Loading...
HomeMy WebLinkAbout20151272.tiff „86, MEMORANDUM ' 1 TO: Steve Elkins, Planning Services DATE: 3/11/15 V311_ FROM: Wayne Howard, P.E., Development Review Engineer G_ O N T? SUBJECT: USR15-0009, Guzman Trucking storage The Weld County Department of Planning Services-Engineering has reviewed this proposal. Staff comments made during this phase of the application process may not be all-inclusive, as other issues may arise during the remaining application process. COMMENTS: General Project Information/Location: Truck and Trailer parking SOUTH OF AND ADJACENT TO 16TH STREET. WEST OF AND ADJACENT TO BALSAM AVENUE. Roads: County Road Balsam Ave. is a Paved road and is designated on the Weld County Road Classification Plan as a Local road, which requires 60 feet of right-of-way at full buildout. The applicant shall verify and delineate on the plat the future and existing right-of-way and the documents creating the existing right-of- way. If the existing right of way cannot be verified it shall be dedicated. All setbacks shall be measured from the edge of future right-of-way. This road is maintained by Weld County. County Road E. 16th St. is a Paved road and is designated on the Weld County Road Classification Plan as a Local road, which requires 60 feet of right-of-way at full buildout. The applicant shall verify and delineate on the plat the future and existing right-of-way and the documents creating the existing right-of- way. If the existing right of way cannot be verified it shall be dedicated. All setbacks shall be measured from the edge of future right-of-way. This road is maintained by Weld County. Latest ADT on Balsam Ave. was taken on 8/8/14 which counted 2109 vpd with 5% trucks. Latest ADT on BE. 16`h St. was taken on 8/6/14 which counted 1092 vpd with 21%trucks. Traffic: The traffic information provided with the submittal states that the site will have approx. 10 trucks per day. Access: An access permit has been approved for the access to the site (AP15-00084) for access onto Balsam Ave. Entrance gates (if applicable) must be set back a minimum of 75 feet from edge of existing right of way (future right of way if classification is other than local) to allow a truck and trailer or RV to pull completely off of the roadway and open the gate. In no case shall any vehicle(s) stopped for gate be allowed to create a safety issue for roadway users. Tracking Control: Tracking control is required to prevent tracking from the site onto the County Roadway. Minimal standards are listed below. Temporary Tracking Control shall be used during construction unless permanent tracking control is installed ahead of construction activities. Minimum requirement for all projects include 300ft of road base/recycled asphalt. Surface improvements less than 300ft may be allowed if site constraints would prohibit meeting condition. Other PW Permits: A Right-of-Way Use Permit is required for any work in the Weld County Right-of-Way. Contact Weld County Public Works at 970-304-6496 ext. 3764. A Transport Permit is required for any oversize and/or over weight vehicles. Contact Weld County Public Works at 970-304-6496 ext. 3764. Geologic Hazard Area: This area IS NOT in a Geologic Hazard Area. Floodplain: This area IS NOT in a Floodplain. Drainage Study: A signed and stamped drainage narrative and water quality feature design was submitted and is acceptable to Engineering. Label the water quality feature on the plat as "Water Quality Feature, No Build/Storage Area" and label the required volume. The applicants will be required to maintain historic drainage flows and run-off amounts on the property. Grading Permit: A Weld County Grading Permit will be required if disturbing more than 1 acre. Contact the Planning Department for more information. A Construction Stormwater Permit is also required with the State for disturbing more than 1 acre. Contact: Colorado Department of Public Health and Environment, Water Quality Control Division, Rik Gay, 303- 692-3575. CONDITIONS OF APPROVAL: Prior to recording the plat: The map shall be amended to delineate the following: A. County Road Balsam Ave. is a Paved road and is designated on the Weld County Road Classification Plan as a Local road, which requires 60 feet of right-of-way at full buildout. The applicant shall verify and delineate on the plat the future and existing right-of-way and the documents creating the existing right-of-way. If the existing right of way cannot be verified it shall be dedicated. All setbacks shall be measured from the edge of future right-of-way. This road is maintained by Weld County. B. County Road E. 16`" St. is a Paved road and is designated on the Weld County Road Classification Plan as a Local road, which requires 60 feet of right-of-way at full