Loading...
HomeMy WebLinkAbout20162823.tiffCOLORADO Department of Public Health & Environment Dedicated to protecting and improving the health and environment of the people of Colorado Weld County - Clerk to the Board 11500 St PO Box 758 Greeley, CO 80632 August 31, 2016 Dear Sir or Madam: On September 8, 2016, the Air Pollution Control Division will begin a 30 -day public notice period for PDC Energy, Inc. - Hunt Federal Sec 28 Pad. A copy of this public notice and the public comment packet are enclosed. Thank you for assisting the Division by posting a copy of this public comment packet in your office. Public copies of these documents are required by Colorado Air Quality Control Commission regulations. The packet must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please send any comment regarding this public notice to the address below. Colorado Dept. of Public Health ft Environment APCD-SS-B1 4300 Cherry Creek Drive South Denver, Colorado 80246-1530 Attention: Clara Gonzales Regards, Clara Gonzales Public Notice Coordinator Stationary Sources Program Air Pollution Control Division Enclosure )t...) b t; c Zvi f.k1 cf/tOtCo 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe John W. Hickentooper, Governor Larry Wolk, MD, MSPH, Executive Director and Chief Medical Officer CC P L C mrn / ---c pw CE.%(chi l zr(Y /c c) ctlllaotc, SEP a 6 2C5 2016-2823 Air Pollution Control Division Notice of a Proposed Project or Activity Warranting Public Comment Website Title: PDC Energy, Inc. - Hunt Federal Sec 28 Pad - Weld County Notice Period Begins: September 8, 2016 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: PDC Energy, Inc. Facility: Hunt Federal Sec 28 Pad Exploration and production facility SESE Sec 28 T4N R66W Weld County The proposed project or activity is as follows: Hydrocarbon loadout at a new exploration and production facility. Loadout is conducted by submerged fill, and emissions are not controlled. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • permitted emissions exceed public notice threshold values in Regulation No. 3, Part B, Section III.C.1.a (25 tpy in a non -attainment area and/or 50 tpy in an attainment area) The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 16WE0823 have been filed with the Weld County Clerk's office. A copy of the draft permit and the Division's analysis are available on the Division's website at https://www.colorado.gov/pacific/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Any such comment must be submitted in writing to the following addressee: Betsy Gillard Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 cdphe.commentsapcd@state.co.us COLORADO 1 I AV3, E Division Information Engineer: Betsy Gillard Control Engineer: Stefanie Rucker Review Date: 08/26/2016 Application Date: 07/08/2016 Facility Identifiers Permit No. 16WE0823 AIRs County# 123 IWeld Facility # 9E9F Facility Type: exploration and production facility ❑✓ Located in the 8 -hour non -attainment area? Administrative Information O True Minor Synthetic Minor for: VOC 1"NOx fCO Company Name: PDC Energy, Inc. Source Name: Hunt Federal Sec 28 Pad Source Location: SIC: SESE Sec 28 T4N R66W 1311 Mailing Address Address 1: Address 2: ty, State Zip: PDC Energy, Inc. 1775 Sherman Street, Suite 3000 Denver, CO 80203 Person To Contact Name: Phone: Fax: Email: Elizabeth Duncan 303-860-5800 Elizabeth.Duncan@@pdce.com Requested Action Self Certification Required? Issuance Number: No 1 Source Description: Oil and gas exploration and production facility known as the Hunt Federal Sec 28 Pad, located in the SESE Sec 28 T4N R66W, Weld County, Colorado. Point Name Type Control Action 004 LOAD -1 Loadout None Newly reported