Loading...
HomeMy WebLinkAbout20161478.tiff INVENTORY OF ITEMS FOR CONSIDERATION Applicant Hans Wimmer Case Number USR16-0007 Submitted or Prepared Prior to At Hearing Hearing 1 Seepage Report X I hereby certify that the one item identified herein was submitted to the Department of Planning Services at or prior to the scheduled Planning Commissioners hearing. D Aungs P Planner r SEEPAGE EASEMENT AGREEMENT THIS SEEPAGE EASEMENT AGREEMENT (the "Agreement") is made and entered into this day of , 201 , by and between ("Grantor"), the owner of real property legally described as , and the The Farmers Reservoir and Irrigation Company, whose address is 80 South 27th Avenue, Brighton, Colorado ("FRICO"). WITNESSETH: GRANTOR HEREBY ACKNOWLEDGES the historical presence and operation of FRICO's canal, commonly referred to as the (the "Canal"), through and across or adjacent to Grantor's land, more particularly described in Exhibit A attached and incorporated by this reference (the "Property"). Grantor further acknowledges that the Canal is an earthen canal, that the operation of the Canal results in subsurface seepage of water from the Canal to the surrounding land, and that the Canal's historical operation may have resulted in prescriptive rights for such seepage affecting the Property. FOR AND IN CONSIDERATION of the sum of ten dollars ($10.00) and other good and valuable consideration, receipt of which is hereby acknowledged, and in consideration of the mutual covenants contained herein, Grantor hereby grants, bargains and sells to FRICO, its successors and assigns, a seepage easement across Grantor's Property, for the purpose of continuing the historical seepage appurtenant to the Canal. IT IS FURTHER MUTUALLY COVENANTED AND AGREED by and between Grantor and FRICO as follows: 1. Grantor retains the right to the undisturbed use and occupancy of the Property more particularly described in Exhibit A, insofar as such use and occupancy is consistent with and does not impair any grant or agreement contained in this Agreement. However, Grantor specifically grants FRICO an casement to seep water from the Canal on, over and through the Property, and Grantor specifically waives, releases and disclaims any right to claim damage caused by the seepage of water arising from FRICO's ownership, operation and maintenance of the Canal. Grantor agrees to hold FRICO harmless from any damage to Grantor's Property or the improvements constructed on the Property or from the loss of use of such Property or improvements caused by such seepage from the Canal. 2. FRICO agrees that following any construction, maintenance, or other activity by it or its agent that involves disturbance of the surface of the ground, FRICO shall restore the surface and its landscaping substantially to the grade and condition it was in immediately prior to the disturbance. 3. Grantor warrants that it has full right, title and lawful authority to grant the easement herein, and to make and enforce the promises in this Agreement, subject to existing easements, restrictions, and rights-of-way of record. EXHIBIT 1_ E' L. ,�._ u >IC 16 4. Grantor will not excavate or construct any facility, active or passive,to capture or convey groundwater(including but not limited to subsurface drainage systems, pumps, and passive drainage systems), or which would tend to increase the rate of seepage from the Canal (collectively, "Groundwater Capture Facilities"), without FRICO's prior approval. FRICO's approval may be withheld in FRICO's sole discretion, and may be conditioned upon Grantor providing protective measures (including but not limited to construction of improvements to prevent seepage from the Canal) at Grantor's expense. 