Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Browse
Search
Address Info: 1150 O Street, P.O. Box 758, Greeley, CO 80632 | Phone:
(970) 400-4225
| Fax: (970) 336-7233 | Email:
egesick@weld.gov
| Official: Esther Gesick -
Clerk to the Board
Privacy Statement and Disclaimer
|
Accessibility and ADA Information
|
Social Media Commenting Policy
Home
My WebLink
About
20153585.tiff
RESOLUTION RE: APPROVE CONSTRUCTION AGREEMENT FOR BRIDGE 35/38A AND AUTHORIZE CHAIR TO SIGN - FARMERS RESERVOIR AND IRRIGATION COMPANY WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Construction Agreement for Bridge 35/38A between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and Farmers Reservoir and Irrigation Company, 80 South 27th Avenue, Brighton, Colorado 80601 with terms and conditions being as stated in said agreement, and WHEREAS, after review,the Board deems it advisable to approve said agreement, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Construction Agreement for Bridge 35/38A between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and Farmers Reservoir and Irrigation Company, be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said agreement. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 9th day of November, A.D., 2015. BOARD OF COUNTY COMMISSIONERS W LD COUNTY, C LORADO ATTEST:CC�� C/ '11 arbara Kirkmeye , Chair W- • •unty Clerk to the Board • Mike Freeman, Pro-Tem BY: D y Clerk to the :oard aan P. Co ay APPROVED AS TO FORM: r :r'�,'_ • �i.i/ 1161 t ,�ti �-_A. C•zad r- unty Attorney � ijJ�Y ` • - eve Moreno I Date of signature: 113 2015-3585 EG0072 CG:?W(Fe,/R )1xb 7 MEMORANDUM S861Se Date : November 3 , 2015 ,C p U N T Y To : Board of County Commissioners From : Richard White, P .E. R E C E I V E D Don Dunker, County Engineer NOV 032015 RE : 2015 Bridge Rehab Project, FRICO Agreement WELD COUNTY For Bridge 35/38A, BOCC Approval Date Nov. 9, 2015 COMMISSIONERS On March 18th of this year, Public Works entered into a Construction Contract with Weld County Construction Inc . for the 2015 Bridge Rehabilitations Project. This annual project is needed to improve the condition of existing WC bridges and increase the life of the bridges. There were eight bridges that were selected by Public Works to make up the rehabilitation project this year, two of them cross irrigation canals operated by Farmers Reservoir and Irrigation Company (FRICO) . The bridge numbers are 6/41A and 35/38A. Attached is a standard form agreement from FRICO for bridge 35/38A, we previously brought the agreement for bridge 6/41A to the BOCC, the work on bridge 6/41A is now complete. Weld County typically agrees to the terms of these agreements, which include time frames for the rehab work, as well as requirements that apply to the contractor and Weld County while the rehab work is being done . The agreement has been reviewed by Public Works and Weld County Attorney staff. It is staff s recommendation to approve the agreement with FRICO, to allow the Weld County contractor, Weld County Construction Inc . to complete the work by the end of the year. 2015-3585 BRIDGE # 35/38A CONSTRUCTION AGREEMENT #3538 FARMERS RESERVOIR AND IRRIGATION COMPANY PV 2015-35 AND WELD COUNTY, COLORADO THIS AGREEMENT is made this 16th day of October 2015 , by and between Farmers Reservoir and Irrigation Company, whose address is 80 South 27th Avenue, Brighton, Colorado 80601 , hereinafter referred to as "Company," and the County of Weld, a body corporate . and politic of the State of Colorado, by and through its Board of County Commissioners, whose address is 1150 "0" Street, Greeley, Colorado 80631 hereinafter referred to as "County." WITNESSETH : WHEREAS, County finds it necessary to rebuild/construct/improve Weld County Road 35 , (hereinafter referred to as "the Road"), which will involve said road ' s realignment/ construction, as well as the construction of Weld County Bridge Number 35/38A (hereinafter referred to as "the Bridge"), (collectively, the construction of the road and bridge are referred to as "the Project"), and WHEREAS , Company is the owner of that certain right-of-way (which may include fee title) within which lie certain canal improvements and related appurtenances, and such land and structures are referred to in this Agreement as "the Canal", and WHEREAS , County and Company acknowledge that the Project is located within the area of the Canal at the following location, on County Road 35 and the Platte Valley Canal, (A copy of said location information is attached hereto and made a part hereof by