HomeMy WebLinkAbout20160192.tiff •
DEPARTMENT OF PLANNING SERVICES
�Z' l /11
t, 1555 N 17th AVE
GREELEY, CO 80631
PHONE: (970) 353-6100 EXT. 3540
� FAX: (970) 30404-6498
l�l _o N T‘(
October 13, 2015
NOTICE TO REFERRAL AGENCIES
CASE NUMBER: USR15-0049
There will be a Public Hearing before the Weld County Planning Commission on Tuesday, November 3, 2015
at 12:30 p.m. A subsequent hearing will be held on December 16, 2015 at 10:00 a.m.with the Board of County Commissioners.
Both hearings will be held in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado,
80631.
NAME: Tri-State Generation &Transmission Inc
FOR: A Site Specific Development Plan and Use by Special Review Permit for a Major Facility of a Public Utility or
Public Agency (approximately 30.5 miles of transmission lines) and facility construction laydown yards near
the Greenhouse, Colfer, Rattlesnake Ridge and South Kersey substations (consisting of two construction
trailers, multiple storage containers and other associated equipment) in the A(Agricultural)Zone District
LEGAL DESCRIPTION: Commencing at the Greenhouse substation located within the Corporate City Limits of Fort
Lupton in Section 34, T2N, R66W then crossing Sections 35, 26, and 25, T2N, R66W and
then into Sections 30, 29, 28, 27, and 22, T2N, R65W into the Golfer Substation.
Commencing at the Golfer substation heading into Section 22, T2N, R65W and crossing
Sections 15, 10, 11, and 2, T2N, R65W and entering Section 35, T3N, R65 and crossing
into Section 36 and 25, T3N, R65W into the Rattlesnake Ridge substation. From Section
26, T3N, R65W the transmission line enters Section 30, T3N, R64W then crosses through
Sections 30, 19, 18, 7 and 6, T3N, R64W and into Section 1, T3N, R65W then crossing
Sections 36 and 25, T4N, R65W then entering Section 30, T4N, R64W and crossing
Sections 30, 24, and 14, T4N, R65W into the Milton substation. Commencing at the
Milton substation entering Section 18, T4N, R64W and crossing Sections 7 and 6, T4N,
R65W and then entering Section 32, T5N, R65W and terminating at the South Kersey
substation.
LOCATION: APPROXIMATELY 0.5 MILES SOUTH OF CR 52; WEST OF AND ADJACENT TO CR 51;
APPROXIMATELY 0.5 MILES NORTH OF CR 14 AND EAST OF AND ADJACENT TO CR 31.
Submit by Email
ltk Weld County Referral
� }ds� �rx'• 1 _
•
August 21 , 2015
The Weld County Department of Planning Services has received the following item for review:
Applicant: Tri-State Generation & Transmission, Inc. Case Number: USR15-0049
Please Reply By: September 18, 2015 Planner: Kim Ogle
Project: A Site Specific Development Plan and Use by Special Review Permit for a Major Facility of a
Public Utility or Public Agency (approximately 30.5 miles of transmission lines) and facility construction
laydown yards near the Greenhouse, Colfer, Rattlesnake Ridge and South Kersey substations
(consisting of two construction trailers, multiple storage containers and other associated equipment) in
the A (Agricultural) Zone District (Tri-State Generation and Transmission, Inc.)
