Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Browse
Search
Address Info: 1150 O Street, P.O. Box 758, Greeley, CO 80632 | Phone:
(970) 400-4225
| Fax: (970) 336-7233 | Email:
egesick@weld.gov
| Official: Esther Gesick -
Clerk to the Board
Privacy Statement and Disclaimer
|
Accessibility and ADA Information
|
Social Media Commenting Policy
Home
My WebLink
About
20162208.tiff
CDPHE ;COLORADO Department of Public Health & Environment Dedicated to protecting and improving the health and environment of the people of Colorado Weld County - Clerk to the Board 1150O St PO Box 758 Greeley, CO 80632 July 6, 2016 Dear Sir or Madam: pp RECEIVED JUL. 1 1 2016 On July 7, 2016, the Air Pollution Control Division will begin a 30 -day public notice period for Whiting Oil and Gas Corporation - Razor 22D Production Facility. A copy of this public notice and the public comment packet are enclosed. Thank you for assisting the Division by posting a copy of this public comment packet in your office. Public copies of these documents are required by Colorado Air Quality Control Commission regulations. The packet must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please send any comment regarding this public notice to the address below. Colorado Dept. of Public Health Et Environment APCD-SS-B1 4300 Cherry Creek Drive South Denver, Colorado 80246-1530 Attention: Clara Gonzales Regards, /, f Clara Gonzales Public Notice Coordinator Stationary Sources Program Air Pollution Control Division Enclosure l vb1 C. VivA&' / lam/ IC Cc; ; P L. , t-1 c.... , P cc ttl/I(o 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado-govicdphe John W. Hickenlooper. Governor Larry Wolk. MD, MSPH, Executive Director and Chief Medical Officer 2016-2208 Air Pollution Control Division Notice of a Proposed Project or Activity Warranting Public Comment Website Title: Whiting Oil and Gas Corporation - Razor 22D Production Facility - Weld County Notice Period Begins: July 7, 2016 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: Whiting Oil and Gas Corporation Facility: Razor 22D Production Facility Exploration and Production Facility NWNW Section 22 T1ON R58W Weld County The proposed project or activity is as follows: The applicant proposes to permit a new production facility including condensate storage tanks, produced water storage tanks, pump jack engine, separator venting, and condensate loadout operations. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • permitted emissions exceed public notice threshold values in Regulation No. 3, Part B, Section III.C.1.a (25 tpy in a non -attainment area and/or 50 tpy in an attainment area) • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 15WE1206 have been filed with the Weld County Clerk's office. A copy of the draft permit and the Division's analysis are available on the Division's website at https://www.colorado.gov/pacific/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Any such comment must be submitted in writing to the following addressee: David Thompson Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 cdphe.commentsapcd@state.co.us i.V OLONAJO STATE OF COLORADO COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 PERMIT NO: DATE ISSUED: ISSUED TO: 15WE1206 Whiting Oil and Gas CONSTRUCTION PERMIT Issuance 1 THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: Oil and gas facility, known as the Razor 22D Production Facility, located in NWNW Sec22, T10N, R58W, in Weld County, Colorado. THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: Facility Equipment ID AIRS Point Description ENG-03 001 One (1) Caterpillar, Model CG137-8, Serial Number WWF00184, natural gas -fired, naturally aspirated, 4SRB reciprocating internal combustion engine, site rated at 388 horsepower. This engine shall be equipped with a non- selective catalytic reduction (NSCR) system and air -fuel ratio control. This emission unit is used as a pump jack engine. This engine may be replaced with another engine in accordance with the temporary engine replacement provision or with another Caterpillar CG137-8 engine in accordance with the permanent replacement provision of the Alternate Operating Scenario (AOS), included in this permit as Attachment A. THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION AND CONTROL ACT C.R.S. (25-7-101 et seq), TO THOSE GENERAL TERMS AND CONDITIONS INCLUDED IN THIS DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: REQUIREMENTS TO SELF -CERTIFY FOR FINAL AUTHORIZATION 1. Within one hundred and eighty days (180) of the latter of commencement of operation or issuance of this permit, compliance with the conditions contained in this permit shall be demonstrated to the Division. It is the owner or operator's responsibility to self -certify compliance with the conditions. Failure to demonstrate compliance within 180 days may result in revocation of the permit. (Reference: Regulation No. 3, Part B, III.G.2). This permit shall expire if the owner or operator of the source for which this permit was issued: (i) does not commence construction/modification or operation of this source AIRS ID: 123/9E15/001 Page 1 of 14 NGEngine Version 2014-1 Public Health and Environment Air Pollution Control Division within 18 months after either, the date of issuance of this construction permit or the date on which such construction or activity was scheduled to commence as set forth in the permit application associated with this permit; (ii) discontinues construction for a period of eighteen months or more; (iii) does not complete construction within a reasonable time of the estimated completion date. The Division may grant extensions of the deadline per Regulation No. 3, Part B, III.F.4.b. (Reference: Regulation No. 3, part B, III.F.4.) 3. The operator shall complete all initial compliance testing and sampling as required in this permit and submit the results to the Division as part of the self -certification process. (Reference: Regulation No. 3, Part B, Section III.E.) 4. The operator shall retain the permit final authorization letter issued by the Division after completion of self -certification, with the most current construction permit. This construction permit alone does not provide final authority for the operation of this source. EMISSION LIMITATIONS AND RECORDS 5. Emissions of air pollutants shall not exceed the following limitations (as calculated in the Division's preliminary analysis). (Reference: Regulation No. 3, Part B, Section II.A.4) Annual Limits: Facility Equipment ID AIRS Point Tons per Year Emission Type NO, NO VOC CO ENG-03 001 3.8 2.6 7.5 Point See "Notes to Permit Holder" for information on emission factors and methods used to calculate limits. Facility -wide emissions of each individual hazardous air pollutant shall be less than 8.0 tpy. Facility -wide emissions of total hazardous air pollutants shall be less than 20.0 tpy. Compliance with the annual limits shall be determined by recording the facility's annual criteria pollutant emissions, (including all HAPs above the de-minimis reporting level) from each emission unit, on a rolling twelve (12) month total. By the end of each month a new twelve-month total shall be calculated based on the previous twelve months' data. The permit holder shall calculate emissions each month and keep a compliance record on site or at a local field office with site responsibility, for Division review. This rolling twelve-month total shall apply to all permitted emission units, requiring an APEN, at this facility. 6. The emission points in the table below shall be operated and maintained with the control equipment as listed in order to reduce emissions to less than or equal to the limits established in this permit (Reference: Regulation No.3, Part B, Section III.E.) Facility Equipment ID AIRS Point Control Device Pollutants Controlled ENG-03 001 Non -Selective Catalytic Reduction System and Air- Fuel Ratio Control NOx and CO AIRS ID: 123/9E15/001 Page 2 of 14 of Public Health and Environment Air Pollution Control Division PROCESS LIMITATIONS AND RECORDS 7. This source shall be limited to the following maximum processing rates as listed below. Monthly records of the actual processing rate shall be maintained by the owner or operator and made available to the Division for inspection upon request. (Reference: Regulation 3, Part B, II.A.4) Process/Consumption Limits Facility Equipment ID AIRS Point Process Parameter Annual Limit ENG-03 001 Consumption of natural gas as a fuel 16.40 MMscf/yr The owner or operator shall calculate monthly process rates based on the calendar month. Compliance with the annual throughput limits shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve-month total is calculated based on the previous twelve months' data. The permit holder shall calculate throughput each month and keep a compliance record on site or at a local field office with site responsibility, for Division review. STATE AND FEDERAL REGULATORY REQUIREMENTS 8. The permit number and AIRS ID point number (e.g. 123/4567/890) shall be marked on the subject equipment for ease of identification. (Reference: Regulation Number 3, Part B, III.E.) (State only enforceable) 9. Visible emissions shall not exceed twenty percent (20%) opacity during normal operation of the source. During periods of startup, process modification, or adjustment of control equipment visible emissions shall not exceed 30% opacity for more than six minutes in any sixty consecutive minutes. Emission control devices subject to Regulation 7, Sections XII.C.1.d or XVII.B.2.b shall have no visible emissions. (Reference: Regulation No. 1, Section II.A.1. & 4.) 10. This source is subject to the odor requirements of Regulation No. 2. (State only enforceable) 11. This equipment is subject to the control requirements for natural gas -fired reciprocating internal combustion engines under Regulation No. 7, Section XVII.E (State only enforceable). The owner or operator of any natural gas -fired reciprocating internal combustion engine that is either constructed or relocated to the state of Colorado from another state after the date listed in the table below shall operate and maintain each engine according to the manufacturer's written instructions or procedures to the extent practicable and consistent with technological limitations and good engineering and maintenance practices over the entire life of the engine so that it achieves the emission standards required in the table below: Maximum' Engine HP Construction or Relocation Date Emission Standard in g/hp-hr NOx CO VOC <100HP Any N/A N/A N/A AIRS ID: 123/9E15/001 Page 3 of 14 Public Health and Environment Air Pollution Control Division ≥100HP and January 1, 2008 2.0 4.0 1.0 <500HP January 1, 2011 1.0 2.0 0.7 ≥500HP July 1, 2007 July 1, 2010 2.0 1.0 4.0 2.0 1.0 0.7 Maximum engine horsepower is the nameplate rating of the engine and does not account for deration. OPERATING & MAINTENANCE REQUIREMENTS 12. Upon startup of these points, the owner or operator shall follow the most recent operating and maintenance (O&M) plan and record keeping format approved by the Division, in order to demonstrate compliance on an ongoing basis with the requirements of this permit. Revisions to your O&M plan are subject to Division approval prior to implementation. (Reference: Regulation No. 3, Part B, Section III.G.7.) COMPLIANCE TESTING AND SAMPLING Initial Testing Requirements 13. A source initial compliance test shall be conducted on emissions point 001 to measure the emission rate(s) for the pollutants listed below in order to demonstrate compliance with the emission limits in this permit. The test protocol must be in accordance with the requirements of the Air Pollution Control Division Compliance Test Manual and shall be submitted to the Division for review and approval at least thirty (30) days prior to testing. No compliance test shall be conducted without prior approval from the Division. Any compliance