expected damage and other in- fluences from each entire route in order to have a fair comparison of the relative agricultural impact. (4) Engineering studies will also be made with regard to radio and TV interference, electrostatic effects, and other phenomena raised at the public hearing. (5) Ownership lists will have to be compiled on property owners along the I-25 alternative route and these property owners must be contacted as to the best location of a line in this area to cause least dis- ruption to their property use. Presumably some of them will want to attend the COG hearing. (6) Platte River's staff will also be investigating other alternative routes between Loveland and Long- mont with the objective of satisfying most of the concerns raised at the public hearings, with accept- able costs to our electric energy consumers. This will include alternatives for routing the line along property lines, fence lines, and section lines , and will reflect accommodation of future county road expansions. (7) Finally, our legal counsel will have several matters to study in order to provide our Board and management with guidance as to Platte River's rights and obliga- tions under Colorado law. These necessary and substantial studies are already in progress , but they will take about two months to complete. If we may have the time to finish them before we are required to appear before your Governing Board, we feel that a much more productive body of information will be available to share with the Larimer-Weld COG and upon which it may base its recommendation to the Boards of County Commissioners . If accept- able to you, we will undertake to complete these studies and be prepared to present Platte River's position before the Larimer-Weld COG at its September 3, 1975 meeting. PLATTE -3- --'Mr. Richard D. MacRavey RIVER June 10, 1975 1. POWER AUTHORITY If you have any questions concerning this proposed schedule, please telephone me or Mr. Slimak, Platte River's Director of Engineering. Sincerely, PLA E RAVER PO R AUTH0 ITY V A ert J. Hamilton General Manager cc: L-Tfie Honorable Glenn K. Billings, Chairman, Board of Commissioners, Weld County The Honorable William Lopez, Chairman, Board of Commissioners, Larimer County I /kr Hello