Location: APPROXIMATELY 0.5 MILES SOUTH OF CR 52; WEST OF AND ADJACENT TO CR 51 ;
APPROXIMATELY 0.5 MILES NORTH OF CR 14 AND EAST OF AND ADJACENT TO CR 31
Parcel Number: Multiple Parcels
Legal: Commencing at the Greenhouse substation located within the Corporate City Limits of Fort
Lupton in Section 34, T2N , R66W then crossing Sections 35, 26, and 25, T2N , R66W and then into
Sections 30, 29, 28, 27, and 22, T2N , R65W into the Colfer Substation . Commencing at the Colfer
substation heading into Section 22, T2N , R65W and crossing Sections 15, 10, 11 , and 2, T2N , R65W
and entering Section 35, T3N , R65 and crossing into Section 36 and 25, T3N , R65W into the
Rattlesnake Ridge substation . From Section 26, T3N , R65W the transmission line enters Section 30,
T3N, R64W then crosses through Sections 30, 19, 18, 7 and 6, T3N, R64W and into Section 1 , T3N,
R65W then crossing Sections 36 and 25, T4N , R65W then entering Section 30, T4N , R64W and
crossing Sections 30, 24, and 14, T4N, R65W into the Milton substation. Commencing at the Milton
substation entering Section 18, T4N , R64W and crossing Sections 7 and 6, T4N , R65W and then
entering Section 32, T5N , R65W and terminating at the South Kersey substation.
The application is submitted to you for review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding the application , please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
We have reviewed the request and find that it does / does not comply with our Comprehensive
Plan because:
4 We have reviewed the request and find no conflicts with our interests.
See attached letter.
Signature BPascoe Date 08/24/2015
Agency Zoning Compliance
Weld County Planning Dept. 1555 N 17th Ave, Greeley, CO. 80631 (970) 353-6100 ext.3540 (970) 304-6498 fax
Submit by Email
ltk Weld County Referral
� }ds� �rx'• 1 _
•
August 21 , 2015
The Weld County Department of Planning Services has received the following item for review:
Applicant: Tri-State Generation & Transmission, Inc. Case Number: USR15-0049
Please Reply By: September 18, 2015 Planner: Kim Ogle
Project: A Site Specific Development Plan and Use by Special Review Permit for a Major Facility of a
Public Utility or Public Agency (approximately 30.5 miles of transmission lines) and facility construction
laydown yards near the Greenhouse, Colfer, Rattlesnake Ridge and South Kersey substations
(consisting of two construction trailers, multiple storage containers and other associated equipment) in
the A (Agricultural) Zone District (Tri-State Generation and Transmission, Inc.)
Location: APPROXIMATELY 0.5 MILES SOUTH OF CR 52; WEST OF AND ADJACENT TO CR 51 ;
APPROXIMATELY 0.5 MILES NORTH OF CR 14 AND EAST OF AND ADJACENT TO CR 31
Parcel Number: Multiple Parcels
Legal: Commencing at the Greenhouse substation located within the Corporate City Limits of Fort
Lupton in Section 34, T2N , R66W then crossing Sections 35, 26, and 25, T2N , R66W and then into
Sections 30, 29, 28, 27, and 22, T2N , R65W into the Colfer Substation . Commencing at the Colfer
substation heading into Section 22, T2N , R65W and crossing Sections 15, 10, 11 , and 2, T2N , R65W
and entering Section 35, T3N , R65 and crossing into Section 36 and 25, T3N , R65W into the
Rattlesnake Ridge substation . From Section 26, T3N , R65W the transmission line enters Section 30,
T3N, R64W then crosses through Sections 30, 19, 18, 7 and 6, T3N, R64W and into Section 1 , T3N,
R65W then crossing Sections 36 and 25, T4N , R65W then entering Section 30, T4N , R64W and
crossing Sections 30, 24, and 14, T4N, R65W into the Milton substation. Commencing at the Milton
substation entering Section 18, T4N , R64W and crossing Sections 7 and 6, T4N , R65W and then
entering Section 32, T5N , R65W and terminating at the South Kersey substation.
The application is submitted to you for review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding the application , please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
We have reviewed the request and find that it does / does not comply with our Comprehensive
Plan because:
4 We have reviewed the request and find no conflicts with our interests.
See attached letter.