source 004 Hydrocarbon Loadout to Tanker Trucks Calculations L = 12.46*S*P*M/T (AP -42: Chapter 5.2, Equation 1) L = loading losses in lb per 1000 gallons loaded Factor Meaning Value Units Source S Saturation Factor 0.6 AP -42 P True Vapor Pressure 7.4 psia ProMax M Molecular Weight of Vap 54.469 lb/lb-mole ProMax T Liquid Temperature 516.46 deg. R ProMax L 5.83 lb/10^3 gal 2.45E-01 lb/bbl Annual requested Throughput Annual requested VOC emissions 278195 BBL/yr 11684190 gal/yr 68173 lb/yr 34.09 tpy Control: Flare Efficiency: 0.00% Note: Flare only operates on 300,000 bbl/yr. Controlled emissions reflect partial control. NCRPs Component Mass Fraction Benzene 0.0035 Toluene 0.0046 Xylenes 0.0011 n -hexane 0.0258 Source: ProMax Emissions Summary Table Pollutant Emission Factor Uncontrolled Emissions Controlled Emissions Source VOC 0.2451 lb/bbl 34.1 tpy 34.1 tpy AP -42 Benzene 0.0008 lb/bbl 236 lb/yr 236 lb/yr AP -42 Toluene 0.0011 lb/bbl 315 lb/yr 315.0 lb/yr AP -42 Xylenes 0.0003 lb/bbl 72 lb/yr 71.6 lb/yr AP -42 n -Hexane 0.0063 lb/bbl 1760 lb/yr 1760.2 lb/yr AP -42 Regulatory Review Regulation 3 - APEN and Permitting Requirements Is this site considered an exploration and production location (e.g. well pad)? If yes, review the following two exemptions for applicability: Does the operator unload less than 10,000 gallons (238 BBLs) per day of crude oil on an annual average basis? If yes, this emissions point is categorically exempt from permit requirements per Regulation 3, Part B, Section II.D.1.I Does this operator unload less than 6,750 bbls per year of condensate via splash fill or 16,308 bbls per year of condensate via submerged fill procedure? If yes, this emissions point is categorically exempt from permit requirements per Regulation 3, Part B, Section II.D.1.I No Yes No STATE OF COLORADO LOR • DEPARTM NT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 16WE0823 Issuance 1 DATE ISSUED: ISSUED TO: PDC Energy, Inc. THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: Oil and gas exploration and production facility known as the Hunt Federal Sec 28 Pad, located in the SESE Sect. 28 T4N, R66W, Weld County, Colorado. THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: Facility Equipment ID AIRS Point Description LOAD -1 004 Hydrocarbon Loadout to Tanker Trucks. Emissions are uncontrolled. THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION AND CONTROL ACT C.R.S. (25-7-101 et seq), TO THOSE GENERAL TERMS AND CONDITIONS INCLUDED IN THIS DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: REQUIREMENTS TO SELF -CERTIFY FOR FINAL AUTHORIZATION 1. This construction permit represents final permit approval and authority to operate this emissions source. Therefore, it is not necessary to self -certify (Regulation 3, Part B, Section III.G.5). EMISSION LIMITATIONS AND RECORDS 2. Emissions of air pollutants shall not exceed the following limitations (as calculated in the Division's preliminary analysis). (Reference: Regulation No. 3, Part B, Section II.A.4) Annual Limits: Facility Equipment ID AIRS Point Tons per Year Emission Type NO X VOC CO LOAD -1 004 -- 34.1 -- Point See "Notes to Permit Holder" for information on emission factors and methods used to calculate limits. AIRS ID: 123/9E9F Page 1 of 7 olorDepa Health and Environment it Pollution Control Division Compliance nn J b 9 facility's �. _xt� ed b . `'t� r.