Loading...
HomeMy WebLinkAbout20152975 = \ 11 J � L April 30, 2015 (revised June 8, 2015) 0213021.00, Task 28 LAMP RYNEARSON & ASSOCIATES ENGINEERS I SURVEYORS I PLANNERS 4715 Innovation Drive, Suite 100 Ms. Diana Aungst Fort Collins, Colorado 80525 Weld County Department of Planning Services [P] 970 226 0342 [F] 970 226 0879 1555 N. 17th Avenue, 2nd Floor www LISA-Inc COM Greeley, Colorado 80631 RE: Evidence of Adequate Water Supply PRE15-0073 COZ Lot 18 (Ag to 1-3) NE corner of CR 23.75 and 64.5 Great Western Industrial Park, Maan II property— Lot 18 Weld County Road 641/2, Dear Ms. Aungst: This letter is regarding the adequate water supply requirement of the Change of Zone (COZ) application. Currently the property is an agricultural use. As discussed in the pre-application meeting, the owner is requesting a Change of Zone to 1-3 without a proposed use. At such time as a use is proposed for the property and the potable water requirement (rate or volume) is understood there are options for water service. Water service has been discussed with the City of Greeley and North Weld County Water District (NWCWD). Additionally there is the option of well water. Currently the City of Greeley does not have potable water adjacent to the site but if required it could be extended. NWCWD does have water adjacent to the site in WCR 64'4. A copy of an Intent to Serve letter from NWCWD, dated June 5, 2015, is included with this letter. (see Attachment). If an application for water service were submitted to NWCWD they would send it to Greeley (per NWCWD's IGA). If Greeley allowed NWCWD to provide service the District would evaluate the user's requirement. If you have any questions or need additional information please contact me. Sincerely, LAMP RYNEARSON &ASSOCIATES, INC. • John Tufte, PE Senior Project Manager Leaving a Legacy of Enduring improvements to Our Communities- PURPOSE STATEMENT ENGINEERS SURVEYORS PLANNERS P:A_EngineeringVGW IPA0213021 APRO.IECTSV0213021.00-028 Maan 2 Rezone ADOCUMENTSVCOZ(2015-04-30)AMaan II-Evidence of Water Supply(rev 2015-06-08).docx BOARD OF DIRECTORS 11:1-0410 � FI y,� NORTH WELD COUNTY WATER DISTRICT CHARLES ACHZIGER ` 32825 CR 39 • LUCERNE, CO 80646 GENE STILLE ? RICK PICKARD, DISTRICT MANAGER GARY SIMPSON TODD BEAN P.O. BOX 56 • BUS: (970) 356-3020 • FAX: (970) 395-0997 ROBERT ARNBRECHT 1/1/,‘1 . WWW.NWCWD.ORG • EMAIL: WATER@NWCWD.ORG June 5, 2015 M2 Landco, LLC Lamp Rynearson C/O John Tufte 252 Clayton Street,4th Floor 4715 Innovation Drive Denver, CO 80206 Fort Collins, CO 80525 970.226.0342 RE: Intent to Serve the property located at Approx. 11871 WCR 64%, Greeley, CO Legal Description: Lot B of AMD RE-833 being part of the E1/2 of the NE Y of Section 25,Township 6 North, Range 67 West and part of the W'/of the NW 1/4 of Section 30,Township 6 North, Range 66 West, 6th P.M., County of Weld, State of Colorado. To Whom It May Concern: North Weld County Water District intends to provide domestic water service to the property located at approximately 11871 WCR 64 1/2, Greeley. The current owner of the property is M2 Landco, LLC. The District has no conflict with the applicant listed above applying for a change of zone. The District will provide a Letter of Intent detailing the requirements of water service once a Water Tap Request Form has been submitted & reviewed detailing the intention for service. Water tap/service is placed on the physical property, defined by a legal description. In case of a Recorded Exemption, the water tap shall only serve the parcel that the water tap is located on. Service shall NOT cross the legal description of one parcel to serve the other parcel, unless an easement has been recorded for the water service and has been approved by the District. The District guarantees treatment and delivery of water purchased. All water