Signature CAPT ALAN CALDWELL Date 082115
Agency WCSO
Weld County Planning Dept. 1555 N 17th Ave, Greeley, CO. 80631 (970) 353-6100 ext.3540 (970) 304-6498 fax
Submit by Email
Weld County Referral
S .4-
August 21,2015
The Weld County Department of Planning Services has received the following item for review:
Applicant:Tri-State Generation &Transmission, Inc. Case Number: USR15-0049
Please Reply By: September 18, 2015 Planner: Kim Ogle
Project: A Site Specific Development Plan and Use by Special Review Permit for a Major Facility of a
Public Utility or Public Agency (approximately 30.5 miles of transmission lines) and facility construction
laydown yards near the Greenhouse, Colfer, Rattlesnake Ridge and South Kersey substations
(consisting of two construction trailers, multiple storage containers and other associated equipment) in
the A(Agricultural)Zone District (Tri-State Generation and Transmission, Inc.)
Location:APPROXIMATELY 0.5 MILES SOUTH OF CR 52; WEST OF AND ADJACENT TO CR 51;
APPROXIMATELY 0.5 MILES NORTH OF CR 14 AND EAST OF AND ADJACENT TO CR 31
Parcel Number: Multiple Parcels
Legal: Commencing at the Greenhouse substation located within the Corporate City Limits of Fort
Lupton in Section 34, T2N, R66W then crossing Sections 35, 26, and 25, T2N, R66W and then into
Sections 30, 29, 28, 27, and 22, T2N, R65W into the Colfer Substation. Commencing at the Colfer
substation heading into Section 22, T2N, R65W and crossing Sections 15, 10, 11, and 2, T2N, R65W
and entering Section 35, T3N, R65 and crossing into Section 36 and 25, T3N, R65W into the
Rattlesnake Ridge substation. From Section 26, T3N, R65W the transmission line enters Section 30,
T3N, R64W then crosses through Sections 30, 19, 18, 7 and 6, T3N, R64W and into Section 1, T3N,
R65W then crossing Sections 36 and 25, T4N, R65W then entering Section 30, T4N, R64W and
crossing Sections 30, 24, and 14, T4N, R65W into the Milton substation. Commencing at the Milton
substation entering Section 18, T4N, R64W and crossing Sections 7 and 6, T4N, R65W and then
entering Section 32,T5N, R65W and terminating at the South Kersey substation.
The application is submitted to you for review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding the application, please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
pi We have reviewed the request and find that it does/does not comply with our Comprehensive
Eref
Ian because:
We have reviewed the request and find no conflicts with our interests.
See attached letter. �^
Signature Ø-4._._. y, Date 9/S/T ory
Agency pL191I� (1—L(Fy A ��A9kf�
Weld County Planning Dept 1555 N 17th Ave,Greeley,CO 80631 (970)353-6100 ext 3540 (970)304-6498 fax
Sep 02 2015 1 : 07PM HP LASERJET FAX p. 2
WELD
3,1
September 2, 2015
Weld County Department of Planning Services
918 10`° Street
Greeley, Colorado 80631
Case Number: USR15-0049
Dear Kim Ogle:
Thank you for your recent referral for the property belonging to Tri-State Generation and Transmission
Association Inc. Please accept this letter as evidence that Weld County School District RE-3J has no
objections to the special review permit for a Major Facility of a Public Utility or Public Agency.
If more than this letter is needed for your dealings with the county please let me know.
Sincerely,
Greg Rabenhorst
Weld County School District Re-3J
Submit by Email
•41.
=
Weld County Referral
_
August 21, 2015
The Weld County Department of Planning Services has received the following item for review:
Applicant: Tri-State Generation &Transmission, Inc. Case Number: USR15-0049
Please Reply By: September 18, 2015 Planner: Kim Ogle
Project: A Site Specific Development Plan and Use by Special Review Permit for a Major Facility of a
Public Utility or Public Agency (approximately 30.5 miles of transmission lines) and facility construction
laydown yards near the Greenhouse, Colfer, Rattlesnake Ridge and South Kersey substations
(consisting of two construction trailers, multiple storage containers and other associated equipment) in
the A(Agricultural) Zone District (Tri-State Generation and Transmission, Inc.)
