Loading...
HomeMy WebLinkAbout20163035.tiffWATER SUPPLY INFORMATION SUMMARY Section 30.28•I33,Idl, C.R.S. requires that the applicant submit to the County/Adequate evidence that a water supply that is sufficient in terms of quantity, quality and dependability will be available to ensure an adequate supply of water. Lily Farm Fresh Skin Care 1. NAME OF DEVELOPMENT AS PROPOSED 2. LAND USE ACTIONCommercial, Irrigation, Domestic 3. NAME OF EXISTING PARCEL AS RECORDED 147529100015 SUBDIVISION RE -4232 FILING BLOCK LOT A 4. TOTAL ACREAGE 34.5 5. NUMBER OF LOTS PROPOSED 1 YES PLAT MAP ENCLOSED t/ B. PARCEL HISTORY . Please attach A, Was parcel recorded with county prior 8. Has the parcel ever been part of a If yes, describe the previous action copies of deeds, plats or other evidence to June 1, 1972? ❑ YES ❑ NO division of land action since June 1, 1972? Recorded L%emu"°n No. 1475-29-1 aL-4232 or documentation. ✓ YES ❑ NO 7. LOCATION Of PARCEL - Include a map deliniatiny the project area and tie to a section corner. NE 114 OF NE E 114 SECTION 29 TOWNSHIP 1 WIN ❑ S RANGE 64 ❑ E J W PRINCIPAL MERIDIAN: ❑✓ 6TH ❑ KM. ❑ UTE ❑ COSTILLA 8. PLAT . Location of ail wells en property must be plotted and permit numbers Surveyors plat I] Yes O No If not, scaled hand provided. drawn sketch • Yes ❑ No 9. ESTIMATED WATER REQUIREMENTS - Gallons per Day or Acre Feet per Year HOUSEHOLD USE A' of units GPO AF 10. WATER SUPPLY SOURCE O EXISTING ❑ DEVELOPED WELLS SPRING WELL PERMIT NUMBERS 791 78-F p NEW WELLS - PROPOSER AOUFn6 - ICHECK Ott) ❑ 'Aim: a OPFER A RAPAHUE ❑ LPPER OAWSOIN 0 LOWER APAPAHet ° LOWER oA"eoe ° (AMA IE FOX MS O Daum ° DAKOTA ❑ OTHER COMMERCIAL USE # 5,613 of S.F. GPO Al IRRIGATION I of acres GPO AF WATER COURT DECREE CASE NO.'S El MUNICIPAL STOCK WATERING I of head GPD AF OTHER - GPO AF ❑ ASSOCIATION C COMPANY ■ DISTRICT TOTAL 11.6 GPO Al NAME LETTER OF COMMITMENT FOR SERVICE ❑ YES ❑ NO 11. ENGINEER'S WATER SUPPLY REPORT ❑✓ YES ❑ NO IF YES, PLEASE FORWARD WITH THIS FORM. (This may be required Wore oar review a completed.) 12. TYPE OF SEWAGE DISPOSAL SYSTEM Engineered Septic System © CENTRAL SYSTEM C VAULT . LOCATION - Leach Field - DISTRICT NAME ✓ SEPTIC TANKILEACH FIELD ❑ LAGOON SEWAGE HAULED TO / ENGINEERED SYSTEM (Attach t copy of mgineerinp Weigel • OTHER • Form No. GWS-25 APPLICANT OFFICE OF THE STATE ENGINEER COLORADO DIVISION OF WATER RESOURCES 818 Centennial Bldg.. 1313 Sherman St., Denver, Colorado 80203 (303) 866-3581 RENTCO LLC CIO ELIZABETH COHILL PO BOX 190 HENDERSON, CO 80640- (303) 668-1128 PERMIT TO CONSTRUCT A WELL 1) 2) 3) 4) 5) 6) 7) S) 9) 10) 11) 12) 13) 14) TIC WELL PERMIT NUMBER 79178 -F DIV. 1 WD1 DES. BASIN MD Lot: A&B Block: FilingSubdiv: COUNTY EXEMPTION NC. 1475-29-1 RE4232 APPROVED WELL LOCATION WELD COUNTY NE 1/4 NE 1/4 Section 29 Township 1 N Range 64 W Sixth P.M. DISTANCES FROM SECTION LINES 350 Ft. from North Section Line 200 Ft. from East Section Line UTM COORDINATES (Meters,Zone:13,NAD83) Fasting: Northing: ISSUANCE OF THIS PERMIT DOES NOT CONFER A WATER RIGHT CONDITIONS OF APPROVAL This well shall be used in such a way as to cause no material injury to existing water rights, The issuance of this permit does not ensure that no injury will occur to another vested water right or preclude another owner of a vested water right from seeking relief in a civil court action. The construction of this well shall be in compliance with the Water Well Construction Rules 2 CCR 402-2, unless approval of a varianbe has been granted by the State Board of Examiners of Water Well Construction and Pump Installation Contractors in accordance with Pule 18. Approved pursuant to CRS 37-90-137(4) and the findings of the Slate Engineer dated July 15, 2015 The use of ground water from this well is limited to commercial, irrigation, and domestic. The pumping rate of this well shall not exceed 300 GPM. The average annual amount of ground water to be appropriated shall not exceed 11.6 acre-feet. Production is limited to the Lower Arapahoe aquifer which is located 270 feet below rand surface and extends to a depth of 