Loading...
HomeMy WebLinkAbout20152697.tiff 1� c DEPARTMENT OF BUILDINGS AND GROUNDS r',� PHONE: (970) 304-6531 r.....•-ter'/� !\ FAX: (970) 304-6532 N T WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 August 7, 2015 To: Board of County Commissioners From: Toby Taylor Subject: Change Order#1 for Southwest Office Remodel—Choice Builders The minor remodel for offices at the Southwest Building has incurred an owner directed change to increase an office size in order to create a conference room. The original project was bid as an informal bid and assigned a purchase order of P1500633. The change order for the scope of work is for$8,275.00 Buildings and Grounds is recommending approval of this change order. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director 2015-2697 M(T�) 46 -Obl7 1,10 � '.� Jul 23 15 12: O1p Choice Builder 9703782523 p. 1 Change Order Choice Builders Date: 7-23-15 2125 9th St. Change Order#1 Greeley,Colorado 80631 [970] 302-7796 Fax: 378-2523 To: Weld County Job Location: 1105 H St. 4209 WCR 24.5 Greeley Co. 80631 Longmont,Co Attn: Toby Taylor SW Weld Service Center Fax: 304-6532 Description of Change Order: Labor and material to enlarge one of the new offices. Our price includes: 1. Remove front wall,door and frame from new South East office 2. Build approximately 20' of wall to create larger office 3. Sound insulation 4. 5/8 drywall (hang and finish) 5. Painting 6. Suspended ceiling work 7. Rubber base 8. Add one sprinkler head (performed by flow fire protection) 9. Re use 3'x7' hollow metal frame with side light and door 10.HVAC: (performed by M.D. Heating& Air Inc.) 11.Electrical: relocate electrical in wall being removed into new exterior wall (performed by Spring Creek Electric Inc.) Exclusions: Floor covering All work in change order to be preformed and completed in a substantial work like manner for the sum of Eight Thousand Two Hundred Seventy Five Dollars(58,27.5.00). Payment will be made at completion of change order. Any alteration or deviation from specifications involving cost will become an extra charge over and above the estimate. Owner to carry fire and other necessary insurances on above work. Liability insurance on above work to be taken out by Choice Builders Inc. Resp ectf Sub • ed by of e Build rs Inc. Per rp--7 The above price, specification and cone(' s are salsfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined AUG 1 0 2015 Accepted/Dated �/ Signature to) K__( 1,tA j �pti SAO o2oi5-026, 97 ZGooi1 CHANGE ORDER #1 -SOUTHWEST WELD REMODEL - CHOICE BUILDERS, INC. ATTEST: ddrA44) BOARD OF COUNTY COMMISSIONERS Weld . n Clerk to the Boa d WELD COUNTY, C LORADO BY: Deputy CI to t e Bo +;�� Lam, Barbara Kirkmey. r, Chair AUG 1 0 2Q15 APPROVED AS O F (kg, APPROVED AS JO SUBSTANCE: r Controller `i , � � Elected Official or Department Head rr APP OVED AST ORM: i Director of General Services County Attorney Hello