HomeMy WebLinkAbout20163294.tiffRESOLUTION RE: APPROVE AGREEMENT FOR PRELIMINARY ENGINEERING SERVICES AND SUBMITTAL OF EXHIBIT "A" FOR RAILROAD APPROVAL AND AUTHORIZE CHAIR TO SIGN - UNION PACIFIC RAILROAD (UPRR) WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with an Agreement for Preliminary Engineering Services and Submittal of Exhibit "A" for Railroad Approval between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and Union Pacific Railroad (UPRR), commencing upon full execution and ending with further terms and conditions being as stated in said agreement, and WHEREAS, after review, the Board deems it advisable to approve said agreement, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Agreement for Preliminary Engineering Services and Submittal of Exhibit "A" for Railroad Approval between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and the Union Pacific Railroad (UPRR) be and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said agreement. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 24th day of October, A.D., 2016. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: d ) G: Jeito•ok, Mike Freeman, Chair Weld County Clerk to the Board arbara Kirkmey County Attorney Date of signature: «I €c( ICo cc R CK 1O -m) I1lC1/I(0 Steve Moreno 2016-3294 EG0073 .pr1kka S.a MEMORANDUM TO: Esther Gesick, CTB DATE: October 19, 2016 FROM: Clay Kimmi, P.E., Public Works SUBJECT: Union Pacific Railroad Preliminary Engineering Agreement for CR 49 Corridor Crossing near CR 54 Attached are 2 original agreements. Please place the attached agreement on the BOCC Agenda. Please return a copy of the agreement to me so I can forward to the railroad. The BOCC approved the pass -around request to put this on the BOCC agenda on October 18, 2016. This agreement is between the Union Pacific Railroad (UPRR) and Weld County so UPRR can begin the preliminary design for the CR 49 railroad crossing just north of CR 54. UPRR is to be reimbursed $5,000 for their time and materials to develop the preliminary design. IHC is responsible for the reimbursement through the design -build contract. UPRR is aware the crossing has been listed as exempt by the PUC due to the fact that there are no trains on the line at this time. It is anticipated the preliminary design will include the extension of the concrete panels and the installation of conduits for a future crossing signal. No signaling equipment is anticipated to be installed as part of the CR 49 Corridor project. I will plan on attending the BOCC hearing to answer any questions that the Board may have regarding this agreement. 2016-3294 Page 1 of 1 M:\Active Projects\Strategic Corridor\WCR 49 Corridor\Railroad\Preliminary Engineering Agreement\UPRR Agreement Memo to BOCC.docx BOARD OF COUNTY COMMISSIONERS PASS -AROUND REVIEW/ WORK SESSION REQUEST RE: Union Pacific Railroad Preliminary Engineering Agreement for CR 49 Corridor Crossing near CR 54 DEPARTMENT: Pubic Works DATE: October 7, 2016 PERSON REQUESTING: Clay Kimmi Brief description of the problem/issue: In order to complete the CR 49 corridor, the project has to cross the Union Pacific Railroad just north of CR 54. UPRR requires a preliminary engineering agreement