HomeMy WebLinkAbout20153793.tiff RESOLUTION
RE: ACTION OF BOARD CONCERNING USE BY SPECIAL REVIEW PERMIT, USR15-
0049, FOR A MAJOR FACILITY OF A PUBLIC UTILITY OR PUBLIC AGENCY
(APPROXIMATELY 30.5 MILES OF TRANSMISSION LINES) AND FACILITY
CONSTRUCTION LAYDOWN YARDS NEAR THE GREENHOUSE, GOLFER,
RATTLESNAKE RIDGE AND SOUTH KERSEY SUBSTATIONS (CONSISTING OF
TWO CONSTRUCTION TRAILERS, MULTIPLE STORAGE CONTAINERS AND
OTHER ASSOCIATED EQUIPMENT) IN THE A (AGRICULTURAL) ZONE DISTRICT -
TRI-STATE GENERATION AND TRANSMISSION, INC.
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, the Board of County Commissioners held a public hearing on the 16th day of
December, 2015, at the hour of 10:00 a.m., in the Chambers of the Board for the purpose of
hearing the application of Tri-State Generation and Transmission, Inc., 1100 West 116th Avenue,
Westminster, CO 80233-0695, for a Site Specific Development Plan and Use by Special Review
Permit, USR15-0049, for a Major Facility of a Public Utility or Public Agency (approximately 30.5
miles of transmission lines) and facility construction laydown yards near the Greenhouse, Colfer,
Rattlesnake Ridge and South Kersey substations (consisting of two construction trailers, multiple
storage containers and other associated equipment) in the A (Agricultural) Zone District, on the
following described real estate, to-wit:
Commencing at the Greenhouse substation located within the Corporate City
Limits of Fort Lupton in Section 34, T2N, R66W then crossing Sections 35, 26, and
25, T2N, R66W and then into Sections 30, 29, 28, 27, and 22, T2N, R65W into the
Colfer Substation. Commencing at the Colfer Substation heading into Section 22,
T2N, R65W and crossing Sections 15, 10, 11, and 2, T2N, R65W and entering
Section 35, T3N, R65 and crossing into Sections 36 and 25, T3N, R65W into the
Rattlesnake Ridge Substation. From Section 26, T3N, R65W the transmission line
enters Section 30, T3N, R64W then crosses through Sections 30, 19, 18, 7 and 6,
T3N, R64W and into Section 1, T3N, R65W then crossing Sections 36 and 25,
T4N, R65W then entering Section 30, T4N, R64W and crossing Sections 30, 24,
and 14, T4N, R65W into the Milton Substation. Commencing at the Milton
Substation entering Section 18, T4N, R64W and crossing Sections 7 and 6, T4N,
R65W and then entering Section 32, T5N, R65W and terminating at the South
Kersey substation.
WHEREAS, the Board heard all of the testimony and statements of those present and
reviewed the request of the applicant for a permit and, having been fully informed, finds that this
request be continued to March 2, 2016, at 10:00 a.m., to allow adequate time for Public Works
staff to complete the County Road 49 horizontal/vertical alignments and for the applicant to work
with staff to ensure the projects are well coordinated to resolve any outstanding issues.
2015-3793
CO- e0--,` f I . 2/aa- PL2383
RE: CONTINUANCE (USR15-0049) -TRI-STATE GENERATION AND TRANSMISSION, INC.
PAGE 2
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld
County, Colorado, that the abovementioned matter be, and hereby is, continued to March 2, 2016,
at 10:00 a.m.
The above and foregoing Resolution was, on motion duly made and seconded, ado
pted
ted
9 9 p
by the following vote on the 16th day of December, A.D., 2015.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, CO RADO
ATTEST:W.41tAgov .aC,1Lo;14 r ara Kirkmeye , Chair
Weld County Clerk to the Board
EXCUSED
Mike Freeman, Pro-Tem
%uty Clerk to th Board • 7":::).
ELa Sean P. Conway
O ED ORM
tsar t 107 P
. Cozad
ounty Attorney
,� Steve Moreno
Date of signature: "11
2015-3793
PL2383
Prtspos,e4 Ratas ,
appluish4
RESOLUTION
RE : ACTION OF BOARD CONCERNING USE BY SPECIAL REVIEW PERMIT,
USR15-0049 , FOR A MAJOR FACILITY OF A PUBLIC UTILITY OR PUBLIC AGENCY
(APPROXIMATELY 30 . 5 MILES OF TRANSMISSION LINES ) AND FACILITY
CONSTRUCTION LAYDOWN YARDS NEAR THE GREENHOUSE , COLFER,
RATTLESNAKE RIDGE AND SOUTH KERSEY SUBSTATIONS ( CONSISTING OF
TWO CONSTRUCTION TRAILERS , MULTIPLE STORAGE CONTAINERS AND
OTHER ASSOCIATED EQUIPMENT) IN THE A (AGRICULTURAL ) ZONE DISTRICT -
TRI -STATE GENERATION AND TRANSMISSION , INC .