test conducted to show compliance with a monthly or annual emission limitation shall have the results projected up to the monthly or annual averaging time by multiplying the test results by the allowable number of operating hours for that averaging time (Reference: Regulation No. 3, Part B., Section III.G.3) Oxides of Nitrogen using EPA approved methods. Carbon Monoxide using EPA approved methods. Periodic Testing Requirements 14. This engine is subject to the periodic testing requirements as specified in the operating and maintenance (O&M) plan as approved by the Division. Revisions to your O&M plan are subject to Division approval. Replacements of this unit completed as Alternative Operating Scenarios may be subject to additional testing requirements as specified in Attachment A. ADDITIONAL REQUIREMENTS 15. A revised Air Pollutant Emission Notice (APEN) shall be filed: (Reference: Regulation No. 3, Part A, I I.C) a. Annually by April 30th whenever a significant increase in emissions occurs as follows: For any criteria pollutant: For sources emitting less than 100 tons per year, a change in actual emissions of five (5) tons per year or more, above the level reported on the last APEN; or AIRS ID: 12319E151001 Page 4 of 14 or Public Health and Environment Air Pollution Control Division For sources emitting 100 tons per year or more, a change in actual emissions of five percent or 50 tons per year or more, whichever is less, above the level reported on the last APEN submitted; or For any non -criteria reportable pollutant: If the emissions increase by 50% or five (5) tons per year, whichever is less, above the level reported on the last APEN submitted to the Division. b. Whenever there is a change in the owner or operator of any facility, process, or activity; or c. Whenever new control equipment is installed, or whenever a different type of control equipment replaces an existing type of control equipment; or d. Whenever a permit limitation must be modified; or e. No later than 30 days before the existing APEN expires. f. Within 14 calendar days of commencing operation of a permanent replacement engine under the alternative operating scenario outlined in this permit as Attachment A. The APEN shall include the specific manufacturer, model and serial number and horsepower of the permanent replacement engine, the appropriate APEN filing fee and a cover letter explaining that the owner or operator is exercising an alternative -operating scenario and is installing a permanent replacement engine. 16. Federal regulatory program requirements (i.e. PSD or NANSR) shall apply to this source at any such time that this source becomes major solely by virtue of a relaxation in any permit condition. Any relaxation that increases the potential to emit above the applicable Federal program threshold will require a full review of the source as though construction had not yet commenced on the source. The source shall not exceed the Federal program threshold until a permit is granted. (Regulation No. 3 Part D). GENERAL TERMS AND CONDITIONS 17. This permit and any attachments must be retained and made available for inspection upon request. The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation No. 3, Part B, Section II.B upon a request for transfer of ownership and the submittal of a revised APEN and the required fee. 18. If this permit specifically states that final authorization has been granted, then the remainder of this condition is not applicable. Otherwise, the issuance of this construction permit does not provide "final" authority for this activity or operation of this source. Final authorization of the permit must be secured from the APCD in writing in accordance with the provisions of 25-7-114.5(12)(a) C.R.S. and AQCC Regulation No. 3, Part B, Section III.G. Final authorization cannot be granted until the operation or activity commences and has been verified by the APCD as conforming in all respects with the conditions of the permit. Once self -certification of all points has been reviewed and approved by the Division, it will provide written documentation of such final authorization. Details for obtaining final authorization to operate are located in the Requirements to Self - Certify for Final Authorization section of this permit. 19. This permit is issued in reliance upon the accuracy and completeness of information supplied by the owner or operator and is conditioned upon conduct of the activity, or construction, installation and operation of the source, in accordance with this information AIRS ID: 123/9E15/001 Page 5 of 14 Public Health and Environment Air Pollution Control Division and with representations made by the owner or operator or owner or operator's agents. It is valid only for the equipment and operations or activity specifically identified on the permit. 20. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been determined by the APCD to be necessary to assure compliance with the provisions of Section 25-7-114.5(7)(a), C.R.S. 21. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be deemed denied ab initio. This permit may be revoked at any time prior to self -certification and final authorization by the Air Pollution Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Control Commission (AQCC), including failure to meet any express term or condition of the permit. If the Division denies a permit, conditions imposed upon a permit are contested by the owner or operator, or the Division revokes a permit, the owner or operator of a source may request a hearing before the AQCC for review of the Division's action. 22. Section 25-7-114.7(2)(a), C.R.S. requires that all sources required to file an Air Pollution Emission Notice (APEN) must pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee billing will terminate. 23. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and Control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections 25-7-115 (enforcement), -121 (injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.R.S. By: David Thompson Permit Engineer Permit Histo Issuance Date Description Issuance 1 This Issuance Issued to Whiting Oil and Gas Corporation. AIRS ID: 123/9E15/001 Page 6 of 14 eft of Public Health and Environment Air Pollution Control Division Notes to Permit Holder at the time of this permit issuance: 1) The permit holder is required to pay fees for the processing time for this permit. An invoice for these fees will be issued after the permit is issued. The permit holder shall pay the invoice within 30 days of receipt of the invoice. Failure to pay the invoice will result in revocation of this permit (Reference: Regulation No. 3, Part A, Section VI.B.) 2) The production or raw material processing limits and emission limits contained in this permit are based on the consumption rates requested in the permit application. These limits may be revised upon request of the owner or operator providing there is no exceedance of any specific emission control regulation or any ambient air quality standard. A revised air pollution emission notice (APEN) and complete application form must be submitted with a request for a permit revision. 3) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative Defense Provision for Excess Emissions During Malfunctions. The owner or operator shall notify the Division of any malfunction condition which causes a violation of any emission limit or limits stated in this permit as soon as possible, but no later than noon of the next working day, followed by written notice to the Division addressing all of the criteria set forth in Part II.E.1. of the Common Provisions Regulation. See: https://www.colorado.gov/pacific/cdphe/agcc-reqs 4) The following emissions of non -criteria reportable air pollutants are estimated based upon the process limits as indicated in this permit. This information is listed to inform the operator of the Division's analysis of the specific compounds emitted if the source(s) operate at the permitted limitations. AIRS Point Pollutant CAS # BIN Uncontrolled Emission Rate (Ib/yr) Are the emissions reportable? Controlled Emission Rate (Ib/yr) 001 Formaldehyde 50000 A 3,227 Yes 3,227 Methanol 67561 C 77 No 77 Acetaldehyde 75070 A 70 No 70 Acrolein 107028 A 66 No 66 Benzene 71432 A 40 No 40 1,3 -Butadiene 106990 A 17 No 17 Toluene 108883 C 14 No 14 5) The emission levels contained in this permit are based on the following emission factors: Point 001: CAS Pollutant Emission Uncontrolled lb/MMBtu Factors - g/bhp-hr Emission Factors — Controlled lb/MMBtu g/bhp-hr NOx 3.5453 11.90 0.2978 1.00 CO 3.6942 12.40 0.5948 2.00 VOC 0.2085 0.70 0.2085 0.70 50000 Formdaedehy 0.1281 0.43 0.1281 0.43 67561 Methanol 0.0031 0.01 0.0031 f 0.01 75070 Acetaldehyd e 0.0028 0.01 0.0028 0.01 107028 Acrolein 0.0026 0.01 0.0026 0.01 71432 Benzene 0.0016 0.01 0.0016 0.01 AIRS ID: 123/9E15/001 Page 7 of 14 Public Health and Environment Air Pollution Control Division CAS Pollutant Emission Uncontrolled lb/MMBtu Factors - g/bhp-hr Emission Controlled lb/MMBtu Factors — g/bhp-hr 106990 1'3 Butadiene 0.0007 0.00 0.0007 0.00 108883 Toluene 0.0006 0.00 0.0006 0.00 Emission factors are based on a Brake -Specific Fuel Consumption Factor of 7400 Btu/hp-hr, a site -rated horsepower value of 388, and a fuel heat value of 1536 Btu/scf. Emission Factor Sources: CAS Pollutant Uncontrolled EFSource Controlled EF Source NOx Manufacturer Manufacturer CO Manufacturer Manufacturer VOC Manufacturer Manufacturer 50000 Formaldehy de Manufacturer Manufacturer 67561 Methanol AP -42; Table 3.2-3 (7/2000); Natural Gas No Control 75070 Acetaldehyd e AP -42; Table 3.2-3 (7/2000); Natural Gas No Control 107028 Acrolein AP -42; Table 3.2-3 (7/2000); Natural Gas No Control 71432 Benzene AP -42; Table 3.2-3 (7/2000); Natural Gas No Control 106990 1,3- Butadiene AP -42; Table 3.2-3 (7/2000); Natural Gas No Control 108883 Toluene AP -42; Table 3.2-3 (7/2000); Natural Gas No Control 6) In accordance with C.R.S. 25-7-114.1, each Air Pollutant Emission Notice (APEN) associated with this permit is valid for a term of five years from the date it was received by the Division. A revised APEN shall be submitted no later than 30 days before the five-year term expires. Please refer to the most recent annual fee invoice to determine the APEN expiration date for each emissions point associated with this permit. For any questions regarding a specific expiration date call the Division at (303)-692-3150. 