that is delivered with surcharge is subject to water availability. Water purchased through the District shall be 70% delivery of an Acre-Foot of water (228,000 gallons), if the allotment for Colorado-Big Thompson (CBT) project water, which is determined by the Northern Colorado Water Conservancy District, is 50% or greater. North Weld County Water District will restrict the delivery as necessary when the CBT allotment is less than 50%. A portion of the Raw Water Fee is utilized by the District to construct storage reservoirs. The Plant Investment Fee pays for the infrastructure required to deliver 1 AFU (228,000 gallons). If usage exceeds the number of Plant Investments that were purchased, an additional Plant Investment Surcharge will be applied to the account. Plant Investments may be purchased to increase the amount of water to be delivered and avoid the Plant Investment Surcharge. Refer to table below for current Plant Investment Surcharge schedule. Water Surcharge Surcharge will be assessed when an account's year to date usage exceeds their annual allotment. Currently surcharge is $2.00 per 1,000 gallons. This fee is to recover the District's cost to obtain additional water rights for delivery. All water that is delivered with surcharge is subject to water availability. Plant Investment Surcharge When an account's year to date usage exceeds their Plant Investment Allotment (U of Equivalent Taps x 228,000 gallons), a surcharge will be assessed. The transfer of additional water will not remove this charge. Additional Plant Investments must be purchased to increase the allotment and reduce the Plant Investment Surcharges. 0 to 456,000 gallons above the Plant Investment Allotment (228,000 gallons) $3.95 per 1,000 gallons More than 456,000 gallons above the Plant Investment Allotment $1.95 per 1,000 gallons Respectfully, Leann Koons Leann Koons, Office Assistant = \ 11 April 30, 2015 (revised June 8, 2015) J I L 0213021.00, Task 28 LAMP RYNEARSON & ASSOCIATES ENGINEERS I SURVEYORS I PLANNERS Ms. Diana Aungst 4715 Innovation Drive, Suite 100 Weld County Department of Planning Services Fort Collins, Colorado 80525 1555 N. 17th Avenue, 2nd Floor [P] 970 226 0342 [F] 970 226 0879 Greeley, Colorado 80631 www LRA-Inc COM RE: Evidence of Adequate Sewage Disposal PRE15-0073 COZ Lot 18 (Ag to 1-3) NE corner of CR 23.75 and 64.5 Great Western Industrial Park, Maan II property— Lot 18 Weld County Road 641/2, Dear Ms. Aungst: This letter is regarding the adequate sewage disposal requirement of the Change of Zone (COZ) application. Currently the property is an agricultural use. As discussed in the pre-application meeting, the owner is requesting a Change of Zone to 1-3 without a proposed use. At such time as a use is proposed for the property and the sewage disposal requirement (volume) is understood there are options for treatment. As discussed in our meeting, if the demand is low it may be feasible to use an onsite septic system. Currently it is anticipated, based on similar uses within the industrial park, that an engineered septic system can be a solution to sewer service. If a proposed use has a high demand, sewage disposal may require offsite improvements such as extension of sanitary sewer from Greeley. Currently the existing gravity sewer from Greeley is several miles from this property and would be cost prohibitive for a small demand. This option has also been discussed with Greeley as an alternative. If you have any questions or need additional information please contact me. Sincerely, LAMP RYNEARSON &ASSOCIATES, INC. John Tufte, PE Senior Project Manager Leaving a Legacy of Enduring improvements to Our Communities- PURPOSE STATEMENT ENGINEERS SURVEYORS PLANNERS Ps_Engineering Maan 2 RezoneADOCUMENTSVCOZ(2015-04-30)AMaan II-Evidence of Sewage Disposal(rev 2015-06-08).docx Hello