-�• rdin the facilit 's annual criteria pollutant emissions, (including all HAPs above the de-minimis reporting level) from each emission unit, on a rolling twelve (12) month total. By the end of each month a new twelve-month total shall be calculated based on the previous twelve months' data. The permit holder shall calculate emissions each month and keep a compliance record on site or at a local field office with site responsibility, for Division review. This rolling twelve-month total shall apply to all permitted emission units, requiring an APEN, at this facility. PROCESS LIMITATIONS AND RECORDS 3. This source shall be limited to the following maximum processing rates as listed below. Monthly records of the actual processing rates shall be maintained by the owner or operator and made available to the Division for inspection upon request. (Reference: Regulation 3, Part B, II.A.4) Process/Consumption Limits Facility Equipment ID AIRS Point Process Parameter Annual Limit LOAD -1 004 Condensate Loaded by Submerged Fill 278,195 BBL Compliance with the annual throughput limits shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve-month total is calculated based on the previous twelve months' data. The permit holder shall calculate throughput each month and keep a compliance record on site or at a local field office with site responsibility, for Division review. STATE AND FEDERAL REGULATORY REQUIREMENTS 4. Visible emissions shall not exceed twenty percent (20%) opacity during normal operation of the source. During periods of startup, process modification, or adjustment of control equipment visible emissions shall not exceed 30% opacity for more than six minutes in any sixty consecutive minutes. Emission control devices subject to Regulation 7, Sections XII.C.1.d or XVII.B.2.b shall have no visible emissions. (Reference: Regulation No. 1, Section I I.A.1. & 4.) 5. This source is subject to the odor requirements of Regulation No. 2. (State only enforceable) 6. This source is located in an ozone non -attainment or attainment -maintenance area and is subject to the Reasonably Available Control Technology (RACT) requirements of Regulation Number 3, Part B, III.D.2.a. Condensate loading to truck tanks shall be conducted by submerged fill. (Reference: Regulation 3, Part B, III.E) 7. The owner or operator shall follow loading procedures that minimize the leakage of VOCs to the atmosphere including, but not limited to (Reference: Regulation 3, Part B, III.E): a. Hoses, couplings, and valves shall be maintained to prevent dripping, leaking, or other liquid or vapor loss during loading and unloading. b. All compartment hatches (including thief hatches) shall be closed and latched at all times when loading operations are not active, except for periods of maintenance, gauging, or safety of personnel and equipment. AIRS ID: 123/9E9F Page 2 of 7 Health and Environment it Pollution Control Division c. Theo " pe g s pe : equi • i and operations on site at the time of the inspection to ensure compliance with the conditions (a) and (b) above. The inspections shall occur at least monthly. Each inspection shall be documented in a log available to the Division on request. 8. All hydrocarbon liquid loading operations, regardless of size, shall be designed, operated and maintained so as to minimize leakage of volatile organic compounds to the atmosphere to the maximum extent practicable. OPERATING & MAINTENANCE REQUIREMENTS 9. This source is not required to follow a Division -approved operating and maintenance plan. COMPLIANCE TESTING AND SAMPLING Initial Testing Requirements 10. This source is not required to comply with any testing and sampling requirements. ADDITIONAL REQUIREMENTS 11. A revised Air Pollutant Emission Notice (APEN) shall be filed: (Reference: Regulation No. 3, Part A, II.C) d. Annually by April 30th whenever a significant increase in emissions occurs as follows: For any criteria pollutant: For sources emitting less than 100 tons per year, a