Loading...
HomeMy WebLinkAbout20160747.tiff 'rte. 1� RFil/A LAND USE APPLICATION SUMMARY SHEET L cc' N 2S PLANNER: C. Gathman HEARING DATE: February 2, 2016 CASE NUMBER: COZ15-0003 APPLICANT: Wes Moser, Inc. ADDRESS: P.O. Box 205, Fort Lupton, CO 80621 REPRESENTATIVE: Tim Naylor- AGPROfessionals REQUEST: Change of Zone from the A (Agricultural)Zone District to the 1-3 (Industrial)Zone District. LEGAL: Part of the E2 of Section 25 T3N R65W of the 6th PM, Weld County, Colorado LOCATION: West of and adjacent to County Road 49 and south of and adjacent to County Road 30. ACRES: +/-240.73 acres PARCEL#: 121325400006 POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS The Department of Planning Services' staff has received responses from the following agencies: With Comment: Department of Public Health and Environment, referral received December 28, 2015 Department of Planning Services— Engineer, referral received December 28, 2015 Weld County Public Works, referral received January 18, 2015 Department of Planning Services— Floodplain, referral received December 3, 2015 Without Comment: Weld County Sheriffs Office, referral received December 21, 2015 Colorado Parks and Wildlife, referral received December 15, 2015 Weld County Public Works, referral received October 22, 2015 Weld County Code Compliance, referral received December 8, 2015 The Department of Planning Services' staff has not received responses from: Weld County Sheriff's Office Colorado Division of Water Resources Colorado Parks and Wildlife Southeast Weld Fire Protection District School District RE-3J Platte Valley Soil Conservation District COZ15-0003- Moser Page 1 1 f ADMINISTRATIVE RECOMMENDATION G G v T Y CHANGE OF ZONE PLANNER: C. Gathman HEARING DATE: February 2, 2016 CASE NUMBER: COZ15-0003 APPLICANT: Wes Moser, Inc. ADDRESS: P.O. Box, 205, Fort Lupton CO 80621 REPRESENTATIVE: Tim Naylor-AGPROfessionals REQUEST: Change of Zone from the A (Agricultural)Zone District to the 1-3 (Industrial)Zone District. LEGAL: Part of the E2 of Section 25 T3N R65W of the 6th PM, Weld County, Colorado LOCATION: West of and adjacent to County Road 49 and south of and adjacent to County Road 30. ACRES: +/- 240.73 acres PARCEL#: 121325400006 THE DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED/DENIED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-50 of the Weld County Code. 2. The submitted materials are in compliance with Section 23-2-30 of the Weld County Code, as follows: A. Section 23-2-30.A.1. - That the proposal is consistent with Chapter 22 of the Weld County Code. Section 22-2-80.A.2 — Industrial Goals and Policies (.Policy 1.2. of the Weld County Code states, "Encourage new industrial development within existing industrial areas." There are industrial uses (oil and gas support and service facilities) located adjacent to the proposed change of zone to the north and northwest. Section 22-2-80.A.3 — Industrial Goals and Policies A.3 I.Policy 1.3 of the Weld County Code states, "Encourage industrial development by improving major transportation corridors." COZ15-0003- Moser Page 2 The proposed change of zone is located adjacent to an existing transportation corridor(County Road 49)that is in the process of being widened. Section 22-6-20 ECON.Policy 3.1. states, "County activities and regulation should protect the rights of private property owners and the public health, safety and welfare, recognizing that these basic rights and protections allow the free market to prosper and grow the local economy." The applicant is requesting a Change of Zone to 1-3 Industrial in accordance with the Change of Zone process outlined in the Weld County Code. This industrial zone contributes to the growth of the local economy. Section 22-2-70 D. I.Goal 4. states, "All new industrial development should pay its own way." The applicant will be responsible for covering all costs for all on-site and any applicable off-site improvements associated with this use, as required through the Improvements Agreement. Section 22-6-20 E. ECON.Goal 5. states, "Recognize and promote specific places and resources in the County that can uniquely support economic development." This Change of Zone will add to the land suitable for industrial development and support economic development of the County. 