7) This engine is subject to 40 CFR, Part 60, Subpart JJJJ—Standards of Performance for Stationary Spark Ignition Internal Combustion Engines (See January 18, 2008 Federal Register posting — effective March 18, 2008). This rule has not yet been incorporated into Colorado Air Quality Control Commission's Regulation No. 6. A copy of the complete subpart is available on the EPA website at: http://www.epa.00v/ttn/atw/area/fr18ia08.pdf 8) This engine is subject to 40 CFR, Part 63, Subpart ZZZZ - National Emission Standards for Hazardous Air Pollutants for Reciprocating Internal Combustion Engines. (See January 18, 2008 Federal Register posting - effective March 18, 2008). The January 18, 2008 amendments to include requirements for area sources and engines < 500 hp located at major sources have not yet been incorporated into Colorado Air Quality Control Commission's Regulation No. 8. A copy of the complete subpart is available on the EPA website at: http://www.epa.gov/ttn/atw/areaffr18ia08.pdf Additional information regarding area source standards can be found on the EPA website at: http://www. epa. qov/ttn/atw/area/arearu les. htm I 9) This engine is subject to 40 CFR, Part 63, Subpart ZZZZ - National Emission Standards for Hazardous Air Pollutants for Reciprocating Internal Combustion Engines (See August 20, 2010 Federal Register posting - effective October 19, 2010). The August 20, 2010 amendments to include requirements for existing engines located at area sources and existing engines < 500 hp located at major sources have not yet been incorporated into Colorado Air Quality Control Commission's Regulation No. 8. A copy of the complete subpart is available on the EPA website at: AIRS ID: 123/9E15/001 Page 8 of 14 of Public Health and Environment Air Pollution Control Division http://www.epa.gov/ttn/atw/rice/fr20au10.pdf Additional information regarding area source standards can be found on the EPA website at: http://www.epa.gov/ttn/atw/area/arearules.html 10) This facility is classified as follows: Applicable Requirement Status Operating Permit Synthetic Minor Source of: VOC, HAPs, n -Hexane PSD Synthetic Minor Source of: VOC MACT ZZZZ Major Source Requirements: Not Applicable Area Source Requirements: Applicable 11) Full text of the Title 40, Protection of Environment Electronic Code of Federal Regulations can be found at the website listed below: http://ecfr.gpoaccess.gov/ Part 60: Standards of Performance for New Stationary Sources NSPS 60.1 -End Subpart A — Subpart KKKK NSPS Part 60, Appendixes Appendix A — Appendix I Part 63: National Emission Standards for Hazardous Air Pollutants for Source Categories MACT 63.1-63.599 Subpart A — Subpart Z MACT 63.600-63.1199 Subpart AA — Subpart DDD MACT 63.1200-63.1439 Subpart EEE — Subpart PPP MACT 63.1440-63.6175 Subpart QQQ — Subpart YYYY MACT 63.6580-63.8830 Subpart ZZZZ — Subpart MMMMM MACT 63.8980 -End Subpart NNNNN — Subpart XXXXXX 12) A self certification form and guidance on how to self -certify compliance as required by this permit may be obtained online at: http://www.colorado.gov/pacific/cdphe/air-permit-self-certification AIRS ID: 123/9E15/001 Page 9 of 14 Public Health and Environment Air Pollution Control Division ATTACHMENT A: ALTERNATIVE OPERATING SCENARIOS RECIPROCATING INTERNAL COMBUSTION ENGINES October 12, 2012 2. Alternative Operating Scenarios The following Alternative Operating Scenario (AOS) for the temporary and permanent replacement of natural gas fired reciprocating internal combustion engines has been reviewed in accordance with the requirements of Regulation No. 3., Part A, Section IV.A, Operational Flexibility -Alternative Operating Scenarios, Regulation No. 3, Part B, Construction Permits, and Regulation No. 3, Part D, Major Stationary Source New Source Review and Prevention of Significant Deterioration, and it has been found to meet all applicable substantive and procedural requirements. This permit incorporates and shall be considered a Construction Permit for any engine replacement performed in accordance with this AOS, and the owner or operator shall be allowed to perform such engine replacement without applying for a revision to this permit or obtaining a new Construction Permit. 2.1 Engine Replacement The following AOS is incorporated into this permit in order to deal with a compressor engine breakdown or periodic routine maintenance and repair of an existing onsite engine that requires the use of either a temporary or permanent replacement engine. "Temporary" is defined as in the same service for 90 operating days or less in any 12 month period. "Permanent" is defined as in the same service for more than 90 operating days in any 12 month period. The 90 days is the total number of days that the engine is in operation. If the engine operates only part of a day, that day shall count as a single day towards the 90 day total. The compliance demonstrations and any periodic monitoring required by this AOS are in addition to any compliance demonstrations or periodic monitoring required by this permit. All replacement engines are subject to all federally applicable and state -only requirements set forth in this permit (including monitoring and record keeping). The results of all tests and the associated calculations required by this AOS shall be submitted to the Division within 30 calendar days of the test or within 60 days of the test if such testing is required to demonstrate compliance with NSPS or MACT requirements. Results of all tests shall be kept on site for five (5) years and made available to the Division upon request. The owner or operator shall maintain a log on -site and contemporaneously record the start and stop date of any engine replacement, the manufacturer, date of manufacture, model number, horsepower, and serial number of the engine(s) that are replaced during the term of this permit, and the manufacturer, model number, horsepower, and serial number of the replacement engine. In addition to the log, the owner or operator shall maintain a copy of all Applicability Reports required under section 2.1.2 and make them available to the Division upon request. 2.1.1 The owner or operator may temporarily replace an existing compressor engine that is subject to the emission limits set forth in this permit with an engine that is of the same manufacturer, model, and horsepower or a different manufacturer, model, or horsepower as the existing engine without modifying this permit, so long as the temporary replacement engine complies with all permit limitations and other requirements applicable to the existing engine. Measurement of emissions from the temporary replacement engine shall be made as set forth in section 2.2. AIRS ID: 123/9E15/001 Page 10 of 14 e o'Public Health and Environment Air Pollution Control Division 2.1.2 The owner or operator may permanently replace the existing compressor engine with another engine with the same manufacturer, model, and horsepower engines without modifying this permit so long as the permanent replacement engine complies with all permit limitations and other requirements applicable to the existing engine as well as any new applicable requirements for the replacement engine. Measurement of emissions from the permanent replacement engine and compliance with the applicable emission limitations shall be made as set forth in section 2.2. An Air Pollutant Emissions Notice (APEN) that includes the specific manufacturer, model and serial number and horsepower of the permanent replacement engine shall be filed with the Division for the permanent replacement engine within 14 calendar days of commencing operation of the replacement engine. The APEN shall be accompanied by the appropriate APEN filing fee, a cover letter explaining that the owner or operator is exercising an alternative operating scenario and is installing a permanent replacement engine, and a copy of the relevant Applicability Reports for the replacement engine. Example Applicability Reports can be found at http://www.cdphe.state.co.us/ap/oilgaspermitting.html. This submittal shall be accompanied by a certification from the Responsible Official indicating that "based on the information and belief formed after reasonable inquiry, the statements and information included in the submittal are true, accurate and complete". This AOS cannot be used for permanent engine replacement of a grandfathered or permit exempt engine or an engine that is not subject to emission limits. The owner or operator shall agree to pay fees based on the normal permit processing rate for review of information submitted to the Division in regard to any permanent engine replacement. 2.2 Portable Analyzer Testing Note: In some cases there may be conflicting and/or duplicative testing requirements due to overlapping Applicable Requirements. In those instances, please contact the Division Field Services Unit to discuss streamlining the testing requirements. Note that the testing required by this Condition may be used to satisfy the periodic testing requirements specified by the permit for the relevant time period (i.e. if the permit requires quarterly portable analyzer testing, this test conducted under the AOS will serve as the quarterly test and an additional portable analyzer test is not required for another three months). The owner or operator may conduct a reference method test, in lieu of the portable analyzer test required by this Condition, if approved in advance by the Division. The owner or operator shall measure nitrogen oxide (NOX) and carbon monoxide (CO) emissions in the exhaust from the replacement engine using a portable flue gas analyzer within seven (7) calendar days of commencing operation of the replacement engine. All portable analyzer testing required by this permit shall be conducted using the Division's Portable Analyzer Monitoring Protocol (ver March 2006 or newer) as found on the Division's web site at: https://www.colorado.gov/pacific/sites/default/files/AP Portable-Analyzer-Monitorinq-Protocol.pdf Results of the portable analyzer tests shall be used to monitor the compliance status of this unit. For comparison with an annual (tons/year) or short term (lbs/unit of time) emission limit, the results of the tests shall be converted to a lb/hr basis and multiplied by the allowable operating hours in the month or year (whichever applies) in order to monitor compliance. If a source is not limited in its hours of operation AIRS ID: 123/9E15/001 Page 11 of 14 Public Health and Environment Air Pollution Control Division the test results will be multiplied by the maximum number of hours in the month or year (8760), whichever applies. For comparison with a short-term limit that is either input based (lb/mmBtu), output based (g/hp-hr) or concentration based (ppmvd @ 15% O2) that the existing unit is currently subject to or the replacement engine will be subject to, the results of the test shall be converted to the appropriate units as described in the above -mentioned Portable Analyzer Monitoring Protocol document. If the portable analyzer results indicate compliance with both the NOX and CO emission limitations, in the absence of credible evidence to the contrary, the source may certify that the engine is in compliance with both the NOX and CO emission limitations for the relevant time period. Subject to the provisions of C.R.S. 25-7-123.1 and in the absence of credible evidence to the contrary, if the portable analyzer results fail to demonstrate compliance with either the NOX or CO emission limitations, the engine will be considered to be out of compliance from the date of the portable analyzer test until a portable analyzer test indicates compliance with both the NOX and CO emission limitations or until the engine is taken offline. 2.3 Applicable Regulations for Permanent Engine Replacements 2.3.1 Reasonably Available Control Technology (RACT): Reg 3, Part B § II.D.2 All permanent replacement engines that are located in an area that is classified as attainment/maintenance or nonattainment must apply Reasonably Available Control Technology (RACT) for the pollutants for which the area is attainment/maintenance or nonattainment. Note that both VOC and NOX are precursors for ozone. RACT shall be applied for any level of emissions of the pollutant for which the area is in attainment/maintenance or nonattainment, except as follows: In the Denver Metropolitan PM10 attainment/maintenance area, RACT applies to PM10 at any level of emissions and to NOX and SO2, as precursors to PM10, if the potential to emit of NOX or SO2 exceeds 40 tons/yr. For purposes of this AOS, the following shall be considered RACT for natural gas fired reciprocating internal combustion engines: VOC: The emission limitations in NSPS JJJJ CO: The emission limitations in NSPS JJJJ NOX: The emission limitations in NSPS JJJJ SO2: Use of natural gas as fuel PM10: Use of natural gas as fuel As defined in 40 CFR Part 60 Subparts GG (§ 60.331) and 40 CFR Part 72 (§ 72.2), natural gas contains 20.0 grains or less of total sulfur per 100 standard cubic feet. 2.3.2 Control Requirements and Emission Standards: Regulation No. 7, Sections XVI. and XVII.E (State - Only conditions). Control Requirements: Section XVI Any permanent replacement engine located within the boundaries of an ozone nonattainment area is subject to the applicable control requirements specified in Regulation No. 7, section XVI, as specified below: Rich burn engines with a manufacturer's design rate greater than 500 hp shall use a non- selective catalyst and air fuel controller to reduce emission. AIRS ID: 12319E151001 Page 12 of 14 ,, rtme pt ofPublicHealth and Environment Air Pollution Control Division Lean burn engines with a manufacturer's design rate greater than 500 hp shall use an oxidation catalyst to reduce emissions. The above emission control equipment shall be appropriately sized for the engine and shall be operated and maintained according to manufacturer specifications. The source shall submit copies of the relevant Applicability Reports required under Condition 2.1.2. Emission Standards: Section XVII. E — State -only requirements Any permanent engine that is either constructed or relocated to the state of Colorado from another state, after the date listed in the table below shall operate and maintain each engine according to the manufacturer's written instructions or procedures to the extent practicable and consistent with technological limitations and good engineering and maintenance practices over the entire life of the engine so that it achieves the emission standards required in the table below: Construction or Emission Standards in G/hp-hr Max Engine HP Relocation Date NOx CO VOC January 1, 2008 2.0 4.0 1.0 100<Hp<500 January 1, 2011 1.0 2.0 0.7 500<Hp July 1, 2007 July 1, 2010 2.0 1.0 4.0 2.0 1.0 0.7 The source shall submit copies of the relevant Applicability Reports required under Condition 2.1.2. 