Loading...
HomeMy WebLinkAbout20162408.tiffRESOLUTION RE: APPROVE WORK ORDER FORM AND CHANGE ORDER #2 FOR FLOOD REPAIRS EM-BR54/13A FOR DESIGN AND CONSTRUCTION ADMINISTRATION SERVICES FOR PERMANENT REPAIRS AND AUTHORIZE CHAIR TO SIGN - BOHANNAN HUSTON, INC. WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Work Order Form and Change Order #2 for Flood Repairs EM-BR54/13A for Design and Construction Administration Services for Permanent Repairs between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and Bohannan Huston, Inc., commencing June 28, 2016, with a completion date of October 31, 2016, and with further terms and conditions being as stated in said work order form and change order #2, and WHEREAS, after review, the Board deems it advisable to approve said work order form and change order #2, a copies of which are attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Work Order Form and Change Order #2 for Flood Repairs EM-BR54/13A for Design and Construction Administration Services for Permanent Repairs between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and Bohannan Huston, Inc., be, and hereby are, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said work order form and change order #2. ccFWCRW/et) 9/94/ tCc 2016-2408 EG0073 BC0045 WORK ORDER FORM AND CHANGE ORDER #2 FLOOD REPAIRS FOR EM-BR54/13A FOR DESIGN AND CONSTRUCTION ADMINISTRATION SERVICES FOR PERMANENT REPAIRS - BOHANNAN HUSTON, INC. PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 27th day of July, A.D., 2016, nunc pro tunc June 28, 2016. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: 4.+HJ jilt" Weld County Clerk to the Board BY Dep ty Clerk to the Board ARP -ROVED Cou ty Attorney / Date of signature: g/11/i, Mike Freeman, C air Sean P. Conway, Piro --Tern O0, A. Cozad / 7 2 Kirkmeyer ve Moreno 2016-2408 EG0073 BC0045 c,orrl-rotl cr%CQc-t MEMORANDUM TY ' C O u N - -. TO: Clerk to the Board DATE: July 22, 2016 FROM: Richard White, Public Works Department SUBJECT: Agenda Item RE: Doc #2015-1242 Bridge 54/13A Work Order with Bohannan Huston, Inc. for Replacement of Bridge 54/13A for design of • permanent flood recovery repairs. 2016-2408 ca o 73 �c0O(45 BOARD OF COUNTY COMMISSIONERS REVIEW/WORK SESSION REQUEST RE: Thompson River Corridor Flood Recovery Project, Design Consultant Contract Modification regarding Bridge 54/13A DEPARTMENT: PUBLIC WORKS DATE: 06/28/2016 PERSON(S) REQUESTING: Richard White, Don Dunker Brief description of the problem/issue: The Public Works Department entered into a contract with Bohanan Huston Inc (BHI) for design of permanent flood recovery repairs in August of 2014. BHI has satisfactorily completed design work for the Thompson (FEMA) Sites Flood Recovery Project. At this time, BHI is doing design work for flood recovery repairs for Bridge 54/13A, the remaining Thompson River Corridor site, which is an FHWA site. Because Bridge 54/13A is an FHWA site, due to the classification of WCR 54 as an arterial roadway, the more stringent design, review and acceptance process by CDOT is required. Weld County previously received a scope and fee proposal from BHI which included Bridge 54/13A. At that time, in August of last year, the estimated design cost for Bridge 54/13A was $51,223.20. Since that time, the County has met with CDOT and they have revised the Environmental Clearance requirements for this site. Based on this direction from FHWA and CDOT, BHI has revised their scope and fee to cover the additional work which was not in the original scope & fee. Due to the more stringent Environmental Clearance process by CDOT, the cost estimates are reasonable for this work. The additional cost will be requested by CDOT from FHWA to be added to the amount to be reimbursed to the County, this was done in the latest revision of the DDIR, signed by FHWA May 19, 2016. Public Works recommends a change order to the contract already in place with BHI to include this work, in the amount of $17,645.00 the new contract total is $72,672.00. See attached change order and work order forms. Mike Freeman, Chair Approve Schedule Recommendation Work Session Barbara Kirkmeyer Sean P. Conway Julie Cozad Steve Moreno Attachments: Revised BHI scope/fee Comments WORK ORDER FORM (FLOOD REPAIRS) PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND BOHANNAN HUSTON, INC. DATED: June 28, 2016 Work Order Number: B1-11- 54/13A-2016 Project Title: EM-BR54/I3A Design & Coust. Admin. Services (Permanent Repairs) Commencement Date: June 28, 2016 Completion Date: Octobber 31, 2016 Limitations on compensation: Not to exceed $17,645.00 Professional agrees to perform the services Work, Exhibit B — Cost/Fee Breakdown, identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties, dated Weld Count January 13, 2014. In the event of a conflict between or ambiguity in the terms of the By: Professional Services Agreement and this work Project Manager order (including the attached forms) the Date: Professional Services Agreement shall control. Bohannan Elusion, Inc. By: Title: PreF.idee S VP Date: /- ry Exhibit C — Proposed Schedule. County Engineer Date: 0 7/,2.