Loading...
HomeMy WebLinkAbout20162097.tiff29/01 2007 18:55 FAX 9703562819 AJR FARMS Cj001 IIIIDEVELOPERS OF AGRICULTURE AGPROfessionals August 4, 2014 To Whom It May Concern: A.J.R. Dairy is contracted with AGPROfessionals to process work related to all land use and permitting processes. AGPROfessionals is authorized to represent and request the release of all records necessary on the behalf of A.J.R. Dairy. Sincerely, p/c/ Date ENGINEERING, PLANNING, CONSULTING & REAL ESTATE 3050 67th Avenue is Suite 200 • Greeley, CO 80634 970.535.9318 /office a 970.535.98541 fax ■ www.agpros.com CHANGE OF ZONE (Z) APPLICATION FOR PLANNING DEPARTMENT USE DATE RECEIVED: RECEIPT/AMOUNT# /$ CASE#ASSIGNED: APPLICATION RECEIVED BY PLANNER ASSIGNED: Parcel Number 0 9 6 1. 1 3. 4- 0 0. 0 2 6 0 q (p I 1 3 0 0 0 p t (p (12 digit number - found on Tax I.D. information, obtainable at the Weld County Assessor's Office, or www.co.weld.co.us) (Include all lots being included in the application area. If additional space is required, attach an additional sheet) Legal Description Pt N2 SE4 & E2 SW4 , Section 13 , Township 5 North, Range 65 West 522 next- ?aG2 Property Address (If Applicable) 27294 WCR 47.5, Greeley, CO 80631 P0Y ?ukl 1 BQa\J) \'2scr\01'010s Existing Zone District: AG Proposed Zone District: 1-3 Total Acreage: 151.26 Proposed #/Lots: 2 Average Lot Size: 75 Acres Minimum Lot Size: 2.5 Acres Proposed Subdivision Name: n/a FEE OWNER(S) OF THE PROPERTY (If additional space is required, attach an additional sheet) Name: Andrew Hop Work Phone # (970) 352-9526 Home Phone # Email Address Address: 27294 WCR 47.5 City/State/Zip Code Greeley, CO 80631 APPLICANT OR AUTHORIZED AGENT (See Below: Authorization must accompany applications signed by Authorized Agent) Name: Tim Naylor Work Phone # (970) 535-9318 Home Phone # Email Address tnaylor@agpros.com Address: 3050 67th Ave. #200 City/State/Zip Code Greeley, CO 80634 UTILITIES: Water: Sewer: Gas: Electric: Phone: Central Weld County Water District Weld County ISDS Atmos Energy Xcel Energy Century Link DISTRICTS: School: RE -7 Fire: Post Office: Platte Valley Fire Protection District I (We), the undersigned, hereby request hearings before the Weld County Planning Commission and the Weld County Board of County Commissioners concerning the proposed Change of Zone for the following described unincorporated area of Weld County, Colorado: I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included indicating the signatory has the legal authority to sign for the corporation. i�elsw!! 48 11(p Signature: O ner or Authorized Agent Date Signature: Owner or Authorized Agent Date -4- Parcel Numbers and Legal Descriptions — A.J.R. Dairy 1. Parcel: 096113400026 Legal Description: PT N2SE4 13-5-65 LOT B REC EXEMPT RE -4040 EXC BEG S1/16 COR N89D55W 70 NOOD20W 511.22 TH ALNG CURVE L 819.70 (R=2830 CH=N08D40W) S89D48E 146.21 TH ALNG CURVE R 173.95 (R=2970 CH=S14D29E) SOOD20E 1152.76 TO POB Section: 13, Township 5 North, Range 65 West 2. Parcel: 096113000076 Legal Description: 12412 E2SW4 13 5 65 EXC BEG S89D49'E 1320.27' & NOD06'W 724.93' FROM SW COR OF SEC CONT NOD06'VV 350.85' N89D53'E 519.50' S45D38'W 140.96' S53D16W 423.37' S89D53W 76.68' TO BEG EXC HWY BK 1301 REC 2253238 ALSO EXC UPRR(2.22D3R.37L) Section: 13, Township 5 North, Range 65 West REZONING QUESTIONNAIRE FOR ANDREW J. HOP 1. How is the proposed rezoning consistent with the policies of the Weld County Code, Chapter 22? If the proposed rezoning is not consistent with the Comprehensive Plan, explain how the proposed rezoning will correct what the applicant perceives as faulty zoning, or how the proposed rezoning will fit with what the applicant perceives as the changing conditions in the area. Andrew J. Hop of A.J.R. Dairy is requesting a Change of Zone for a 151 +/- acre property, parcels 096113400026 and 096113000076 located on the northeast corner of Weld County Road 47'/2 and