1-3 Industrial zoning allows a wide- range of uses that are available to businesses. Section 22-2-80.F I.Goal 6. of the Weld County Code states, "Minimize the incompatibilities that occur between industrial uses and surrounding properties. Should this change of zone be approved, any proposed uses on the site will require a Site Plan Review or a Use by Special Review permit (depending on the use) prior to developing the site. Uses will need to meet the Industrial operational and design standards delineated in Sections 23-3-340 and 23-3-350 of the Weld County Code. These standards address drainage, parking, loading, setbacks, landscaping and lot coverage, noise, lighting... B. Section 23-2-30.A.2. - The uses which would be allowed on the subject property by granting the change of zone will be compatible with the surrounding land uses. The proposed change of zone site is located adjacent to a number of industrial uses. USR15-0016 (oil and gas transloading and storage) is located immediately to the north and west of the site. MUSR13-0011 and MUSR14-0025 (crude oil tank farm, truck unloading facility, oil polishing facility), and USR14-0048 (Central Oil Stabilization Facility) are located to the north of (across County Road 30) from the site. Two single-family residences are located to the east of the site (across County Road 49). No phone calls or correspondence has been received from surrounding property owners in regards to this case. Should this change of zone be approved, any proposed uses on the site will require a site plan review prior to site development. Uses will need to meet the Industrial standards of the Weld County Code in regards to noise, lighting, air quality, property maintenance...Additionally, the 1-3 Industrial Zone District requires that outdoor storage be screened from adjacent properties and rights-of-way. COZ15-0003- Moser Page 3 C. Section 23-2-30.A.3. - Adequate water and sewer service can be made available to the site to serve the uses permitted within the proposed zone district. Septic systems and wells will be installed at the time of development. D. Section 23-2-30.A.4. - Street or highway facilities providing access to the property are adequate in size to meet the requirements of the proposed zone districts. The site is adjacent to an existing collector road (County Road 30) and an existing Arterial Road (County Road 49) that is in the process of being widened. E. Section 23-2-30.A.5. - In those instances where the following characteristics are applicable to the rezoning request, the applicant has demonstrated compliance with the applicable standards: 1) Section 23-2-30.A.5.a. — A portion of the proposed Change of Zone is partially located in the 100-year floodplain. Any future development within the floodplain will require a flood hazard development permit. 2) Section 23-2-30.A.5.b. — According to the Geologic Evaluation dated August 19, 2015, no economically recoverable gravel resources at this site. 3) Section 23-2-30.A.5.c. — According to the Geologic Evaluation dated August 19, 2015, based on evaluation of Soil Conservation Service Maps indicate that could be used for support of lightly to moderately industrial structures. An On-site Geotechnical Soils Report needs to be submitted prior to recording of Site Plan Review or Use By Special Review that includes a preliminary design for the roads to be constructed on-site. Additionally, engineered foundation plans along with a soils report or open hole inspection report are required to be submitted with building permit(s). This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Change of Zone from the A (Agricultural) Zone District to 1-3 (Industrial) Zone District is conditional upon the following: 1. Prior to recording the plat: A. The applicant shall provide the Weld County Department of Planning Services with a Statement of Taxes from the Weld County Treasurer showing no delinquent taxes exist for the parcel. (Department of Planning Services) B. Due to the industrial use of this site Public Works requires the submittal of a traffic study to determine any potential required roadway improvements. Roadway improvements may be triggered due to heavy truck traffic associated with the facility including turn lanes onto County Road 49 and on to County Road 30; the following is a list of triggers for turn lanes: a. 25 vph turning right into the facility during a peak hour. b. 10 vph turning left into the facility during a peak hour. c. 50 vph turning right out of the facility during a peak hour. (Department of Public Works) COZ15-0003- Moser Page 4 2. The plat shall be amended to delineate the following: A. All pages of the plat shall be labeled COZ15-0003. (Department of Planning Services) B. The plat shall adhere to Section 23-2-50.C and D. of the Weld County Code. (Department of Planning Services) C. All recorded easements shall be shall be shown and dimensioned on the Change of Zone plat. (Department of Planning Services) D. County Road 30 is a paved road and is designated on the Weld County Road Classification Plan as a collector road, which requires 80 feet of right-of-way at full buildout. An additional 10 feet shall be delineated on the plat as future right- of-way. The applicant shall verify and delineate on the plat the future and existing right-of-way and the documents creating the existing right-of-way. If the existing right of way cannot