5. The word "Grantor" as used herein, whenever the context requires or permits, shall include the heirs,personal representatives, beneficiaries, successors, grantees, and assigns of each of the owners of the land through which the easement runs or the respective owners from time to time of portions thereof. The burdens and benefits of this Agreement shall be deemed covenants running with said easement and said land. 6. The terms and provisions of this Agreement, except as qualified above, shall be binding upon and shall inure to the benefit of the respective heirs,personal representatives, beneficiaries, successors, grantees and assigns of the parties hereto. IN WITNESS WHEREOF, the parties have executed the within Agreement as of the day and year first above written. GRANTOR: a corporation By: Its: STATE OF ) ) ss. COUNTY OF ) 2 The foregoing instrument was acknowledged before me this day of , 2013, by as _ of , a_ corporation. Witness my hand and notarial seal. [SEAL] Notary Public My commission expires THE FARMERS RESERVOIR AND IRRIGATION COMPANY By: Scott Edgar, General Manager ATTEST: Mary Hanssen, Corporate Secretary STATE OF COLORADO ) ) ss. COUNTY OF ADAMS ) The foregoing instrument was acknowledged before me this day of , 2013, by Scott Edgar as General Manager and Mary IIanssen as Secretary of The Fanners Reservoir and Irrigation Company. Witness my hand and notarial seal. [SEAL] Notary Public 3 Show Full Headers I Print I Close Printer View From: Eve Craven <Eve@farmersres.com> To: "sherilockman@what-wire.com" <sherilockman@what-wire.com> Subject: RE: Project Application USR16-0007 Date: Fri 04/15/16 12:00 PM Sheri, I have attached a draft copy of the seepage agreement for your reference. Could you send me a drawing of the 6' chain link fencing that you made comments on in your original email? We would like to verify where it will be. Thanks, Eve Eve Craven Projects Coordinator Farmers Reservoir and Irrigation Company 80 South 27th Avenue Brighton, CO 80601 303-659-7373 ext. 312 Eve@farmersres.com From: sherilockman@what-wire.com [mailto:sherilockman@what-wire.com] Sent: Thursday, April 14, 2016 9:40 PM To: Eve Craven <Eve@farmersres.com> Subject: RE: Project Application USR16-0007 Eve, Can you please send me a sample of a seepage agreement that I can show the property owner. Thank you, Sheri Lockman 36509 CR 41 Eaton, CO 80615 — EveLalfarmersres.com wrote: From: Eve Craven <EveC&farmersres.com> To: "sherilockman@what-wire.com" <sherilockman@what-wire.com> Subject: RE: Project Application USR16-0007 Date: Thu, 14 Apr 2016 23:02:34 +0000 Sheri, Thank you for sending over the revised plans. We would still like to get a seepage agreement on the property. Thanks, Eve Eve Craven Projects Coordinator Farmers Reservoir and Irrigation Company 80 South 27th Avenue Brighton, CO 80601 303-659-7373 ext. 312 Eve(alfa rmersres.corn From: sherilockman(Mwhat-wire.com Imailto:sherilockman @what-wire.com] Sent: Wednesday,April 13, 2016 4:22 PM To: Eve Craven <Eve @ farmersres.corn> Subject: RE: Project Application USR16-0007 Eve, I have attached the updated pages 5 and 8. These pages have also been forwarded to the Weld County Planning Office. Please let me know what other concerns you have regarding the project so that we can attempt to address them. Thank you, Sheri Lockman Lockman Land Consulting, LLC 36509 CR 41 Eaton, CO 80615 970-381-0526 — Eve(afarmersres.com wrote: From: Eve Craven <Eveefarmersres.com> To: "sherilockman(alwhat-wire.com" <sherilockman@what-wire.com> CC: "dauigst®co.weld.co.us" <daungst a co.weld.co.us> Subject: RE: Project Application USR16-0007 Date: Tue, 12 Apr 2016 21:16:32 +0000 Sheri, Looking at the site plan, it does show the ditch with a 65' ROW, however, on page 8 of 8 (attached) it shows evergreen trees along the west side of the ditch, crossing over, and ending on the east side of the ditch. The existing fence is shown on the east side of the ditch as well. On page 5 of 8, it shows the silt fence within FRICO's ROW and blocking access to the ditch on the northwest side of the ditch. FRICO still has