Loading...
HomeMy WebLinkAbout780392.tiff :I I 17111 I ' '. I ! ` 1C11S IC!iJLIt', :,s6 ,x000 EXT. 200 PJ?. Box 758 �j; /�� (;RtE!_l V, COLORADO 80631 11 LI"COLORADO December 12, 1978 Mr. Albert J. Hazle, Director Radiation and Hazardous Wastes Control Division Colorado Department of Health 4210 East 11th Avenue Denver, CO 80220 Dear Mr. Hazle: RE: Notice of Violation Solid Waste Disposal Sites Concerning the violation notice from your office dated November 16, 1978, please find attached a letter from Mr. Ralph Rohweder, owner of Weld Landfill , Inc. , which states the measures he is taking to bring the Windsor and Ft. Lupton sites into compliance. The Board of Weld County Commissioners is undertaking a study of all the designated landfill sites in Weld County to determine our ability to meet and maintain the standards as well as to ensure the economic viability of these sites. We will also be examining alternate methods of disposal which might be available to Weld County in an attempt to meet those objectives. Please advise the Board as soon as possible should you require further information on actions being taken in this matter. Sincerely, June K. Steinmark, Chairman Pro-Tem Board of Weld County Commissioners JKS/clb cc Jon Hall , Weld County Health Department �LOta7 78O:392 WELD LANDFILL, TNC . 6037 77th Avenue Greeley, Colorado 80631 December 5, 1978 Board of County Commissioners Weld County Greeley, Colorado 80631 Ladies and Gentlemen: In response to your letter dated November 27, 1978 regarding non-compliance at two sites, t he necessary steps to improve the conditions at these sites is underway. We have sufficient men and machinery at work now. We request a re-inspection of these sites on December 21 , 1978 to show that we are making good progress in bringing and keeping these sites in compliance. Our future plan of operation is to keep the top and sides of the trash covered daily at the Ft. Lupton site. We will also keep the trash covered at the Windsor site adequately. There is not sufficient cover material necessary to cover the working face daily. If any obnoxious odors or wind- blown paper becomes a nuisance, we will cover the working face. The fence is being upgraded at this time and we will continue until it is in compliance. Sincerely, I / Ralph Roweder • rr:jr Hello