530 feet, Plain casing must be installed and grouted to prevent the withdrawal of ground water from other aquifers and the movement of ground water between aquifers. The entire length of the hole shall be geophysically logged as required by Rule 9 of the Statewide Noniributary Ground Water Rules prior to installing casing The owner shall mark the well in a conspicuous place with well permit number(s), name of the aquifer, and coup case number(s) as I appropriate. The owner shall take necessary means and precautions to preserve these markings. A totalizing flow meter must be installed on this weli and maintained in good working order. Permanent records of all diversions must'be maintained by the well owner (recorded at least annually) and submitted to the Division Engineer upon request, This well shall he constructed at least 600 feet from any existing well. completed in the same aquifer. that is not owned by the applicant This well shall be constructed not more than 200 feet from the location specified on this permit. Pursuant to CRS 37-90-137(9)(h) and the Denver Basin Rules, no more than 987n of the nontributary ground water withdrawn annually shall be consumed and the well owner shall demonstrate to the reasonable satisfaction of the State Engineer that no more than 98% of theiwater withdrawn will be consumed. This well is subject to administration by the Division Engineer in accordance with applicable decrees, statutes. rules, and regulations. NOTE: The ability of this well to withdraw its authorized amount of water from this non-renewable aquifer may be less than the 190 years upon which the amount of water in the aquifer is allocated, due to anticipated water level declines. NOTE: To ensure a maximum productive life of this weli, perforated casing should be set through the entire producing interval of the approved zone or aquifer indicated above. NOTICE: This permit has been approved for a maximum pumping rate and a location other than applied for based on our conversation concerning 600 foot spacing from other wells producing from the Lower Arapahoe in the area. You are hereby notified that you have the right to appeal the issuance of this permit, by filing a written request with this office within sixty (60) days of the date of issuance, pursuant to the State Administrative Procedures Act. (See Section 24-4.104 through 106, C.R.S.) NOTE: This permit will expire on the expiration dale unless the well is constructed and a pump is installed by that date. A Well Construction and Test Report (GWS-31) and Pump Installation and Test Report (GWS-32) must be submitted to the Division of Water Resources to verify the well has been constructed and the pump has been installed. A one-time extension of the expiration date may be available. Contact the DWR for additional information or refer to the extension request form (GWS-64) available al: http7fwww_water.state.caus APPROVED JLV end State Engineer „Receipt No. 3669917 DATE ISSUED FINDINGS OF THE STATE ENGINEER IN THE MATTER OF AN APPLICATION FOR A PERMIT TO CONSTRUCT A WELL IN WATER DIVISION NO. 1, WELD COUNTY, COLORADO APPLICANT : RENTCO. LLC AQUIFER: LOWER ARAPAHOE PERMIT NO.: 79178-F In compliance with C.R.S. 37-90-137(1) and the Statewide Nontributary Ground Water Rules, Rentco, LLC, (hereinafter "applicant") submitted an application for a permit to construct a well. Based on information provided by the applicant and records of the Division of Water Resources, the State Engineer finds as follows: 1 _ The application was received complete by the State Engineer on May 28, 2015. 2. The applicant proposes to construct the well in the NE1/4 of the NE1/4 of Section 29, Township 1 North, Range 64 West, 6th Principal Meridian. 3. The proposed well is located outside the boundaries of a designated ground water basin. 4. The applicant proposes to apply the water withdrawn from the well to the following beneficial uses: commercial, irrigation, and domestic. 