WHEREAS , the Board of County Commissioners of Weld County , Colorado , pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County , Colorado , and
WHEREAS , the Board of County Commissioners held a public hearing on the 16th day of
December, 2015 , at the hour of 10 : 00 a . m . , in the Chambers of the Board for the purpose of
hearing the application of Tri -State Generation and Transmission , Inc . , 1100 West 116th Avenue ,
Westminster, CO 80233-0695 , for a Site Specific Development Plan and Use by Special Review
Permit, USR15-0049 , for a Major Facility of a Public Utility or Public Agency (approximately 30 . 5
miles of transmission lines ) and facility construction laydown yards near the Greenhouse , Colfer,
Rattlesnake Ridge and South Kersey substations (consisting of two construction trailers , multiple
storage containers and other associated equipment) in the A (Agricultural ) Zone District , on the
following described real estate , to-wit :
Commencing at the Greenhouse substation located within the Corporate City
Limits of Fort Lupton in Section 34 , T2N , R66W then crossing Sections 35 , 26 , and
25 , T2N , R66W and then into Sections 30 , 29 , 28 , 27 , and 22 , T2N , R65W into the
Colfer Substation . Commencing at the Colfer Substation heading into Section 22 ,
T2N , R65W and crossing Sections 15 , 10 , 11 , and 2 , T2N , R65W and entering
Section 35 , T3N , R65 and crossing into Sections 36 and 25 , T3N , R65W into the
Rattlesnake Ridge Substation . From Section 26 , T3N , R65W the transmission line
enters Section 30 , T3N , R64W then crosses through Sections 30 , 19 , 18 , 7 and 6 ,
T3N , R64W and into Section 1 , T3N , R65W then crossing Sections 36 and 25 ,
T4N , R65W then entering Section 30 , T4N , R64W and crossing Sections 30 , 24 ,
and 14 , T4N , R65W into the Milton Substation . Commencing at the Milton
Substation entering Section 18 , T4N , R64W and crossing Sections 7 and 6 , T4N ,
R65W and then entering Section 32 , T5N , R65W and terminating at the South
Kersey substation .
WHEREAS , the Board heard all of the testimony and statements of those present and
reviewed the request of the applicant for a permit and , having been fully informed , finds that this
request be approved and the matter should be continued to March 2 , 2016 , at 10 : 00 a . m . , to allow
adequate time for Public Works staff to complete the County Road 49 horizontal/vertical
alignments and for the applicant to work with staff to ensure the projects are well coordinated to
resolve any outstanding issues .
2015-3793
PL2383
Esther Gesick
Subject: FW: BOARD OF COUNTY COMMISSIONERS RESOLUTION.docx
Attachments: RE153793_revised.docx
From: Kim Ogle
Sent: Monday,January 25, 2016 11:51 AM
To: Esther Gesick<egesick@co.weld.co.us>
Subject: FW: BOARD OF COUNTY COMMISSIONERS RESOLUTION.docx
Esther
Please find attached a request to modify the RESO for USR15-0049 Tri-State. It is the contention of Tri-State that the
Board of County Commissioners requested the continuance and not Tri-State, therefore there is new language proposed
to so reflect this circumstance.
Thanks
Kim
Kim Ogle
Planner
Department of Planning
1555 North 17th Avenue
Greeley, Colorado 80631
Direct: 970.353.6100 x 3549
Office: 970.353.6100 x 3540
Facsimile:970.304.6498
Dui
Confidentiality Notice:This electronic transmission and any attached documents or other writings are intended only for
the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise
protected from disclosure. If you have received this communication in error, please immediately notify sender by return
e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the
contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited.
Think Green -Not every email needs to be printed
From: Koler, Selina [mailto:skoler@tristategt.org]
Sent: Monday,January 25, 2016 10:22 AM
To: Kim Ogle<kogle@co.weld.co.us>
Cc: Gray,Steve<sgrayPtristategt.org>; Crain, Casey<ccrain@tristategt.org>
Subject: RE: BOARD OF COUNTY COMMISSIONERS RESOLUTION.docx
Hi Kim,
Thank you for the opportunity to comment on the proposed Resolution related to Tri-State's Application for a
II
Site Specific Development Plan and Use by Special Review Permit. Please see the attached redline of the
1
proposed Resolution which clarifies that Tri-State did not request a continuance but rather the Board decided to
continue this matter for the stated reasons.
