Dear Sir or Madam:
On December 16, 2015, the Air Pollution Control Division will begin a 30 -day public notice period for
Heartland Biogas, LLC - Heartland Biogas. A copy of this public notice and the public comment
packet are enclosed.
Thank you for assisting the Division by posting a copy of this public comment packet in your office.
Public copies of these documents are required by Colorado Air Quality Control Commission
regulations. The packet must be available for public inspection for a period of thirty (30) days from
the beginning of the public notice period. Please send any comment regarding this public notice to
the address below.
Colorado Dept. of Public Health Et Environment
APCD-SS-B1
4300 Cherry Creek Drive South
Denver, Colorado 80246-1530
Attention: Clara Gonzales
Regards,
Clara Gonzales
Public Notice Coordinator
Stationary Sources Program
Air Pollution Control Division
Enclosure
iNittp tai
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
John W. Hickenlooper, Governor I Larry Wolk, MD, MSPH, Executive Director and Chief Medical Officer
2016-0032
Air Pollution Control Division
Notice of a Proposed Project or Activity Warranting Public
Comment
Website Title: Heartland Biogas, LLC - Heartland Biogas - Weld County
Notice Period Begins: December 16, 2015
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Heartland Biogas, LLC
Facility: Heartland Biogas
Manure anaerobic digestion facility
SE 1/4 of Sec 25, T4N, R65W of the 6th PM
Weld County
The proposed project or activity is as follows: The applicant is proposing to increase production of methane
obtained from processing manure in an anaerobic digestion process and adding additional biofilters to
control hydrogen sulfide (H2S) emissions.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 12WE3172 have been
filed with the Weld County Clerk's office. A copy of the draft permit and the Division's analysis are
available on the Division's website at https://www.colorado.gov/pacific/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Any such comment must be submitted in writing to the following addressee:
Michael Harris
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
cdphe.commentsapcd@state.co.us
COLORADO
1 I A
DRAFT
STATE OF COLORADO
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT
AIR POLLUTION CONTROL DIVISION
TELEPHONE: (303) 692-3150
CONSTRUCTION PERMIT
PERMIT NUMBER:
DATE ISSUED:
ISSUED TO:
12WE3172
Heartland Biogas, LLC
Issuance 2
THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:
Anaerobic Digester facility, located in SE quarter of Section 25 T4N, R65W, in Weld
County, Colorado.
THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING:
Facility
Equipment
ID
AIRS
Point
Description
Boilers
001
Two (2) Clever Brooks Model LFX Fuel Series 700 size 1000 boilers
each rated at 12 mm btu/hr
Serial Numbers: 010070-1-1 and 010070-1-2
Fueled by natural gas
Subject to NSPS Subpart Dc
Anaerobic
Digester
002
Anaerobic Digester consisting of
• Six (6) -1.7 million gallon tanks
• Covered anaerobic lagoon (CAL) — volume = 6 million gallons
• Substrate storage tanks
• Manure receiving pit
• Water storage ponds
• Solids separation centrifuge building and storage pit
• 3 Biorem Biotrickling filter units connected in series.
• AwiFLEX Cool process analysis system — used to monitor H2S
emissions for demonstrating compliance with the emission H2S
emissions limits.
• Biogas Upgrading System
• Biogas product compressors and gas pipeline interconnection
The Anaerobic Digester process accepts manure and substrate to
produce a raw bio gas containing methane, hydrogen sulfide and carbon
dioxide. The biogas is processed through the Biogas Upgrading System
which extracts methane for pipeline injection and a Biorem, H2S control
technology system. Hydrogen sulfide emissions are controlled by three
Biorem biotrickling filters connected in series.
AIRS ID: 12319A94/
Page 1 of 14
Version 2009-1
Heartland Biogas, LLC
Permit Number 12WE3172
Issuance 2
DRAFT
ublic Health and Environment
Air Pollution Control Division
Facility
Equipment
ID
AIRS
Point
Description
Flare
003
John Zink Model ZTOF Biogas Flare, 13' diameter, 70' high (treats raw
gas from anaerobic digester)
Design basis 229 MM BTU/hr, maximum rated use of 201 MM BTU/hour
Serial Number TBD
Flare used whenever raw gas produced in the digester is not sent to the
pipeline for shipment.
Fugitive
Dust
005
Fugitive Dust emissions fr traffic
THIS PERMIT IS GRANTED SUBJECT TO AL
AIR QUALITY CONTROL COMMISSION AND T
CONTROL ACT C.R.S. (25-7-101 , TO
INCLUDED IN THIS DOCUMENT AND E FOLL
REQUIREMENTS TO SE ► IFY
1. YOU MUST notify the Air Polluti
after commencem = • operation
(NOS) form to . The Not
https://www. s • • .gov • c/cdp
of startup of fitted • - is a viol = AQCC R
III.G.1 and can n the w ion of th - rmit.
2.
ES AND REGULA OF THE COLORADO
LORADO AIR POLL PREVENTION AND
SE G - L TE - ' D CONDITIONS
TERMS AN ' DITIONS:
be
certifi
dred
ton. It is th
nstrate comp
y the Division.
from the Di
(Reference:
3. Within one
Digester, the
permit and subm
Regulation Number
L APPROVAL
n) no later than fifteen days
n ! a Noti � • f tartu
be downloaded online at
ces. Failure to notify the Division
ation Number 3, Part B, Section
mencement of operation of the Anaerobic
condit • r in • n this permit shall be demonstrated to the
nsibilcertify compliance with the conditions. Failure to
days may ult in revocation of the permit or enforcement
how to certify compliance was mailed with the permit or can
https://www.colorado.gov/pacific/cdphe/air-permit-self-
ulation ber 3, Part B, III.G.2).
days (180) after commencement of operation of the Anaerobic
all initial compliance testing and sampling as required in this
to the Division as part of the self -certification process. (Reference:
B, Section III.E.)
4. The owner or operator shall develop a revised operating and maintenance (O&M) plan to include
the equipment as listed in this permit and a recordkeeping format that outlines how the applicant
will maintain compliance on an ongoing basis with the requirements of this permit. Compliance
with the O&M plan shall commence at startup of the Anaerobic Digester. Within one
hundred and eighty days (180) after commencement of operation, the owner or operator shall
submit the O&M plan to the Division. -Failure to submit an acceptable operating and maintenance
plan could result in revocation of the permit. (Reference: Regulation Number 3, Part B, III.E.)