so they can start designing the crossing. The cost for the preliminary engineering provided by UPRR was $5,000. IHC will be responsible for paying all costs associated with the crossing. However, UPRR will not enter into the agreement with IHC. The agreement has to be with Weld County since the road is ultimately ours to maintain. UPRR is aware the crossing has been listed as exempt by the PUC due to the fact that there are no trains on the line at this time. It is anticipated the preliminary design will include the extension of the concrete panels through the width of CR 49 and the relocation of the signaling equipment. It is anticipated the design will include plumbing the crossing for future signals but no signaling equipment will be placed. What options exist for the Board? (Include consequences, impacts, costs, etc. of options) 1. Approve the preliminary engineering agreement so the Segment 3 design for the roadway can be completed. 2. Do not sign the agreement. Recommendation: 1. Sign the agreement so the design can be completed. Mike Freeman, Chair Sean P. Conway, Pro-Tem Julie A. Cozad Barbara Kirkmeyer Steve Moreno M:\FORMS\WorkSession-passaround2016. doc Approve Recommendation IfY\P Schedule Work Session Other/Comments: October 7, 2016 PUBLIC WORKS DEPARTMENT 1111 H STREET, P.O. BOX 758 GREELEY, COLORADO 80632 WEBSITE: WWW.CO.WELD.CO.US PHONE: (970) 356-4000, EXT. 3750 FAX: (970) 304-6497 AGREEMENT FOR PRELIMINARY ENGINEERING SERVICES AND SUBMITTAL OF EXHIBIT "A" FOR RAILROAD APPROVAL Crossing: Existing Public: Yes State: Colorado City: near Kersey M.P. 145.19. Monfort Industrial Lead Subdivision County Road 49/DOT No. 805243D Weld County Lance Kippen Manager, Industry & Public Projects Union Pacific Railroad Company 1400 West 52nd Avenue Denver, CO 80221 Dear Mr. Kippen: Weld County and its design -build contractor (IHC) are preparing plans to widen County Road 49 across the existing Union Pacific Railroad tracks crossing at the location referenced above. The proposed work includes widening the roadway, which necessitates extending the crossing surface material and relocating the existing active crossing warning devices or removing the existing active crossing warning devices for salvage. Note the track is currently inactive with "exempt" signage at the project crossing. In connection with the project, Weld County considers it necessary for the successful advancement of the project for Union Pacific Railroad to collaborate in the development of the project by performing the following: • preliminary engineering and other related services; • development of cost estimates; • review of the projects preliminary layouts; and • submit current train and switching moves. Weld County authorizes and agrees to reimburse the Railroad for its expenses and actual costs that are incurred for collaborating in the development of the project's preliminary engineering and other preliminary activities. The Railroad has estimated these preliminary engineering and other preliminary costs will be $5,000.00. Payment will be made within thirty (30) days from agrWeld County's receipt and approval of the Railroad's request for reimbursement. The Railroad will refer to Weld County's Project