be verified it shall be dedicated. All setbacks shall be measured from the edge of future right-of-way. This road is maintained by Weld County. (Department of Planning Services-Engineer) E. County Road 49 is designated on the Weld County Classification plan as an arterial road, which typically requires 140ft of right-of-way at full build out. Weld County is currently in the process of widening this corridor. The alignment of the road widening project varies along the section line for the corridor. Contact Public Works for the location of the existing and future right of way and easements and delineate these on the map. (Department of Planning Services-Engineer) F. The point of beginning and the point of commencement on the plat shall be verified and corrected as necessary. (Department of Public Works) G. The south dimension shall be clarified if it is from section corner to the south quarter corner or from right-of-way to quarter corners. (Department of Public Works) H. The subdivision exemption boundary (if recorded prior to the change of zone plat)for SUBX15-0023 shall be shown. (Department of Public Works) Show County Road 49 future right-of-way (generally 70-feet from section line plus corner sight triangle at County Road 30 and 20-foot permanent utility easement abutting proposed right-of-way). (Department of Public Works) J. Show the 50-foot access easement along the property line adjacent to the Magellan USR. (Department of Public Works) K. Add access easement across property from County Road 49 to the Magellan property. (Department of Public Works) L. Show a 60-foot turning radius as required on all accesses to Public Roads to accommodate truck traffic. (Department of Public Works) M. The spelling of "DCP Midstream" shall be corrected. (Department of Public Works) N. The spelling of "Board of County Commissioners" shall be corrected on the Planning Commission Certificate. (Department of Public Works) O. The Section/Township/Range should be changed from "2/7/66" to "25/3/65" on the bottom of plat sheet 1. (Department of Public Works) COZ15-0003- Moser Page 5 P. Show and label the approved accesses (AP15-00502). (Department of Planning Services-Engineer) Q. Show the floodplain and floodway (if applicable) boundaries on the map. Label the floodplain boundaries with the FEMA Flood Zone and FEMA Map Panel Number or appropriate study. (Department of Planning Services - Floodplain) 3. The following notes shall be delineated on the Change of Zone plat: A. The Change of Zone allows for 1-3 (Industrial) uses which shall comply with the I- 3 (Industrial) Zone District requirements as set forth in Article III Division 5 of the Weld County Code. (Department of Planning Services) B. The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. (Department of Planning Services) C. Any future structures or uses on site must obtain the appropriate zoning and building permits. (Department of Planning Services) D. Water service may be obtained from an individual well. (Department of Public Health and Environment) E. The parcel is currently not served by a municipal sanitary sewer system. Sewage disposal may be by septic systems designed in accordance with the regulations of the Colorado Department of Public Health and Environment, Water Quality Control Division and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. (Department of Public Health and Environment) F. Language for the preservation and/or protection of the absorption field shall be placed on the plat. The note shall state; Activity or use on the surface of the ground over any part of the OWTS must be restricted to that which shall allow the system to function as designed and which shall not contribute to compaction of the soil or to structural loading detrimental to the structural integrity or capability of the component to function as designed. (Department of Public Health and Environment) G. During development of the site, all land disturbances shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions, at the request of the Weld County Health Department, a fugitive dust control plan must be submitted. (Department of Public Health and Environment) H. If land development creates more than a 25-acre contiguous disturbance, or exceeds 6 months in duration, the responsible party shall prepare a fugitive dust control plan, submit an air pollution emissions notice, and apply for a permit from the Colorado Department of Public Health and Environment. (Department of Public Health and Environment) A stormwater discharge permit may be required for a development/redevelopment /construction site where a contiguous or non- contiguous land disturbance is greater than or equal to one acre in area. Contact the Water Quality Control Division of the Colorado Department of Public Health and the Environment at www.cdphe.state.co.us/wq/PermitsUnit