5. Within thirty days (30) after commencement of operation of the Anaerobic Digester, the AIRS ID
number shall be marked on the subject equipment for ease of identification. (Reference:
Regulation Number 3, Part B, III.E.) (State only enforceable)
AIRS ID: 123/9A94
Page 2of14
Heartland Biogas, LLC
Permit Number 12WE3172
Issuance 2
DRAFT
'ublic Health and Environment
Air Pollution Control Division
6. The manufacturer, model number and serial number of the subject equipment shall be provided
to the Division within one hundred and eighty days (180) after commencement of operation of the
Anaerobic Digester (Reference: Regulation Number 3, Part B, III.E.)
EMISSION LIMITATIONS AND RECORDS
7. Emissions of air pollutants shall not exceed the following lira
emission factors included in the Notes to Permit Holder s
the actual emission rates shall be maintained by the ap
for inspection upon request. (Reference: Regulation
Quarterly Limits:
Facility
Equipment ID
AIRS
Point
PM PKo
2 (two) Boilers
001
Anaerobic
Digester
002
1 (one) flare
Fugitive
emissions
Fugitive dust
TOTA
003
05
0.13 0.13 0.1
2.7
ons (as calculated using the
f this permit). Annual records of
and made available to the Division
, Part B, Section II.A.4)
ons per Quarte
NO„ SO2
1.75
i3
VO
0.66
Emission
type
CO
5.3
H2S
Point
2.14
Point
8.5
0.74
0.09
Point
0.003
Fugitive
Fugitive
8.6
1.4
6.3
2.24
Facility
Equipment ID
AIRS
Point
Tons per Year
Emission
type
PMK°
PM2.5
NO„
SO2
VOC
CO
HZS
2 (two) Boilers
.5
0.5
0.5
3.1
0.1
2.63
3.9
----
Point
Anaerobic
Digester
002
----
----
----
----
---
----
----
8.56
Point
1 (one) flare
003
---
----
---
3.9
33.9
2.96
21.2
0.36
Point
Fugitive
emissions
004
---
---
---
---
---
---
---
0.01
Fugitive
Fugitive dust
005
39.8
10.74
1.07
---
--
---
--
--
Fugitive
TOTAL
Point
0.5
0.5
0.5
7.0
34
5.6
25.1
8.93
Fugitive
39.8
10.74
1.07
----
----
----
----
----
AIRS ID: 12319A94
Page 3 of 14
Heartland,Biogas, LLC
Permit Number 12WE3172
Issuance 2
DRAFT
'ublic Health and Environment
Air Pollution Control Division
See `Notes to Permit Holder #3' for information on emission factors and methods used to
calculate limits.
The fugitive dust emission limits are based on the production rates listed above. The Division
assumes that the fugitive emission levels are being met if the control measures stated in the
approved control plan are followed and the stated process rates are not exceeded.
8. The particulate emission control measures listed on Attachment A (as approved by the Division)
shall be applied to the particulate emission producing sources as required by Regulation Number
1, Section III.D.1.b.
9. The emission points in the table below shall be maintai
equipment as listed. The emission control devices s
renewed, and operated as per the manufactures'
performance of the devices. (Reference: Reg • mber
Facility Equipment ID
AIRS
Point
C
Digester
Digester
002
PROCESS LIMITATIO AND RE
10. This source s
operational
by the applican
Regulation 3, Part
P.
Bio'
It
operated with the control
ed, monitored, maintained /
•• ns, and ensure the satisfactory
B, Section III.E.)
C
Poll
H2S
Fla = H2S
tion, processing and/or
rocess rate shall be maintained
n for inspection upon request. (Reference:
SkyP
ent ID
P.
Parameter
Annual Limit
Quarterly Limit
2 (tw • • Hers
001
onsu of natural gas
229 MM scf
57.3 MM scf
Anaerobic
Digester
, 2
• uction of raw biogas
2,738 MM scf
684.5 MM scf
uction of methane
of raw biogas volume)
1,834 MM scf
458.5 MM scf
anure feed
73 MM gallons
18.25 MM gallons
Substrate Feed (1)
172 MM gallons
43 MM gallons
1 (One) Flare
003
Combustion of raw biogas
180 MM scf (2)
45 MM scf
(1) - a list of acceptable substrate materials is in Attachment B
(2) — based on process throughput of 7.5 mmscf/day and 24 days of operation
AIRS ID: 123/9A94
Page 4 of 14
Heartland Biogas, LLC
Permit Number 12WE3172
Issuance 2
DRAFT
ublic Health and Environment
Air Pollution Control Division
STATE AND FEDERAL REGULATORY REQUIREMENTS
11. Visible emissions shall not exceed twenty percent (20%) opacity during normal operation of the
source. During periods of startup, process modification, or adjustment of control equipment
visible emissions shall not exceed 30% opacity for more than six minutes in any sixty consecutive
minutes. Opacity shall be determined using EPA Method 9. (Reference: Regulation Number 1,
Section II.A.1. & 4.)
12. This source is subject to the odor requirements of Regulation/Number 2. (State only enforceable)
13. The boilers (AIRS ID 001) are subject to the New Sourc rmance Standards requirements of
Regulation Number 6, Part A , Subpart Dc , Standard , ormance for Small Industrial —
Commercial — Institutional Steam Generating Units:' t not limited to, the following:
a. §60.40c Reporting and record kee quirements
(a). The owner or operator of each d facility shall s _ notification of the date of
construction or reconstruction an al startup, as provider ,60.7 of this part. This
notification shall include:
(1) The design heat input ca of the ..'W ted facility *entification of
fuels to be combusted in the a
ty factor at owner or operator icipates
ed on all fu- ` -d and based on each
(3) The annua
operating the affected
individual fuel fired.
14. The following requirements of Regu
apply:
a.
6
all times,
ontrol e
op„ ding
mini •
ainte�.
ivisi
o• a tions,
of th -. v , rce.
40 CF11
No article,
which wou
cealr
roce
art A, General Provisions,
uding pe art -up, own, and malfunction, the facility
ment sha ; yy the extent practicable, be maintained and
ner consi with good air pollution control practices for
eterm on of whether or not acceptable operating and
used will be based on information available to
ich may but is not limited to, monitoring results, opacity
ew of oper' g and maintenance procedures, and inspection
ence: Regulation Number 6, Part A. General Provisions from
chine, equipment or process shall be used to conceal an emission
therwise constitute a violation of an applicable standard. Such
ncludes, but is not limited to, the use of gaseous diluents to
pliance with an opacity standard or with a standard which is based
on _: centration of a pollutant in the gases discharged to the atmosphere.
(§ 60."x)
c. Written notification of construction and initial startup dates shall be submitted to
the Division as required under § 60.7.
d. Records of startups, shutdowns, and malfunctions shall be maintained, as
required under § 60.7
15. This source is located in an ozone non -attainment or attainment -maintenance area and subject to
the Reasonably Available Control Technology (RACT) requirements of Regulation Number 3,
Part B, III.D.2.b. RACT was determined to be no control due to the high cost per ton of pollutant
removed.
