Loading...
HomeMy WebLinkAbout20150416.tiff RESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 90 BETWEEN COUNTY ROADS 39 AND 41 FOR FIVE (5) WORKING DAYS, FOR CULVERT REPLACEMENT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close to through traffic and to regulate, warn and guide vehicular traffic on said County roads by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 90, between County Roads 39 and 41, be temporarily closed, with said closure being effective February 23, 2015, for approximately five (5) working days for a culvert replacement, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. 2015-0416 EG0024 ROAD CLOSURE - CR 90 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 9th day of February, A.D., 2015. BOARD OF COUNTY COMMISSIONERS WE COUNTY, OLORADO ATTEST: f f� ���,,// t dimity G. JC,l�fo%� arbara Kirk yer, C air Weld County Clerk to the Board ' Freeman, Pro-Tem ,Sty Clerk toth Boa : fill 'USED P on ,=y APPROVE AS TO FORM: / �' ie A. Cozad � County Attorney i� Steve Moreno Date of signature: ./19 2015-0416 EG0024 ►, t, MEMORANDUM _COUNTY TO: Clerk to the Board DATE: February 2, 2015 FROM: Janet Lundquist, Public Works Department SUBJECT: BOCC Agenda Item WCR 38 between WCR 31 & WCR 33 is scheduled to be closed from 2/17/2015 to 4/10/2015 to replace a bridge. WCR 90 between WCR 39 & WCR 41 is scheduled to be closed from 2/23/2015 to 2/27/2015 to replace a culvert. WCR 19 between WCR 44 & WCR 46.5 is scheduled to be closed from 2/23/2015 to 2/27/2015 to replace a culvert. WCR 90 between WCR 41 & WCR 43 is scheduled to be closed from 3/2/2015 to 3/6/2015 to replace a culvert. See attached diagrams. M:\Fraacie\AGENDA memos\Agenda Road Closures-I docx 2015-0416 V N rn d gal Lip m co et in*t al o. CM r0 t O r 2 2 a0 m a N Z cn o aN � O E E E C N n. C --o- U N Z 5 C d o' co o `r° orn w 0 N E c 2 0 cb d ss= CeCCCe 3aiCL Cl. z M ` a > U U U c oU WD frt cp v -O t � > H 5 O. 0 � c c c U c � H Vin ` S ccc co — CO CO CO -� �, �, w w r Oa. v rnMrn c) ° 0 � C) J Q a) M > co- O UUU 03 .0) y0 o ` � ° N V 7ocu �. c c c .ch .N no c - E .a -p0aoi aoi aoi.._. $ am CO c m m ica ow 4-N - rn .n Uo .0 o c.) a' n rn ao a .y .. oV o UUU tb I- > rn> Ea) m 0 o co z o a_ a a . . COMS. tiaa. M 1L Q/111. VA . A IA rctr- (C/ / sZR CO CC A ci %1464... 0 . rte Ai rni%,%i. 1 11 y wNiN►N►••••• WI"M►M•9.►II.INN .....f' j •S NNIMIN.•• M►oN•►••••N►&&&&I I • O . Hello