change in actual emissions of five (5) tons per year or more, above the level reported on the last APEN; or For volatile organic compounds (VOC) and nitrogen oxides sources (NO,) in ozone nonattainment areas emitting less than 100 tons of VOC or NO„ per year, a change in annual actual emissions of one (1) ton per year or more or five percent, whichever is greater, above the level reported on the last APEN; or For sources emitting 100 tons per year or more, a change in actual emissions of five percent or 50 tons per year or more, whichever is less, above the level reported on the last APEN submitted; or For any non -criteria reportable pollutant: If the emissions increase by 50% or five (5) tons per year, whichever is less, above the level reported on the last APEN submitted to the Division. e. Whenever there is a change in the owner or operator of any facility, process, or activity; or f. Whenever new control equipment is installed, or whenever a different type of control equipment replaces an existing type of control equipment; or g. Whenever a permit limitation must be modified; or h. No later than 30 days before the existing APEN expires. 12. Federal regulatory program requirements (i.e. PSD, NANSR or Title V Operating Permit) shall apply to this source at any such time that this source becomes major solely by virtue of a relaxation in any permit condition. Any relaxation that increases the potential AIRS ID: 123/9E9F Page 3 of 7 Ii Health and Environment it Pollution Control Division to emit above hold equire a full review of the source as though construction had not yet commenced on the source. The source shall not exceed the Federal program threshold until a permit is granted. (Regulation No. 3 Part D). GENERAL TERMS AND CONDITIONS 13. This permit and any attachments must be retained and made available for inspection upon request. The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation No. 3, Part B, Section II.B upon a request for transfer of ownership and the submittal of a revised APEN and the required fee. 14. If this permit specifically states that final authorization has been granted, then the remainder of this condition is not applicable. Otherwise, the issuance of this construction permit does not provide "final" authority for this activity or operation of this source. Final authorization of the permit must be secured from the APCD in writing in accordance with the provisions of 25-7-114.5(12)(a) C.R.S. and AQCC Regulation No. 3, Part B, Section III.G. Final authorization cannot be granted until the operation or activity commences and has been verified by the APCD as conforming in all respects with the conditions of the permit. Once self -certification of all points has been reviewed and approved by the Division, it will provide written documentation of such final authorization. Details for obtaining final authorization to operate are located in the Requirements to Self - Certify for Final Authorization section of this permit. 15. This permit is issued in reliance upon the accuracy and completeness of information supplied by the owner or operator and is conditioned upon conduct of the activity, or construction, installation and operation of the source, in accordance with this information and with representations made by the owner or operator or owner or operator's agents. It is valid only for the equipment and operations or activity specifically identified on the permit. 16. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been determined by the APCD to be necessary to assure compliance with the provisions of Section 25-7-114.5(7)(a), C.R.S. 17. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be deemed denied ab initio. This permit may be revoked at any time prior to self -certification and final authorization by the Air Pollution Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Control Commission (AQCC), including failure to meet any express term or condition of the permit. If the Division denies a permit, conditions imposed upon a permit are contested by the owner or operator, or the Division revokes a permit, the owner or operator of a source may request a hearing before the AQCC for review of the Division's action. 18. Section 25-7-114.7(2)(a), C.R.S. requires that all sources required to file an Air Pollution Emission Notice (APEN) must pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee billing will terminate. 19. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and Control Act or the regulations of the AQCC may result in administrative, AIRS ID: 123/9E9F Page 4 of 7 civil or crime cep u s ions 115 (enforcement), -121 (injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.R.S. IidHealth and Environment it Pollution Control Division By: Betsy Gillard Permit Engineer Permit Histo Issuance Date Description Issuance 1 This Issuance Issued to PDC Energy, Inc. AIRS ID: 123/9E9F Page 5 of 7 i ` Health and Environment it Pollution Control Division Notes to Permit Holder " ` me o 'sr=•e 1) The permit holder is required to pay fees for the processing time for this permit. An invoice for these fees will be issued after the permit is issued. The permit holder shall pay the invoice within 30 days of receipt of the invoice. Failure to pay the invoice will result in revocation of this permit (Reference: Regulation No. 3, Part A, Section VI.B.) 2) The production or raw material processing limits and emission limits contained in this permit are based on the consumption rates requested in the permit application. These limits may be revised upon request of the owner or operator providing there is no exceedance of any specific emission control regulation or any ambient air quality standard. A revised air pollution emission notice (APEN) and complete application form must be submitted with a request for a permit revision. 3) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative Defense Provision for Excess Emissions During Malfunctions. The owner or operator shall notify the Division of any malfunction condition which causes a violation of any emission limit or limits stated in this permit as soon as possible, but no later than noon of the next working day, followed by written notice to the Division addressing all of the criteria set forth in Part II.E.1 of the Common Provisions Regulation. See: http://www.colorado.gov/cs/Satellite?c=Document C&childpagename=CDPHE- Main%2FDocument C%2FCBONAddLinkView&cid=1251599389641 &pagename=CBONWrapper 4) The following emissions of non -criteria reportable air pollutants are estimated based upon the process limits as indicated in this permit. This information is listed to inform the operator of the Division's analysis of the specific compounds emitted if the source(s) operate at the permitted limitations. AIRS Point Pollutant CAS # Uncontrolled Emission Rate (Ib/yr) Are the emissions reportable? Controlled Emission Rate (Ib/yr) 004 Benzene 71432 236 Yes N/A n -Hexane 110543 1760 Yes N/A Toluene 108883 315 Yes N/A 5) The emission levels contained in this permit are based on the following emission factors: Point 004: Pollutant Emission lb/BBL loaded Factors - Uncontrolled Source VOC 0.2451 AP -42 Benzene 0.0008 ProMax / AP -42 n -Hexane 0.0063 ProMax / AP -42 Toluene 0.0011 ProMax / AP -42 The uncontrolled VOC emission factor was calculated using AP -42, Chapter 5.2, Equation 1 (version 1/95) using