buildout. The applicant shall verify and delineate on the plat the future and existing right-of-way and the documents creating the existing right-of-way. If the existing right of way cannot be verified it shall be dedicated. All setbacks shall be measured from the edge of future right-of-way. This road is maintained by Weld County. C. Show the approved access(es) on the plat and label with the approved access permit number (AP15-00084). D. Show and label standard tracking control onto publically maintained roadways on the map. E. Show the accepted water quality feature on the map with volume and label as WATER QUALITY FEATURE, NO-BUILD OR STORAGE AREA. F. Show and label the accepted drainage features, drainage flow arrows, turning radii, and parking and circulation on the map. G. Show any proposed gate back a minimum of 75ft from the right of way. Prior to Construction: A. If more than 1 acre is to be disturbed, a Weld County grading permit will be required prior to the start of construction. Contact the Planning Department for application information. Prior to Operation: A. Accepted construction drawings and construction of the offsite roadway improvements are required prior to operation. B. Construction of the approved access and/or tracking control improvements is required prior to operation. DEVELOPMENT STANDARDS (NOTES ON THE PLAT) 1. Should noxious weeds exist on the property, or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling the noxious weeds, pursuant to Chapter 15, Articles I and II, of the Weld County Code. 2. The historical flow patterns and runoff amounts will be maintained on the site. 3. Weld County is not responsible for the maintenance of onsite drainage related features. 4. There shall be no parking or staging of vehicles on County roads. On-site parking shall be utilized. 5. There shall be no tracking of dirt or debris from the site onto publically maintained roads. The applicant is responsible for mitigation of any offsite tracking and maintaining onsite tracking control devices. MEMORANDUM �■Ii �� TO: STEVE ELKINS, PLANNING SERVICES va a _0-u Ni T Y FROM: LAUREN LIGHT, ENVIRONMENTAL HEALTH SUBJECT: USR15-0009 DATE: MARCH 3, 2015 Environmental Health Services has reviewed this proposal for a Site Specific Development Plan and Use by Special Review Permit for a Use Permitted as a Use By Right, an Accessory Use, or a Use By Special Review in the Commercial or Industrial Zone Districts, provided that the property is not a Lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any regulations controlling subdivisions (trucking business and truck and trailer parking), in the A (Agricultural) Zone District. There will be up to 10 employees accessing the site. The application indicates there is an existing residence on site that is served by North Weld County Water District and City of Greeley for sewer. It is acceptable to utilize the residence for restrooms for employees however building code requirements shall be verified by the applicant. The dust abatement plan states that the drive and parking area will consist of gravel or road base and water will be utilized if necessary. The waste handling plan indicates there will be no maintenance of vehicles and no disposal of fluids. Employee trash will be contained in a dumpster and disposed of by Northern Colorado Disposal. The proposed building will store bicycles, vehicles, air compressor, ladders, sandpaper, paper towels, trash cans, kid's toys and household furniture. There will be no storage of chemicals. We have no objections to the proposal; we recommend that the following requirement be met prior to allowing the plat to be recorded: 1. The applicant shall remove "maintenance" from the USR plat. We recommend that the following requirements be incorporated into the permit as development standards: 1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S.) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. 3. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. The applicant shall operate in accordance with the approved Waste Handling Plan, at all times. 4. Fugitive dust and fugitive particulate emissions shall be controlled on this site. The facility shall be operated in accordance with the approved Dust Abatement Plan, at all times. 5. This facility shall adhere to the maximum permissible noise levels allowed in the Non-Specified Zone as delineated in Section 14-9-30 of the Weld County Code. 6. Adequate drinking, hand washing and toilet facilities shall be provided for employees and patrons of the facility, at all times. For employees or contractors on site for less than 2 consecutive hours a day, portable toilets and bottled water are acceptable. Records of maintenance and proper disposal for portable toilets shall be retained on a quarterly basis and available for review by the Weld County Department of Public Health and Environment. Portable toilets shall be serviced by a cleaner licensed in Weld County and shall contain hand sanitizers. 