State Highway 34 adjacent to Weld County Parkway. With the development of the Weld County Road 49 corridor, properties in the area will be developed into industrial sites through the USR process. The County Comprehensive Plan's goal is to consider how transportation infrastructure is affected by the impacts of new or expanding industrial development; this change of zone request will utilize the impacts of the new transportation corridor to expand the industrial uses in the area. Andrew J. Hop wishes to rezone the property to the 1-3 zone district to best position the property for future market conditions. Rezoning the property will align the future of the property with the goals and policies set forth in Weld County Comprehensive Plan to create "shovel -ready" industrial sites throughout the County available for immediate use. The proposed rezoning is consistent with the Weld County Comprehensive Plan in accordance with the following sections designated in the Weld County Code. Sec. 22-6-20. Economic Development Goals and Policies. C. ECON.Goal 3. Structure land use policies and regulations so that they encourage County -wide economic prosperity and economic growth. 1. ECON.Policy 3.1. County activities and regulation should protect the rights of private property owners and public health, safety and welfare, recognizing that these basic rights and protections allow the free market to prosper and grow the local economy. 2. ECON.Policy 3.2. Ensure that County land use policies and regulations are structured so as Not to impede economic prosperity and growth. E. ECON.Goal 5. Recognize and promote specific places and resources in the County that can uniquely support economic development. 1. ECON.Policy 5.1. The County should encourage an adequate supply of both services and land suitable for industrial development and redevelopment. a. Recommended Strategy ECON.5.1.a. Develop a program to create "shovel -ready" industrial sites throughout the County, where primary job providers would be able to develop or re -develop. Zoning, infrastructure and services would ideally be immediately available for use is such areas. Sec.22-2-80. Industrial Development Goals and Policies. A.I.Goal.1. Promote the location of industrial uses within municipalities, County Urban Growth Boundary areas, and Intergovernmental Agreement urban growth areas, growth management areas as defined in municipalities' comprehensive plans, the Regional Urbanization Areas, Urban Development Nodes, along railroad infrastructure or where adequate services are currently available or reasonably obtainable. 2. (.Policy 1.2. Encourage new industrial development within existing industrial areas. A.3 (.Policy 1.3. Encourage industrial development by improving major transportation corridors. Section 22-2-150.A.I.Goal 1. Encourages conversion of agricultural land to industrial uses when adequate services are currently available or reasonably obtainable. Section 22-2-150.B.I.Goal 2. Encourages the expansion and diversification of the industrial economic base. Section 22-2-150.C.I.Goal 3. Promotes a well-balanced diversified industrial base in order to provide a stable tax base and to provide a variety of job opportunities for County citizens. 2. How will the uses allowed by the proposed rezoning be compatible with the surrounding land uses? Include a description of existing land uses for all properties adjacent to the subject property. Although specific uses have not yet been determined, the uses permitted under the proposed 1-3 zoning are generally compatible with the existing uses on the surrounding properties. The property is located within the Highway 34 Corridor and adjacent to the new Weld County Parkway, which is a major north -south thoroughfare. With the development of this new transportation corridor, adequate services are now currently available and reasonably obtainable to sustain new industrial uses in the area. Conversion of agricultural land to industrial use is encouraged under these circumstances, in accordance with the Weld County Comprehensive Plan. The proposed change of zone will utilize the impacts of this new Weld County Parkway and support economic growth in the area. 3. Will the property use a septic system or public sewer facilities? Individual septic system(s) will be utilized and will be constructed to Weld County Standards after the approval of a site plan review on the property until public services are available. 