the following values: L = 12.46" S`P*M/T S = 0.6 (Submerged loading: dedicated normal service) P (true vapor pressure) = 7.40 psia M (vapor molecular weight) = 54.47 lb/lb-mol AIRS ID: 123/9E9F Page 6 of 7 T (tem licit 6) In accordance with C.R.S. 25-7-114.1, each Air Pollutant Emission Notice (APEN) associated with this permit is valid for a term of five years from the date it was received by the Division. A revised APEN shall be submitted no later than 30 days before the five-year term expires. Please refer to the most recent annual fee invoice to determine the APEN expiration date for each emissions point associated with this permit. For any questions regarding a specific expiration date call the Division at (303)-692-3150. 7) This facility is classified as follows: IiHealth and Environment it Pollution Control Division Applicable Requirement Status Operating Permit Synthetic Minor Source of: VOC, n -Hexane NANSR Synthetic Minor Source of: VOC MACT HH Major Source Requirements: Not Applicable Area Source Requirements: Not Applicable 8) Full text of the Title 40, Protection of Environment Electronic Code of Federal Regulations can be found at the website listed below: http://ecfr.cipoaccess.gov/ Part 60: Standards of Performance for New Stationary Sources NSPS 60.1 -End Subpart A — Subpart KKKK NSPS Part 60, Appendixes Appendix A — Appendix I Part 63: National Emission Standards for Hazardous Air Pollutants for Source Categories MACT 63.1-63.599 Subpart A — Subpart Z MACT 63.600-63.1199 Subpart AA — Subpart DDD MACT 63.1200-63.1439 Subpart EEE — Subpart PPP MACT 63.1440-63.6175 Subpart QQQ — Subpart YYYY MACT 63.6580-63.8830 Subpart ZZZZ — Subpart MMMMM MACT 63.8980 -End Subpart NNNNN — Subpart XXXXXX AIRS ID: 123/9E9F Page 7 of 7 uid Loadin a cAn o N UL. c 71 •... U E U .9 L •, .O O c c i° W c O V .O w i. .�. P. wVD U O �5 _ O y x 0. C Qcr 6.2ozi c C'c E o c s r.. E a et U •- O C a O. oD 9 Col m .2 Z -o clkCa I L4c0 C U ^Q — E z t E- 74 O w En" U W ..-IIcu . J U _ -C1 i.:45 no Q w p z-14.> c z°Ac . o' U FH el Z 0. Z W pmt l v Z S O 46 Permit Number: Facility Equipment ID: uested Action (Check applicable request boxes) Section 02 — Re Section 01 — Administrative Information General Permit GP07 El Individual Permit ❑ 0 4.4 0 0 U 1, 0. G R r R i = O d 0 L 0- a 0 , 0 u .0 L 0 r,c 0 0 V CU n O 0) = V 7 E❑❑ •0 0.) .� 0, V .. e0DJ]bn 0 y r C 01. > 4. En L u O N ›, Lz V 5. w E C z 0 H Z 0 .E. 0 0 F. H cr C4a o E W U d F, U — a�z � Utt S C.) UA o. c. O W W L z CY. © oa..) n cn h y ++ V es cod 0 a) d d L .0 O'• 0• = Q' U U F g g L 4G ❑ ❑ El ❑ ❑ U 72, Q U z� Change company name County: Weld Transfer of ownership 0 U > 0 ❑ ❑ ZIP Code: 80203 Elizabeth Duncan Person To Conta Elizabeth.Duncan@pdce.com E-mail Address: Phone Number: (303) 860-5800 Initial permit request for new facility Addl. Info. & Notes: Section 03 — General Information 5 UU U days/week 52 Normal Hours of Source Operation: O 0 N U 0 C. En En 0 U U .O C C ro U c O O U 0 0 U cC 0 Loading of condensate from storage tanks to tank trucks Don't know Don't know 3 3 3 ❑ ❑ ❑ ❑ ❑ z z zzz I: DOE a < a V En En En En U U U U U > >- El ❑ ❑ E ❑ En U L 0. U En C 0 0 0 O A O N En .0 VI VI 0 0 . .0 'n cn 0. U En al G. El U 0 U C 0 O cC 0. 5. R N U U R � x •7•-•� _ V-+. 0 C-. C U L 03 C O U C U 6 0 un 0 0 U C. b cn U O 0 0'C d CD C 0 MI)b R C = 0 O O U , O O '0 C'F') � cn u C1. CC o o,LI sw En oo . 0� 10 4--.S a eel cC 0 0 C O U c ...0:.0 C C 7 U• - C iC — O cn U CO 08 y C 5 U G. , „ SD i U C cn O U 0.: En U Oy .Q -I.2-2% n- Ct U C C7A «- U 0 0 E _ 0 0 C Q R c o 71 := > A L 0 C o o c O E L A O R L 0 U -za E z V C a E O C 0 0 — O Es' =w 0 w 0� L .0 V; V • a may. U L .0 7 .R• > R O .