for more information. (Department of Public Health and Environment) COZ15-0003- Moser Page 6 J. Should noxious weeds exist on the property, or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling the noxious weeds, pursuant to Chapter 15, Articles I and II, of the Weld County Code. (Department of Planning Services) K. The historical flow patterns and runoff amounts will be maintained on the site. (Department of Planning Services) L. An Improvements and Road Maintenance Agreement will be required as part of a Site Plan Review, Use by Special Review, or Subdivision application. (Department of Public Works) M. Building permits shall be obtained prior to the construction of any new building. A plan review is required for each building. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are required when applying for each permit. (Department of Building Inspection) N. Buildings, structures shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2012 International Building Code; 2012 International Mechanical Code; 2012 International Plumbing Code: 20121nternational Energy Code; 2006 International Fuel Gas Code; the 2012 International Plumbing Code; 2014 National Electrical Code; 2003 ANSI 117.1 Accessibility Code and Chapter 29 of the Weld County Code. (Department of Building Inspection) O. A Flood Hazard Development Permit is required for all construction or development occurring in the floodplain or floodway as delineated on Federal Emergency Management Agency (FEMA) FIRM Community Panel Map #08123C-1975E effective date will be January 20, 2016 (Box Elder Floodplain). Any development shall comply with all applicable Weld County requirements, Colorado Water Conservation Board requirements as described in Rules and Regulations for Regulatory Floodplains in Colorado, and FEMA regulations and requirements as described in 44 CFR parts 59, 60, and 65. The FEMA definition of development is any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation, drilling operations, or storage of equipment and materials. (Department of Planning Services- Floodplain) P. Building Permits issued on the proposed lots will be required to adhere to the fee structure of the Weld County Road Impact Program. (Ordinance 2011-2) Q. Building Permits issued on the proposed lots, will be required to adhere to the fee structure of the County Facility Fee and Drainage Impact Fee. (Ordinance 2011- 2) R. Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations. (Department of Planning Services) S. RIGHT TO EXTRACT MINERAL RESOURCES STATEMENT: Weld County has some of the most abundant mineral resources, including, but not limited to, sand and gravel, oil, natural gas, and coal. Under title 34 of the Colorado Revised Statutes, minerals are vital resources because (a)the state's commercial mineral COZ15-0003- Moser Page 7 deposits are essential to the state's economy; (b) the populous counties of the state face a critical shortage of such deposits; and (c) such deposits should be extracted according to a rational plan, calculated to avoid waste of such deposits and cause the least practicable disruption of the ecology and quality of life of the citizens of the populous counties of the state. Mineral resource locations are widespread throughout the County and person moving into these areas must recognize the various impacts associated with this development. Often times, mineral resource sites are fixed to their geographical and geophysical locations. Moreover, these resources are protected property rights and mineral owners should be afforded the opportunity to extract the mineral resources. T. WELD COUNTY'S RIGHT TO FARM: Weld County is one of the most productive agricultural counties in the United States, typically ranking in the top ten counties in the country in total market value of agricultural products sold. The rural areas of Weld County may be open and spacious, but they are intensively used for agriculture. Persons moving into a rural area must recognize and accept there are drawbacks, including conflicts with long-standing agricultural practices and a lower level of services than in town. Along with the drawbacks come the incentives which attract urban dwellers to relocate to rural areas: open views, spaciousness, wildlife, lack of city noise and congestion, and the rural atmosphere and way of life. Without neighboring farms, those features which attract urban dwellers to rural Weld County would quickly be gone forever. Agricultural users of the land should not be expected to change their long- established agricultural practices to accommodate the intrusions of urban users into a rural area. Well-run agricultural activities will generate off-site impacts, including noise from tractors and equipment; slow-moving farm vehicles on rural roads; dust from animal pens, field work, harvest and gravel