AIRS ID: 123/9A94
Page 5 of 14
Heartland Biogas; LLC
Permit Number 12WE3172,
Issuance 2
DRAFT
'ublic Health and Environment
Air Pollution Control Division
OPERATING & MAINTENANCE REQUIREMENTS
16. The owner or operator shall develop a revised operating and maintenance (O&M) plan to include
the equipment as listed in this permit and a recordkeeping format that outlines how the applicant
will maintain compliance on an ongoing basis with the requirements of this permit. Compliance
with the O&M plan shall -commence at startup of the Anaerobic Digestsr.`Within one
hundred and eighty days (180) after commencement of operation of the Anaerobic Digester, the
owner or operator shall submit the O&M plan to the Division. allure to submit an acceptable
operating and maintenance plan could result in revocation permit. (Reference: Regulation
Number 3, Part B, III.E.)
COMPLIANCE TESTING AND SAMPLING
initial Testina Requirements
17. Within 180 days after issuance of this pe e owner or operator s
compliance with Condition 11, using EPA ' 9 to Mee ure opacity
003). The owner or operator of a flare shall u = _ - od 9 in
Part 60 to demonstrate complia . - - with the o., of the applica
observation period shall be 1 • uration. (AQ a fation Number 1,
18. Within 180 days after issuance
on the digester/scrubber/ biofilter (
listed bebw in ord = • - onstrate
permit condition ill last fo
emission D
pas will talc
accordance with
and shall be subm
the result
by the all
3, Part B.,
emonstrate
flare (AIRS point
A of 40 CFR
bpart. The
on II.A.5)
source i • pliance test shall be conducted
@asu = emission rate for the pollutant
(H2S) emission limit in
hours to measure the
lin, incoming aas and the treated tail
win a' ---t. The test protocol must be in
ution Control Division Compliance Test Manual
nd approval at least thirty (30) days prior to
out prior approval from the Division. Any
a monthly or annual emission limitation shall
nnual averaging time by multiplying the test
urs for that averaging time (Reference: Regulation
using EPA approved methods.
19. A second complia all be conducted on the Digester/scrubber/ biofilter (AIRS ID 002) to
measure the emissio e(s) for the pollutants listed below in order to demonstrate compliance
with hydrogen sulfide (H2S) emission limit in permit condition 8 and overall reduction in H2S�in
permit condition 7.
If the initial compliance testing is completed during the period defined by December 1, through
February 28 of the following year, then the second test should be completed between the
following July 1 and September 30.
If the initial testing is completed between March 1 and November 30 then the second compliance
test shall be completed between the following December 1 and February 28 with a minimum _of 45
days between tests
AIRS ID: 123/9A94 Page 6 of 14
Heartland Biogas, LLC
Permit Number 12WE3172.
Issuance 2
DRAFT
'ublic Health and Environment
Air Pollution Control Division
The test will last for a minimum of 24 consecutive hours to measure an emission profile
throughout the operating day. Sampling of the incoming gas and the treated tail gas will take
place at a minimum of every 3 hours during the test. The test protocol must be in accordance
with the requirements of the Air Pollution Control Division Compliance Test Manual and shall be
submitted to the Division for review and approval at least thirty (30) days prior to testing. No
compliance test shall be conducted without prior approval from the Division. Any compliance test
conducted to show compliance with a monthly or annual emission limitation shall have the results
projected up to the monthly or annual averaging time by multiplying the test results by the
allowable number of operating hours for that averaging time (Reference: Regulation Number 3,
Part B., Section III.G.3)
Hydrogen Sulfide (H2S) using EPA a__ " methods.
20. The owner or operator shall install and operate an
system (or similar system with Division approv
emissions of hydrogen sulfide (H2S) from t
21.
EA
mbined wi
ter/H2S scrub
X Cool process analysis
s flow meter to measure
IRS 002).
Daily emissions of H2S shall be determined multiplying the volume ,. gas emitted to the
atmosphere times the average concentration' S in the tail gas for th- The calculated
emissions shall be made in lb of H2S emitted.
Monthly emissions of H2S shall i f mined by s
month.
Annual emissions of H2S shall be d
calendar year.
Records of the
Division inspec
II.A.4)
C) testin,
tinuous Monit
g the daily emissions for the calendar
nthly emissions for the
d annual s shal " ` intained and made available for
(Referen ference: Regulation Number 3, Part B, Section
alys4r dergo Quality Assurance/Quality Control
idelines on V of the "Guidelines for State -Only Required
the State o olorado" which can found at the link listed below:
https://www.colorado.gov/pacific/sites/default/files/AP Continuous-Monitoring-System-Guidelines.pdf
ADDITIONAL IREME
22. All previous very f, ermit are cancelled upon issuance of this permit.
23. Continuous fugitive lAWMonitoring shall be conducted ON SITE as listed below. The Heartland
facility shall install 7 continuous H2S monitors and alarms onsite for overall safety with the
following provisions:
• 3 monitors shall be located within the digester island containment area
• 2 monitors shall be located with the BUS (biogas upgrade system) and Biorem area
• 1 monitor shall be located near the CAL (covered lagoon)
• 1 monitor shall be located near the centrifuge building
• All monitors shall be set to alarm at 10 ppm H2S
• All personnel working near potential H2S sources shall wear individual H2S monitors set
to alarm at 10 ppm H2S.
AIRS ID: 123/9A94
Page 7 of 14
Heartland Biogas, LLC
Permit Number 12WE3172
Issuance 2
DRAFT
'ublic Health and Environment
Air Pollution Control Division
24. The terms, conditions and information contained in Attachments A and B are hereby incorporated
into this permit, and shall be enforceable as if fully set forth herein including, but not limited to,
emission point description, emission factor summary, emission limits or other limitations, controls,
and specific requirements. (Reference: Regulation Number 3, Part B III.E.)
25. This permit replaces the following permits and/or points, which are canceled upon startup of the
points in this permk. The owner or operator shall submit a cancelation notice for the following
equipment with the Notice of Startup for the corresponding new equipment in this permit.
Permit
Number
AIRS ID
Notes
13WE2980
12319A941008
Temporary Flare ink or equivalent rated at 650 scfm
13WE2981
123/9A94/009
Kanuka Gas C em
13WE2982
123/9A94/010
Temporary : •` = - • 4 mm BTU ,
13WE2983.XP
12319A941011
Tempora► , engine- - = 39 hp.