Thanks,
Selina Koler
Senior Transmission Siting & Environmental Planner
Direct: 303.254.3720
Cell: 303.229.3207
skoler@tristategt.org
TtI-STATE
Generation and Transnnnion
Assoclation,Inc.,
A TooLititirnc I ncrt*y'CCxvcratwwc 1�
www.tristategt.org
From: Kim Ogle [mailto:kogleco.weld.co.us]
Sent: Tuesday, January 19, 2016 2:10 PM
To: Koler, Selina
Cc: Gray, Steve; Crain, Casey
Subject: BOARD OF COUNTY COMMISSIONERS RESOLUTION.docx
Selina,
Please find attached for the record.
USR15-0049
Kim
2
RESOLUTION
RE: ACTION OF BOARD CONCERNING USE BY SPECIAL REVIEW PERMIT, USR15-
0049, FOR A MAJOR FACILITY OF A PUBLIC UTILITY OR PUBLIC AGENCY
(APPROXIMATELY 30.5 MILES OF TRANSMISSION LINES) AND FACILITY
CONSTRUCTION LAYDOWN YARDS NEAR THE GREENHOUSE, COLFER,
RATTLESNAKE RIDGE AND SOUTH KERSEY SUBSTATIONS (CONSISTING OF
TWO CONSTRUCTION TRAILERS, MULTIPLE STORAGE CONTAINERS AND
OTHER ASSOCIATED EQUIPMENT) IN THE A (AGRICULTURAL) ZONE DISTRICT-
TRI-STATE GENERATION AND TRANSMISSION, INC.
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, the Board of County Commissioners held a public hearing on the 16th day of
December, 2015, at the hour of 10:00 a.m., in the Chambers of the Board for the purpose of
hearing the application of Tri-State Generation and Transmission, Inc., 1100 West 116th Avenue,
Westminster, CO 80233-0695, for a Site Specific Development Plan and Use by Special Review
Permit, USR15-0049, for a Major Facility of a Public Utility or Public Agency (approximately 30.5
miles of transmission lines) and facility construction laydown yards near the Greenhouse, Colfer,
Rattlesnake Ridge and South Kersey substations (consisting of two construction trailers, multiple
storage containers and other associated equipment) in the A (Agricultural) Zone District, on the
following described real estate, to-wit:
Commencing at the Greenhouse substation located within the Corporate City
Limits of Fort Lupton in Section 34, T2N, R66W then crossing Sections 35, 26, and
25, T2N, R66W and then into Sections 30, 29, 28, 27, and 22, T2N, R65W into the
Colfer Substation. Commencing at the Colfer Substation heading into Section 22,
T2N, R65W and crossing Sections 15, 10, 11, and 2, T2N, R65W and entering
Section 35, T3N, R65 and crossing into Sections 36 and 25, T3N, R65W into the
Rattlesnake Ridge Substation. From Section 26, T3N, R65W the transmission line
enters Section 30, T3N, R64W then crosses through Sections 30, 19, 18, 7 and 6,
T3N, R64W and into Section 1, T3N, R65W then crossing Sections 36 and 25,
T4N, R65W then entering Section 30, T4N, R64W and crossing Sections 30, 24,
and 14, T4N, R65W into the Milton Substation. Commencing at the Milton
Substation entering Section 18, T4N, R64W and crossing Sections 7 and 6, T4N,
R65W and then entering Section 32, T5N, R65W and terminating at the South
Kersey substation.
WHEREAS, the Board heard all of the testimony and statements of those present and
reviewed the request of the applicant and, having been fully informed, finds that this request be
approved and the matter should be continued to March 2, 2016, at 10:00 a.m., to allow adequate
time for Public Works staff to complete the County Road 49 horizontal/vertical alignments and for
the applicant to work with staff to ensure the projects are well coordinated to resolve any
outstanding issues.
2015-3793
CC: COL, i4L ' -P" ')& PL2383
RE: CONTINUANCE (USR15-0049) -TRI-STATE GENERATION AND TRANSMISSION, INC.
PAGE 2
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld
County, Colorado, that the abovementioned matter be, and hereby is, continued to March 2, 2016,
at 10:00 a.m.
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 16th day of December, A.D., 2015.
BOARD OF COUNTY COMMISSIONERS
,.` W D COUNTY, CO ORADO
ATTEST: ""'Q�' 'e1
rbara KirkmeY a Chair
Weld County Clerk to the Board
/ EXCUSED
��•.,,� Mike Freeman, Pro-Tern
B • .,ice.. , . �.._ ,. —�� / /`
-puty Clerk to the Boar•
P. Co way11161 t ae,(7dc---:--- --
��
APPR ED ORM:
- A. Cozad
County Attorney ► • ✓/�%� G� '�— �
Steve Moreno
Date of signature: licQD/Il'
2015-3793
PL2383
Hello