this reference as Exhibit A), and WHEREAS , Company and County recognize that County has a statutory obligation to maintain its roads and bridges to protect the safety of the travelling public and that Company also has legal obligations to maintain the Canal and deliver water to its shareholder/members and others, and WHEREAS , County and Company worked together in a cooperative manner with respect to the design of the Project in order to accommodate the interests of each Party, and County complied with Company' s design criteria and considered Company' s design-related requests and suggestions, WHEREAS , County represents that County has designed the Bridge to accommodate the peak_ water capacity of the Canal, and that such design is reflected in the construction and design drawings, a copy of which are attached hereto and made a part hereof by this reference as Exhibit B, and WHEREAS , each party desires to cooperate in a manner that permits each to meet its obligations. • NOW , THEREFORE, in consideration of the promises and covenants expressed herein, the parties mutually agree as follows : Page 1 of 11 st05egro.. I. COMPANY' S RIGHTS AND RESPONSIBILITIES : 1 . Construction and Design Drawings : Company has reviewed the construction and design drawings attached as Exhibit B ("Plans") and hereby authorizes County to build the Project according to the Plans . County agrees that Company has no responsibility for the design or construction of the Project, and that Company ' s design review of the Project and acceptance of the Plans shall not serve to : ( 1 ) create any joint venture between Company and County; (2) create any liability for Company with respect to the design or construction of the Project; (3) waive any future claims or causes of action by Company against the County with respect to the design or construction of the Project. If for any reason the County changes the design of the Project from the Plans, then County shall notify Company of the need for design changes and provide Company with revised drawings, plans and / or specifications ("Changed Plans") for review and approval according to Company' s applicable design standards . Upon approval by Company, the revised drawings, plans and/or specifications shall be attached hereto and made a part hereof as Exhibit B( 1 ) . 2 . Construction of Project: Company hereby grants permission to County to construct the Bridge in accordance with the Plans and thereafter maintain said bridge, within the area occupied by the Canal, as described and illustrated in the construction and design drawings reflected in Exhibit B . 3 . Grant of Right of Ingress & Egress : Company hereby grants to County the right of ingress and egress to and from the Project and across the Canal property, as necessary and reasonable for the exercise of the purposes of this Agreement. This right of ingress and egress shall not be construed to allow the County access to the Canal bed or surface water while water is flowing in the Canal without adequate means of conveying water delivery, nor shall it create a right of public access to the Canal at any time . 4 . Company' s Field Inspections : Company shall conduct field inspections at the initial stage of construction and within three (3 ) business days of County' s notification to Company that construction has been substantially completed. . In addition, in Company' s discretion, field inspections may be conducted during the construction of the Project. Company shall notify County in writing of all necessary corrective work it deems necessary within three (3) days of such field inspections. Such corrective work shall be completed promptly at the sole expense of County. Failure of Company to notify County of the need for corrective work within three (3) business days of Company' s inspection shall be deemed to constitute Company' s acceptance and approval of the construction of the Project through the date of that inspection . 5 . Company ' s Present and Future Rights to Maintain Canal : Company has, and shall continue to have full power to operate, maintain, alter, enlarge, relocate, clean and manage the Canal as if this Agreement had not been made, except to the extent that Weld County right-of-way for the Road and the Road may be damaged by Company' s activities or negligence in conducting said activities. It is specifically agreed that maintenance and repair activities, including the operation of machinery for such purposes upon the canal right-of-way and within the canal itself, shall not constitute negligence, even if damage to the Project is caused by failure of Company ' s equipment. If, however, any such activity on the part of the Company could reasonably be expected to damage County' s bridge, road or right-of-way, Company agrees to Page 2 of 11 give prior notice to County, and to cooperate with County to avoid said injuries or damages to the County' s bridge, road and/or right-of way, and this Project. 