7. The operation shall comply with all applicable rules and regulations of State and Federal agencies and the Weld County Code. 2 Submit by Email g. Weld County Referral ffi if ft, jr February 10,2015 The Weld County Department of Planning Services has received the following item for review: Applicant: Daniel&Rebecca Guzman Case Number: USR15-0009 Please Reply By: March 10, 2015 Planner: Steve Elkins Project:A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT FOR A USE PERMITTED AS A USE BY RIGHT,AN ACCESSORY USE OR A USE BY SPECIAL REVIEW IN THE COMMERCIAL OR INDUSTRIAL ZONE DISTRICTS(TRUCKING BUSINESS AND TRUCK AND TRAILER PARKING)PROVIDED THAT THE PROPERTY IS NOT A LOT IN AN APPROVED OR RECORDED SUBDIVISION PLAT OR LOTS PARTS OF A MAP OR PLAN FILED PRIOR TO ADOPTION OF ANY REGULATIONS CONTROLLING SUBDIVISIONS IN THE A(AGRICULTURAL) ZONE DISTRICT. Location:SOUTH OF AND ADJACENT TO EAST 16TH ST;WEST OF AND ADJACENT TO BALSAM AVENUE. Parcel Number 096109300082-R0015193 Legal: NE4SW4 SECTION 9,T5N, R65W of the 6th P.M., Weld County, Colorado. The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. ElWe have reviewed the request and find that it does/does not comply with our Comprehensive Plan because: We have reviewed the request and find no conflicts with our interests. See attached letter. Signature i a7�l/ Date 3/10/2015 Agency City of Greeley Weld County Planning Dept. 1555 N 17th Ave,Greeley,CO.80631 (970)353-6100 ext.3540 (970)304-6498 fax 7 Project Review Comments Date: 2/25/2015 Greel ey Project Name: WCR 16:15 (USR15-0009) Location: 1609 Balsam Avenue Reviewed By: Caleb Jackson Phone: (970) 350-9823 Department: Community Development / Planning Submittal: 2/11/2015 Submittal #: 1 Case #: WCR 16:15 All code sections are from the Greeley Development Code and from the City of Greeley Design Criteria and Construction Specifications, Volumes I, II, & III. Sections of the Code or Construction Specifications are shown in brackets as part of the review comments below. For additional information on the City Code or the Design Criteria, see the City of Greeley web site at the following location: Planning: https./will.colocode.con2/greeleiptll8.hrnil Engineering: kitty /greelergoi..contserwces/dcsigrt-criteria-and-coastrttction-,specifications General ❑ Advisory. The subject property is located within the City of Greeley's Long Range Expected Growth Area (LREGA). The LREGA is the range in which the community anticipates development occurring within the coming 20+years. Particular care in site design is imperative to set the tone of development in this area and increase compatibility with the urbanization of this part of the community. ❑ Advisory. Greeley's Comprehensive Transportation Plan identifies both East 16`h Street and Balsam Avenue as collectors. Being important thoroughfares in the community, an attractive site should be created through the construction of architecturally-significant structures, screening of storage, and installation of landscaping. Development Standards E Such industrial development should adopt a setback of 25 feet adjacent to streets. All site improvements, except landscaping, should be located outside of this setback. This setback should take into account the anticipated upgrade of the adjacent roads, and the setback should be from the future right-of-way required, mentioned more specifically in the Engineering comments below, rather than the roadways as they exist today. E A perimeter landscape treatment should be employed along the adjacent streets to enhance and beautify the corridors. This landscaping should be installed outside of,but immediately adjacent to, the future required right-of-way to avoid this investment from being removed upon the final design of the thoroughfares. Five medium shrubs (4-8 ft. tall at maturity) and ten small shrubs (<4 ft. tall at maturity) should be planted for every one hundred linear feet of frontage. In the same manner, street trees should be installed every thirty-five feet for shade trees or every twenty-five feet for ornamental trees. Page I of 4 ❑ All drive aisles and employee parking spaces should be paved with asphalt or concrete to minimize airborne dust generated by traffic and reduce the amount of mud and dirt tracked onto public thoroughfares. ❑ Outdoor storage should be on gravel or another all-weather surface and fully screened from view of all adjacent properties and roadways. This can be accomplished through the construction of a solid wall or fence or the installation of landscaping of sufficient height and