> DJ) d c era A E u C ` o L R d y DO C:' d L "r C) A w o U U t O ^O up .0 o L A U = o o c) o > R N O Q.i OM g For guidance on how to complete this APEN form: CN Q1re) en en 0) O O O rn en en �c G E 00 C OL .o C: >_ U •C U O .C a Td Q � ermitstatus 0 Permit status: www.colorado. Information L s O 6) 0 U ❑ Condensate a Product Loaded: bD _ 0 31) 33.3 .0 a E 0 u L L R C.) 0 I00 u 0 •O R a L 0 R w • U) C) 75 r N U En b C En U ro a Q r U) C) N- N =0 U C Annual Volume Loaded: 0 0 CC 0 H L R C R En L Tank Trucks O C U w C C 8 O U U En 0 C 00 O n. w C s 0 `4- r O 3.3 E 0 r O ?r w O En En R 0 _ O 3.3 E d 0 u O '0 d C U O .7 O S 37, G En r.l • -o 0 0 0 'O C O' C GQ 0 I- C En S b0 En U _ w C O En C En U) 0 E C) O u� 0 C. R 0 U En C. O C 0 0 b0 3 C C U O w O O E 0) O L True Vapor Pressure: .-a En Cs - O C U U En 0 O O U C w Load Line Volume4: 5.0 FORM APCD-208 uid Loadin Please use the Fuel Dispe Permit Number: Section 05 — Stack Information (Combustion stacks must be listed here) COGCC Website O N CO c u CO s C Co z� E -104.77431 c+i H o Lo N co (C Other (Describe): O J i 3U o w" F• Width (inches) = CC C CC CD C 7 N a) �.> O U 3 N U CC a) -5 U U Direction of stack outlet (check one): 111 y y C) 6J a) A CC O cip CD C C O C U U I C. r O � Nr. CC o W U Cip Section 08 — Emissions Inventory Information ((yy''�� O C R x C ..7 O E Y Oa R O C C. R O C. C N sc C7 E 0. R L C w 61 .C C' 0�. 0 U ;Tr col 0 E i CC C� C U N C CA N O Condensate I) CC C)) C .-J CA r-� CD O C a, N C (C I O 0 O O C CD 0 r 67 u Cn toc 023 C a C O L_ C CD A C O N E L R CC ^C C R 7 _ 61 R L R R R L 0 C S d U u C) C. CO C Cl) 7 .C s CC CC R C O R C E _ 0 O R C 0 E 111 Estimation Method or Emission Factor Source x (j ^O LL x co ^1O LL x (o ^^O LL Please use the APCD Non -Criteria Reportable Air Pollutant Addendum form to report pollutants not listed above. Requested. Permitted Emissions Controlled (Tons/Year) 34.09 235.73 lb/yr (DM) 1760.22 lb/yr Uncontrolled (Tons/Year) 34.09 235.73 lb/yr (DM) a N N 0 r -- c- Actual Calendar Year Emissions5 Controlled (Tons/Year) 34.09 235.73 lb/yr (DM) '5,.0 N 6 m r-- - Uncontrolled (Tons/Year) a) 235.73 lb/yr (DM) 1760.22 lb/yr O 4 vo Emission Factor CC C .0 so so .O Uncontrolled Basis 0.2451 O O O O O O Control Efficiency (% Reduction) in Section 07 Control Device Description Primary Secondary Pollutant N VOC CO Benzene n -Hexane O z C O CC R L C R N L U d L O u 'C c R o u 0. =•c7 E }' L d G C. E R u y Un C y = CO O 4. R C 0. © R C O u ate+ ) L u R 3 s C 3 y E O R = C E O O E 2• C •C CC C R C as • O. y L y O L •3 CC R O U C 6a O C) CC 7 E o L h C r R CC R w IQ t a+ C fl. CD L w ° 'O s r O EHS Professional Elizabeth Duncan Name of Legally Authorized Person (Please print) L R 00 a+ y C pp R L — 61 aa.,u O C y E w )e c a 7 V. OE .+ VCT R © V V U .z© o' c V CA C O C.. J u 4wN EA z CO C U C c 2 O 0 C 0. V. N O N G) Cc cC :Zr 2 z w O w U_ F- 0 z z 0 U) 2 w H z F J J 0 a w -J m IN 0 a w Ce w I- 0 z E O m rn C a) Q E O O C O a) U C 5 C) 0 a) U) a) a) a) a) AIRS ID Number: TBD I2 - q q F --O4 O m H Permit Number: PDC Energy, Inc. Company Name: U) O O a_ N O O Hunt Federal Sec 28 Pad Plant Location: CO Co 0 0 0 00 Fax Number: Elizabeth.Duncan@pdce.com E-mail Address: Controlled Actual Emissions (lbs/year) O LCD M Uncontrolled Actual Emissions (lbs/year) L; 7) Emission Factor Source ProMax Emission Factor (Include Units) 0.0011 lb/bbl Control Equipment / Reduction (%) V/N Chemical Name Toluene Chemical Abstract Service (CAS) Number 108883 CO 0 N Calendar Year for which Actual Data Applies: EHS Professional Elizabeth Duncan Title of Person Legally Authorized to Supply Data Name of Person Legally Authorized to Supply Data (Please print) Fnrm Ravisinn (late Anril 14 7(114 Hello