//k By: Director of Date: The attached forms are hereby accepted and By: incorporated herein: Exhibit A — Scope of Mike Freeman, BOCC Chair orks ATTES lerk to the Board my Clerk to tBoard 11 "IS O7„O/‘ - � � CHANGE ORDER NO.2 Date: June 28.2016 Project: BRIDGE 54/13A DESIGN SERVICES f EM-BR34113A) Owner: Weld County. Colorado Consultant: BHI.Inc. The following change is hereby made to the Contract Documents: The original scope of services related to the Agreement for Professional Services dated January 13, 2014 needs to be modified. In order to keep the design moving, BI -II was directed to do additional work that was not part of the original scope of work. Additional Environmental and Right- of- Way work associated with the preparation of Right -of -Way plans. PW staff is planning to have the construction bid set ready by October, 2016. Details of the scope of services are described in the attached documents provided by the consultant: • Scope of Work • Fee Estimate CHANGE TO CONTRACT PRICE: Original Contract Price: $51.232.00 Current Contract Price adjusted by previous Change Order: $3,745:00 The Contract Price due to this Change Order will be increased by: $17,645.00 The new Contract Price, including this Change Order, will be: $72,672.00 CHANGE TO CONTRACT TIME: The Contract Time will be increased by 0 months. The date for completion of all Work will be: October 31.2016 RECOMMENDED: Project Manager: County Engineer: Don Dunker, P.E., APPROVALS: Consultant:; BHT. Inc. ,:v7 s# L ; Owner: ^�` LGe�•. Mike Freemen (BOCC Chair) Date: Date: UL 2 7 201& ao/G Bohannan Huston June 27, 2016 Mr. Richard White Weld County Public Works Department 1111 H Street; PO Box 758 Greeley, CO 80632-0758 Re: RFP#1300201 Engineering Services for 2013 Flood Recovery Design Services Work Orders Bridge 54/13A - Work Order Phase 25 Supplemental Services #2 Dear Sir - Meridian One 9785 Maroon Circle Suite 140 Englewood, CO 80112-5928 www.bhinc.com voice: 303.799.5103 facsimile: 303.799.5104 toll free: 877.799.5103 In association with the flood recovery project noted above; Bohannan Huston, Inc. (BHI) will provide the following services in order to complete the project design and address comments from CDOT review comments provided at a May 3, 2016 FOR meeting, and subsequent meetings with the design team and follow up conversations with CDOT. (BHI) will coordinate with project environmental sub -consultant Darcy Tiglas to provide the required Environmental Individual Permit. Below is a summary of the supplemental scope items and fees for these services: Environmental Individual Permit Darcy Tiglas $ 3,000.00 Environmental Coordination BHI $ 435.00 Construction Easement Legal Documents BHI Survey $ 3,500.00 Traffic Control/Detour Plans BHI $ 2,180.00 Final Design Plans BHI $ 8,530.00 Total... $17,645.00 These total fee will be charged on an hourly basis per our original agreement for these services. See attached Exhibit 'A' for additional information. Jared M. Lee, P.E., will be the professional engineer project manager with project oversight and can be reached at (303) 799-5103 or flee@bhinc.com. We look forward to working with you on this project and ask that if you have any questions on scope, level of effort, or schedule to please call us to discuss. We want to ensure that your expectations are met in the most efficient and effective way possible. Engineering • Spatial Data Advanced Technologies • Thank you again for the opportunity to submit these materials. Should you have any questions, please do not hesitate to contact us. Jared M. Lee, P.E., LEEDAP Senior Project Manager JML/LLD Enclosures EXHIBIT A Bohannan . Huston HOURLY BREAKDOWN AND COST ESTIMATE WELD COUNTY FLOOD REPAIRS FHWA SITE 1: EM-BR54-13A '°" `„ CHANGE ORDER #2 27 -Jun -16 '" a M r $ 435.00 $ 435.00 m N $ 1,860.00 $ 3,500.00 n n eH M $ 1,575.00 $ 1,540.00 $ 2,570.00 $ 1,825.00 $ 1,020.00 0 n 1 m N N Direct Costs I Mileage / Subs iO O LLa^] H e 13.5 12.0 21.0 I- y m m m 17.0 $ 125.00 o Ng to o # fq $ 135.00 e n 7.0 Construction Inspector iri I-- m N m N O 5.0 22.5 E3 N N 3.0 N :fim N 47.5 E5 W f .- 2 N N 2.0. 4.0 n 'Anna Rate BASIC SERVICES Environmental Individual Permit Subconsultant - Darcy Tiglas Environmental Coordination Coordination 1 Construction Easement Legal Documents Revise ROW Maps Legal Descriptions Traffic Control/Detour Plans Detour Plan Sheet Traffic Control Details Final Design Plans Bendwey Weir Jusification Estimate and Quantities Address FOR Comments Additional Details Meetings 8, Coordination _ .... ._ N IV CO n V< a NNO m N N Hello