variety to provide year-round screening. ❑ The base standard for open space on industrial sites in urban settings is 10%. This open space should be set aside and maintained as a landscaped area, of which 50% should be covered in living material. The landscaped area should also have an acceptable groundcover such as landscape rock, mulch, or lawn. ❑ Any mechanical units installed should be screened from view of all adjacent properties and roadways. Units installed on the ground can be screened by plantings or walls. Equipment placed on the roof should be concealed by screening walls. ❑ Refuse generated on the site should be contained. Please ensure that the trash receptacle is sufficient in size to accommodate the trash generated by the use, is provided on-site in a location which does not impede pedestrian or vehicular circulation, is not visible from streets, and is accessible to refuse trucks. Such receptacle or a grouping of receptacles which occupies an area in excess of fifteen square feet in the aggregate should be enclosed on at least three sides by a solid wall or fence six feet in height and by a solid gate no less than five feet in height on the fourth side. All trash receptacles should have lids which should be kept closed. ❑ Blank wall expanses should be avoided when visible from neighboring properties. Windows and doorways should be situated along facades visible from adjacent properties and roadways to create an attractive building design. A minimum of 20% of each visible facade should be occupied by fenestrations. ❑ Architectural elements should be designed to create an interesting and appealing development. This can include exterior wall articulation, roof articulation, awnings, canopies or enhanced entryways, varied building materials, ornamental lighting fixtures, or additional features adding to the architectural definition of the structure. ❑ Facades visible from the adjacent streets or non-industrial uses should be at least 75% covered with non-metal materials such as brick, stone, tinted and textured masonry block, precast concrete, wood, or stucco. ❑ All outdoor lighting should be downward cast and should not shed light beyond the property line. Page 2 of 4 r. 7 Project Review Comments Date: 03/10/2015 Greel ey Project Name: WCR 16:15 (USR15-0009) Location: 1609 Balsam Avenue Reviewed By: Eva Rojas Phone: (970) 336-4137 Department: Community Development / Engineering Submittal: 2/11/2015 Submittal #: 1 Case #: WCR 16:15 All code sections are from the Greeley Development Code and from the City of Greeley Design Criteria and Construction Specifications, Volumes I, II, & III. Sections of the Code or Construction Specifications are shown in brackets as part of the review comments below. For additional information on the City Code or the Design Criteria, see the City of Greeley web site at the following location: Planning: http:i/mill.colocode.con2/greeleiptll8.hrnil Engineering: http /greelergoi..contserwces/dcsisnt-criteria-and-coastrttction-,specifications Provide written responses to the comments below. General ❑ Advisory. Per phone conversation on March 10, 2015 with Weld County Planning (Steve Elkins) the applicant will not require water and/or sewer service to the new proposed building. If this were to change please contact the City of Greeley. The City of Greeley and North Weld County Water District have adopted a Water Service Agreement for providing water in this area. The City of Greeley is agreeable to North Weld Water District continuing to provide water service for the property, however, please note that if additional water service is requested then the City of Greeley will decide if water will be provided by the City of Greeley or North Weld Water District in accordance to the executed Water Service Agreement. E Advisory. City of Greeley's 2035 Comprehensive Transportation indicates that both Balsam Avenue and East 16`h Street will be 2 lane collector roadways in this location, requiring an 80 foot total right of way. Please ensure that the proposed plan calls out an additional 10' of future Right-of-Way along the north side of the property for East 16th Street and an additional 10'of right-pf-way along the east side of the property for a total west half right of way of 40' for Balsam Avenue. Please ensure that all proposed structures are set back a minimum of 25 feet from the future right of way line. Fire Protection E The City of Greeley will be providing fire protection per our intergovernmental agreement with Western Hills Fire Protection District. A fire hydrant is required to be installed within 300 ft. of the proposed building. Stormwater Drainage Page 3 of 4 ❑ Advisory. There seems to be stonnwater infrastructure (a pipe and a manhole) on the eastern edge of the