6 . Emergency Repairs to Canal : If Company finds it necessary to perform emergency repairs to the Canal , either during County' s construction of the Project or at any time in the future, and such activity causes damage to County' s bridge, road, right-of way and/or Project, Company shall be without liability for damages to County as the result of the performance of such repairs, except as to such damage caused by Company' s negligence . Emergency actions by the Company to mitigate the threat of loss of life or property in the event of a natural or man-made disaster (including intentional breach of the Canal to relieve flood risk in populated areas), or the absence thereof, shall not be considered negligent. If Company determines that emergency repairs to the Canal must be made, which repairs are caused by the acts or omissions of County in constructing or maintaining the Project, Company shall notify County of the need for such repairs; if County is able to conduct such repair work, it will so notify Company immediately, and will commence said repairs within a time period agreed to by Company. If County is unable to undertake said repair work within a time period to which Company agrees, and Company expends any sum for said emergency repairs of the Canal, Company shall notify County of the expenditure, submit documentation of the expense incurred and, subject to the approval of and appropriation of funds by the Weld County Board of Commissioners, County shall reimburse the Company for any reasonable expense. 7 . Flow of Water During Construction of Project: In order to protect the safety and property of those involved in the construction of the Project, and in order to allow County to take necessary steps to facilitate the uninterrupted free flow of water through the Canal, Company may notify County Personnel identified pursuant to Section I1 .4 ., below, regarding the carriage of water in the Canal during construction of the Project at least four hours before water is expected to reach the location of the Project. Notice to County Personnel shall be deemed given upon : ( 1 ) transmission of an email to the address provided to Company; (2) personal contact via telephone between a representative of Company and the person designated by the County to receive notice. In no event shall FRICO be liable to the County, its contractors, subcontractors, employees, agents, or assigns if for any reason FRICO fails to notify the County pursuant to this Section. II. COUNTY'S RIGHTS AND RESPONSIBILITIES 1 . County to Provide Notice of Work: No work shall be performed on the Project until Company has approved County' s plans and specifications, after such engineering and legal consultation as Company considers necessary. Such approval shall not be unreasonably withheld or delayed. Prior to commencement of work, County shall also provide Company at least 24 hours ' notice of such commencement, and shall provide the information required by Section II.4. , below 2 . County 's Construction Responsibilities: County agrees to construct the Project, and thereafter maintain it in such a manner as to avoid damage to the canal, particularly the embankments and access thereto, to avoid interference with the flow of water through the canal , and to prevent an increased pollutant load to the Canal from the County right-of-way. Any damage to the Canal caused by County' s construction of the Project, including damage to the canal ' s embankments and facilities appurtenant to the Canal , shall be addressed as follows : Page 3 of 11 ( 1 ) If Company determines that repairs to the Canal must be made, which repairs are caused by the acts or omissions of County in constructing or maintaining the Project, Company shall notify County of the need for such repairs; (2) If County is able to conduct such repair work, it will so notify Company immediately, and will commence said repairs within a time period agreed to by Company; (3) If County is unable to undertake said repair work within a time period to which Company agrees, and Company expends any sum for said repairs of the canal, Company shall notify County of the expenditure, submit documentation of the expense incurred and, subject to the approval of and appropriation of funds by the Weld County Board of Commissioners, County shall reimburse the Company for any reasonable expense. 