26. The AIRS ID number shall be marked on
(Reference: Regulation Number 3, Part B,
27. The particulate emission control i easures list
shall be applied to the particul
1, Section III.D.1.b.
28. A Revised Air Pollutant Emission
Part A, Section II.C.
a. Annu
For an
For volati
non-attainm
ange in act
er, above t
For
actua
level re
ignifica
t:
abo
ject equipment for • identification.
(State only enforceab
ion produc
A (as app
as required by
the Division)
ulation Number
Reference: Regulation Number 3,
occurs as follows:
r year, a change in actual emissions of five
ed on the last APEN submitted; or
unds (VO - nd nitrogen oxide (NOx) sources in an ozone
a less than 100 tons of VOC or nitrogen oxide per year, a
issio • ne ton per year or more or five percent, whichever is
vel repo • on the last APEN submitted; or
00 tons per year or more of a criteria pollutant, a change in
percent or 50 tonsrper year or more, whichever is less, above the
last APEN submitted; or
For sources e rtting any amount of lead, a change in actual emissions, above the level
reported on the last APEN submitted, of fifty (50) pounds of lead
For any non -criteria reportable pollutant:
If the emissions increase by 50% or five (5) tons per year, whichever is less, above the
level reported on the last APEN submitted to the Division.
b. Whenever there is a change in the owner or operator of any facility, process, or activity;
or
AIRS ID: 12319A94 Page 8 of 14
Heartland Biogas, LLC
Permit Number 12WE3172
Issuance 2
DRAFT
'ublic Health and Environment
Air Pollution Control Division
c. Whenever new control equipment is installed, or whenever a different type of control
equipment replaces an existing type of control equipment; or
d. Whenever a permit limitation must be modified; or
e. No later than 30 days before the existing APEN expires.
GENERAL TERMS AND CONDITIONS:
29. This permit and any attachments must be retained and
request. The permit may be reissued to a new owner
Number 3, Part B, Section II.B upon a request for tr
revised APEN and the required fee.
ailable for inspection upon
ivision as provided in Regulation
nership and the submittal of a
30. If this permit specifically states that final ap as been grant ; n the remainder of this
condition is not applicable. Otherwise, thee nce of this construct' rmit does not provide
"final" authority for this activity or operation is source. Final approves e permit must be
secured from the Division in writing in accor with th *visions of 14.5(12)(a) C.R.S.
and Regulation Number 3, Part B Section III.G. a cannot be gr until the
operation or activity commenc
respects with the conditions of
and approved by the Division, it
for obtaining final approval to o
Final Approval sectin of this per
31. This permit is i
the applicant
operation of the
applicant or applic
spe entified
By:
I Harris, P. E.
Permit Engineer
Permit Histo
Issuance
Da =
::-cription
Issuance 2
`�Fd� ��
This is =
rease biogas throughput, increase H2S concentration, increase bio
liters from 1 to 3 units and adjust emissions as needed. Change in
name/ownership from Heartland Renewable Energy to Heartland
Biogas LLC.
Issuance 1
May 20, 2013
Issued to Heartland Renewable Energy.
upon th
upon co
ance wit
valid onl
erenc
has been ve
Once self-
ritten doc
ted in
e Division as conf•'"ing in all
cation of all points has been reviewed
tation of such final approval. Details
quirements to Self -Certify for
eteness of information supplied by
e activi construction, installation and
information and with representations made by the
the equipment and operations or activity
gulation Number 3, Part B III. E.).
R K Hancock III, P.E.
Construction Permits Unit Supervisor
Notes to Permit Holder (as of date of permit issuance):
1) The production or raw material processing limits and emission limits contained in this permit are
based on the production/processing rates requested in the permit application. These limits may
be revised upon request of the permittee providing there is no exceedence of any specific
emission control regulation or any ambient air quality standard. A revised air pollution emission
AIRS ID: 123/9A94
Page 9 of 14
Heartland Biogas; LLC
Permit Number 12WE3172
Issuance 2
DRAFT
'ublic Health and Environment
Air Pollution Control Division
notice (APEN) and application form must be submitted with a request for a permit revision.
(Reference: Regulation Number3, Part B II.A.4)
2) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative
Defense Provision for Excess Emissions During Malfunctions. The permittee shall notify the
Division of any malfunction condition which causes a violation of any emission limit or limits
stated in this permit as soon as possible, but no later than noon of the next working day, followed
by written notice to the Division addressing all of the criteria set forth in Part II.E.1. of the
Common Provisions Regulation. See: https://www.colorado.gov/pacificcdphe/agcc-regs.
3) The emission levels contained in this permit are based olowing emission factors:
Point 001:2 (two) Boilers rated at 12 mm BTIUh
CAS
Pollutant
Etr •- - - tin
ibImm, • rce
led/controlled
PM/PM10/PM2.5
0.0048 Mfr
NO„
0.029 1 Mfr
SO2
— • _
7.6 e-4 =1
-
based on
••m)
ent in
CO
(011116,s_Mfr
VOC
i"
Point 002: Anae
con
m biotricldina filters
% capacity, Biorem biotrickling filter facility
Pollutant
w Emission Factors —
IbJMM Source
PM/PM,o/PM2.5
Smokeless flare
NO,
AP 42 table 13.5-1
SO2
0.5
Eng. Estimate based on H2S content in bio gas = 2350 ppm and
daily biogas throughput = 7.5 mm scf at 640 btu/scf and 98%
conversion to SO2
CO
0.37
AP 42 table 13.5-1
VOC
0.052
AP 42 ' table 13.5-1 (reduced by 63% to account for methane and
ethane (AP 42 table 13.5-2)
H2S
0.0061
Eng estimate based on 98% flare efficiency for converting H2S to
SO2
Raw Biogas throughput = 7.5 mm scf per day @ 64% CH4; 24 days of operation
Point 005: Vehicle traffic — fugitive dust
Emissions calculated using AP 42 Section 13.2
4) The following equipment/process is currently exempt from construction permitting requirements
AIRS ID: 123/9A94
Page 10 of 14
Heartland Biogas, LLC
Permit Number 12WE3172
Issuance 2
DRAFT
'ublic Health and Environment
Air Pollution Control Division
based on information provided by the operator for the Division's analysis:
AIRS ID
Facility ID
Description
Notes
123/9A941013
Permit
15WE0954.XP
Composting
Digester solids are treated
in a composting operation
as a finishing step (moisture
control)
APEN Required
Permit Exempt
VOC emissions =
48 tpy
Compost piles are
Permit Exempt by
Regulation 3, Part
B Section II.D.h
5) In accordance with C.R.S. 25-7-114.1, each Air Pollutant
with this permit is valid for a term of five years from the d
revised APEN shall be submitted no later than 30 days
refer to the most recent annual fee invoice to deter
emissions point associated with this permit. For an
call the Division at (303)-692-3150.