Location:APPROXIMATELY 0.5 MILES SOUTH OF CR 52; WEST OF AND ADJACENT TO CR 51;
APPROXIMATELY 0.5 MILES NORTH OF CR 14 AND EAST OF AND ADJACENT TO CR 31
Parcel Number: Multiple Parcels
Legal: Commencing at the Greenhouse substation located within the Corporate City Limits of Fort
Lupton in Section 34, T2N, R66W then crossing Sections 35, 26, and 25, T2N, R66W and then into
Sections 30, 29, 28, 27, and 22, T2N, R65W into the Colfer Substation. Commencing at the Colter
substation heading into Section 22, T2N, R65W and crossing Sections 15, 10, 11, and 2, T2N, R65W
and entering Section 35, T3N, R65 and crossing into Section 36 and 25, T3N, R65W into the
Rattlesnake Ridge substation. From Section 26, T3N, R65W the transmission line enters Section 30,
T3N, R64W then crosses through Sections 30, 19, 18, 7 and 6, T3N, R64W and into Section 1, T3N,
R65W then crossing Sections 36 and 25, T4N, R65W then entering Section 30, T4N, R64W and
crossing Sections 30, 24, and 14, T4N, R65W into the Milton substation. Commencing at the Milton
substation entering Section 18, T4N, R64W and crossing Sections 7 and 6, T4N, R65W and then
entering Section 32, T5N, R65W and terminating at the South Kersey substation.
The application is submitted to you for review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding the application, please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
FT We have reviewed the request and find that it does/does not comply with our Comprehensive
Plan because:
El We have reviewed the request and find no conflicts with our interests.
■ See attached letter.
Signature Chief Financial Officer Date 08/21/2015
Agency Weld County School District RE-1
Weld County Planning Dept. 1555 N 17th Ave,Greeley,CO.80631 (970)353-6100 ext.3540 (970)304-6498 fax
Submit by Email
Ar Weld County Referral
IF ft-
ONY -
!mil
August 21, 2015
The Weld County Department of Planning Services has received the following item for review:
Applicant: Tri-State Generation &Transmission, Inc. Case Number: USR15-0049
Please Reply By: September 18, 2015 Planner: Kim Ogle
Project: A Site Specific Development Plan and Use by Special Review Permit for a Major Facility of a
Public Utility or Public Agency (approximately 30.5 miles of transmission lines) and facility construction
laydown yards near the Greenhouse, Colfer, Rattlesnake Ridge and South Kersey substations
(consisting of two construction trailers, multiple storage containers and other associated equipment) in
the A(Agricultural)Zone District (Tri-State Generation and Transmission, Inc.)
Location:APPROXIMATELY 0.5 MILES SOUTH OF CR 52; WEST OF AND ADJACENT TO CR 51;
APPROXIMATELY 0.5 MILES NORTH OF CR 14 AND EAST OF AND ADJACENT TO CR 31
Parcel Number: Multiple Parcels
Legal: Commencing at the Greenhouse substation located within the Corporate City Limits of Fort
Lupton in Section 34, T2N, R66W then crossing Sections 35, 26, and 25, T2N, R66W and then into
Sections 30, 29, 28, 27, and 22, T2N, R65W into the Colfer Substation. Commencing at the Colfer
substation heading into Section 22, T2N, R65W and crossing Sections 15, 10, 11, and 2, T2N, R65W
and entering Section 35, T3N, R65 and crossing into Section 36 and 25, T3N, R65W into the
Rattlesnake Ridge substation. From Section 26, T3N, R65W the transmission line enters Section 30,
T3N, R64W then crosses through Sections 30, 19, 18, 7 and 6, T3N, R64W and into Section 1, T3N,
R65W then crossing Sections 36 and 25, T4N, R65W then entering Section 30, T4N, R64W and
crossing Sections 30, 24, and 14, T4N, R65W into the Milton substation. Commencing at the Milton
substation entering Section 18, T4N, R64W and crossing Sections 7 and 6, T4N, R65W and then
entering Section 32, T5N, R65W and terminating at the South Kersey substation.