2.3.3 NSPS for stationary spark ignition internal combustion engines: 40 CFR Part 60, Subpart JJJJ A permanent replacement engine that is manufactured on or after 7/1/09 for emergency engines greater than 25 hp, 7/1/2008 for engines less than 500 hp, 7/1/2007 for engines greater than or equal to 500 hp except for lean burn engines greater than or equal to 500 hp and less than 1,350 hp, and 1/1/2008 for lean burn engines greater than or equal to 500 hp and less than 1,350 hp are subject to the requirements of 40 CFR Part 60, Subpart JJJJ. An analysis of applicable monitoring, recordkeeping, and reporting requirements for the permanent engine replacement shall be included in the Applicability Reports required under Condition 2.1.2. Any testing required by the NSPS is in addition to that required by this AOS. Note that the initial test required by NSPS Subpart JJJJ can serve as the testing required by this AOS under Condition 2.2, if approved in advance by the Division, provided that such test is conducted within the time frame specified in Condition 2.2. Note that under the provisions of Regulation No. 6. Part B, section I.B. that Relocation of a source from outside of the State of Colorado into the State of Colorado is considered to be a new source, subject to the requirements of Regulation No. 6 (i.e., the date that the source is first relocated to Colorado becomes equivalent to the manufacture date for purposes of determining the applicability of NSPS JJJJ requirements). However, as of October 1, 2011 the Division has not yet adopted NSPS JJJJ. Until such time as it does, any engine subject to NSPS will be subject only under Federal law. Once the Division adopts NSPS JJJJ, there will be an additional step added to the determination of the NSPS. Under the provisions of Regulation No. 6, Part 8, § 1.8 (which is referenced in Pad A), any engine relocated from outside of the State of Colorado into the State of Colorado is considered to be a new source, subject to the requirements of NSPS JJJJ. 2.3.4 Reciprocating internal combustion engine (RICE) MACT: 40 CFR Part 63, Subpart ZZZZ AIRS ID: 123/9E15/001 Page 13 of 14 Public Health and Environment Air Pollution Control Division A permanent replacement engine located at either an area or major source is subject to the requirements in 40 CFR Part 63, Subpart ZZZZ. An analysis of the applicable monitoring, recordkeeping, and reporting requirements for the permanent engine replacement shall be included in the Applicability Reports required under Condition 2.1.2. Any testing required by the MACT is in addition to that required by this AOS. Note that the initial test required by the MACT can serve as the testing required by this AOS under Condition 2.2, if approved in advance by the Division, provided that such test is conducted within the time frame specified in Condition 2.2. 2.4 Additional Sources The replacement of an existing engine with a new engine is viewed by the Division as the installation of a new emissions unit, not "routine replacement" of an existing unit. The AOS is therefore essentially an advanced construction permit review. The AOS cannot be used for additional new emission points for any site; an engine that is being installed as an entirely new emission point and not as part of an AOS- approved replacement of an existing onsite engine has to go through the appropriate Construction/Operating permitting process prior to installation. AIRS ID: 123/9E15/001 Page 14 of 14 Colorado Air Permitting Project Project Details Review Engineer: Package it: Received Date: Review Start Date: Section 01- Facility Information David Thompson 338909 10/9/2015 1/25/2016 Company Name: County AIRS ID: Plant AIRS ID: Facility Name: Physical Address/Location: Type of Facility: What industry segment? Is this facility located in a NAAQS non -attainment area? If yes, for what pollutant? ❑ Carbon Monoxide (CO) Whiting Oil and Gas Corporation 123 9E15 Razor 22D Production Facility NWNW Sec22 T10N R58W Oil Stabilization (Exploration & Production) Oil & Natural Gas Production &Processing Section 02 - Emissions Units In Permit Application No ❑ Particulate Matter (PM) ❑ Ozone (NOx & VOC) AIRS Point # Emissions Source Type Emissions Control? Permit k Issuance ti Self Cert Required? Action Engineering Remarks 001 Natural Gas RICE Yes 15WE1206 1 Yes Permit Initial Issuance 002 Produced Water Storage Tank Yes 15WE1207 1 Yes Permit Initial Issuance 003 Hydrocarbon Liquid Loading Yes 15WE1208 1 Yes Permit Initial Issuance 004 Crude Oil Storage Tank Yes 15WE1209 1 Yes Permit Initial Issuance 005 Separator Venting Yes 15WE1210 1 Yes Permit Initial Issuance 006 Pneumatic Pump No 1SWE1211 1 Yes Permit Initial Issuance Section 03 - Description of Project Section 04 - Public Comment Requirments Is Public Comment Required? Yes Colorado Air Permitting Project If yes, why?' Requesting Synthetic Minor Permit Section 05 - Ambient Air Impact Analysis Requirements Was a quantitative modeling analysis required?2 No <> If yes, for what pollutants? If yes, attach a copy of Technical Services Unit modeling results summary. Section 06 - Facility -Wide Stationary Source Classification Is this stationary source a true minor? Is this stationary source a synthetic minor? If yes, explain what programs and which pollutants here: Prevention of Significant Deterioration (PSD): VOC, Title V Operating Permits (OP) VOC, HAPs Non -Attainment New Source Review (NANSR): NA Is this stationary source a major source? No If yes, explain what programs and which pollutants here: Prevention of Significant Deterioration (P5O): SO2, NOx, CO, VOC, PM2.5, PM10 Title V Operating Permits (OP) : 5O2, NOx, CO, VOC, PM2.5, PM10, TSP, HAPs Non -Attainment New Source Review (NANSR): NOx, VOC 15WE 1207 Construction Permit Air Pollution Control Division Permit number: Date issued: Issued to: Facility Name: Plant AIRS ID: Physical Location: County: General Description: Issuance: 1 Whiting Oil and Gas Corporation Razor 22D Production Facility 123/9E15/002 NWNW Sec 22 Ti ON R58W Weld County Well Production Facility Equipment or activity subject to this permit: Facility Equipment ID AIRS Point Equipment Description Emissions Control Description PW-01 through PW-06 002 Six (6) 400 barrel fixed roof storage vessels used to store produced water Emissions are routed to a gas gathering system through a VRU during normal operation. Emissions are routed to an open flare while gas gathering is not available This permit is granted subject to all rules and regulations of the Colorado Air Quality Control Commission and the Colorado Air Pollution Prevention and Control Act (C.R.S. 25-7-101 et seq), to the specific general terms and conditions included in this document and the following specific terms and conditions. REQUIREMENTS TO SELF -CERTIFY FOR FINAL AUTHORIZATION 1. Within one hundred and eighty days (180) of the latter of commencement of operation or issuance of this permit, compliance with the conditions contained in this permit shalt be demonstrated to the Division. It is the owner or operator's responsibility to self -certify compliance with the conditions. Failure to demonstrate compliance within 180 days may result in revocation of the permit. A self certification form and guidance on how to self -certify compliance as required by this permit may be obtained online at www.colorado.gov/pacific/cdphe/air-permit-self-certification. (Regulation Number 3, Part B, Section III.G.2.) 2. This permit shall expire if the owner or operator of the source for which this permit was issued: (i) does not commence construction/modification or operation of this source within 18 months after either, the date of issuance of this construction permit or the date on which such Page 1 of 7 s sched-=ed to commence as set forth in the permit application soci is (ii) .` tinues construction for a period of eighteen months or more; (iii) does not complete construction within a reasonable time of the estimated completion date. The Division may grant extensions of the deadline. (Regulation Number 3, Part B, Section III.F.4.) 3. The operator shall complete all initial compliance testing and sampling as required in this permit and submit the results to the Division as part of the self -certification process. (Regulation Number 3, Part B, Section III.E.) 4. The operator shall retain the permit final authorization letter issued by the Division, after completion of self -certification, with the most current construction permit. This construction permit alone does not provide final authority for the operation of this source. EMISSION LIMITATIONS AND RECORDS 5. Emissions of air pollutants shall not exceed the following limitations. (Regulation Number 3, Part B, Section II.A.4.) Annual Limits: Facility Equipment ID AIRS Point Tons per Year Emission Type PM2.5 NO, VOC CO PW-01 through PW-06 002 0.0 0.0 0.58 0.0 Point ote: See "Notes to Permit Holder" for information on emission factors and methods used to calculate limits. Facility -wide emissions of each individual hazardous air pollutant shall not exceed 8.0 tons per year. Facility -wide emissions of total hazardous air pollutants shall not exceed 20.0 tons per year. The facility -wide emissions limitation for hazardous air pollutants shall apply to all permitted emission units at this facility. Compliance with the annual limits, for both criteria and hazardous air pollutants, shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve month total is calculated based on the previous twelve months' data. The permit holder shall calculate actual emissions each month and keep a compliance record on site or at a local field office with site responsibility for Division review. 