3 . Stormwater Management: County agrees that it will not discharge untreated stormwater into the Canal from the Project or the County' s right of way. County will design, construct, utilize and maintain appropriate temporary and permanent best management practices ("BMPs") to control runoff pollutants (including but not limited to oils, chlorides, and sediment) that are likely to be associated with the construction and ongoing use of the Project. 4 . Flow of Water During Construction of Project: It is a primary goal of County in the construction of this Project, not to interrupt the flow of water through Company' s canal. To that end, County agrees that absent accidents involving third parties, County will not interrupt the flow of water through Company' s Canal . Additionally, Company has advised County that water is generally run through its Canal at the following times : March 1 through October 31 of each year. The parties have agreed that County shall construct the Project during the fifteen ( 15) day period beginning on the 1st day of November, 2015 and ending at 5 : 00 p. m. on the 15th day of November, 2015. As the parties are aware that water could be transferred through the Canal for a variety of reasons at any time during the construction period, Company has agreed to provide notice to County as provided in Section I. 7 . , above . County shall remove its equipment from the Canal bed at the conclusion of each working day, and within four hours of receipt of notice from Company that water is expected to reach the location of the Project. Upon notice to Company that County will be commencing the Project, County shall provide Company with telephone numbers and email addresses of two people who are designated to receive notices pursuant to this Section. County shall not commence the Project until such information is provided to Company. The County and its contractors ASSUME ALL RISKS of performing construction or maintenance work from within the Canal. IN NO EVENT shall Company be liable to County or any third party, including County' s contractors, for damage to equipment, personnel (including loss of life), or the Project as a result of any release of water into the Canal. 5 . Repair and Maintenance of Project After Construction : All post-construction repairs, replacements or maintenance of the Project by County which could impact Company' s use and operation of the Canal shall, in the absence of an emergency, be undertaken during a period when the Canal is not being used to carry water, and such work shall be completed before that use begins. County agrees to notify Company of the need to repair, replace or maintain the Project, and to provide proposed plans and a processing fee to Company if the proposed work involves modifications to the Project or replacement of the Project as provided in Section I. 1 . , above, and Company agrees to provide County with a flow schedule that will allow County to perform its work when the Canal is not expected to be used to carry water. In the event of an emergency situation caused by an immediate and unforeseen incident causing damage to the Bridge that creates a danger to the travelling public, County agrees to immediately notify Page 4 of 1 1 Company of the need to conduct such repairs, and to the extent possible, Company agrees to cooperate to allow County to complete said repairs . The County will work with the Company annually to remove the accumulated sediment under the bridge . 6 . County's Responsibilities Following Construction and/or Repair, Replacement and Maintenance: Upon County' s completion of construction of the Project, and following any subsequent repair, replacement and/or maintenance activity related to the Project, either of which takes place below, within, or over the Canal, County agrees to clean the Canal and canal bank area in order to place it in the same or better condition than it was before the activity began . The County will remove the accumulated sediment under the bridge as well as upstream and downstream of the bridge, within the limits of the road right-of-way, as part of this project. The sediment removal upstream and downstream will be based on the direction of the Company. The County will work with the Company annually to remove the accumulated sediment as described above. 