E ion Notice (APEN) associated
s received by the Division. A
the five-year term expires. Please
EN expiration date for each
arding a specific expiration date
6) The permit holder is required to pay fees f rocessing time fo permit. An invoice for
these fees will be issued after the permit i 'hued. The permit holder t pay the invoice within
30 days of receipt of the invoice. Failure to pathe invoice pill result in r tion of this permit
(Reference: Regulation Number 3, Part A, Sec l.B.)
7) This facility is classified as follows:
Applicable
Requiremert_
Operating Perm
Synth e
minor (H
a regulated pollutant)
PSD
nthinor
(H2S `
regulated pollutant)
NAB:s
8) aw tial to emit fo
ges in proces
ises (GHG) emissions as reported by the source and adjusted
Sour
CO2e tons/year
2 Boilers rs
13,600
Flare (
12,290
Scrubber
58,471
Digester tank fugitive
7
Equipment fugitive
1,085
Liquids/solids separation
5,456
Solids composting fugitive
353
Lagoon fugitive
1,714
Total
92,976
9) Greenhouse gas (GHG) emissions. This source may be subject to the GHG reporting
requirements under the 'Mandatory Greenhouse Gas Reporting Rule for EPA. (See — 40CFR
Part 98 for more information.)
AIRS ID: 123/9A94
Page 11 of 14
Heartland Biogas, LLC
Permit Number 12WE3172
Issuance 2
DRAFT
'ublic Health and Environment
Air Pollution Control'Division
10) Unless specifically stated otherwise, the general and specific conditions contained in this permit
have been determined by the Division to be necessary to assure compliance with the provisions
of Section 25-7-114.5(7)(a), C.R.S.
11) Each and every condition of this permit is a material part hereof and is not severable. My
challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and
upon such occurrence, this permit shall be deemed denied ab initio. This permit may be revoked
at any time prior to self -certification and final authorization by the Division on grounds set forth in
the Colorado Air Pollution Prevention and Control Act and ions of the AQCC including
failure to meet any express term or condition of the pe Division denies a permit,
conditions imposed upon a permit are contested by th . - nt, or the Division revokes a
permit, the applicant or owner or operator of a sou est a hearing before the AQCC for
review of the Division's action. (Reference: Regui- 1 um • Part B III.F.)
12) Section 25-7-114.7(2)(a), C.R.S. requires t
Emission Notice (APEN) must pay an an
discontinued, the owner must notify the D
Upon notification, annual fee billing will term
13) Violation of the terms of a pe
Control Act or the regulations
enforcement actions under
penalties), -122.1 (criminal penalt
14) Full text of the Ti tection
be found at th ite:
7
c)
111.0t3,
•
of
urces requir
!salon fee. If a so
in writing requesting
an Air Pollutant
r activity is to be
lation of the permit.
the provisio • lorado Air Poll - revenion and
C may res : dministrative, civil or criminal
(enfo , -121 (injunctions), -122 (civil
Federal Regulations can
AIRS ID: 12319A94 Page 12 of 14
Heartland Biogas, LLC
Permit Number 12WE3172
Issuance 2
DRAFT
'ublic Health and Environment
Air Pollution Control Division
ATTACHMENT A
PARTICULATE EMISSIONS CONTROL PLAN FOR PROCESSING ACTIVITIES
THE FOLLOWING PARTICULATE EMISSIONS CONTROL MEASURES SHALL BE USED FOR
COMPLIANCE PURPOSES ON THE ACTIVITIES COVERED BY THIS PERMIT, AS REQUIRED BY
THE AIR QUALITY CONTROL COMMISSION REGULATION NUMBER1, Section III.D.1.b. THIS
SOURCE IS SUBJECT TO THE FOLLOWING EMISSION GUIDELINES:
a.
b.
c.
Processing Activities - Visible emissions not to excee.
visible emissions.
Haul Roads - No off -property transport of visibl
nuisance guidelines shall apply to off -site ha
Haul Trucks - There shall be no off -prop
operating on the property of the owner or o
visible emissions from the material in the haul
owner or operator.
1. Unpaved haul road ered as o
opacity, no off -property transport of
ply to on -site haul roads, the
ansport of visible emis
r. There shall be no o
rating off o
from haul trucks when
'ccle transport of
roperty of the
llitive particulate emissions.
AIRS ID: 123/9A94
Page 13 of 14
Heartland Biogas, LLC
Permit Number 12WE3172
Issuance 2
DRAFT
'ublic Health and Environment
Air Pollution Control Division
•
ATTACHMENT B
Heartland Renewable Energy, LLC
Weld County, Cho
LIST OF ACCEPTABLE FEEDSTOCK SUBSTRATES
Acceptable for Air Pennit.
Any additional feedstock types must be accepted by Air Department before utilized at Heartland
This is a Class I CompostFacility'which accepts Types 1, 2: and 3 Fr fs.
• Type 1 includes; Agriculture mop residues, manure, untreated wood wades, yard, paper
and green wastes
• Type.2 includes: Animal material, animal mortalities, and some separated &a# WOOS
• Type 3 includes; Biosolids, solid waste, processed sad waste and sludges
Feedstocksdmt will be accepted include:
• Grease Tank Rattans from meat rendaring
•
• premed aentr fugd Dissoilyed Air Floatation 0MF, Gake from ford PreddssinitkidusitY
• Fats, oils and des (FOG) - higbMcordentinaterid born trod ping'
U
• Concentrated Grease Trap •(GM
• Pprtltry,striineds beef processifl btu 1rlcwd feathers and hides
• Processed dewateted DAF front f od
byproducts ((at, vita, Wee
Coneesitrated whey, lactose or deiattam 1paaa claw ce (RO) system
Reject 'pmcesSed foods ow )
• Food waste
Dewar DAF from food.. inestry
• Poultry latcherywaste
Ultla filtered whey or e
Paunch manure
• High moisRue DAF and GTW from foodprocessuvrindustlyor mamma
High moilaufe organic materials from processed , sugar beets,:
potatoes, onions, and other processed a l products
Feedstoc whihid I WILL NOT be
ricipel Waste
'Waste
AIRS ID: 12319A94
Page 14 of 14
AIR POLLUTION CONTROL DIVISION
PRELIMINARY ANALYSIS SUMMARY
PERMIT NUMBERS: 12WE3172 DATE: December 16, 2015
APPLICANT: Heartland Biogas, LLC
REVIEW ENGINEER: Michael J. Harris, P.E. CONTROL ENGINEER: R. K. Hancock, Ill, P.E.