4. Who will provide adequate water, including fire protection, to the property? The site will be developed with Central Weld County Water District water taps during the Site Plan Review process. Existing taps are currently on site for use with the Commercial Dairy operation. The Platte Valley Fire Protection District provides fire protection to this area. 5. Does the property have soils with moderate or severe limitations for construction? If yes, the applicant shall submit information which demonstrates that the limitations can be overcome. The Geology Report provided by Soilogic, Inc., does not indicate moderate or severe soil limitations for construction. 6. Is the road and/or highway facilities providing access to the property(ies) adequate to meet the requirements of the proposed zone district? If not, the applicant shall supply information demonstrating the willingness and financial capability to upgrade the road and highway facilities. The existing road and highway facilities providing access to the property are adequate to meet the requirements of the industrial zone district. The property is bordered by the Weld County Parkway to the east and State Highway 34 to the south. Weld County Road 47.5 is an existing north -south street that bisects the property. Although specific uses have not yet been determined, proposed uses and associated site development plans will determine any upgrades necessary to the road and highway facilities. Although not required, a Traffic Impact Study has been provided by Kellar Engineering to address traffic impacts. The study found that the proposed change of zone from Agricultural to Industrial "will not create a traffic burden upon the local and regional traffic system. The proposed development is appropriate in size and scale from a traffic engineering perspective based upon the existing adjacent roadway characteristics." 7. Is the change of zone area located in a Flood Hazard Overlay District? The property is not located in a Flood Hazard Overlay District. 8. Is the change of zone area located in a Geologic Hazard Overlay District? This property is not located in a Geologic Hazard Overlay District. 9. Is the change of zone area located in the AP (Airport) Overlay District? This property is located in the Greeley Weld County Airport Overlay District. All applicable rules relating to the overlay district will be observed. Weld County Public Works Dept. 1111 H Street P.O. Box 758 Greeley, CO 80632 Phone: (970)304-6496 Fax: (970)304-6497 Applicant Name Kelsey Bruxvoort Company AGPROfessionals Address 3050 67th Ave #200 ACCESS PERMIT APPLICATION FORM Property Owner (If different than Applicant) Name Andrew J. Hop - A.J.R. Dairy Address 27294 WCR 47.5 City Greeley State CO Zip 80631 City Greeley State CO Zip 80634 Phone (970) 352-9526 Business Phone (970) 535-9318 Fax (970) 535-9854 E-mail Kbruxvoort@agpros.com Parcel Location & Sketch The access is on WCR 47'5 Nearest Intersection: WCR HWY 34 Distance from Intersection — 125' & WCR 47.5 Parcel Number 096113400026 and 096113000076 Section/Township/Range 13-5-65 Is there an existing access to the property Number of Existing Accesses 6 ES NCO Road Surface Type & Construction Information NA Asphalt Gravel Culvert Size & Type NA Treated Other Materials used to construct Access Construction Start Date NA NA Finish Date NA Proposed Use °Temporary (Tracking Pad Required)/ $75 o Small Commercial or Oil & Gas/$75 o Field (Agriculture Only)/Exempt Fax E-mail A= Existing Access LI= Proposed Access T N WCR c e IP r ,r d. 3 tyli s 4 5)e• " Nvss`s` 34- WCR Q Single Residential/$75 Q Large Commercial/$150 o Industrial/$150 o Subdivision/$150 Is this access associated with a Planning Process? EINo OUSR EIRE 0PUD Other COL Required Attached Documents - Traffic Control Plan -Certificate of Insurance - Access Pictures (From the Left, Right, & into the access) By accepting this permit, the undersigned Applicant, under penalty of perjury, verifies that they have received all pages of the permit application; they have read and understand all of the permit requirements and provisions set forth on all pages; that they have the authority to sign for and bind the Applicant, if the Applicant is a corporation or other entity; and that by virtue of their signature the Applicant is bound by and agrees to comply with all said permit requirements and provisions, all Weld County ordinances, and state laws regarding facilities construction. Signature is v!f! Printed Name V-e1sQ 6rv'r0or* Date 1kici i Itp Approval or Denial will be issued in minimum of 5 days. Approved by Revised Date 6/29/10 5. View to the North 5. View to the South Traffic Impact Study Memorandum AJR Change of Zone AGPRO Job #1101-08 Prepared For: AGPROfessionals 3050 67th Avenue, Suite 200 Greeley, CO 80634 Prepared By: KELLAR ENGINEERING skellar a(�kellarengineering.com 970.219.1602 phone January 28, 2016 Sean K. Kellar, PE, PTOE This document, together with the concepts and recommendations presented herein, as'an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization from Kellar Engineering shall be without liability to Kellar Engineering. Introduction The purpose of this Traffic Impact Study (TIS) Memorandum is to identify project traffic generation characteristics, to identify potential traffic related impacts on the adjacent street system, and to develop mitigation measures required for identified traffic impacts. This TIS Memorandum is for the proposed change of zoning from Agricultural to Industrial for approximately 151 acres of land located at the northwest quadrant of the Weld County Parkway/US 34 intersection. See Location Map. Kellar Engineering (KE) has prepared the TIS Memorandum to document the results of the project's anticipated traffic conditions and to identify projected impacts to the local and regional traffic system. The project consists of a proposed change of zoning from Agricultural to Industrial for approximately 151 acres of land. Therefore the TIS Memorandum analyzes the estimated traffic impacts associated with the General Light Industrial (Code 110) land use category (ITE Trip Generation, 9th Edition). The development is anticipated to generate approximately 697 daily weekday trips, 92 AM peak hour trips, and 97 PM peak hour trips. Existing Conditions and Roadway Network The project site is located at the northwest quadrant of the Weld County Parkway/US 34 intersection in Weld County, Colorado. The current zoning for the property is Agricultural and the property is currently undeveloped. Weld County Parkway is adjacent to the east side of the project site. Weld County Parkway (WC Pkwy) is a recently constructed arterial road in Weld County with a posted speed of 55 mph adjacent to the project site. Weld County Parkway's cross section has four 12' wide travel lanes, two 8' wide paved shoulders, and a 16' center median that becomes a left - turn lane where left -turns are allowed. Weld County Road 47.5 (CR 47.5) is an existing north/south street that bisects the property. CR 47.5 has a roadway cross section with two 12' wide travel lanes without paved shoulders. CR 47.5 has a posted speed of 45 mph adjacent to the project site. Additionally, US Hwy 34 borders the south edge of the project site. US 34 is a CDOT highway