several concerns regarding your proposed project located at Section 28, Township 2 North, Range 67 West, in Weld County (WCR 16 and WCR 17). Please feel free to contact me if you have any further questions. Thanks Eve Eve Craven Projects Coordinator Farmers Reservoir and Irrigation Company 80 South 27th Avenue Brighton, CO 80601 303-659-7373 ext. 312 Eve@farmersres.com Show Full Headers I Print I Close Printer View From: "" <sherilockman@what-wire.com> To: "Eve Craven" <Eve@farmersres.com> Subject: Re: Project Application Date: Wed 04/06/16 10:43 AM Eve, Thank you for the information. After reviewing the paperwork I am asking that you reconsider your request for a Project Review Application. The project has no impact on the ditch. The ditch access will not be altered. We are not proposing any boring or crossing of the ditch. There will be no structures in the ditch right-of-way. There is no proposed drainage to the ditch. The storage facility will be fenced with 6 foot chain link to ensure clients will not have pedestrian or vehicle access to the ditch. Your referral response indicated that the FRICO requires a minimum of 25' on each side of the canal plus the toe of the ditch embankment and the boundaries of the ditch must be agreed upon. The site plan that was included in the County referral clearly shows a 65 foot ditch easement that has not been encroached upon. This 65 foot easement was shown on the recorded exemption and the owner understands your rights to the 65 feet. If you have documentation showing the ditch has a larger easement we would be happy to adjust the site layout accordingly. We do understand the importance of the ditch and your intentions of protecting it, however, the Project Review Application does not seem applicable and the $5,500 (minimum) fees seem unreasonable. Please let us know if we can provide you with any additional information that would satisfy your concerns. Thank you for your consideration, Sheri Lockman Lockman Land Consulting, LLC 36509 CR 41 Eaton, CO 80615 970-381-0526 Eve@farmersres.com wrote: From: Eve Craven <Eve@farmersres.com> To: "sherilockman@what-wire.com" <sherilockman@what-wire.com> Subject: Project Application Date: Tue, 5 Apr 2016 14:55:05 +0000 Good morning Sheri, I have attached a copy of our project application and Design Criteria. Please fill out the application and submit it along with a $500.00 application fee to begin the process. I will forward it onto our Engineering to get an estimate for review costs and will collect that amount from you to begin - review. If you would like to start the review right away, please include a minimum review fee of $5,000.00 to begin the process. If you have any questions, please don't hesitate to contact me. APPLICATION FOR PROJECT REVIEW Review will NOT start until fees are submitted. This includes all that are applicable. (Application fee, legal review fee and engineer review fee.) Please allow a minimum of 3 weeks after receiving all required information from the project owner for FRICO to process the application. This application will be voided after three months of the date the application is submitted to the FRICO office if no activity or communication is had. The application fee will not be reimbursed. PROJECT TITLE: NAME OF CANAL DATE: NATURE OF PROJECT: ON FRICO PROPERTY OFF FRICO PROPERTY CROSSING PURPOSE/FUNCTION (DESCRIBE) INSTALLATION METHOD IIDD Auger Boring Pipe Ramming 1S PIPE: CASED UNCASED OUTSIDE DIAMETER OF PIPE PIPE MATERIAL PRIMARY SOIL TYPE (USCS) MAXIMUM ALLOWABLE DRILLING FLUID PRESSURE (PSI) DISTANCE FROM ENTRY PIT TO CANAL CENTERLINE MINIMUM DISTANCE FROM ENTRY PIT TO EDGE OF CANAL MINIMUM VERTICAL CLEARANCE BETWEEN CANAL BOTTOM AND BORE OUTSIDE DIAMETER MINIMUM DEPTII OF BORE WITHIN FRICO ROW OWNER OF PROPOSED PROJECT (COMPANY,ADDRESS, PHONE & EMAIL) PH ( ) CONTACT PERSON PII( ) EMAIL ADDRESS OWNER'S ENGINEER (COMPANY,ADDRESS, PHONE& EMAIL) PH () CONTACT PERSON PH ( ) EMAIL ADDRESS PERSON(S) MAKING APPLICATION (NAME, ADDRESS,PHONE,EMAIL) PH( ) CONTACT PERSON PH () EMAIL ADDRESS APPLICATION FOR TRENCHLESS PROJECT REVIEW Review will NOT start until fees are submitted. This includes all that are applicable. (Application fee, legal review fee and engineer review fee.) Please allow a minimum of 2 weeks to process the application. PROJECT TITLE: NAME OF CANAL NATURE OF PROJECT: ON FRICO PROPERTY OFF FRICO PROPERTY DATE: UTILITY CROSSING PURPOSE/FUNCTION (DESCRIBE) UTIITY INSTALLATION METHOD (DESCRIBE) OUTSIDE DIAMETER OF PIPE PIPE MATERIAL IS PIPE: CASED UNCASED HORIZONTAL DIRECTIONAL DRILLING: PRIMARY SOIL TYPE (USCS) MAXIMUM ALLOWABLE DRILLING FLUID PRESSURE DISTANCE FROM ENTRY PIT TO CANAL CENTERLINE MINIMUM VERTICAL CLEARANCE BETWEEN CANAL BOTTOM AND BORE OUTSIDE DIAMETER MINIMUM DEPTH OF BORE WITHIN FRICO ROW AUGER BORING & PIPE RAMMING DRILLING: PRIMARY SOIL TYPE (USCS) MINIMUM DISTANCE FROM ENTRY PIT TO EDGE OF CANAL MINIMUM VERTICAL CLEARANCE BETWEEN CANAL BOTTOM AND BORE OUTSIDE DIAMETER MINIMUM DEPTH OF BORE WITHIN FRICO ROW OWNER OF PROPOSED PROJECT (COMPANY,ADDRESS,PHONE & EMAIL) PH ( ) CONTACT PERSON it ( ) EMAIL ADDRESS OWNER'S ENGINEER(COMPANY,ADDRESS, PHONE& EMAIL) PII ( ) CONTACT PERSON PH ( ) EMAIL ADDRESS PERSON(S) MAKING APPLICATION (NAME, ADDRESS, PHONE, EMAIL) Pii ( ) EMAIL ADDRESS: LIST OF AGENCIES (NAME ADDRESSES, PHONE NUMBERS,CONTACT PERSONS) OF GOVERNMENTAL ENTITIES HAVING JURISDICTION OR REVIEWING PLANS AND SPECIFICATIONS: LEGAL DESCRIPTION OF PROJECT LOCATION: (Please include Township, Range, Section and cross roads/streets) ESTIMATED START OF CONSTRUCTION: ESTIMATED COMPLETION OF CONSTRUCTION: PLEASE SUBMIT THE FOLLOWING: A. AERIAL PHOTO SHOWING TIIE PROPOSED CROSSING B. CONSTRUCTION PLANS AND PROCEDURES ADHERING TO REQUIREMENTS OF DESIGN REVIEW PROCESS AND DESIGN CRITERIA FOR FACILIITES OF FARMERS RESERVOIR AND IRRIGATION COMPANY, CHAPTER 5 By completing this application,the Applicant acknowledges Farmers Reservoir and Irrigation Company may or may not approve this application and proposed construction at its discretion;and furthermore,the Applicant agrees to reimburse Farmers Reservoir and Irrigation Company,in full,for all costs associated with its review of the application, regardless of the applications approval or denial. The terms and provisions of this application shall not he merged in or terminated by the issuance of any other documents or instruments by Farmers Reservoir and Irrigation Company,hut shall continue to be effective and survive between the parties,their heirs,successors and assigns. APPLICANT SIGNATURE (DATE) REVIEW PROCESS CHECK LIST Development PIIASE 1: PHASE 2: PHASE 3: PHASE 4: PHASE 5: PHASE 6: PHASE 7: Phase 1: Application and plans are submitted to Farmers Reservoir and Irrigation Company. Farmers Reservoir and Irrigation Company requests a copy of the approved plan(s) and action(s) taken by the County or other authorities that have the powers to approve/deny the development. Phase 2: Estimate of review costs given to developer (prior to review). Phase 3: Developer deposits application fee and any applicable review fees before review begins. Phase 4: The engineer(s) and attorney(s)for Farmers Reservoir and Irrigation Company are given notice to proceed,within the review process dollar limit. Phase 5: The staff of Farmers Reservoir and Irrigation Company, its engineer(s) and its attorney(s) recommend to the Board the action of the development that is to be taken. Phase 6: The approval of the project is conveyed to the project owner with a copy of the easement agreement for signatures. Phase 7: Once Farmers Reservoir and Irrigation Company receives the signed agreement and easement fee a copy of the final signed agreement and final approval to start construction will be given to the project owner. Hello