PROJECT DESCRIPTION
Heartland Biogas, LLC operates an anaerobic digester facility to produce pipeline
quality natural gas (methane) from manure and other substrates. Heartland Biogas is
proposing to increase production of pipeline quality gas from 4.7 to 4.9 million standard
cubic feet (scf) per day and adding two additional biofilters for control of hydrogen sulfide
(H2S) emissions
ESTIMATED EMISSIONS
The resulting estimated controlled emissions from permit 12WE3172 are listed below.
PM
PM10
PM2.5
NOx
VOC
CO
SO2
H2S
Pipeline gas production
0.5
0.5
0.5
7.0
5,6
25.1
34.0
8.93
Haul roads - fugitive
39.8
10.7
1.07
---
--
_-
-_
--
Source Classification
This source is considered a synthetic minor source according to the Air Quality Control
Commission regulations. Emissions could exceed 250 tons per year for H2S (hydrogen
sulfide) if Heartland Biogas, LLC did not accept federally enforceable limits on
production and installation and operation of air pollution control equipment.
The company has made an application for issuance of a federally enforceable, synthetic
minor source permit, limiting the potential to emit to below the major source thresholds.
Therefore, this source is considered a synthetic minor source and not subject to PSD or
Operating Permit requirements. The Division has determined that the proposed source
will comply with all applicable regulations and standards of the Colorado Air Quality
Control Commission and has made a preliminary determination of approval of the
application.
0
O
4
Emission Source
[Leave blank unless APCD has already assigned"a permit # &
12WE3172 IA
[Provide Facility Equipment ID to identify how this equipment is referenced within your organizati
4
40
a w
nested Action (check applicable request boxes)
Section 02 — Re
Section 01— Administrative Information
Request for NEW permit or newly reported emission source
Request PORTABLE source permit
o• 0
Uo
Zr,*
w
O
44
0
0
►4
O
.0
.0
.0
4)
d
u
E
O
0.
CD
0
O
yd
z
O
0
County: Weld
Change company name
O
o.
0
O
cn
❑ ❑
Change fuel or equipment
Change permit limit
El El
4)
fl
O
0 CO
E
T°,
0
Request to limit HAPs with a Federally enforceable limit on PTE
EDF Renewable Development
o P-
o
O
crt
IS. O
440. .y
p O
O M
c
gvyi U
O44 E.� 7
y W O
fo0
yU
tT W
0
0
�+
q
z 0 ✓'^` b
C •a�i a °
Y
a
a❑ ❑
co
O
U
N
San Diego, CA
44
s
4
Person To Contact:
Fax Number:
03 — General Information
0
cted sources, the projected startup date is:
a
L.
Ls
s.
0
0
h
N
a
es
a
I-
a
C
a
as
es
d
a0i w
a
ec
eu
430
ai
E
44.
44
L
CO
44
0
PQ
N
ect
O
General description of equipment and purpose:
o;0
o
O s
g
u �
-,, O
N 173
0
C p U
N .L.
3
o•g
O
w u F7
-0 6 i- o
>tm 0
- o O
ao
g
4
p /t � J i�j
WII' j
O v.aI O'Os. 0
Es co
MenM O
O O O
}O. - vvv
R0 0 b.el 54
iv
Application sta
a 3
O
a.
O
z
O
u
O
b
O
ment Information & Material Use
anufacturin
Section 04 — Processin
Unilux or Equiv
z
z
U
u C
U ^
g
a
S
o o
a a
a
O O
8 8
o
g
0 °
.o °n
U
El El
a
cr
es
•c
cr
8
FORM APCD-200
Emission Source AIRS ID:
12WE3172 IA
Permit Number:
445818.00mN
533329.00mE
en
ao
A
z
❑ Other (Describe):
Width (inches) =
0 Horizontal ❑ Down
0 Other: Length (inches) =
Vertical with obstructing raincap
0
ao
Direction of outlet (check one):
ment & Fuel Consumption Information
.4)
Section 06 — Combustion E
h
In
in
(.1
as
C
229 MMscf/yr
as
G
4r
N
Coo
w
a
z
c
d
s
0
y
u
0
cn
Iv
U
0
u
.V-
7
d
0
.o
ca
O
U
rn
a)
v
8
u
a
0
y
U
4)
U
0
u
•
O
EKG
cd
f
Manufacturer
CO
C
Calc-max H2S
Manufacturer
Manufacturer
Manufacturer
Please use the APCD Non -Criteria Reportable Air Pollutant Addendum form to report pollutants not listed above. 0[] )
-• -_.
r0
OS
O
Eu
OS
na
OS
C
O
G
C
x
773-
na
0.50
na
O
O
` 2.63
CS
CI
eel
0 -0
OO
e7
fi
'
L
o � �
0i� Flvs:
4
t
0
as
C
na
uu
at
0
a
O
CO
C
OS a a
CO
a
na
a
na
a
as
as
na
na
sa
as
as
U 1SmIS910n Factor LocucneIUNI
i
f p
Siyy'
J(
TSP na
waC
C
C
a
na
Bu
o
n
x
x
U
O
A.
P..,
z>"
a
gu
a
leOi
i
w
4)
a)
0
o
01
7.1
C.)
0a
a
as
1.4
.01
:r.._
yas
y
7 8
ri
c q
h
o 0
To
• a
y ,_ 0
'S ara
;3 a
a a
4)
o .0
✓
E a)
o .0
u • •a
$ $
8- a
1 u
y o h
C ~
O
o 0 h
'y
E L. G
6 a0 o
ai
T▪ s
U J+
2A al
g t"
u u
u
L
Uj .O 0
CIfg .0
G ^ H
ii
q
licant Certifi
Section 08 A
Art
w
0
N
ODD
O
Emission Source
12WE3172
Permit NuM uer:
Facility Equipment ID
uested Action (check applicable request boxes)
Section 02 —Re
Section 01— Administrative Information
Request for NEW permit or newly reported emission sour
Request PORTABLE source permit
ob
UU
U_
z V1
d
0.4
as
es
0
w
0
s
u
es
a,
C,
_
E
en
est
C▪ 41
z
0
Q
O
w
w
0
a
Change company name
0
O
Transfer of ownership
❑ ❑
Change fuel or equipment
Change permit limit
El El
U
'O
roa
C o
U
W
C
Request to limit IIAPs with a Federally enforceable limit on PTE
EDF Renewable Development
Cn N p
x0\
o • c W
O Ts an
0 C
V L i
o 0.
O A.+
y 5 . • aw
C
a01)co
O. O = e
W • y w
O et.`
.0 a : o
▪ 4.
T2 t• oto
0 id 0 .