roads; odor from animal confinement, silage and manure; smoke from ditch burning; flies and mosquitoes; hunting and trapping activities; shooting sports, legal hazing of nuisance wildlife; and the use of pesticides and fertilizers in the fields, including the use of aerial spraying. It is common practice for agricultural producers to utilize an accumulation of agricultural machinery and supplies to assist in their agricultural operations. A concentration of miscellaneous agricultural materials often produces a visual disparity between rural and urban areas of the County. Section 35-3.5-102, C.R.S., provides that an agricultural operation shall not be found to be a public or private nuisance if the agricultural operation alleged to be a nuisance employs methods or practices that are commonly or reasonably associated with agricultural production. Water has been, and continues to be, the lifeline for the agricultural community. It is unrealistic to assume that ditches and reservoirs may simply be moved "out of the way" of residential development. When moving to the County, property owners and residents must realize they cannot take water from irrigation ditches, lakes, or other structures, unless they have an adjudicated right to the water. Weld County covers a land area of approximately four thousand (4,000) square miles in size (twice the size of the State of Delaware) with more than three thousand seven hundred (3,700) miles of state and County roads outside of municipalities. The sheer magnitude of the area to be served stretches available resources. Law enforcement is based on responses to complaints more than on patrols of the County, and the distances which must be traveled may delay all emergency responses, including law enforcement, ambulance, and fire. Fire protection is usually provided by volunteers who must leave their jobs and families to respond to emergencies. County gravel roads, no matter how often COZ15-0003- Moser Page 8 they are bladed, will not provide the same kind of surface expected from a paved road. Snow removal priorities mean that roads from subdivisions to arterials may not be cleared for several days after a major snowstorm. Services in rural areas, in many cases, will not be equivalent to municipal services. Rural dwellers must, by necessity, be more self-sufficient than urban dwellers. People are exposed to different hazards in the County than in an urban or suburban setting. Farm equipment and oil field equipment, ponds and irrigation ditches, electrical power for pumps and center pivot operations, high speed traffic, sand burs, puncture vines, territorial farm dogs and livestock, and open burning present real threats. Controlling children's activities is important, not only for their safety, but also for the protection of the farmer's livelihood. 4. Upon completion of Conditions of Approval 1. and 2. above, the applicant shall submit one (1) paper copy or one (1) electronic copy (.pdf) of the plat for preliminary approval to the Weld County Department of Planning Services. Upon approval of the plat the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section 23-2-50.C. and D. of the Weld County Code. The Mylar plat and additional requirements shall be submitted within one- hundred-twenty (120) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. 5. The Change of Zone plat map shall be submitted to the Department of Planning Services' for recording within one-hundred-twenty (120) days of approval by the Board of County Commissioners. With the Change of Zone plat map, the applicant shall submit a digital file of all drawings associated with the Change of Zone application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are .shp (Shape Files), Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif(Group 4) (Group 6 is not acceptable). 6. In accordance with Weld County Code Ordinance 2005-7 approved June 1, 2005, should the plat not be recorded within the required one-hundred-twenty (120) days from the date the Board of County Commissioners resolution a $50.00 recording continuance charge shall added for each additional 3 month period. COZ15-0003- Moser Page 9 H N DEPARTMENT OF PLANNING SERVICES ,..,, 186w,..., 1555 N 17th AVE GREELEY, CO 80631 WEBSITE: www.co.weld.co.us E-MAIL: cgathman@co.weld.co.us 1f PHONE: (970) 353-6100, Ext. 3537 r-p j ` . i FAX: (970) 304-6498 February 05, 2016 NAYLOR TIM 3050 67TH AVE STE 200 GREELEY, CO 80634 Subject: COZ15-0003 - Change of Zone from the A (Agricultural) Zone District to the 1-3 (Industrial) Zone District. On parcel(s)of land described as: E2 SECTION 25, T3N, R65W OF THE 6TH P.M., WELD COUNTY, COLORADO. Dear Applicants: I have rescheduled the meeting with the Weld County Planning Commission to February 23, 2016, at 12:30 p.m. A subsequent hearing with the Board of County Commissioners will be held