6. The emission points in the table below shall be operated and maintained with the emissions control equipment as listed in order to reduce emissions to less than or equal to the limits established in this permit. (Regulation Number 3, Part B, Section III.E.) Facility Equipment ID AIRS Point Control Device Pollutants Controlled PW 01 through PW-06 002 Emissions are routed to a gas gathering system through a VRU during normal operation. Emissions are routed to an open flare while gas gathering is not available VOC and HAP PROCESS LIMITATIONS AND RECORDS 7. This source shall be limited to the following maximum processing rates as listed below. Monthly records of the actual processing rates shall be maintained by the owner or operator and made available to the Division for inspection upon request. (Regulation Number 3, Part B, II.A.4.) COLORADO Pollution Control Division Page 2 of 7 Facility Equipment ID AIRS Point Process Parameter Annual Limit PW-01 through PW-06 002 Produced Water throughput 547,500 barrels The owner or operator shall monitor monthly process rates based on the calendar month. Compliance with the annual throughput limits shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve-month total is calculated based on the previous twelve months' data. The permit holder shall calculate throughput each month and keep a compliance record on site or at a local field office with site responsibility, for Division review. STATE AND FEDERAL REGULATORY REQUIREMENTS 8. The permit number and ten digit AIRS ID number assigned by the Division (e.g. 123/4567/001) shall be marked on the subject equipment for ease of identification. (Regulation Number 3, Part B, Section III.E.) (State only enforceable) 9. This permit fulfills the requirement to hold a valid permit reflecting the storage tank and associated control device per the Colorado Oil and Gas Conservation Commission rule 805b(2)(A) when applicable. 10. This source is subject to the odor requirements of Regulation Number 2. (State only enforceable) 11. The open flare covered by this permit has been approved as an alternative emissions control device under Regulation Number 7, Section XVII.B.2.e. The open flare must have no visible emissions during normal operations and be designed so that an observer can, by means of visual observation from the outside of the open flare, or by other convenient means approved by the Division, determine whether it is operating properly. This open flare must be equipped with an operational auto -igniter according to the following schedule: All combustion devices installed on or after May 1, 2014, must be equipped with an operational auto -igniter upon installation of the combustion device; All combustion devices installed before May 1, 2014, must be equipped with an operational auto -igniter by or before May 1, 2016, or after the next combustion device planned shutdown, whichever comes first. 12. The storage tank covered by this permit is subject to the emission control requirements in Regulation Number 7, Section XVII.C.1. The owner or operator shall install and operate air pollution control equipment that achieves an average hydrocarbon control efficiency of 95%. If a combustion device is used, it must have a design destruction efficiency of at least 98% for hydrocarbons except where the combustion device has been authorized by permit prior to May 1, 2014. The source shall follow the inspection requirements of Regulation Number 7, Section XVII.C.1.d. and maintain records of the inspections for a period of two years, made available to the Division upon request. This control requirement must be met within 90 days of the date that the storage tank commences operation. 13. The storage tanks covered by this permit are subject to the venting and Storage Tank Emission Management System ("STEM") requirements of Regulation Number 7, Section XVII.C.2. OPERATING 8t MAINTENANCE REQUIREMENTS 14. Upon startup of these points, the owner or operator shall follow the most recent operating and maintenance (O&M) plan and record keeping format approved by the Division, in order to demonstrate compliance on an ongoing basis with the requirements of this permit. Revisions to COLORADO Air Pollution Control Division Page 3 of 7 approval prior to implementation. (Regulation Number 3, COMPLIANCE TESTING AND SAMPLING Initial Testing Requirements 15. The owner or operator shall demonstrate compliance with opacity standards, using EPA Reference Method 22, 40.C.F.R. Part 60, Appendix A, to determine the presence or absence of visible emissions. "Visible Emissions" means observations of smoke for any period or periods of duration greater than or equal to one minute in any fifteen minute period during normal operation. (Regulation Number 7, XVII.B.2. and XVII.A.16) ADDITIONAL REQUIREMENTS 16. A revised Air Pollutant Emission Notice (APEN) shall be filed: (Regulation Number 3, Part A, II.C.) • Annually by April 30th whenever a significant increase in emissions occurs as follows: For any criteria pollutant: For sources emitting less than 100 tons per year, a change in actual emissions of five (5) tons per year or more, above the level reported on the last APEN; or For volatile organic compounds (VOC) and nitrogen oxides sources (NO) in ozone nonattainment areas emitting less than 100 tons of VOC or NO, per year, a change in annual actual emissions of one (1) ton per year or more or five percent, whichever is greater, above the level reported on the last APEN; or For sources emitting 100 tons per year or more, a change in actual emissions of five percent or 50 tons per year or more, whichever is less, above the level reported on the last APEN submitted; or For any non -criteria reportable pollutant: If the emissions increase by 50% or five (5) tons per year, whichever is less, above the level reported on the last APEN submitted to the Division. • Whenever there is a change in the owner or operator of any facility, process, or activity; or Whenever new control equipment is installed, or whenever a different type of control equipment replaces an existing type of control equipment; or • Whenever a permit limitation must be modified; or No later than 30 days before the existing APEN expires. 17. Federal regulatory program requirements (i.e. PSD, NANSR) shall apply to this source at any such time that this source becomes major solely by virtue of a relaxation in any permit condition. Any relaxation that increases the potential to emit above the applicable Federal program threshold will require a full review of the source as though construction had not yet commenced on the source. The source shall not exceed the Federal program threshold until a permit is granted. (Regulation Number 3, Parts C and D). GENERAL TERMS AND CONDITIONS 18. This permit and any attachments must be retained and made available for inspection upon request. The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation Number 3, Part B, Section II.B. upon a request for transfer of ownership and the submittal of a revised APEN and the required fee. COLORADO Air Pollution Control Division Page 4 of 7 19. If tins r fi+t sp&cifily sates th*final authorization has been granted, then the remainder of ti t hbnditTh?t`4'15dtltnof1p'pilcable.tff5-erwise, the issuance of this construction permit does not provide "final" authority for this activity or operation of this source. Final authorization of the permit must be secured from the APCD in writing in accordance with the provisions of 25-7- 114.5(12)(a) C.R.S. and AQCC Regulation Number 3, Part B, Section III.G. Final authorization cannot be granted until the operation or activity commences and has been verified by the APCD as conforming in all respects with the conditions of the permit. Once self -certification of all points has been reviewed and approved by the Division, it will provide written documentation of such final authorization. Details for obtaining final authorization to operate are located in the Requirements to Self -Certify for Final Authorization section of this permit. 20. This permit is issued in reliance upon the accuracy and completeness of information supplied by the owner or operator and is conditioned upon conduct of the activity, or construction, installation and operation of the source, in accordance with this information and with representations made by the owner or operator or owner or operator's agents. It is valid only for the equipment and operations or activity specifically identified on the permit. 21. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been determined by the APCD to be necessary to assure compliance with the provisions of Section 25-7-114.5(7)(a), C.R.S. 22. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be deemed denied ab initio. This permit may be revoked at any time prior to self -certification and final authorization by the Air Pollution Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Control Commission (AQCC), including failure to meet any express term or condition of the permit. If the Division denies a permit, conditions imposed upon a permit are contested by the owner or operator, or the Division revokes a permit, the owner or operator of a source may request a hearing before the AQCC for review of the Division's action. 23. Section 25-7-114.7(2)(a), C.R.S. requires that all sources required to file an Air Pollution Emission Notice (APEN) must pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee billing will terminate. 24. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and Control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections 25-7-115 (enforcement), -121 (injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.R.S. By: David Thompson Permit Engineer Permit History Issuance Date Description Issuance 1 This Issuance Issued to Whiting Oil and Gas Corporation COLORADO Air Poliutinn Ccntral Divrsion Page 5 of 7 No t issuance: 1) The permit holder is required to pay fees for the processing time for this permit. An invoice for these fees will be issued after the permit is issued. The permit holder shall pay the invoice within 30 days of receipt of the invoice. Failure to pay the invoice will result in revocation of this permit. (Regulation Number 3, Part A, Section VI.B.) 2) The production or raw material processing limits and emission limits contained in this permit are based on the consumption rates requested in the permit application. These limits may be revised upon request of the owner or operator providing there is no exceedance of any specific emission control regulation or any ambient air quality standard. A revised air pollution emission notice (APEN) and complete application form must be submitted with a request for a permit revision. 3) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative Defense Provision for Excess Emissions During Malfunctions. The owner or operator shall notify the Division of any malfunction condition which causes a violation of any emission limit or limits stated in this permit as soon as possible, but no later than noon of the next working day, followed by written notice to the Division addressing all of the criteria set forth in Part II.E.1 of the Common Provisions Regulation. See: https://www.colorado.gov/pacific/cdphe/aqcc-reps 4) The following emissions of non -criteria reportable air pollutants are estimated based upon the process limits as indicated in this permit. This information is listed to inform the operator of the Division's analysis of the specific compounds emitted if the source(s) operate at the permitted limitations. AIRS Point Pollutant CAS # Uncontrolled Emissions (lb/yr) Controlled Emissions (lb/yr) 001 Benzene 71432 3833 31 n -Hexane 110543 12045 98 Note: All non -criteria reportable pollutants in the table above with uncontrolled emission rates above 250 pounds per year (lb/yr) are reportable and may result in annual emission fees based on the most recent Air Pollution Emission Notice. 5) The emission levels contained in this permit are based on the following emission factors: Point 001: CAS # Pollutant Uncontrolled Emission Factors lb/bbl Controlled Emission Factors lb/bbl Source NOx --- 0.068 AP -42 CO --- 0.31 AP -42 VOC 0.26 2.11 E-03 CDPHE 71432 Benzene 0.007 5.65 E-05 CDPHE 110543 n -Hexane 0.022 1.78 E-04 CDPHE Note: The controlled emissions factors for this point are based on the VRU bypass of 7% and a flare control efficiency of 95%. 6) In accordance with C.R.S. 25-7-114.1, each Air Pollutant Emission Notice (APEN) associated with this permit is valid for a term of five years from the date it was received by the Division. A revised APEN shall be submitted no later than 30 days before the five-year term expires. Please refer to the most recent annual fee invoice to determine the APEN expiration date for each emissions point associated with this permit. For any questions regarding a specific expiration date call the Division at (303)-692-3150. 