Number SRP-28, CR 49 Expansion and forward Invoices to: Page 1 of 3 M:\Active Projects\Strategic Corridor\WCR 49 Corridor\Railroad\Preliminary Engineering Agreement\UPRR Agreement for Preliminary Engineering Services - CR 49 (002).docx do /&. , og4947 6) Mr. Clay Kimmi Project Manager Weld County Public Works Department 1111 H St PO Box 758 Greeley, CO 80623-0758 CKimmi@co.weld.co.us Additionally, attached for your review and approval is one (1) set of half -scale prints of the concept plans marked Exhibit A, which are the 60% complete plans and show the basic features of the proposed roadway expansion project at the location referenced on page 1 . Please review and provide comments on the basic features of Exhibit A as soon as possible. Also enclosed is one (1) set of photos of the project area. The project may require the Railroad to incur costs for force account activities. Please prepare the railroad force account cost estimate for work activities to be provided by your company, as identified in Exhibit A and submit them as your earliest convenience so that they may be attached to the railroad generated Construction & Maintenance (C&M) agreement. Please verify the number of current regular trains (Q) (line inactive) and switching movements (0) with a Maximum Speed of N/A MPH at this location as currently shown in our inventory records. This information will be used by Weld County's Contractor to obtain Railroad Protective Liability Insurance. This agreement is intended to address Preliminary Engineering. It is understood by both parties that the Railroad may withhold its approval for any reason directly or indirectly related to safety or its operations, property issues, or effect to its facilities. If the Project is approved, Union Pacific will continue to work with Weld County to develop Final Plans, Specifications and prepare Material and Cost Estimates for Railroad Construction Work associated with the project. It is also understood that if the project is constructed, it will be at no cost to the railroad. Weld County and the Railroad will enter into separate License, Right of Entry, Construction and Maintenance Agreements associated with the actual construction of the project, if the project is accepted and approved by the Railroad. The Agreements will be drafted by Union Pacific and forwarded to Weld County after the Exhibit A and cost estimates have been approved. Please contact Clay Kimmi at telephone number (970) 304-6496 x3741 or via email at CKimmi@co.weld.co.us ifyou have any questions. Your assistance in this matter is appreciated. Page 2 of 3 M:\ -Active Projects\Strategic Corridor\WCR 49 Corridor\Railroad\Preliminary Engineering Agreement\UPRR Agreement for Preliminary Engineering Services - CR 49 (002).docx WELD COUNTY AND UNION PACIFIC RAILROAD AGREEMENT FOR PRELIMINARY ENGINEERING SERVICES WELD COUNTY ROAD 49 WIDENING PROJECT da4,4) Deputy Clerk h o the Boa ACCEPTED BY: Union Pacific Railroad Company By: Name: Zioreec Title: fi i p' ' / A,il e. fi ZPP ATTEST: BY: r dart- TITLE: "yr rde(p ti ©o BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ike Freeman, Chair OCT 2 4 2016 Date /DA//G Page 3of3 M:\Active Projects\Strategic Corridor\WCR 49 