The application is submitted to you for review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding the application, please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
n We have reviewed the request and find that it does/does not comply with our Comprehensive
Plan because:
✓ We have reviewed the request and find no conflicts with our interests.
See attached letter.
September 11, 2015
Signature �_ — Date
Agency Platte Valley School District Weld RE/
Weld County Planning Dept. 1555 N 17th Ave, Greeley,CO 80631 (970)353-6100 ext 3540 (970)304-6498 fax
Submit by Email
4A. AP Weld County Referral
CCJN y
August 21, 2015
The Weld County Department of Planning Services has received the following item for review:
Applicant: Tri-State Generation &Transmission, Inc. Case Number: USR15-0049
Please Reply By: September 18, 2015 Planner: Kim Ogle
Project: A Site Specific Development Plan and Use by Special Review Permit for a Major Facility of a
Public Utility or Public Agency (approximately 30.5 miles of transmission lines) and facility construction
laydown yards near the Greenhouse, Colfer, Rattlesnake Ridge and South Kersey substations
(consisting of two construction trailers, multiple storage containers and other associated equipment) in
the A(Agricultural)Zone District(Tri-State Generation and Transmission, Inc.)
Location:APPROXIMATELY 0.5 MILES SOUTH OF CR 52; WEST OF AND ADJACENT TO CR 51;
APPROXIMATELY 0.5 MILES NORTH OF CR 14 AND EAST OF AND ADJACENT TO CR 31
Parcel Number: Multiple Parcels
Legal: Commencing at the Greenhouse substation located within the Corporate City Limits of Fort
Lupton in Section 34, T2N, R66W then crossing Sections 35, 26, and 25, T2N, R66W and then into
Sections 30, 29, 28, 27, and 22, T2N, R65W into the Colfer Substation. Commencing at the Colfer
substation heading into Section 22, T2N, R65W and crossing Sections 15, 10, 11, and 2, T2N, R65W
and entering Section 35, T3N, R65 and crossing into Section 36 and 25, T3N, R65W into the
Rattlesnake Ridge substation. From Section 26, T3N, R65W the transmission line enters Section 30,
T3N, R64W then crosses through Sections 30, 19, 18, 7 and 6, T3N, R64W and into Section 1, T3N,
R65W then crossing Sections 36 and 25, T4N, R65W then entering Section 30, T4N, R64W and
crossing Sections 30, 24, and 14, T4N, R65W into the Milton substation. Commencing at the Milton
substation entering Section 18, T4N, R64W and crossing Sections 7 and 6, T4N, R65W and then
entering Section 32, T5N, R65W and terminating at the South Kersey substation.
The application is submitted to you for review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding the application, please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
n We have reviewed the request and find that it does/does not comply with our Comprehensive
Plan because:
4 We have reviewed the request and find no conflicts with our interests.
See attached letter.
Signature Thomas Beach, Fire Chief Date 8/21/2015
Agency Southeast Weld Fire Protection District
Weld County Planning Dept. 1555 N 17th Ave,Greeley,CO.60631 (970)353-6100 ext.3540 (970)304-6498 fax
From: Kristine Ranslem
To: Kim Oale
Subject: FW: U5R15-0049 Referral
Date: Tuesday,August 25,2015 10:12:39 AM
FYI — please see below. Thanks!
/c r[st%vt,e 7z2wstewt
Planning Technician
Weld County Planning Department
1555 N 17th Ave
Greeley, CO 80631
(970) 353-6100 ext. 3519
kranslem@co.weld.co.us
re = L
From: Travis Homyak [mailto:thomyak@pgfpd.org]
Sent: Tuesday, August 25, 201.5 10:01 AM
To: Kristine Ranslem
Subject: RE: USR15-0049 Referral
Just a FYI this is going to be in LaSalle Fire Protection District I believe. IT is just outside
our border so that's why I am thinking that it is theirs.