with a posted speed of 65 mph adjacent to the project site. US 34 has a roadway cross section consisting of four 12' wide travel lanes, 11' wide paved shoulders, and left -turn and right -turn lanes adjacent to the project site. AJR Change of Zone TIS Memorandum Page 1 US 34 currently has full -width left -turn and right -turn lanes at the US 34/CR 47.5 intersection and the US 34/WC Pkwy intersection. Location Map CR 58 0 SITE y SITE HWY :34 AJR Change of Zone TIS Memorandum Page 2 Pedestrian and Bicycle Facilities Currently there are no existing sidewalks or bicycle facilities adjacent to the streets adjacent to and within 1,320 feet of the project site. Additionally, the proposed industrial land use associated with the project is not anticipated to generate additional pedestrian or bicycle trips. Any additional pedestrian or bicycle traffic from this development, if any, would be negligible. Proposed Development The proposed project is an industrial land use within Weld County, CO upon a currently undeveloped property. Vehicular access to the property will be from two existing intersections (Hwy 34/CR 47.5 and WC Pkwy/CR 47.5). The WC Pkwy/CR 47.5 intersection is an existing two-way stop controlled intersection where the minor streets (CR 47.5 and CR 58) have stop signs at the intersection. The US 34/CR 47.5 intersection is an existing stop controlled intersection where CR 47.5 has the stop sign at its intersection with US 34. The US 34/CR 47.5 intersection is approximately 2,700 feet from the signalized intersection of US 34/WC Pkwy. Additionally, the WC Pkwy/CR 47.5 intersection is a recent improvement with the Weld County Parkway Project. A computer model (Synchro) was created to analyze the traffic flow with this project's potential traffic added to the existing WC Pkwy/CR 47.5 intersection using techniques provided in the 2010 Highway Capacity Manual. Trip Generation Site generated traffic estimates are determined through a process known as trip generation. Rates and equations are applied to the proposed land use to estimate traffic generated by the development during a specific time interval. The acknowledged source for trip generation rates is the Trip Generation Report published by the Institute of Transportation Engineers (ITE). ITE has established trip generation rates in nationwide studies of similar land uses. For this study, KE used the 1TE 9th Edition Trip Generation Report average trip rates that apply to the following for the traffic associated with this proposed development: General Light Industrial (Code 110). The development is anticipated to generate approximately 697 daily weekday trips, 92 AM peak hour trips, AJR Change of Zone TIS Memorandum Page 3 and 97 PM peak hour trips. Table 1 summarizes the estimated trip generation for the proposed development. Trip Distribution Distribution of site traffic on the street system was based on the area street system characteristics, existing traffic patterns and volumes, anticipated surrounding development areas, and the proposed access system for the project. The directional distribution of traffic is a means to quantify the percentage of site generated traffic that approaches the site from a given direction and departs the site back to the original source. Figure 1 illustrates the trip distribution used for the project's analysis. Traffic Assignment Traffic assignment was obtained by applying the trip distribution to the estimated trip generation of the development. Figures 2 through 4 shows the traffic assignment. Analysis Methodology Capacity analysis results are listed in terms of level of service (LOS). LOS is a qualitative term from the 2010 Highway Capacity Manual describing operating conditions a driver will experience while traveling on a particular street or highway during a specific time interval. LOS ranges from an A (very little delay) to an F (long delays). AIR Change of Zone TIS Memorandum Page 4 C O d C Piz O O CD .O H PM Peak Hour Trips 2 0 F— 97 Out LU CO W da Cie In CO O C — N r Rate N r - O AM Peak Hour Trips . 