Loading...
HomeMy WebLinkAbout760626.tiff rc„ve iv he United States Department of the Interior BUREAU OF RECLAMATION Ab.d a'e„ CHEYENNE CONSTRUCTION OFFICE -LOWER MISSOURI REGION P.O. BOX 507 IN REPLY CHEYENNE, WYOMING 82001 REFER TO: J-100 330.- Board of County Commissioners Weld County P.O. Box 758 Greeley, Colorado 80631 Gentlemen: A copy of a Department of Interior news release is being transmitted to you for your information. This release announces the award of the contract for construction of the Hayden-Ault 345-kV Transmission Line, which is located across Weld County. Construction will start in the near future as weather permits. Construction will be performed by the contractor named in the release. If you desire further information, please feel free to contact this office at any time. Sincerely, 4 Walter R. Terry, Jr. Construction Engineer Enclosure Q�,ULUTION ern Q m2 U m 2 7176-191 760626 UNITED STATES D_HCPARTMENT of the INT H, RIOR * * * * * * * * * * * * * * * * * * * * *news release BUREAU OF RECLAMATION January 13, 1976 LOWER MISSOURI REGION (303) 234-4257 DENVER, COLORADO FOR IMMEDIATE RELEASE RECLAMATION CONTRACT AWARDED FOR MAIN SECTION OF HAYDEN-AULT TRANSMISSION LINE Assistant Secretary of the Interior Jack 0. Horton today announced the award of a $23,951,566 Bureau of Reclamation contract for construction of a 136-mile section of the Hayden-Ault 345-kilovolt power transmission line in northern Colorado and southeastern Wyoming. "The decision on the right-of-way had been delayed to allow the Wyoming Board of Land Commissioners the opportunity to review the Federal decision document and to determine the benefits of the line to citizens of Wyoming," Horton said. "On January 6, the board determined that the line would provide substantial service to a power-short area of southern Wyoming, and withdrew its objections," Horton said. Commissioner of Reclamation Gilbert G. Stamm said the transmission line is being financed by a joint cost-sharing arrangement between the Bureau of Reclamation and three public power entities: the Colorado-Ute Electric Association; the Tri-State Generation and Transmission Association, Inc. ; and the Platte River Power Authority. He said the arrangement will allow all parties to transmit power to load centers at a lower cost with less adverse impact on the environment than would occur if separate facilities were constructed. The Bureau of Reclamation will use the line to deliver Colorado River Storage Project power across the Continental Divide to Colorado and Wyoming customers east of the Divide. The line will also connect the facilities to the Yampa Project, a thermal powerplant with associated transmission lines being constructed at Craig, Colo. , by the three public power entities. The contract for the second and final stage of the Hayden-Ault line goes to Erickson Air-Crane Co. of Washington, Inc. , Cle Elum, Wash. , on that firm's low bid. EMV Constructors, Inc. of Lincoln, Neb. , submitted the second low bid of $24,137,737, and Donovan Construction Co. of Minnesota, St. Paul, Minn. , submitted the third low bid of $24,265,926. A total of eight bids were received for the contract at a bid opening Nov. 13 at Cheyenne, Wyo. A $3.5 million contract for the first stage of the line, a 4.7-mile section near Steamboat Springs, Colo. , was awarded in August. Work under the contract announced today will include construction of a single-circuit 345-kV transmission line on steel towers, supported by reinforced concrete foundations, and associated accessories and equipment. This section of the line will extend from the Ault Substation and connect with each end of the first stage section near Steamboat Springs. In thanking Wyoming Governor Ed Herschler for the State's expeditious review of the decision document, Horton assured the Governor that a third transmission line through the Hayden-Archer Corridor is not contemplated. * * * * * Hello