7 . Payment of Administrative Fee : County has paid an administrative fee to Company in the amount of Five Hundred Dollars ($500 .00) . County agrees that the fee is reasonable and represents a fair and appropriate payment to Company for the time expended by its officers and/or employees in entering into this Agreement. If design changes are made to the mutual benefit of County and Company, County will not pay any additional Administrative fees. However, if design changes are initiated solely for County ' s benefit, County will pay Company an additional administrative fee for costs incurred by Company for processing plans (including Changed Plans) or amendments that are submitted after the date of this Agreement, to be determined according to Company' s then-current generally applicable fee schedule . 8 . Legal/Engineering Expense Reimbursement: County agrees to reimburse Company for all reasonable legal and/or engineering costs incurred by Company for the legal review of this Agreement and for the professional engineering review of the Project' s design as set out in Exhibit B . County will reimburse Company for all reasonable legal and / or engineering costs incurred by Company for review of plans (including Changed Plans or amendments that are submitted after the date of this Agreement. 9 . Insurance: If the County utilizes contractors to construct or maintain the Project, the County will require the contractors to carry workers compensation insurance as required by statute, and commercial general liability ("CGL") insurance in an amount not less than $ 1 ,000,000 per occurrence and $2 ,000,000 in the aggregate. The CGL policy shall name Company as an additional insured . 10. Standard of Care-No Liens : County and its contractors shall complete all work in a prompt and workmanlike manner, free of all liens and encumbrances against any property for which Company owns a fee or easement interest. 11 . As-Built Drawings : County will provide Company with "as-built" drawings of the Project, including its location, not more than 30 days after completion of construction, in an electronic format approved by Company. Page 5 of 11 III. MISCELLANEOUS 1 . Board of County Commissioners of Weld County Approval : This Agreement shall not be valid until it has been approved by the Board of County Commissioners of Weld County, Colorado . 2 . Agreement Binding : This writing, together with the exhibits, shall be binding upon said parties their officers, employees, agents, and assigns and shall inure to the be nefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. This Agreement may be assigned by County to another governmental entity who by annexation or other governmental action assumes jurisdiction over the Project, without the written consent of Company. Company agrees to notify County of its intent to assign this Agreement in order that it may take such formal action for ratification as may be required by its Board of County Commissioners. • 3 . No Third Party Beneficiary : It is expressly understood and agreed that the enforcement of the terms and conditions of this Agreement, and all rights of action relating to such enforcement, shall be strictly reserved to the undersigned parties, and nothing in this Agreement shall give or allow any claim or right of action whatsoever by any other person not included in this Agreement. It is the express intention of the undersigned parties that any entity other than the undersigned parties receiving services or benefits under this Agreement shall be an incidental beneficiary only. 4. Funds Availability: County has budgeted the funds required to perform its obligations under the terms of this agreement, and assumes that all expenses it is required to pay will be expended within the current calendar year unless otherwise stated. Financial obligations of the Board of County Commissioners of Weld County payable after the current fiscal year are contingent upon funds for that purpose being appropriated, budgeted and otherwise made available . By execution of this Agreement, County does not warrant that funds will be available to fund this Agreement beyond the current fiscal year. 5 . Time of the Essence: Time is of the essence in each and all of the provisions of this Agreement. 6. Severability: If any term or condition of this Agreement shall be held to be invalid, illegal, or unenforceable, this Agreement shall be construed and enforced without such provision, to the extent that this Agreement is then capable of execution within the original intent of the parties. 