property. This should be represented on the site plan more clearly. This infrastructure is referenced in the drainage letter as a roadside ditch. Page 4 of 4 Submit by Email Ar Weld County Referral ` vCJN Y. February 10, 2015 The Weld County Department of Planning Services has received the following item for review: Applicant: Daniel & Rebecca Guzman Case Number: USR1 5-0009 Please Reply By: March 10, 2015 Planner: Steve Elk ins Project: A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT FOR A USE PERMITTED AS A USE BY RIGHT, AN ACCESSORY USE OR A USE BY SPECIAL REVIEW IN THE COMMERCIAL OR INDUSTRIAL ZONE DISTRICTS (TRUCKING BUSINESS AND TRUCK AND TRAILER PARKING) PROVIDED THAT THE PROPERTY IS NOT A LOT IN AN APPROVED OR RECORDED SUBDIVISION PLAT OR LOTS PARTS OF A MAP OR PLAN FILED PRIOR TO ADOPTION OF ANY REGULATIONS CONTROLLING SUBDIVISIONS IN THE A (AGRICULTURAL) ZONE DISTRICT. Location: SOUTH OF AND ADJACENT TO EAST 16TH ST; WEST OF AND ADJACENT TO BALSAM AVENUE. Parcel Number: 096109300082-R0015193 Legal: NE4SW4 SECTION 9, T5N, R65W of the 6th P.M., Weld County, Colorado. The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. nWe have reviewed the request and find that it does/does not comply with our Comprehensive Plan because: We have reviewed the request and find no conflicts with our interests. See attached letter. Sarah Brucker, P.E. 02/25/2015 Signature Date Agency Division of Water Resources Weld County Planning Dept. 1555 N 17th Ave,Greeley,CO.80631 (970)353-6100 ext.3540 (970)304-6498 fax 4 DNR COLORADO COCo Water of v,,r noSor.r,.es 1313 Sherman Street, Room 821 Denver. CO 80203 February 25, 2015 Steve Elkins Weld County Department of Planning Services Transmission via email: selkins@co.weld.co.us Re: Dan Guzman Trucking, LLC (Daniel a Rebecca Guzman) Case No. USR15-0009 Pt. NE'/ SW'/n Section 9, T5N, R65W, 6th P.M. Water Division 1, Water District 3 Dear Mr. Elkins: We have reviewed the above referenced request for a site plan review for a trucking business. The submitted material does not qualify as a "subdivision" as defined in Section 30-28-101(10)(a) C.R.S., therefore, pursuant to the State Engineer's March 4, 2005 and March 11, 2011 memorandums to county planning directors, this office will only perform a cursory review of the referral information and provide comments. The comments will not address the adequacy of the water supply plan for this property or the ability of the water supply plan to satisfy any County regulations or requirements. Please note that the title of the site plan review map incorrectly identifies the subject parcel as being part of the NE 'A of Section 36 and part of the NW Ya of Section 31, T6N, R66W, 6`" P.M. The parcel is correctly identified in the Vicinity Map and Site Plan on that same page. The application proposes to operate a trucking business on a parcel of approximately 4.85 acres. The parcel also contains an existing residence and existing shop/building which will remain on site. The site will be utilized by up to ten (10) drivers to pick up and drop off trucks, and the owners who will continue to occupy the existing residence. The water source for the property is the North Weld County Water District. This office considers the North Weld County Water District to be a reliable water supplier. Should it be necessary to mitigate for excessive dust, a water tanker truck or portable sprinkling system may be used. The site plan review map depicts a well on the site, although this office does not have record of any permitted or decreed well on the subject property. If the well was put to use prior to May 8, 1972, the well may continue to be used for its historical purposes, with no change or expansion of use. If the well was put to use after this date, the owner should contact this office to determine the allowed use of the well. The site is proposed to incorporate a stormwater quality depression with a design requirement volume of 0.052 acre-feet. Any storm water runoff captured by the depression that is not diverted or captured in priority must infiltrate into the ground or be released to the stream system within 72 hours. Otherwise, a substitute water supply plan or an augmentation plan approved by water court must be obtained to replace evaporative losses. Further, construction of the stormwater quality depression must not result in the exposure of ground water without providing replacement water to the stream system. Should you or the applicant have any questions regarding this matter, please contact Sarah Brucker of this office. Sincerely, -) ,"/ 9 Tracy L. Kosloff, P.E. Water Resource Engineer TLK/srb: Guzman USR15-0009 (Weld) `.oF. . k 1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581 F 303.866.3585 www.water.state.co.us i'"/a-to Hello