7) This facility is classified as follows: COLORADO Air Pollution Control Division Page 6 of 7 5 Appticahl:w Requirement Vaiii5 Operating Permit Synthetic Minor Source of: VOC, HAPs, n -Hexane PSD Synthetic Minor/Major Source of: VOC MACT HH Major Source Requirements: Not Applicable Area Source Requirements: Not Applicable 8) Full text of the Title 40, Protection of Environment Electronic Code of Federal Regulations can be found at the website listed below: http://ecfr.gpoaccess.gov/ Part 60: Standards of Performance for New Stationary Sources NSPS 60.1 -End Subpart A - Subpart KKKK NSPS Part 60, Appendixes Appendix A - Appendix I Part 63: National Emission Standards for Hazardous Air Pollutants for Source Categories MACT 63.1-63.599 Subpart A - Subpart Z MACT 63.600-63.1199 Subpart AA - Subpart DDD MACT 63.1200-63.1439 Subpart EEE - Subpart PPP MACT 63.1440-63.6175 Subpart QQQ - Subpart YYYY MACT 63.6580-63.8830 Subpart ZZZZ - Subpart MMMMM MACT 63.8980 -End Subpart NNNNN - Subpart XXXXXX COLORADO Air Pollution Control Division Page 7 of 7 STATE OF COLORADO COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 15WE1208 DATE ISSUED: ISSUED TO: Issuance 1 Whiting Oil and Gas Corporation THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: Oil and gas facility, known as the Razor 22D Production Facility, located in NWNW Sec22, T1 ON, R58W, in Weld County, Colorado. THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: Facility Equipment ID AIRS Point Description LOAD -01 003 Truck loadout of Crude Oil. Emissions from the loadout are controlled by a VRU and an open flare. THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION AND CONTROL ACT C.R.S. (25-7-101 et seq) TO THOSE GENERAL TERMS AND CONDITIONS INCLUDED IN THIS DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: REQUIREMENTS TO SELF -CERTIFY FOR FINAL AUTHORIZATION Within one hundred and eighty days (180) of the latter of commencement of operation or issuance of this permit, compliance with the conditions contained in this permit shall be demonstrated to the Division. It is the owner or operator's responsibility to self -certify compliance with the conditions. Failure to demonstrate compliance within 180 days may result in revocation of the permit. (Reference: Regulation No. 3, Part B, III.G.2). This permit shall expire if the owner or operator of the source for which this permit was issued: (i) does not commence construction/modification or operation of this source within 18 months after either, the date of issuance of this construction permit or the date on which such construction or activity was scheduled to commence as set forth in the permit application associated with this permit; (H) discontinues construction for a period of eighteen months or more; (iii) does not complete construction within a reasonable time of the estimated completion date. The Division may grant extensions of the deadline per Regulation No. 3, Part B, III.F.4.b. (Reference: Regulation No. 3, Part B, III.F.4.) AIRS ID: 123/9E15 Page 1 of 8 Condensate Loadout TM Version 2012-1 Co do I p ;. " e oPublic Health and Environment Air Pollution Control Division 3. The operator shall retain the permit final authorization letter issued by the Division after completion of self -certification, with the most current construction permit. This construction permit alone does not provide final authority for the operation of this source. EMISSION LIMITATIONS AND RECORDS Emissions of air pollutants shall not exceed the following limitations (as calculated in the Division's preliminary analysis). (Reference: Regulation No. 3, Part B, Section II.A.4) Annual Limits: Facility Equipment ID AIRS Point Tons per Year Emission Type VOC LOAD 001 0.1 Point See "Notes to Permit Holder" for information on emission factors and methods used to calculate limits. Facility -wide emissions of each individual hazardous air pollutant shall be less than 8.0 tpy. Facility -wide emissions of total hazardous air pollutants shall be less than 20.0 tpy. Compliance with the annual limits shall be determined by recording the facility's annual criteria pollutant emissions, (including all HAPs above the de-minimis reporting level) from each emission unit, on a rolling twelve (12) month total. By the end of each month a new twelve-month total shall be calculated based on the previous twelve months' data. The permit holder shall calculate emissions each month and keep a compliance record on site or at a local field office with site responsibility, for Division review. This rolling twelve-month total shall apply to all permitted emission units, requiring an APEN, at this facility. 5. The emission points in the table below shall be operated and maintained with the control equipment as listed in order to reduce emissions to less than or equal to the limits established in this permit (Reference: Regulation No.3, Part B, Section III.E.) Facility Equipment ID AIRS Point Control Device Pollutants Controlled LOAD -1 001 VRU/Open Flare VOC, HAP PROCESS LIMITATIONS AND RECORDS This source shall be limited to the following maximum processing rates as listed below. Monthly records of the actual processing rate shall be maintained by the owner or operator and made available to the Division for inspection upon request. (Reference: Regulation 3, Part B, II.A.4) Process/Consumption Limits AIRS ID: 123/9E15 Page 2 of 8 me of Public Health and Environment Air Pollution Control Division AIRS Point Process Parameter Annual Limit 001 Crude Loading 80,300 BBL The owner or operator shall calculate monthly process rates based on the calendar month. Compliance with the annual throughput limits shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve-month total is calculated based on the previous twelve months' data. The permit holder shall calculate throughput each month and keep a compliance record on site or at a local field office with site responsibility, for Division review. 7. Condensate loading to truck tanks shall be conducted by submerged fill. (Reference: Regulation 3, Part B, III.E) STATE AND FEDERAL REGULATORY REQUIREMENTS 8. Visible emissions shall not exceed twenty percent (20%) opacity during normal operation of the source. During periods of startup, process modification, or adjustment of control equipment visible emissions shall not exceed 30% opacity for more than six minutes in any sixty consecutive minutes. Emission control devices subject to Regulation 7, Sections XII.C.1.d or XVII.B.1.c shall have no visible emissions. (Reference: Regulation No. 1, Section II.A.1. & 4.) 9. This source is subject to the odor requirements of Regulation No. 2. (State only enforceable) 10. The owner or operator shall follow loading procedures that minimize the leakage of VOCs to the atmosphere including, but not limited to (Reference: Regulation 3, Part B, III.D.2): a. Hoses, couplings, and valves shall be maintained to prevent dripping, leaking, or other liquid or vapor loss during loading and unloading. b. All compartment hatches at the facility (including thief hatches) shall be closed and latched at all times when loading operations are not active, except for periods of maintenance, gauging, or safety of personnel and equipment. c. The owner or operator shall inspect onsite loading equipment during loading operations to monitor compliance with above conditions. The inspections shall occur at least monthly. Each inspection shall be documented in a log available to the Division on request. 11. All hydrocarbon liquid loading operations, regardless of size, shall be designed, operated and maintained so as to minimize leakage of volatile organic compounds to the atmosphere to the maximum extent practicable. OPERATING & MAINTENANCE REQUIREMENTS AIRS ID: 12319E15 Page 3 of 8 Co do p, "" e o Public Health and Environment Air Pollution Control Division 12. Upon startup of these points, the owner or operator shall follow the most recent operating and maintenance (O&M) plan and record keeping format approved by the Division, in order to demonstrate compliance on an ongoing basis with the requirements of this permit. Revisions to your O&M plan are subject to Division approval prior to implementation. (Reference: Regulation No. 3, Part B, Section III.G.7.) 13. The owner or operator of a loadout emissions are controlled shall: a. Install and operate the vapor collection and return equipment to collect vapors during loading of tank compartments of outbound transport trucks and route these vapors to the described control equipment. b. Include devices to prevent the release of vapor from vapor recovery hoses not in use. c. Use operating procedures to ensure that hydrocarbon liquid cannot be transferred unless the vapor collection equipment is in use. d. Operate all recovery and disposal equipment at a back pressure less than the pressure relief valve setting of transport vehicles. e. Inspect thief hatch seals annually for integrity and replace as necessary. Thief hatch covers shall be weighted and properly seated. f. Inspect pressure relief devices (PRD) annually for proper operation and replace as necessary. PRDs shall be set to release at a pressure that will ensure flashing, working and breathing losses are routed to the control device under normal operating conditions. g. Document annual inspections of thief hatch seals and PRD with an indication of status, a description of any problems found, and their resolution. COMPLIANCE TESTING AND SAMPLING 14. This source is not required to comply with any testing and sampling requirements. ADDITIONAL REQUIREMENTS 15. A revised Air Pollutant Emission Notice (APEN) shall be filed: (Reference: Regulation No. 3, Part A, I I.C) a. Annually by April 30th whenever a significant increase in emissions occurs as follows: For any criteria pollutant: For sources emitting less than 100 tons per year, a change in actual emissions of five (5) tons per year or more, above the level reported on the last APEN; or AIRS ID: 123/9E15 Page 4 of 8 Public Health and Environment Air Pollution Control Division =u •= maiTat ' aairaa gam am zeit a For sources emitting 100 tons per year or more, a change in actual emissions of five percent or 50 tons per year or more, whichever is less, above the level reported on the last APEN submitted; or For any non -criteria reportable pollutant: If the emissions increase by 50% or five (5) tons per year, whichever is less, above the level reported on the last APEN submitted to the Division. b. Whenever there is a change in the owner or operator of any facility, process, or activity; or c. Whenever new control equipment is installed, or whenever a different type of control equipment replaces an existing type of control equipment; or d. Whenever a permit limitation must be modified; or e. No later than 30 days before the existing APEN expires. 