7 . Choice of Law : Colorado law, and rules and regulations established pursuant thereto, shall be applied in the interpretation, execution, and enforcement of this Agreement. Any provision included or incorporated herein by reference which conflicts with said laws, rules and/or regulations shall be null and void . 8 . Governmental Immunity : No term or condition of this contract shall be construed or interpreted as a waiver, express or implied, by either party, of any of the immunities, rights, benefits, protections or other provisions, of the Colorado Governmental Immunity Act § §24- 10- 101 et seq . , as applicable now or hereafter amended ("CGIA"), nor does Page 6 of 11 the Company waive any argument that the CGIA does not apply to claims or defenses related to this Agreement or arising out of the construction, existence, use, operation, or failure of the Project. 9 . Entire Agreement / Modifications : This Agreement contains the entire agreement between the parties with respect to the subject matter contained in this Agreement. This instrument supersedes all prior negotiation, representation, and understanding or agreements with respect to the subject matter contained in this Agreement. This Agreement may be changed or supplemented only by a written instrument executed by both parties. 10 . Compliance with Laws : The County agrees that it shall comply with all applicable federal state and local laws, ordinances, and rules in connection with the construction and / or maintenance of the Project, that it shall obtain such permits and / or approvals required by applicable governmental entities in connection with the construction and / or maintenance of the Project and shall take such affirmative and / or remedial actions required by such entities. 11 . Force Majeure: Neither party to this Agreement shall be liable to the other for delays in performance or a failure to deliver or otherwise to perform any obligation under this Agreement, where such failure is due to any cause beyond its reasonable control, including but not limited to Acts of God, fires, strikes, war, flood, earthquakes or Governmental actions; provided that force majeure shall not excuse interruption or substantial reduction in the flow of water in the Canal during construction, repair, or maintenance activities related to the Project. 12 . Notices : Any notice required or permitted hereunder shall be deemed effective : (i) when emailed to the email address provided below; (ii) when transmitted by facsimile to the numbers provided below, except that facsimile transmissions after 4 : 00 PM shall be effective on the following business day; or (ii) two business days after deposited in the United States mail, postage prepaid, certified mail, return receipt requested, and addressed to the party to whom notice is to be given, as follows : Notice to County: Weld County Public Works Weld County Public Works Attn: Don Dunker, P.E. Attn: Richard White (proj . engineer) Email : dunker@weldgov.com Email : rdwhite@weldgov. com Fax No : 970-304-6497 Fax No. 970-304-6497 P . O. Box 758 P. O. Box 758 1111 H Street 1111 H Street Greeley, CO 80632 Greeley, CO 80632 Weld County Construction Company Weld County Public Works Attn: Leo Naranjo (Contractor) Attn: Josh Holbrook Email : leowccinc@aol . com jholbrockaco .weld. co. us Cell No : 970-534-0897 Fax No : 970-304-6497 P . O . Box 67 P. O. Box 758 Pierce, CO 80650 1111 H Street Greeley, CO 80632 Page 7ofll Notice to Farmers Reservoir and Irrigation Company: Name : Scott Edgar, Manager Name : Molly Lockhart Tel : 303 -659-7373 Tel : 303 -659-7373 Email : Scott iaar,nersres.conn Email : NIlolly@farrersres .com Fax No : 303 -659-6077 6077 Fax No : 303 -659-6077 Address : 80 South 27th Avenue Address: 80 South 27th Avenue Address : Brighton, Colorado 80601 Address : Brighton , Colorado 80601 With a copy to : before February . , 20.14: after February 1 , 2014: Joseph B . Dischinger, Esq . Joseph B . Dischinger, Esq . :Fairfield. and Woods, P.C. Fairfield and Woods, P.C . 1700 Lincoln Street, Suite 2400 1801 California Street, Suite 2600 Denver, CO 80203 Denver, Co 80202 Email : jdisch inger�ffwlaw.com Email : :dischinger@ f viaw.coni * in the event that County or Company designate another individual(s) to receive notice, or change the address or facsimile number listed above, the other party shalt be notified in writing of the new information. The failure to provide new or corrected information shall release the other party of all responsibility for any losses suffered by the party failing to provide the new information .* IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, two duplicate originals of this Agreement, each of which shall be deemed an original , on the date first written above. FARMERS RESERVOIR AND IRRIGATION COMPANY By: Date Name (Printed) : Scott .Ed°ar Title : General Manager Page 8 of 11 t} morrigrommire RE: BRIDGE 35/38A CONSTRUCTION AGREEMENT FARMERS RESERVOIR AND IRRIGATION COMPANY IN WITNESS WHEREOF, Weld County and have caused this agreement to be executed this 9i-k day of 14OgsA Lr. , 2015. ATTEST: .estyv ,�,, �CLito; � BOARD OF COUNTY COMMISSIONERS Weld •u � lerk to the B•and W D COUNTY, CO RADO BY: A .S Deputy Cleik o e Bo rbara Kirkmeye , Chair N @ 9 2015 Ito t 1/42 APPROVED - 0 SUBS EIe d i.a •r Depart ent Head Director of General Services APPROVED AS TO FUNDING: Controller APPROV D AS TO FORM: County Attorney m/5.-.3556) EXHIBIT A Range 65W, Township iN Section • R21 /28 in Weld County, Colorado . . , „ :„.„1, . , ,,, ., . „ 4kir Neres Canal .,..:...)..0. 9." "Aminmor • .';4-‘:‘,-..;',:. Wf ,0 y, M y , rP ^ � .. •♦1 •I `i• Y rj. M W • • r' • r4 J. • .i." , Yrn - , - Ner s t Canal ti 6{ {•. "1Y�1•'^'. V ITV.. ... ._.. . .- .w.•. .. .v..•....-n.. .........-..., � _... _ _. ___... v.. . _. . ......r.....- ...i.... .-ter•- r 32 Y♦.. + ltar- r! I - .� £f ..ea .._ ' ;:w tier b t t b. ..'! y. L ^- r x r •' "'�\(2' <. • * • } A . ll''��••,..: 44,,,,, `�+i t 'V9AY1 } ,. � .•. � 'C ,,.�ttom" ttA s > �'i Tub, 1 ...; ^v ..1'41,:.....41..40.4-,. Yi42rP ? _ r • i tf >..a. n _: 1 (y� • . ,: re., 4. - r^5. t s# •Y `;44...• I. ?.F.' 'did ytl.. A tliti r ; NTV Bridge •�.M ••�! .... 6141A rehab .4 YA t Y Jn J 1 . , '7.' Atilt • r nit .gypp . irt •e mow: w K' rte! _ CRD t 'r e te •-I a:"• r-07 .� t ETC • Y: CI 1D 41 o ! Sr • r} r r ., H t _ �. r i .wy 0. .Y > Iiif kid e 4,...4.:..7,(..Ek r rp �Y n. ..Jt b../..rt." r k ^:` a'b wr a Y.t• y � `tiq' r, ` _ L *t r Y , itsn r r$ e .yam#!' -. t o•-...�.•._..••.,........, _.... ...,.•...._.._ ..r....,.w._.... }.r.^+mrt+!—r-..•.....r....-.............—w.r.................._J.rryl ,.w:M.7�3♦r♦....r� •' ,._ _ .. �.S .- .. Y_ Tf h ""K 7Y' 4i^ .w YW ` . :A $r .4 .. o • r 'Vo'n r • �o 1 G, 7 ' S n .. ° C - % r�J 5 Yj " C Y rV J J y Ry ♦ Y p. a A. ; P9�.1 ( • .";-.;,...1..,"%•..,t,..:•%w.Ip TA Y, 1 A L, h ro • N-/k ? •* oa ✓a 8 J.w Y :'.ro Y '°'C 1 r. Ran. >t. ^ � -r ,•„Z'° •t '♦•0 $}S; ..•••,:'wt ti ..,:",•;;,, 4 x 4 W _ 4. • • ..'�..Yw..1tt}l. =yam• f APh r j• 1 :4.. S esn • � :. ,_ ^ .. I . ,„:4-5A-24;1r* yh f,5 .v, Page 10 of 1 1 EXHIBIT B Construction Plans Page 1 of 1 NOTES: Horizontal bars may be tack welded to piling to support reinforcing steel. Varies A 8` to 10" A Concrete must be thoroughly vibrated I " to flow against sheet piling and around piling. , 1 I i?ainforcing steel may be field bent and Bridge Decking I cut for fabrication. $ i • I r---1 IL All reinforcing steel shall be 3` clear /--1 f--1 i u LI '. E of concrete faces. �� e ... . —� .: J Pier's being encased shall hove rounded ' fridge Stringer it Face of Conc. 4�. • Pile Cop terminations to decrease flow resistance. 3` Clearance (typ.) 1 g't-- Pile Encasement - "• Sheet Wing Cap �c ' n n (Backwall) I ;t - 'r � m : I l...J ...-- Driven Piling r~ at f'ti' I t"1 I . _ '' r Back igr9 • " " ': =d j4 O 18" ✓ '` $ 18• �P (typ.) Each flay . ci *; !.sti --�--- Driven Piling ., . E Face of Conc. r%\ l yaw Point Encasement iv ^\ Under fridge\ J - Original Grad ---• ' I t \J Finished Grade •s x t • . #4 O 18" Each Way A '� A; N J / la r �a \J Excavation and backfiil vary. V A C \a "--- 3" Clearance (typ.) Sea Inspection sketch for % each bridge. Varies 'v. 8" to 10" SECT ON A-A PLAN EW • Excluding bridge stringers and decking, (shown from pile cap down) Computer File information , Shoot Revisions , WELD COUNTY STANDARD Project No./Code *on Mk „„N log,,: or p _ TYPICAL FACING DETAILS test Illittliedlas Das as OM SQSI CD .___�.. 1111 H. � i:� . Dio f nelo n owe,«• c meow► rr Wes,a AA r� swag. .r.• amen. oa eoa :-a7. r ii; srs.�. , • Deng n. 20o. „• riaeo CD c ) a sr. mo nw • c cAnOss P cr+ "men POW wn imo pens t- - �• © •• Voit s+r.e Want _lint sain Shot ant • Concrete facing to be completed (see above exhibit) . No other work has been approved to the bridge. • The County will remove the accumulated sediment under the bridge as well as upstream and downstream of the bridge, within the limits of the road right-of-way, as part of this project. The sediment removal will be based on the direction of FRICO and upon request by FRICO . Page 11 of l l ;, Sr
Hello