Loading...
HomeMy WebLinkAbout20160062.tiff ,./12-rendttriseleo WELD COUNTY CODE ORDINANCE 2015-27 sir Se4 6o P Apt, Aatellenky IN THE MATTER OF REPEALING AND REENACTING, WITH AMENDMENTS, CHAPTER 23 ZONING, OF THE WELD COUNTY CODE BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF THE COUNTY OF WELD, STATE OF COLORADO: WHEREAS, the Board of County Commissioners of the County of Weld, State of Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board of County Commissioners, on December 28, 2000, adopted Weld County Code Ordinance 2000-1 , enacting a comprehensive Code for the County of Weld, including the codification of all previously adopted ordinances of a general and permanent nature enacted on or before said date of adoption, and WHEREAS, the Weld County Code is in need of revision and clarification with regard to procedures, terms, and requirements therein. NOW, THEREFORE, BE IT ORDAINED by the Board of County Commissioners of the County of Weld, State of Colorado, that certain existing Chapters of the Weld County Code be, and hereby are, repealed and re-enacted, with amendments, and the various Chapters are revised to read as follows. CHAPTER 23 ZONING Amend Sec. 23-1 -90. Definitions. For the purposes of this Chapter, certain terms or words used herein shall be interpreted as defined in this Section. The following specific words and phrases, when appearing in this Chapter in uppercase letters, shall have the meanings stated in this Section: Add SOLAR FARMS (also Known as so ar parts, so ar fie cs or soar gardens) are piotovoltaic panes (PV) resigned for tie supp y of merchant power into tie e ectricity grid.SMALL SOLAR ENERGY SYSTEM: A facility which is used for the production of electrical energy from energy collected by the sun including solar energy collectors, power generation facilities, facilities for storing and transforming energy, other appurtenant facilities and any transmission lines under 115 kV, which is developed for the purpose of supplying or distributing electrical energy to users, a customer or customers and will have a rated capacity of three (3) megawatts or less and all equipment will be located on 16 acres or less. This designation shall not include roof mounted solar systems located on permitted principal and accessory buildings and designed to supply power to the principle use(s) on site. PAGE 1 2016-0062 ORD2015-27 Add LARGE SOLAR ENERGY SYSTEM: A facility which is used for the production of electrical energy from energy collected by the sun including solar energy collectors, power generation facilities, facilities for storing and transforming energy, other appurtenant facilities and any transmission lines under 115 kV, which is developed for the purpose of supplying or distributing electrical energy to users, a customer or customers and will either have a rated capacity greater than three (3) megawatts or all equipment is locate on greater than 16 acres. This designation shall not include roof mounted solar systems located on permitted principal and accessory buildings and designed to supply power to the principle use(s) on site. Remainder of section — No change. Amend Sec. 23-3-40. Uses by special review. The following BUILDINGS, STRUCTURES and USES may be constructed, occupied, operated and maintained in the A (Agricultural) Zone District upon approval of a permit in accordance with the requirements and procedures set forth in Article II, Division 4 of this Chapter. A. through R. — No change. S. Any use permitted as a Use by Right, an ACCESSORY USE, or a Use by Special Review in the COMMERCIAL or industrial zone districts, except a SOLAR FARM, except a SOLAR FARM provided that the property is not a Lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any regulations controlling subdivisions. PUD development proposals shall not be permitted to use the special review permit process to develop. T. through KK. — No change. LL. SMALL SOLAR ENERGY SYSTEM. Amend Sec. 23-3-310. 1-1 (Industrial) Zone District. A. through D. 10. — No change. Add 11 and 12. 11 . Small Solar Energy System. 12. Large Solar Energy System. Remainder of Section — No change. Amend Sec. 23-3-320. 1-2 (Industrial) Zone District. A. through D. 17. — No change. Add 18 and 19. 18. SOLAR FARM.SMALL SOLAR ENERGY SYSTEM. 19. LARGE SOLAR ENERGY SYSTEM. Remainder of Section -- No change. PAGE 2 2016-0062 ORD2015-27 Amend Sec. 23-3-330. 1-3 (Industrial) Zone District. A. through D. 19. — No change. Add 20 and 21 . 20. SOLAR FARM.SMALL SOLAR ENERGY SYSTEM. 21 . LARGE SOLAR ENERGY SYSTEM. Remainder of Section — No change. Amend Sec. 23-12-30. Drainage policy. A. through F. 14) — No change. Add F. 1 .a. 15). 15) Concentrated Animal Feeding Operations (CAFO), Animal Feeding Operations (AFO) and Housed Commercial Swine Feeding Operations (HCSFO) which are covered and approved by the Colorado Discharge Permit System (CDPS) regulations. Portions of the site not included or covered by the CDPS permit, shall comply with the Weld County Drainage Code requirements. 16) Approved by a variance. BE IT FURTHER ORDAINED by the Board that the Clerk to the Board be, and hereby is, directed to arrange for Municode to supplement the Weld County Code with the amendments contained herein, to coincide with chapters, articles, divisions, sections, and subsections as they currently exist within said Code; and to resolve any inconsistencies regarding capitalization, grammar, and numbering or placement of chapters, articles, divisions, sections, and subsections in said Code. BE IT FURTHER ORDAINED by the Board, if any section, subsection, paragraph, sentence, clause, or phrase of this Ordinance is for any reason held or decided to be unconstitutional, such decision shall not affect the validity of the remaining portions hereof. The Board of County Commissioners hereby declares that it would have enacted this Ordinance in each and every section, subsection, paragraph, sentence, clause, and phrase thereof irrespective of the fact that any one or more sections, subsections, paragraphs, sentences, clauses, or phrases might be declared to be unconstitutional or invalid. PAGE 3 ' 2016-0062 ORD2015-27 The above and foregoing Ordinance Number 2015-27 was, on motion duly made and seconded, adopted by the following vote on the 4th day of April, A.D., 2016. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: Mike Freeman, Chair Weld County Clerk to the Board Sean P. Conway, Pro-Tem BY: Deputy Clerk to the Board Julie A. Cozad APPROVED AS TO FORM: Barbara Kirkmeyer County Attorney Steve Moreno Publication: November 3, 2015 First Reading: December 14, 2015 Con't to: December 21 , 2015 Publication: January 5, 2016, in the Greeley Tribune Second Reading: January 4, 2016 Con't to: January 25, 2016 Con't to: March 7, 2016 — Referred back to Planning Commission PAGE 4 2016-0062 ORD2015-27 Hello