16. Federal regulatory program requirements (i.e. PSD, NANSR) shall apply to this source at any such time that this source becomes major solely by virtue of a relaxation in any permit condition. Any relaxation that increases the potential to emit above the applicable Federal program threshold will require a full review of the source as though construction had not yet commenced on the source. The source shall not exceed the Federal program threshold until a permit is granted. (Regulation No. 3 Part D). GENERAL TERMS AND CONDITIONS 17. This permit and any attachments must be retained and made available for inspection upon request. The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation No. 3, Part B, Section II.B upon a request for transfer of ownership and the submittal of a revised APEN and the required fee. 18. If this permit specifically states that final authorization has been granted, then the remainder of this condition is not applicable. Otherwise, the issuance of this construction permit does not provide "final" authority for this activity or operation of this source. Final authorization of the permit must be secured from the APCD in writing in accordance with the provisions of 25-7-114.5(12)(a) C.R.S. and AQCC Regulation No. 3, Part B, Section III.G. Final authorization cannot be granted until the operation or activity commences and has been verified by the APCD as conforming in all respects with the conditions of the permit. Once self -certification of all points has been reviewed and approved by the Division, it will provide written documentation of such final authorization. Details for obtaining final authorization to operate are located in the Requirements to Self - Certify for Final Authorization section of this permit. 19. This permit is issued in reliance upon the accuracy and completeness of information supplied by the owner or operator and is conditioned upon conduct of the activity, or construction, installation and operation of the source, in accordance with this information and with representations made by the owner or operator or owner or operator's agents. It is valid only for the equipment and operations or activity specifically identified on the permit. AIRS ID: 12319E15 Page 5 of 8 Public Health and Environment Air Pollution Control Division 20. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been determined by the APCD to be necessary to assure compliance with the provisions of Section 25-7-114.5(7)(a), C.R.S. 21. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be deemed denied ab initio. This permit may be revoked at any time prior to self -certification and final authorization by the Air Pollution Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Control Commission (AQCC), including failure to meet any express term or condition of the permit. If the Division denies a permit, conditions imposed upon a permit are contested by the owner or operator, or the Division revokes a permit, the owner or operator of a source may request a hearing before the AQCC for review of the Division's action. 22. Section 25-7-114.7(2)(a), C.R.S. requires that all sources required to file an Air Pollution Emission Notice (APEN) must pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee billing will terminate. 23. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and Control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections 25-7-115 (enforcement), -121 (injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.R.S. By: David Thompson Permit Engineer Permit History Issuance Date Description Issuance 1 This Issuance Issued to Whiting Oil and Gas Corporation AIRS ID: 123/9E15 Page 6 of 8 of Public Health and Environment Air Pollution Control Division Notes to Permit Holder at the time of this permit issuance: 1) The permit holder is required to pay fees for the processing time for this permit. An invoice for these fees will be issued after the permit is issued. The permit holder shall pay the invoice within 30 days of receipt of the invoice. Failure to pay the invoice will result in revocation of this permit (Reference: Regulation No. 3, Part A, Section VI.B.) 2) The production or raw material processing limits and emission limits contained in this permit are based on the consumption rates requested in the permit application. These limits may be revised upon request of the owner or operator providing there is no exceedance of any specific emission control regulation or any ambient air quality standard. A revised air pollution emission notice (APEN) and complete application form must be submitted with a request for a permit revision. 3) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative Defense Provision for Excess Emissions During Malfunctions. The owner or operator shall notify the Division of any malfunction condition which causes a violation of any emission limit or limits stated in this permit as soon as possible, but no later than noon of the next working day, followed by written notice to the Division addressing all of the criteria set forth in Part II.E.1. of the Common Provisions Regulation. See: https://www.colorado.gov/pacific/cdphe/agcc-regs 4) The following emissions of non -criteria reportable air pollutants are estimated based upon the process limits as indicated in this permit. This information is listed to inform the operator of the Division's analysis of the specific compounds emitted if the source(s) operate at the permitted limitations. AIRS Point Pollutant CAS # BIN Uncontrolled Emission Rate (Ib/yr) Are the emissions reportable? Controlled Emission Rate (Ib/yr) 002 n -Hexane 110543 C 209 NO 2 Benzene 71432 A 39 NO 1 Toluene 108883 C 30 NO 1 Ethylbenzene 100414 C 12 NO 1 Xylenes 1330207 C 8 NO 1 5) The emission levels contained in this permit are based on the following emission factors: CAS Pollutant Emission Factors Uncontrolled Ib/BBL loaded - Source Emission Factors Controlled Lb/BBL loaded — Source VOC 0.10 AP -42 .0006 AP -42 The uncontrolled VOC emission factor was calculated using AP -42, Chapter 5.2, Equation 1 (version 1/95) using the following values: L = 12.46*S*P*M/T S = 0.6 (Submerged loading: dedicated normal service) P (true vapor pressure) = 3.16 psia M (vapor molecular weight) = 51.7 Ib/Ib-mol T (temperature of liquid loaded) = 507.8 °R The uncontrolled non -criteria reportable air pollutant (NCRP) emission factors were calculated by multiplying the mass fraction of each NCRP in the vapors by the VOC emission factor. AIRS ID: 123/9E15 Page 7 of 8 Public Health and Environment Air Pollution Control Division Controlled emission factors are based on a Vapor Gathering Percent of 88% and a flare efficiency of 95%. 6) In accordance with C.R.S. 25-7-114.1, each Air Pollutant Emission Notice (APEN) associated with this permit is valid for a term of five years from the date it was received by the Division. A revised APEN shall be submitted no later than 30 days before the five-year term expires. Please refer to the most recent annual fee invoice to determine the APEN expiration date for each emissions point associated with this permit. For any questions regarding a specific expiration date call the Division at (303)-692-3150. 7) This facility is classified as follows: Applicable Requirement Status Operating Permit Synthetic Minor Source of: VOC, HAPs, n -Hexane PSD Synthetic Minor Source of: VOC 8) Full text of the Title 40, Protection of Environment Electronic Code of Federal Regulations can be found at the website listed below: http://ecfr.gpoaccess.gov/ Part 60: Standards of Performance for New Stationary Sources NSPS 60.1 -End Subpart A— Subpart KKKK NSPS Part 60, Appendixes Appendix A — Appendix I Part 63: National Emission Standards for Hazardous Air Pollutants for Source Categories MACT 63.1-63.599 Subpart A — Subpart Z MACT 63.600-63.1199 Subpart AA — Subpart DDD MACT 63.1200-63.1439 Subpart EEE — Subpart PPP MACT 63.1440-63.6175 Subpart QQQ — Subpart YYYY MACT 63.6580-63.8830 Subpart ZZZZ — Subpart MMMMM MACT 63.8980 -End Subpart NNNNN — Subpart )OOOOO( 9) A self certification form and guidance on how to self -certify compliance as required by this permit may be obtained online at: http://www.colorado.gov/pacific/cdphe/air-permit-self-certification AIRS ID: 123/9E15 Page 8 of 8 15WE1209 Construction Permit Air Pollution Control Division Permit number: Date issued: Issued to: Facility Name: Plant AIRS ID: Physical Location: County: General Description: Issuance: 1 Whiting Oil and Gas Corporation Razor 22D Production Facility 123/9E15/004 NWNW Sec 22 T10N R58W Weld County Well Production Facility Equipment or activity subject to this permit: Facility Equipment ID AIRS Point Equipment Description Emissions Control Description TK-01 through TK- 18 004 Eighteen (18) 400 barrel fixed roof storage vessels used to store crude oil Open Flare/Vapor Recovery Unit This permit is granted subject to all rules and regulations of the Colorado Air Quality Control Commission and the Colorado Air Pollution Prevention and Control Act (C.R.S. 25-7-101 et seq), to the specific general terms and conditions included in this document and the following specific terms and conditions. REQUIREMENTS TO SELF -CERTIFY FOR FINAL AUTHORIZATION 1. Within one hundred and eighty days (180) of the latter of commencement of operation or issuance of this permit, compliance with the conditions contained in this permit shall be demonstrated to the Division. It is the owner or operator's responsibility to self -certify compliance with the conditions. Failure to demonstrate compliance within 180 days may result in revocation of the permit. A self certification form and guidance on how to self -certify compliance as required by this permit may be obtained online at www.colorado.gov/pacific/cdphe/air-permit-self-certification. (Regulation Number 3, Part B, Section III.G.2.) 2. This permit shall expire if the owner or operator of the source for which this permit was issued: (i) does not commence construction/modification or operation of this source within 18 months after either, the date of issuance of this construction permit or the date on which such construction or activity was scheduled to commence as set forth in the permit application associated with this permit; (ii) discontinues construction for a period of eighteen months or more; (iii) does not complete construction within a reasonable time of the estimated completion date. The Division may grant extensions of the deadline. (Regulation Number 3, Part B, Section III.F.4.) Page 1 of 7 3. ''o. a'"b s al pl e all i 1(ial compliance testing and sampling as required in this rmi :'d it `r. "` '''ults ° "'he Division as part of the self -certification process. - - (Regulation Number 3, Part B, Section III.E.) 4. The operator shall retain the permit final authorization letter issued by the Division, after completion of self -certification, with the most current construction permit. This construction permit alone does not provide final authority for the operation of this source. EMISSION LIMITATIONS AND RECORDS 5. Emissions of air pollutants shall not exceed the following limitations. (Regulation Number 3, Part B, Section II.A.4.) Annual Limits: Facility Equipment ID AIRS Point Tons per Year Emission Type PM2.5 NO, VOC CO TK-01 through TK-18 004 0.0 0.25 10.2 1.03 Point Note: See "Notes to Permit Holder" for information on emission factors and methods used to calculate limits. Facility -wide emissions of each individual hazardous air pollutant shall not exceed 8.0 tons per year. Facility -wide emissions of total hazardous air pollutants shall not exceed 20.0 tons per year. The facility -wide emissions limitation for hazardous air pollutants shall apply to all permitted emission units at this facility. Compliance with the annual limits, for both criteria and hazardous air pollutants, shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve month total is calculated based on the previous twelve months' data. The permit holder shall calculate actual emissions each month and keep a compliance record on site or at a local field office with site responsibility for Division review. 