5 O H N O) 45 Or r - C Ce r- r o C — r. co CD 4.0 CU pc r CO o Average Daily Trips as O I— C) ca CL N- rn a N N 100 KSF Land Use General Light Industrial DJ H — O r -0 O O r KSF = Thousand Square Feet AJR Change of Zone TIS Memorandum Figure 1: Trip Distribution NTH 30% Nominal CR 58 C4 U HWY :i4 AJR Change of Zone TIS Memorandum Page 6 Figure 2: Existing Traffic Note: WC Pkwy assigned as north/south street S V CR 47.5 4 co m t!') 4/3 t 5/4 7/10 6/6 6/4 0/0 1 1 1 el lk a-i ezr et a --I p CR 58 AM/PM AJR Change of Zone TIS Memorandum Page 7 Figure 3: Site Generated Traffic Note: WC Pkwy assigned as north/south street A a V CR 47.5 N O O i -► t 0/0 .4 - 0/0 1hr 0/0 3/25 lh 0/0 ► 4/26 11 --► v Ln N O O 4- CR 58 AM/PM AJR Change of Zone TIS Memorandum Page 8 Figure 4: Total Traffic (Existing Traffic + Site Generated Traffic) Note: WC Pkwy assigned as north/south street .Y a u CR 47.5 CO N e-1 el d' TI if en In 9/31 6/4 ► 4/26 Ilr in to N N r-1 V TI ei el el CR 58 AM/PM AIR Change of Zone TIS Memorandum Page 9 Conclusions Based upon the analysis presented in this TIS Memorandum, the proposed change of zoning from Agricultural to Industrial for the - 151 acres of land located at the northwest quadrant of the WC Pkwy/US 34 intersection will not create a traffic burden upon the local and regional traffic system. The proposed development is appropriate in size and scale from a traffic engineering perspective based upon the existing adjacent roadway characteristics. US 34 has a roadway cross section consisting of four 12' wide travel lanes, 11 wide paved shoulders, and left -turn and right -turn lanes adjacent to the project site. US 34 currently has full -width left -turn and right -turn lanes at the US 34/CR 47.5 intersection and the US 34/WC Pkwy signalized intersection. Additionally, the existing intersection geometry of the recently constructed WC Pkwy/CR 47.5 intersection is sufficient to handle the project's traffic. Weld County Parkway's cross section has four 12' wide travel lanes, two 8' wide paved shoulders, and a 12' wide left -turn lane at its intersection with CR 47.5. Additionally, the levels of service (LOS) at the WC Pkwy/CR 47.5 intersection are projected to operate at LOS A during the AM and PM peak hours with the addition of the project's traffic. AJR Change of Zone TIS Memorandum Page 10 APPENDIX: wif AJR Change of Zone TIS Memorandum Page 11 Note: Weld County Pkwy assigned as the north/south street. WC Pkwy/CR 47.5 Intersection. Looking at the North Leg of the Intersection from the West Leg. Posted Speed on WC Pkwy 55 mph. (Photo Date: 1/19/16) WC Pkwy/CR 47.5 Intersection. Looking at the South Leg of the Intersection from the West Leg (Photo Date: 1/19/16) AJR Change of Zone TIS Memorandum Page 12 Weld County Pkwy Looking North in the Northbound Left -turn Lane at the WC Pkwy/CR 47.5 Intersection (Photo Date: 1/19/16) Looking Southbound on CR 47.5. Posted Speed on CR 47.5 is 45 mph. (Photo Date: 1/19/16) AIR Change of Zone TIS Memorandum Page 13 s. < Verizon Lit Go gle Parked on the wide shoulder at the SE Corner of the WC Pkwy/CR 47.5 Intersection for Traffic Counts (Photo Date: 1/19/16) 4:00 PM 64%O Y 4 0 ounty Pd 47 112 AJR Change of Zone TIS Memorandum Page 14 Total Traffic AM 1/2812016 WC Plwy/CR 47.5 Kellar Engineering .*' Movement EEL EBT ERR WBL Lane Configurations f Sign Control Stop Grade 0% Volume (vehlh) 9 8 4 Peak Hour Factor 0 92 0 92 0 92 Hourly flow rate (vph) 10 7 4 Pedestrians Lane Width (ft) Walking Speed (Ws) Percent Blockage Right turn flare Iveh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblotced vC, conflicting volume 306 362 93 278 378 62 188 vC1, stage 1 oonf vol vC2, stage 2 conf vol vCu, unblodced vol 308 352 93 275 378 62 188 tC, single (s) 7.5 6.5 8.9 7.5 8.5 6.9 4.1 tC, 2 stage (s) tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 p0 queue free % 98 99 100 99 99 100 98 cM capacity (vehlh) 805 550 946 634 539 989 1388 Direction. Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) I 4, WET WBR NBL NBT NER SBL SBT SBR 15 t ft if Stop Free Free 0% 0% 0% 7 5 4 28 114 1 5 141 30 0.92 0.92 0.92 0.92 0.92 0 92 0.92 0.92 0.92 8 5 4 28 124 1 5 153 33 None 10 7 4 8 5 4 28 10 0 0 8 0 0 28 0 0 4 0 0 4 0 805 550 946 634 539 989 1386 0.02 0.01 0.00 0.01 0.01 0.00 0.02 1 1 0 1 1 0 2 11.1 11.8 8.8 10.7 11.7 8.7 7.7 BB AB B A A 10.8 10.5 1.4 B B 1.7 25.4% 15 ICU Level of Service NB 2 NB 3 83 42 0 0 0 1 1700 1700 0.05 0.02 0 0 0.0 0.0 A 125 125 4.1 2.2 100 1459 SB 1 SB 2 SB 3 5 102 84 5 0 0 0 0 33 1459 1700 1700 0.00 0.08 0.05 0 0 0 7.5 0.0 0.0 A 0.2 Synchro 9 Report AJR Change of Zone TIS Memorandum Page 15 Total Traffic PM 1/28/2016 WC Pkwy/CR 47.5 Kellar Engineering Movement EBL Lane Configurations Sign Control Grade Volume (vehJh) 31 Peak Hour Factor 0 92 Hourly flow rate (vph) 34 Pedestrians Lane Width (ft) Walking Speed (ft's) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 235 vC1, stage 1 conf vol vC2, stage 2 conf vol vat, unblocked vol tC, single (s) tC. 2 stage (s) tF (s) p0 queue free % cM capacity (vehih) Direction, Lane # Volume Total Volume Left Volume Right GBH Volume to Capacity Queue Length (ft) Control Delay (s) Lane LOS Approach Delay {s) Approach LOS intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) EBT t Stop 0% 4 0.92 4 None t EBR WBL WBT WBR NBL NBT t r I ft Stop Free 0% 0% 26 10 4 3 5 123 0.92 0.92 0.92 0.92 0.92 0.92 28 11 4 3 5 134 None 297 76 252 303 NBR SBL I 1 0.92 1 3 0.92 3 J 4l, SBT SBR tt Free 0% 128 11 0.92 0.92 139 12 67 151 135 235 297 78 252 303 67 151 7.5 8.5 6.9 7.5 8.5 6.9 4.1 3.5 4.0 3.3 3.5 4.0 3.3 2.2 95 99 97 98 99 100 100 691 610 970 855 605 982 1427 EB1 EB2 EB3 WB1 WB2 WB3 NB1 34 4 28 11 4 3 5 34 0 0 11 0 0 5 0 0 28 0 0 3 0 691 610 970 655 805 982 1427 0.05 0.01 0.03 0.02 0.01 0.00 0.00 4 1 2 1 1 0 0 10.5 10.9 8.8 10.8 11.0 8.7 7.5 B B A B B A A 9.8 10.3 0.3 A B 2.4 20.6% 15 ICU Level of Service NB 2 NB 3 89 46 0 0 0 1 1700 1700 0.05 0.03 0 0 0.0 0.0 A 135 4. 2.2 100 1447 SB 1 3 3 0 1447 0.00 0 7.5 A 0.2 SB 2 SB 3 93 58 0 0 0 12 1700 1700 0.05 0.03 0 0 0.0 0.0 Synchro 9 Report AIR Change of Zone TIS Memorandum Page 16 SUMMARY OF VEHICLE COUNTS Intersection: — O Q o CO in-- CC) CO C) CC:) CO to 0o 11') IX) tr) N. '•7 C/) — C) (13 O S I-- vi W cL' a t`- c_i d to tO 0 Westbound: CR 47.5 L S R Total c') 'Zt t, _I ect -- co co co c, -- - . - N -- N - --- - 0 - - - O - - N O- 0- n cc O n C B p I- to co N N co N NN CC 0 0 0 0 0 0 0 0 (i)) Ili CO - N N - -- O - J "t - O ,.-_ N - N -- Total North/South N N - Li)'Cr Ln N- N- to 'Zr •-• En 0 L) N— -Y Southbound: WC Pkwv p H t,l ` t — -7 tn- c7 -- co co ooc,) c? co N cc c', — — c — - CJ N U) 42 38 N M 0c0 N N N- N '7 N 25 J 0 N N N N N `t N Northbound. WC Pkwv Y 0 27 �t N Cr) CO C0c,.—OCD N N N N ••-• Cr 0 o O -- 0 0- 0 0.) N. N t (7.- C`ofD IL) 0 N( N o -)l -- a) J O O- 0 0 0 0 0 a W F- LAO t� N. O R h•- 0 CO IC) ea C 66 ct 0 v�1 Cr, a) N CV Cn O co O N — t it -t N O cc, CD cc, N O to 'Zr CD CO O Cc; O 0 N- (i) h-- LAO 67 70 t� op CA Cr) Cr) h- — N- to •-t `D (, : 9' r-- •-r c Westbound: CR 47 5 L S R Total (V CV N c1 LED -_y '-t "t -- O — — O (N — -- CD — O — — — O Eastbound CR 58 L S R Total ON 0000 00 - O - O - N O •..-- CD 2 c� 'n O L H t 0 Z N u)til c", --r-. CJ LD N.- N- --to C t h- ti/ Ln Southbound WC Pkwy fl H (JD N CD N OD OD COD CD et'r't O! OD cc — CJ CJ co -- — O — c!i N trl tr, N 33 c, N o M 25 v 'Y J• N '7 O N N CV CV Northbound: WC Pkwy ON 1 — I 24 NCOOirt 0 co CC m— O- 0 0 0 O 0 tf) N t N (L) N G) N O c^i c i M -- M Cr) N J O O '- O C, -- O O -0 Q) a Cr- In F- to "t O COn0r-Mrt0 'T 4C) 'J O id 4C) Lll O In 4D LCl O CO t0 M 'N Ci O '7 --• 9Q 0 (71 is ) cp O M CO N C') C‘J AJR Change of Zone TIS Memorandum Hello