Corridor\Railroad\Preliminary Engineering Agreement\UPRR Agreement for Preliminary Engineering Services - CR 49 (002).docx c,20 /6, ^ 307911 (2_) • 4 -r 104 LF OF ROADWAY RAIL AT CROSSING 2 W F a. Z w Q m S tl F i a rO W Q = w a O wag U a0 Z 5 ZQ -m a ow w ww (n Q IS- Z ceO U w cra' O W _J z W a 5o> w w) -0W IY JIe O_ZF-OW WCawam w r MMJQO Q QQJ LU 0QW2 I - (n S 0 -I-I F-=F-W≤W ~oS z 0 Z F- < w iii -1-00 _ LQQ.w I- Oa U M0ZQ Oz< DOJa. Q O_ a O Qw=�i)aF- OU (n - _1_10war Q3 zm-Ii6Li wi— tty) XIY a0‹ om a W W Q C7 S �za? I - ow w< m<J3—(n (DO 1m Li LiD3gD o: QO LLL. O _ � OD OQ m4-0 z mz a:o 0=w(nSS 0Q am u-<zaF-- to Y W W 3 <0 a Z O 3� z0 W FAO Oav zcT JOm 02 WDJ Q_L zN OOzLi Z U o! 000 Ow? o:=w aF-a W Jz0 00x 0 a cern 0 Z W 15= a� ~ zoo F- WQO I -Oa J J v, 0 5� } W a= 3(n 0w 041 av wN LJZ cO up Z p Ow OM WORK BY CONTRACTOR WORK BY RAILROAD Q. OF ROADWAY W H 30 N Z Ow U~O W M XD W M F- — Z? J Q aw 0a w5 � o wwmP 3Jw J cE m03 J J roe n O (n0U WOW MC<0CZ m 00Q ZZ>- U w a XX O 0 Z mU aLai :m2 0 N O t N n x O a W v (n a (APPROACH WIDTH - 4") x 0 a W (1) o' X H J o _m S Jw QJ m--, 3 u- L""'" m J Z arf 0 zwcr-D m 0 rnM5z I z NIraO- z . O o0wo(r O NQ Um Qaa V >,l, �aXm wiz', = W L� m Q�O Ce va) aw i-Occ,m ow IrM VQOw z (na QSawm crtj- 0 0 Oa U pin a a N F - <Z < o J wmw ;z woo! UJ30 al D5 =t Fz-c�_ moo_ 0 mmw Ww wZQ a:Sa' oP W U > p- I- cc: LJJ 0 E"0w-I om4J• Z a§O zww 00 ,...cLnfm w0E-~F- O NL<< QQ:ZUQ Uo 0 N 00=00w - m=+ aJ\ am-�M Qag Uag' Pit (wn(� 3L�0 _z z0 ~~F, ( mW craw ZQ aa} Dui 0)i OO J OU=wo.z 000 O 0 Ln W I - SECTION A -A NOT TO SCALE cn N)) r- Q 0 Oro I-wO DoZg� Ow"' (/) J J CY 00 3 4^) y L �E ccn z (C O 0 0 t!1 4a-) a) L (n LL (n C 01 U) a) 0 J 0 L a) O a) O 3 As Constructed No Revisions: a) 0 a) 0 0 Ni 0 co O 0 Y U L O 3 a) o O 00 O DOT a �tD t Ln Q a) M dJ t L C+O FNO) 4- S L a O r C Cr- C m�t CDT- Ct. a) a) N co 0 C a) 0 0 nnno I a 0 Lei N N (C 0 N N N O) a) 4E; 0 t2 C 0- 3 T a O 0 N 0 F — z N 0 to •NN -- 1.l a) 0 z LL Horizontal Scale: N/A 0 O 41 3 0 't N T--03 % 0(-40 (f 0h • o 509h N G 0 C 0 (7 d .C it LOUau. .agcH yclason •Ad 04 cc -L �; . l LZ/6 'Xoo3Z0IN^Z0—Ccc, . la L,H.r 614 v ' M�cooll�o� .;�pyJ BC 6r83M Zc-ccct.L\I N J r l w U z w w a a D 0 a UPRR ROW H- z w w w HORIZONTAL SCALE: 1"=50' O t!) In N O 0 w (n a a j) I n a1 I r- TOE OF FILL w U z O Ci I - w O w Lai w 0 < wa (n 0 I I ' I 01 I tI I OO+1OO L I :.LS 3NIl HOIVW 09+16601. •VJ S I I 4 I \I rl I I w D 0 D U) as U } =n o w c0 oQDCD v►=Dz oD v)� CC0LP' a o O�U 0 w Coa CL 0< a() w CC U z 0 (a_ z w wW < U.1 a TOP OF CUT 0 Q r a0 0 a3 W X W N HORIZONTAL SCALE: 1"= 50' )E I I �. I 1 I II/ I I I II II O 0 O .0 N O 0S+0 LOLL •VVIS TOP OF CUT a 1 a Cr U z o La -I - z Ow I wW 00< wa TRAFFIC COUNTS 0 O O o 0 t CO U, I I .. 0 Na o wa F- 0 0 < Q I I I I I I I I I � I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II I I I I I I I I I I { : I I II II 1- z W w (n I 00+10011 NIS 3N11 HOlVWI 0 U .a) 0 0 0 z a) a) L (n O 0 sor)zr 11r - 0c /Z rh_� tl V) �O D Ooo 0 < it) LLM0�1/2) O U) m 0 a) O a) 0 As Constructed No Revisions: -o a) In a) a U 0 O O O O M 0 (.0 CO Y 0 O U v0 0 • a) I 0-o • M o c L)0 - = ai ✓ C a.