Travis Homyak, CFEI, FIT, INVF (T)
Fire Prevention/Fire Investigator
Platteville-Gilcrest Fire Protection District
thomyak@pgfpd.org
Work: 970-785-2232 ext. 106
Cell: 97O-371-7917
"When a man becomes a fireman his greatest act of bravery has been accomplished. What
he does after that is all in the line of work. - —Edward F. Croker
From: Kristine Ranslem [mailto:kranslem(cdco.wcld.co.us]
Sent: Tuesday, August 25, 2O15 9:47 AM
To: Bethany Pascoe <bpascoc(ccco.wcld.co.us>; Roy Rudisill <rrudisill(wco.wcld.co.us>;
Alan Caldwell <acaldwell(wco.weld.co.us>; sands billings�Dstate co us; Jeff Behncke
<Jcff.bchnckc(wstatc.co.us>; dcnisc.kostiv(custatc.co.us; larry.rogstad(cvstatc.co.us;
chris.mettenbrink(a)state.co.us; 'thodges@fortlupton.org' <thodges(a fortlupton.org>;
'mpena@fortlupton.org' <mpcna(cufortlupton.org>; 'Alyssa Knutson'
<AKnutson(cufortlupton org>; clerk(cuhudsoncolorado.org; jpiper@ci.kersey.co.us'
<jpiper(mci.kersev.co.us>; barbb(a(dgmllc.com; ptittany(aiftluptontire.com;
rweigum(a ttluptonfirc.com; mdittman(wftluptonfire.com; chief(cuhudsonfirccolo.corn,
dmycrs(a plattcvallcyfirc.org, hschacfcr(ci(plattcvalleytire.org; hhulscy(a lasallctire.com;
sewfpd3961@gmail.com; Travis Homyak <thomyak(a pgfpd.org>; mossd(wwcld-
rc1.k12.co.us; lisaclark(o)rc3j.com; Ifrccmycr(cupvs.kl2.co.us; Richard Hawley
<RHawlcy(cuftlupton.kl 2.co.us>; wsarazen(cuftlupton.k 1 2.co.us;jhoag@ftlupton.k12.co.us;
kandcc.noursc(awgcd.org; cindv.cinspahr(a;co.usda.gov; molly(trfarmcrsres.com;
scott(a farmersres.com; ldhagenlocic( dcpmidstream.com; binylmainobleenergyinc.com;
lcslcy.hall(cccncana.com; lois.hall(mcncana.com; Idavis(a;noblccncrgyinc.com;
jakc.billadcau(canadarko.com; donna.gcorge(c(xcelenergy.com
Cc: Kim Ogle <koglc(a(co.weld.co.us>
Subject: FW: USR15-0049 Referral
Please see attached addendum to application for USR15-0049 Tri-State.
If you have any questions, please let us know. Thank you!
Kristine Ranslem
Planning Technician
Weld County Planning Department
1555 N 17th Ave
Greeley, CO 80631
(970) 353-6100 ext. 3519
kianslem(cuco.weld.co.us
),t ra = h
rl
Confidentiality Notice: This electronic transmission and any attached documents or other
writings are intended only for the person or entity to which it is addressed and may contain
information that is privileged, confidential or otherwise protected from disclosure. If you
have received this communication in error, please immediately notify sender by return e-mail
and destroy the communication. Any disclosure, copying, distribution or the taking of any
action concerning the contents of this communication or any attachments by anyone other
than the named recipient is strictly prohibited.