on March 9, 2016 at 10:00 a.m. Both hearings will be held in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members or Board of County Commissioners may have. If you have any questions concerning this matter, please call. Respectfully, j �. RDeasallyn: signed mthea Kristine his dom �r Reason:l b uthor of Ranslecument Date:2016.02.05 1302:14-07'00' Chris Gathman Planner H N DEPARTMENT OF PLANNING SERVICES a $6i 1555 N 17th AVE GREELEY, CO 80631 WEBSITE: www.co.weld.co.us E-MAIL: cgathman@co.weld.co.us �f PHONE: (970) 353-6100, Ext. 3537 p - i FAX: (970) 304-6498 January 08, 2016 NAYLOR TIM 3050 67TH AVE STE 200 GREELEY, CO 80634 Subject: C0Z15-0003 - Change of Zone from the A (Agricultural) Zone District to the 1-3 (Industrial) Zone District. On parcel(s)of land described as: E2 SECTION 25, T3N, R65W OF THE 6TH P.M., WELD COUNTY, COLORADO. Dear Applicants: I have scheduled a meeting with the Weld County Planning Commission on February 2, 2016, at 12:30 p.m. A subsequent hearing with the Board of County Commissioners will be held on February 17, 2016 at 10:00 a.m. Both hearings will be held in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members or Board of County Commissioners may have. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant needs to provide the Weld County Planning Department with written certification indicating the above requirement has been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission and will be included in the staff report one week prior to the scheduled Planning Commission hearing. You may view the staff report at www.weldcou ntyplanningcases.orq If you have any questions concerning this matter, please call. Respectfully, Digitally signed by Kristine Ranslem {w� swWw - — Date: 2016.01.08 14:55:52 -07'00' Chris Gathman Planner N DEPARTMENT OF PLANNING SERVICES i 1555 N 17th AVE j ' r ^ GREELEY, CO 80631 (t ', WEBSITE: www.co.weld.co.us � E-MAIL: cgathman@co.weld.co.us iri �j, PHONE: (970)353-6100, Ext. 3537 �: X ? . FAX: (970)304-6498 December 03, 2015 NAYLOR TIM 3050 67TH AVE STE 200 GREELEY, CO 80634 Subject: COZ15-0003 - Application for a Change of Zone from A (Agricultural) to 1-3 (Industrial) Zone District. On parcel(s)of land described as: E2 SECTION 25, T3N, R65W OF THE 6TH P.M., WELD COUNTY, COLORADO. Dear Applicants: Your application and related materials for the request described above are complete and in order at this time. I will schedule a meeting with you at the end of the review period to discuss the referral comments received by our office. If you have any questions concerning this matter, please call. Respectfully, Digitally signed by Kristine Ranslem • Reason:I am the author of this document l-11/fAA Date:2015.12.03 11:45:09-0700' Chris Gathman Planner FIELD CHECK inspection dates: 1/21 & 2/12/2016 APPLICANT: Wes Moser, Inc. CASE #: COZ15-0003 REQUEST: Change of Zone from the A (Agricultural)Zone District to the 1-3 (Industrial)Zone District. LEGAL: Part of the E2 of Section 25 T3N R65W of the 6'" PM, Weld County, Colorado LOCATION: West of and adjacent to County Road 49 and south of and adjacent to County Road 30. PARCEL ID #s: 121325400006 ACRES: +/- 240.73 acres Zoning Land Use N A N USR15-0016 (oil and gas transloading and storage)/MUSR13-0011 and MUSR14-0025 (crude oil tank farm, truck unloading facility, oil polishing facility)and USR14-0048 (Central Oil Stabilization Facility) E A E 2 SF residences/Farmground S A S Cropland W A W Cropland COMMENTS: Cropland. Existing oil wells and well heads on property. C Chris Gathman - Planner III MEMORANDUM TO: C. Gathman DATE: December 3, 2015 2- c cu ?YJ FROM: Diana Aungst, CFM SUBJECT: COZ15-0003, Wes Moser, Inc PROJECT: Change of Zone from the A(Agricultural)to the 1-3 (Industrial)Zone District. PARCEL: 121325400006 FLOOD ZONE: A(Approximate) DELINEATE ON THE PLAT: Show the floodplain and floodway (if applicable) boundaries on the map. Label the floodplain boundaries with the FEMA Flood Zone and FEMA Map Panel Number or appropriate study. (Department of Planning Services- Floodplain) PLAT NOTE: A Flood Hazard Development Permit is required for all construction or development occurring in the floodplain or floodway as delineated on Federal Emergency Management Agency (FEMA) FIRM Community Panel Map #08123C-1975E effective date will be January 20, 2016 (Box Elder Floodplain). Any development shall comply with all applicable Weld County requirements, Colorado Water Conservation Board requirements as described in Rules and Regulations for Regulatory Floodplains in Colorado, and FEMA regulations and requirements as described in 44 CFR parts 59, 60, and 65. The FEMA definition of development is any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation, drilling operations, or storage of equipment and materials. (Department of Planning Services- Floodplain) Hello