� o o..a U, C 0 0) fY t v) to C a) E 0 0 a) 0 0 000 a 11) r M N (0 0 N CO N a) a) v 0 c a v+ 3 D a 0 U rn c a a' a) z U - Vertical Scale: 50 Horizontal Scale: 50 m°D co U t ra o n o c <� Inwyo o c o c O * I.) C it o O & u OM. • vg9tr %j 0 O N r 9b9tr 59 tr 9b 99n 9 )991 99Y 4668 699tr vat, 9tr :L9t t r t 0 O N in r I2 - W 0 m a W 6 3 O -J W LT_ W IL ct O 2 0 O W W uj < Wa I I It I 994 6 94 94 I 94 9<9 a I I 4 6I I I <92r, 94 I • 0 - — t t i In - L1 S9 2s P.S9n W4 9n 95, 6 y4 Syy 9991; 9191" 4680 4682 N r 4632 t 4633 1 I I I I O O ja 0 0 c U-iCr Q w Q 4637- M&]DAIRY 4-1 A 96 9r L a) O O Z a 00 O 6 2 d d L U) Sheet Revisions t c IComments Date J r a U) a 2 OW W wa 01 a O U I ao O N 0 I M In 1- u E 0 z a 4.0 C 0 N 0 r 00 Kano idasor 'vi 4Z:ect 9Loi/9Z/6 'XdcoM3N a0VLoc0-cGitii Le\67 - snot nt, .inr d -•\IMO p&. dL 6r'JJM - L" -ice h. t Cc Q. UPRR ROW 00 Qen W N r o- Li O J O (/) J CC 0 W CD O Li z w w fig el3M • .. - N N J cc co O Lai 0 •• <�d 0<1.. Z H l� wwo th I E N I ZO o M v~-ia i ir Z } O z W I ascr ( t I II II 11 I I 0) w W Q r _J S m HaLIGto MMYN1'ci' HORIZONTAL SCALE: 1-=100' 0 O N O O O u) 0 Li co c te0 Z O d' a tasi o '_ O to S Lc' l9+9880 1 3d O O cC 1- I co t * ro N O co * * * L0'1£9t 8'££91, SZ'4£94 0£'tr£9t :A313 I. 8'2£917 81'1£91 VC: 300.00' V�: 300.0 _._..._.. ill K: 4.52 I I • fi4B 1' E: 0.17' cn• i Snr Ls MPS: 75 M 00 e0+19001 :y1S I. ti tt't£9t b a sIN .- O = Z'i£9ti t0'S£9t £'S91 l3 Od .. tai J ¢Q O N • Lai J U N c_, . ; c 8£'S£9 1 D0'0'.+90011 L'S£917 :b1S 13 Od 0" N o id I , I I I I - zo 0 NI x o > O'Z£9t £L'S£9t D0'01)+90011 :VAS id 1717 t I r 50'9£9-v -i r ` , 0 S' l £917 0£'9£91 E: .34' MDS: 75 MPH • s'9£9t 13 IdA I f i O z li Y.'; c<72 r Lt'9£9t 60'0•+17001 l VIS IdA I x Li „ , 9S'9£91 69'9£• • :A313 (1.7ck1t dH �0' L9+£0l l l :d1S dH 8S'9£91 £'.'9£917 = e13 OdA £5'9£91 0b'00 £0011 IS OdA co o _ 9'7c9 V 1717'9£9b I •'9£917 : 3 1dANic 8£'9£917 0'S ZOO I. L V1S 1dA O O U I�2 r 18'' 6+ (COL :V1S I d � � up 'n I r x Z U 00 0' I. 91 £4'9£94 o1sct 09'9£91 O W frL) z I 1-s !S 9li 68'9£94 r r 3 aw 8'Z£9b 0£'L£9t %00'Z— b L .6611 S 8 z£9t/ £8'1£91 %O0'Z- 11 as 917 ml ff Id I £'5£9V 8t'8£9t 00'S' +6601 :d1. Id )► —r 0 O ►.a 7_ ::4917 SZ'6£91 OI Cl. , -- ' -- Z'/Sgt tl'01917 r ?, `sb SL'11917 e O o 10997i —1 .00% /'6Srit 8Z'Zt9t t J(n� K 0 o 1 i R Ittit ZS'£191 ,11'11791 :A31 Od 01� o o c' t(tt 99'117917 I 00'c L+96601 :Vi_ Od ^ O co d O N c0 O co co f co g O N cc f O Co f / 717 917 O O rn 8 8 ao S 8 N- S O O m S O O 0 8 f S S O O S N O O O O S O O O 0 8 a rn S 8 m OO)) O + a) 0 U O z cy N 0 z a v r COUNTY ROAD 49 0 3 M W O 20 0 + w0 vio l0 r * ct o w U 30 l0 [rco a' O 0 O_ CL od a Constructed U) IL d Cn co 0 in .J v v to No Revisions: 0 W. M co O m Yo O U 3 U y0 aao• 3 v coin 9- _Jr") v— +� O C �^ ✓ +� E =v o c 0 o -4 U) C O cn a) 0C a) a) _C N a) a O 01 3 v T 0 U to Q_ C CL N O I M M CY v 0 U- 0 N (l/ a O (1) a O O O Horizontal Scale: O O 03 to a N T O r to °0 co ≥.ONO UN - ,a O C rh c m(1) .C ea (ID Uau. • St uDWs,InC•at, •r 'Yd 10:cl:i 9.0Z/9Z/6 'Xdo39ldbdZ0-£5cb1 L8 \6, 83 - ti")"_ (1): J° dr\rnn, !:', 8C 61,88 A \] i EXHIBIT B RAIL CROSSING LOCATION (Cabinet in southwest quadrant) i • 11. FI i I hI II I F • vS4,.:Aeiar: a --a on - EXHIBIT C RAIL CROSSING ON WCR 49 View of southwest quadrant I RAIL CROSSING ON WCR 49 View of northwest quadrant Hello