From: Kristine Ranslem
Sent: Friday, August 21, 2015 11:25 AM
To: Bethany Pascoe; Roy Rudisill; Alan Caldwell; 'sandra.billings@state.co.us;
jeffcouch7(a>comcast.net; 'denise.kostiv@state.co.us'; larry.rogstad@state.co.us; 'Mettenbrink
- DNR, Chris'; 'thodges@fortlupton.org; 'mpena@fortlupton.org; 'Alyssa Knutson';
'clerk@hudsoncolorado.org; 'jpiper@ci.kersey.co.us; barbb@dgmllc.com;
ptiffany(aiftluptontirc.com; 'rweigum@ftluptonfire.com; 'mdittman tuftluptonfire.com;
'chiefo7hudsonfirecolo.com; 'dmyers@plattevalleyfire.org; bschaefer(c)plattevalleyfire.org;
'bhulsey@lasallefire.com; 'sewfpd3961 @gmail.com; 'THOMYAK@PGFPD.ORG';
'mossd@weld-rel.kl2.co.us; lisaclark@re3j.com; 'lfreemyer cupvs.kl2.co.us; 'Richard
Hawley'; 'wsarazen@ftlupton.kl2.co.us; 'jhoag@ftlupton.kl2.co.us;
'kandee.nourse@wgcd.org'; 'cindy.einspahr@co.usda.gov; 'molly@farmersres.com;
'scott@fannersres.com; 'ldhagenlock@dcpmidstream.com; 'bmyhr@nobleenergyinc.com;
'ldavis@nobleenergyinc.com'; 'mike_schween@eogressources.com;
jake.billadeau@anadarko.com; 'donna.george@xcelenergy.com'
Cc: Kim Ogle
Subject: USR15-0049 Referral
We have received a case (USR15-0049) in which we ask that you review the material and
send a referral to us. Please click on the link below and select "Search Applications" under
the Planning tab. Input the record number and scroll down to Attachments. Click on the
arrow next to the Attachments and you will find all the information including the referral
form to submit back to us. The following is a quick link to the case search:
https://acccla-aca.co.wcld.co.us/citizcnacccss/.
If you have any questions, please don't hesitate to contact me at the number below. Thank
you!
Kristine Ranslem
Planning Technician
Weld County Planning Department
1555 N 17th Ave
Greeley, CO 80631
(970) 353-6100 ext. 3519
kranslcm(cuco.wcld.co.us
1 r h
rl
Confidentiality Notice: This electronic transmission and any attached documents or other
writings are intended only for the person or entity to which it is addressed and may contain
information that is privileged, confidential or otherwise protected from disclosure. If you
have received this communication in error, please immediately notify sender by return e-mail
and destroy the communication. Any disclosure, copying, distribution or the taking of any
action concerning the contents of this communication or any attachments by anyone other
than the named recipient is strictly prohibited.
Submit by Email
4A. AP Weld County Referral
CCJN y
August 21, 2015
The Weld County Department of Planning Services has received the following item for review:
Applicant: Tri-State Generation &Transmission, Inc. Case Number: USR15-0049
Please Reply By: September 18, 2015 Planner: Kim Ogle
Project: A Site Specific Development Plan and Use by Special Review Permit for a Major Facility of a
Public Utility or Public Agency (approximately 30.5 miles of transmission lines) and facility construction
laydown yards near the Greenhouse, Colfer, Rattlesnake Ridge and South Kersey substations
(consisting of two construction trailers, multiple storage containers and other associated equipment) in
the A(Agricultural)Zone District(Tri-State Generation and Transmission, Inc.)