5. The proposed maximum pumping rate of the well is 300 gallons per minute, and the requested average annual amount of ground water to be withdrawn is 11.6 acre-feet. 6. The applicant is the owner of the land on which the well will be constructed. 7. The proposed well would withdraw ground water from the Lower Arapahoe Aquifer (hereinafter "aquifer"), which, according to the Denver Basin Rules, is located 270 feet to 530 feet below land surface at the location of the proposed welt. 8. The location of the proposed well is more than 600 feet from any existing well completed in the aquifer. 9. According to a sworn statement, the applicant owns, or has consent to withdraw ground water underlying 80 acres of land as further described in said statement, which is attached hereto as Exhibit A. 10. Withdrawal of ground water from the aquifer underlying the land claimed by the applicant will not, within one hundred years of continuous withdrawal, deplete the flow of a natural stream at an annual rate greater than one -tenth of one percent of the annual rate of withdrawal and therefore the ground water is nontributary ground water as defined in ORS. 37-90-103(10.5). Applicant: Rentco, LLC Aquifer: Lower Arapahoe Permit no.: 79178-F Page 11. In considering whether the requested permit shall be approved the provisions of C.R.J. 37-94-137(4) and the Denver Basin Rules shall apply. Withdrawals shall be allowed on the basis of an aquifer's life of 100 years, C.R.S. 37-90-137(4)(b)(l). 12. The quantity of water in the aquifer, exclusive of artificial recharge, underlying the 80 acres of land described in Exhibit A is 1,156 acre-feet. This determination was based on the following as specified in the Denver Basin Rules: a. The average specific yield of the saturated aquifer materials underlying the land under consideration is 17 percent. b. The average thickness of the saturated aquifer materials underlying the land under consideration is 85 feet. 13. A review of the records in the State Engineer's office has not disclosed that there are any existing wells or other water rights claiming or diverting ground water from the aquifer underlying the land claimed by the applicant. Based on the above, the State Engineer finds that there is water available for withdrawal by the proposed well and no material injury to vested water rights would result from the issuance ,of the requested permit subject to the following conditions: a. The allowed average annual amount of water to be withdrawn from the aquifer by the well shall not exceed 11 6 acre-feet (the quantity of water which is considered available divided by the 100 year aquifer life). b. The well shall be constructed no more than 200 feet from the location specified on the permit application. c. The applicant shall submit geophysical and lithologic logs after the construction of the well. The geophysical logs shall be obtained from the hole before the casings are installed. d. The maximum pumping rate of the well shall not exceed 300 gallons per minute. e. A totalizing flow meter must be installed on the well and maintained in good working order. Permanent records of all diversions must be maintained by the well owner (recorded at least annually) and submitted to the Division Engineer upon request. f. Production is limited to the Lower Arapahoe Aquifer. The well must be constructed with plain, non -perforated casing properly grouted so as to prevent intermingling of water between aquifers. g. Pursuant to C.R.S. 37-90-137(9)(b) and the Denver Basin Rules, no more than 98% of the nontributary ground water withdrawn annually shall be consumed and the applicant shall demonstrate to the reasonable satisfaction of the Stale Engineer that no more than 98% of the water withdrawn will be consumed. Applicant: Rentco, LLC Aquifer: Lower Arapahoe Permit no: 79178-F Page 3 h. The owner shall mark the well in a conspicuous place with appropriate well permit numbers, name of the aquifer, and court case numbers. He shall take necessary means and precautions to preserve these markings. Dated this Prepared by: JLV Form:0546(o) day of By C, , 20 az 4)4- !' Dick Wolfe, P.E. Director/State Engineer illiams source Engineer Hello