DC on U ceid
• • 0 8 E.
as• 6.
aJ o a
u >+3 POo
as'0. >d
N
b
0
C.)
N
15445 Innovation Drive
Mailing Address:
San Diego, CA
a
C.
Person To Contac
as
Fax Number:
ralph.daley@edf-re.com
E-mail Addr
Section 03 — General Information
ti
3
v
v
N
en
0
0
w
C
W
W
Ce
d
C.
0
c
W
u
a
en
seg
.t�
bD
0
0
0
e
Po
w
3
e.
iXt
z
rn
I
C
R
a .s
za
.5
00.
N6.0
..
O. •0
—0 U
V
H
ment Information & Material Use
/Manufacturin
Section 04 — Processin
Description of equipment':
W
0
O
z
C)
0
.
3,450 mmscf/yr
U
O
O 0
en
O 0
O 0
a .0.
0 0
O 0
G ▪ N
UQ
O 0
00 .C .
CJ • 0
42
O U
❑ ❑
fA.
Residual Biogas
120415 Biorem APEN Phase lB
FORM APCD-200
Emission Source
AIR POLLUTANT EMISSION NOTICE (APF-
L
an
0
0
a
y
2
a)
W
O
.o
.5
a)
L
N
y
w
aQi
«t
U
O
w
N
a
an
O
.0
a
w
0
0
C7
445818.00mN
533329.00mE
M
0
00
E
Qa
0 Other (Describe):
Width (inches) =
❑ Horizontal ❑ Down
0 Other: Length (inches) =
Vertical with obstructing raincap
itlet (c
Exhaust Opening Shape & Size (check one):
ment & Fuel Consumption Information
Section 06 — Combustion E
0
z
4)
0
Manufacturer:
Company equipment Identification No.:
o
of
Ofn
v
O
N
O
O:
g
T
o
0
p.
O
O
Sa ca
E
L
O
0. i..i
b O
fl
8 O
-0 U
0 O
O
1
b
0 ad
FA
N a o o
C 0
0 S
g...
E rc
•
2.4-4
€ I.
O
0. r+
u
R
o 9 P.
y-.
0 N
C
O
y GO
0
0 's
a. -,z)
W
o
44 o
u
i
} C
v
t1
/7--a--IA'ep:
p.,.1.,
O
Please use the APCD Non -Criteria Reportable Air Pollutant Addendum form to report pollutants not listed above.
mar--
'd `
,
-,
�
r
ru
ww
44
Li :,
e.
a.
o
x
XON
U
O
0
.0
O
0
.0
Y
g
Z0
W Y
o a
a-�
e
aq
0
0
O a
w
g
g C
0•
0
U
00
v
4 w
2 O
e
d®
o► ,d
dp
L
a
w
8
.O
0
u
a
0
O
0
O
0
Q
apo
q A
0 a
O
2
d
.a
0
0
O
ou
a
O
E
N
0
.�C
4)
C.>
ant Certification
Section 08 A
Heartland 120415 Biorem APEN Phase IB
N
0
0
AIRS ID Number:
Permit Number:
O
U
N
Plant Location:
V
A
Person to Contact:
Fax Number:
Ralph.daley@edf-re.com
E-mail Address:
U
C
go
N o
co
WO
w
o
u_
• c
C • 0
cn
cn U
E C
W
Chemical Name
cd
g
cn
.0
N
Hydrogen Sulfide
4
I
c
7783064
a
C
E
Z
C
G
z
t
4
O
Calendar Year for which Actual Data Applies:
m
M
O
N
0
•co
U
C
O
a
a)
ce
Cu
cc
co
>
C2
C2
O
N
0
L
CU
m
J
C
0
1.2
a)
a
O
I -
a
a)
Cl)
Co
a
ca
a
�n Q
0
N 0
N
O I N o
k. L N
N
0
Q
E
0) N
C J
O
CO
N al
N O
O a C
2 .444
O
a) cc
a E
V) Z ti
O
5-
[Leave blank unless APCD has already assigne`a"a permit # &
12WE3172
Permit Number:
0
Facility Equipment ID:
Section 02 — Requested Action (check applicable request boxes)
Section 01— Administrative Information
Request for NEW permit or newly reported emission source
Request PORTABLE source permit
❑❑
o 4)
•0
UU
zco
Heartland Biogas, LLC
Flare - limited to output below
z z
C U
0. 0
o�
U
I-.
40
h 4)
9: O d0
d
ca. T
o W
❑ 0 O
0 .'
OS u
o o a m a
O IS
O LL W u O 0 v
.0 % a = 0" 0 0
'o, ° :c es
M Z
as d
0 e ti �a
p •
0 as a
..Vi 0 td d ea 0 a 00 ttl) es V W
O F o. o ° E h
C C K U) TA •0 O0 w et
to ❑ ❑
G .O = �w
«• E O
C m b O
4 u u
Z$ > •g Z '° .O e
C v m A m.0
E+ u. y a ¢� 0 8 L
4. :'' CC U 'q - W 0
U ° 'O RS N •• ,d0 W
., G) O Y • u — 0 ,
T
4)
C
a
EDF Renewable Development
00
N
O.'
'0
0
U
San Diego, CA
4)
s
Person To Contact:
es
e
Fax Number:
Section 03 — General Information
00
U,
I)
•o
For new or reconstructed sources, the projected startu
0 0
e
s
•O
a
4)
0.
y7
L
L
O
d
OD
0
0
'O
as
w
u
a
0
C
E
d
C
O
O
a
FlIN 0
4
C
N 'C
O e
ca
cn
r
a
V
ov
.0
.O 0
i
4)
N G4
N
O O.
o
0
o u
14 O 0
0
u u
V1 0 °
wE a
O C •g
z
4
u � �
0
zc�
o ,uO
L
0 E p -p '.,0
N
C C N
C W u N +��+ci.�~ f�N
O .4.-
U A u •w+' ON w
L u d v ,CDO ,p
WA .0 itl d e 000
CC >
.0 C ++ ra O� C 0
0 0m N z
es � y.� .�-�ca
1.4
� v
_ u o w 6
C .r• �+ w ��+�yy �q+
DI hE
1.
wO �+°'a u� o u
:o c �° 0 a oa v°
u a+ 0 ;m gqu c�
a+ P. ++ '�' p .'� O V A Fn 01
cn
o F �e A�
Aas
0. PL P. i a3 � g. fel
I�N 4 I pA
Od >`G 0 E e,,_,Uo2o o U y .n
^ W° L V y p N
as •° w ,oA� �'O v o.E
o u 10 � � :d
O °" aO _ E.36" v
.•0C) .EooUoot 6yoa.
cd
APEN forms:
0.
o
AA
z
0
ment Information & Material Use
.a
anufacturin
Section 04 — Processin
EF-12"x #5" or equiv
0 °
John Zink or Equiv
z
•
0
°
a
i
. •4)
0. a.
g
b
00
0 0
GO COI
QU o
N N
w s•.