Location:APPROXIMATELY 0.5 MILES SOUTH OF CR 52; WEST OF AND ADJACENT TO CR 51;
APPROXIMATELY 0.5 MILES NORTH OF CR 14 AND EAST OF AND ADJACENT TO CR 31
Parcel Number: Multiple Parcels
Legal: Commencing at the Greenhouse substation located within the Corporate City Limits of Fort
Lupton in Section 34, T2N, R66W then crossing Sections 35, 26, and 25, T2N, R66W and then into
Sections 30, 29, 28, 27, and 22, T2N, R65W into the Colfer Substation. Commencing at the Colfer
substation heading into Section 22, T2N, R65W and crossing Sections 15, 10, 11, and 2, T2N, R65W
and entering Section 35, T3N, R65 and crossing into Section 36 and 25, T3N, R65W into the
Rattlesnake Ridge substation. From Section 26, T3N, R65W the transmission line enters Section 30,
T3N, R64W then crosses through Sections 30, 19, 18, 7 and 6, T3N, R64W and into Section 1, T3N,
R65W then crossing Sections 36 and 25, T4N, R65W then entering Section 30, T4N, R64W and
crossing Sections 30, 24, and 14, T4N, R65W into the Milton substation. Commencing at the Milton
substation entering Section 18, T4N, R64W and crossing Sections 7 and 6, T4N, R65W and then
entering Section 32, T5N, R65W and terminating at the South Kersey substation.
The application is submitted to you for review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding the application, please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
n We have reviewed the request and find that it does/does not comply with our Comprehensive
Plan because:
4 We have reviewed the request and find no conflicts with our interests.
See attached letter.
Signature Randall S.Weigum Date 8/27/2015
Agency Fort Lupton Fire Protection District
Weld County Planning Dept. 1555 N 17th Ave,Greeley,CO.60631 (970)353-6100 ext.3540 (970)304-6498 fax
Submit by Email
4A. AP Weld County Referral
CCJN y
August 21, 2015
The Weld County Department of Planning Services has received the following item for review:
Applicant: Tri-State Generation &Transmission, Inc. Case Number: USR15-0049
Please Reply By: September 18, 2015 Planner: Kim Ogle
Project: A Site Specific Development Plan and Use by Special Review Permit for a Major Facility of a
Public Utility or Public Agency (approximately 30.5 miles of transmission lines) and facility construction
laydown yards near the Greenhouse, Colfer, Rattlesnake Ridge and South Kersey substations
(consisting of two construction trailers, multiple storage containers and other associated equipment) in
the A(Agricultural)Zone District(Tri-State Generation and Transmission, Inc.)
Location:APPROXIMATELY 0.5 MILES SOUTH OF CR 52; WEST OF AND ADJACENT TO CR 51;
APPROXIMATELY 0.5 MILES NORTH OF CR 14 AND EAST OF AND ADJACENT TO CR 31
Parcel Number: Multiple Parcels
Legal: Commencing at the Greenhouse substation located within the Corporate City Limits of Fort
Lupton in Section 34, T2N, R66W then crossing Sections 35, 26, and 25, T2N, R66W and then into
Sections 30, 29, 28, 27, and 22, T2N, R65W into the Colfer Substation. Commencing at the Colfer
substation heading into Section 22, T2N, R65W and crossing Sections 15, 10, 11, and 2, T2N, R65W
and entering Section 35, T3N, R65 and crossing into Section 36 and 25, T3N, R65W into the
Rattlesnake Ridge substation. From Section 26, T3N, R65W the transmission line enters Section 30,
T3N, R64W then crosses through Sections 30, 19, 18, 7 and 6, T3N, R64W and into Section 1, T3N,
R65W then crossing Sections 36 and 25, T4N, R65W then entering Section 30, T4N, R64W and
crossing Sections 30, 24, and 14, T4N, R65W into the Milton substation. Commencing at the Milton
substation entering Section 18, T4N, R64W and crossing Sections 7 and 6, T4N, R65W and then
entering Section 32, T5N, R65W and terminating at the South Kersey substation.
The application is submitted to you for review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding the application, please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
n We have reviewed the request and find that it does/does not comply with our Comprehensive
Plan because:
4 We have reviewed the request and find no conflicts with our interests.
See attached letter.
Signature Jeff Behncke, Greeley South DWM Date 08/31/2015
Agency Colorado Parks and Wildlife
Weld County Planning Dept. 1555 N 17th Ave,Greeley,CO.60631 (970)353-6100 ext.3540 (970)304-6498 fax
Hello