O 2
00
0
0 U
❑ ❑
7
6
E
8
OO
0
•
x
*F-)
W
0
a
FORM APCD-200
Emission Source
445818.00mN
533329.00mE
V
a
O Other (Describe):
Width (inches) _
: Length (i
z
.49
° o
"O
❑
O
0'
ca N
y u
O
"S E
3
i3 .
> A
Ta
C)
O
.5
O.
Section 06 — Combustion Eaui
Company equipment Identification No.:
J
.40
N
N
0
In
N
U
h
N
In
N
-O4
177 MMscf/yr
a
C
O
N
J
C)
o
la
aS-
0
a
y O
9 a
cos 0. a
ro o
TA' 4-
8 o
O
b U
a
y
u E
u W
an
u a
Q Si
O 0I
0 E
w>>
a
0. r+
u a
Oaa
E C
8
77"3 O
ch VI
Y 40
'
W
«°3 I
V
er 0
a o
u
eta
cl
p
O Q
E7
O
N
I
d
oaA
c �
M
C
1-
ed
q
Calc. from H2S I
I-
1'
I.
Please use the APCD Non -Criteria Reportable Air Pollutant Addendum form to report pollutants not listed above.
_ ._ _ _ .n. .... .. ....
Yi
d3 Q
3
O
O
O
OS
C
na
c0
C
C
o
EU
EU
33.88
2.96
H
-.4C,.,-O,
- m
,C
^3�i't ".
ta
"
CO
CO
CO
EU
CO
a
C Ux:
O
O
C
C
C
Bu
i
a
C
CO
O
na
CO
C
a
C
a
a
na
a
s
a
s
CO
a
V_
C
C
C
C
C
C
.k A k
rt
C
CO
C
na
na
C
C
]4
2
r+
x
I XON
x
Q
11
w
d
0
.N
O
O
V
a
CO
.24
749
V
a
O
ft
E
V..I
q
a G
a
q
•L
4)
4)
q
4-
O
u
C
In'4
w aso
q
a
4)
d
V
O
4)
d
q
O
U
.q
a
Section 08 —A
C
V
P
Gel
L.
u
•
Attach
N
O
N
00
,t Application for Construction Perm
C
z
C
c4
>-1
C
a
Emission Source
[Leave blank unless APCD has already assigned a permit # & AIRS ID]
12WE3172
Permit Number:
[Provide Facility Equipment ID to identify how this equipment is referenced within your organizati
Facility Equipment ID:
Section 02 — Requested Action (check applicable request boxes)
Section 01— Administrative Information
y
d.
0.
O.
C
a
.O
O
O
T.)
a
1.. O l"
O • r u
h .fl 0
C - .Y
O oL.sco
• v
0
w
s
L
a a
aa on
14
L •P
4) d
y
• a
• 4'
L O
O L z
ti O O
Oin -
le
. Q g
L O
I... • a
4) 0 d
C. Q' Cr
Change company name
Change fuel or equipment
0
F
u C
F O
O
o
.-, a)
4-,
L
aa
L
H w
C
W
r
a"
0
in
cs
Change permit limit
❑❑❑ 0
0
O
U
zc
Heartland Biogas, LLC
O
C
Ii
EDF Renewable Development, Inc.
co
N
O\
•0
O
U
T
U,
O
O
a
0
L I
.O 0
0
❑ ❑
San Diego, CA
Person To Contact: Ralph Daley
ao
C
0
z
G�.
Section 03 — General Information
e'
N
N
N
N
For new or reconstructed sources, the projected startup date is:
m
C
O
.0
52 weeks/year
N
General description of equipment and purpose:
4'
C
e
C
W U
-O 01
e ..
5 o
•h
U A
.. o
o e
Q/ O
oU
a C
O 0 w
s
a
dF
W M_ p
0
c0 yn en en
W Q -so 1/40
w
>h.`o •O
Z en
of cri
N
In en en
a . 0
NW in 441 Z C
W
APEN forms: h
C.)
he.state.co.us/
•U
Application status: h
3
.01
ment Information & Material Use
0
/Manufacturin
Section 04 — Processin
• as
C
0
z
U)
CC
C
z
0
z
U
' O
�a
a
s2
O .0.
O 0
O 0
a 0
O O
O O
.O .O
XE •k
0 N
U • • U
OE
Heartland 110713 Fugitive Dust Trucking APEN
O
N
O
FORM APCD-200
Ge
Ge
iw
aa
a
10.1
et
.0!C
"V
U
°AO
Emission Source
Permit Number:
Section 05 — Emission Release Information (Attach aseparate sheet with relevant information in the event of multiple releases; provide datum & either Lat/Long or UTM)
445818.00mN
533329.00mE
fel
oo
yA
GOO
❑
Width (inches) =
tt5
a
O
0
O
0.1
E
cLI
L
>
O Nu
.9 U
❑
O
O
.O
N
O
u
10▪ 1
• b0
o O
O O.
a 0
O
a
▪ W
O
O
a
9
w
a
O
O
a
O
a
U
Ge
a
Ge
a
a
a
a
O
0
a
O'
U
of
u
0
z
,
O
Manufacturer:
Company equipment Identification No.:
4
k/2
•
•
Section 07 — Emissions Inventory Information & Emission Control Information
O
0
0
VS �• H
a.
▪ I
O
ado s
t3 A
a
vs La
C
• o
a
� W
0
4.1
a
0
C
Xa
7
ea
a
a
wo
3,1
rO}a�G�E
1"
1,
AP -42
Pollutants not listed above. I
i
M
j,t t
na
na
....4A.
en
10.74
1.07
na J
na
a
a
0
0
I.
1,441U
IPlease use the APCD Non -Criteria Reportable Air Pollutant Addendum form to report
yy
N h
Cria
na
id
O
00
00
ed O
a
0
na
na
na
r.WF
na
na
na
':
a
a
s
a
a
el
s
e
na 1
na
a
a
0
o.
a.0'
z
O
0
I.
I.
O
b
a
a
N
w
Ge
Ge
O.
0
u
a
O
a
O.
a
z
O
a
O
.9
a
•O
a
.9
a
a
a
O
'r+
a
a
O
a
a
a
Ge
u
Geri
d
in▪ ot
a
O
a
Ge
U
a
Section 08 A
Ga
P.
4
s;
rl
Di• -'-Trucking APEN
N
to,
a
•
Hello