6. The emission points in the table below shall be operated and maintained with the emissions control equipment as listed in order to reduce emissions to less than or equal to the limits established in this permit. (Regulation Number 3, Part B, Section III.E.) Facility Equipment ID AIRS Point Control Device Pollutants Controlled TK-01 through TK- 18 004 Open FlareNapor Recovery Unit VOC and HAP PROCESS LIMITATIONS AND RECORDS 7. This source shall be limited to the following maximum processing rates as listed below. Monthly records of the actual processing rates shall be maintained by the owner or operator and made available to the Division for inspection upon request. (Regulation Number 3, Part B, II.A.4.) Process Limits Facility Equipment ID AIRS Point Process Parameter Annual Limit COLORADO Ass Pollution Control Division Page 2 of 7 through TK- 18 004 r I'3 Crude Oil 401,500 barrels The owner or operator shall monitor monthly process rates based on the calendar month. Compliance with the annual throughput limits shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve-month total is calculated based on the previous twelve months' data. The permit holder shall calculate throughput each month and keep a compliance record on site or at a local field office with site responsibility, for Division review. STATE AND FEDERAL REGULATORY REQUIREMENTS 8. The permit number and ten digit AIRS ID number assigned by the Division (e.g. 123/4567/001) shalt be marked on the subject equipment for ease of identification. (Regulation Number 3, Part B, Section III.E.) (State only enforceable) 9. This permit fulfills the requirement to hold a valid permit reflecting the storage tank and associated control device per the Colorado Oil and Gas Conservation Commission rule 805b(2)(A) when applicable. 10. This source is subject to the odor requirements of Regulation Number 2. (State only enforceable) 11. The open flare covered by this permit has been approved as an alternative emissions control device under Regulation Number 7, Section XVII.B.2.e. The open flare must have no visible emissions during normal operations and be designed so that an observer can, by means of visual observation from the outside of the open flare, or by other convenient means approved by the Division, determine whether it is operating properly. This open flare must be equipped with an operational auto -igniter according to the following schedule: All combustion devices installed on or after May 1, 2014, must be equipped with an operational auto -igniter upon installation of the combustion device; • All combustion devices installed before May 1, 2014, must be equipped with an operational auto -igniter by or before May 1, 2016, or after the next combustion device planned shutdown, whichever comes first. 12. The storage tank covered by this permit is subject to the emission control requirements in Regulation Number 7, Section XVII.C.1. The owner or operator shall install and operate air pollution control equipment that achieves an average hydrocarbon control efficiency of 95%. If a combustion device is used, it must have a design destruction efficiency of at least 98% for hydrocarbons except where the combustion device has been authorized by permit prior to May 1, 2014. The source shall follow the inspection requirements of Regulation Number 7, Section XVII.C.1.d. and maintain records of the inspections for a period of two years, made available to the Division upon request. This control requirement must be met within 90 days of the date that the storage tank commences operation. 13. The storage tanks covered by this permit are subject to the venting and Storage Tank Emission Management System ("STEM") requirements of Regulation Number 7, Section XVII.C.2. OPERATING Et MAINTENANCE REQUIREMENTS 14. Upon startup of these points, the owner or operator shall follow the most recent operating and maintenance (O&M) plan and record keeping format approved by the Division, in order to demonstrate compliance on an ongoing basis with the requirements of this permit. Revisions to the O&M plan are subject to Division approval prior to implementation. (Regulation Number 3, Part B, Section III.G.7.) COMPLIANCE TESTING AND SAMPLING COLORADO Air Pollution Control Division Page 3 of 7 15. The owner or operator shall demonstrate compliance with opacity standards, using EPA Reference Method 22, 40 C.F.R. Part 60, Appendix A, to determine the presence or absence of visible emissions. "Visible Emissions" means observations of smoke for any period or periods of duration greater than or equal to one minute in any fifteen minute period during normal operation. (Regulation Number 7, XVII.B.2. and XVII.A.16) ADDITIONAL REQUIREMENTS 16. A revised Air Pollutant Emission Notice (APEN) shall be filed: (Regulation Number 3, Part A, II.C.) Annually by April 30th whenever a significant increase in emissions occurs as follows: For any criteria pollutant: For sources emitting less than 100 tons per year, a change in actual emissions of five (5) tons per year or more, above the level reported on the last APEN; or For volatile organic compounds (VOC) and nitrogen oxides sources (NO,) in ozone nonattainment areas emitting less than 100 tons of VOC or NO, per year, a change in annual actual emissions of one (1) ton per year or more or five percent, whichever is greater, above the level reported on the last APEN; or For sources emitting 100 tons per year or more, a change in actual emissions of five percent or 50 tons per year or more, whichever is less, above the level reported on the last APEN submitted; or For any non -criteria reportable pollutant: If the emissions increase by 50% or five (5) tons per year, whichever is less, above the level reported on the last APEN submitted to the Division. • Whenever there is a change in the owner or operator of any facility, process, or activity; or Whenever new control equipment is installed, or whenever a different type of control equipment replaces an existing type of control equipment; or Whenever a permit limitation must be modified; or • No later than 30 days before the existing APEN expires. 17. Federal regulatory program requirements (i.e. PSD, NANSR) shall apply to this source at any such time that this source becomes major solely by virtue of a relaxation in any permit condition. Any relaxation that increases the potential to emit above the applicable Federal program threshold will require a full review of the source as though construction had not yet commenced on the source. The source shall not exceed the Federal program threshold until a permit is granted. (Regulation Number 3, Parts C and D). GENERAL TERMS AND CONDITIONS 18. This permit and any attachments must be retained and made available for inspection upon request. The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation Number 3, Part B, Section II.B. upon a request for transfer of ownership and the submittal of a revised APEN and the required fee. 19. If this permit specifically states that final authorization has been granted, then the remainder of this condition is not applicable. Otherwise, the issuance of this construction permit does not provide "final" authority for this activity or operation of this source. Final authorization of the permit must be secured from the APCD in writing in accordance with the provisions of 25-7- 114.5(12)(a) C.R.S. and AQCC Regulation Number 3, Part B, Section III.G. Final authorization COLORADO Air Pollution Control Division Page 4 of 7 n carot Oe gOnte until theoperatic or activity commences and has been verified by the APCD b's corifiYffninrrall'Pds'pPffi withlFM conditions of the permit. Once self -certification of all points has been reviewed and approved by the Division, it will provide written documentation of such final authorization. Details for obtaining final authorization to operate are located in the Requirements to Self -Certify for Final Authorization section of this permit. 20. This permit is issued in reliance upon the accuracy and completeness of information supplied by the owner or operator and is conditioned upon conduct of the activity, or construction, installation and operation of the source, in accordance with this information and with representations made by the owner or operator or owner or operator's agents. It is valid only for the equipment and operations or activity specifically identified on the permit. 21. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been determined by the APCD to be necessary to assure compliance with the provisions of Section 25-7-114.5(7)(a), C.R.S. 22. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be deemed denied ab initio. This permit may be revoked at any time prior to self -certification and final authorization by the Air Pollution Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Control Commission (AQCC), including failure to meet any express term or condition of the permit. If the Division denies a permit, conditions imposed upon a permit are contested by the owner or operator, or the Division revokes a permit, the owner or operator of a source may request a hearing before the AQCC for review of the Division's action. 23. Section 25-7-114.7(2)(a), C.R.S. requires that all sources required to file an Air Pollution Emission Notice (APEN) must pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee billing will terminate. 24. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and Control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections 25-7-115 (enforcement), -121 (injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.R.S. By: David Thompson Permit Engineer Permit History Issuance Date Description Issuance 1 This Issuance Issued to Whiting Oil and Gas Corporation COLORADO An Pollution Control Civison Page 5 of 7 No th this = 11.,, it issuance: 1) The permit holder is required to pay fees for the processing time for this permit. An invoice for these fees will be issued after the permit is issued. The permit holder shall pay the invoice within 30 days of receipt of the invoice. Failure to pay the invoice will result in revocation of this permit. (Regulation Number 3, Part A, Section VI.B.) 2) The production or raw material processing limits and 'emission limits contained in this permit are based on the consumption rates requested in the permit application. These limits may be revised upon request of the owner or operator providing there is nq exceedance of any specific emission control regulation or any ambient air quality standard. A revised air pollution emission notice (APEN) and complete application form must be submitted with a request for a permit revision. 3) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative Defense Provision for Excess Emissions During Malfunctions. The owner or operator shall notify the Division of any malfunction condition which causes a violation of any emission limit or limits stated in this permit as soon as possible, but no later than noon of the next working day, followed by written notice to the Division addressing all of the criteria set forth in Part II.E.1 of the Common Provisions Regulation. See: https://www.colorado.gov/pacific/cdphe/aqcc-reps 4) The following emissions of non -criteria reportable air pollutants are estimated based upon the process limits as indicated in this permit. This information is listed to inform the operator of the Division's analysis of the specific compounds emitted if the source(s) operate at the permitted limitations. AIRS Point Pollutant CAS # Uncontrolled Emissions (Ib/yr) Controlled Emissions (lb/yr) 004 Benzene 71432 11,845 96 Toluene 108883 9,195 75 Ethylbenzene 100414 3,574 29 Xylenes 1130207 2,329 19 n -Hexane 110543 65,043 525 2,2,4- Trimethylpentane 540841 7,268 59 Note: All non -criteria reportable pollutants in the table above with uncontrolled emission rates above 250 pounds per year (lb/yr) are reportable and may result in annual emission fees based on the most recent Air Pollution Emission Notice. 5) The emission levels contained in this permit are based on the following emission factors: Point 004: CAS # Pollutant Uncontrolled Emission Factors lb/bbl Controlled Emission Factors lb/bbl Source NOx --- 0.068 AP -42 CO --- 0.31 AP -42 VOC 6.30 0.05 Hysis 71432 Benzene 0.030 0.000238 Hysis 108883 Toluene 0.023 0.000185 Hysis 100414 Ethylbenzene 0.009 0.000072 Hysis 1330207 Xylene 0.006 0.000047 Hysis 110543 n -Hexane 0.162 0.001307 Hysis COLORADO Pollution Control Division Page 6 of 7 AS # "' b "�oilutant Uncontrolled Erni55ion Factors lb/bbl Controlled Emission Factors lb/bbl Source 540841 2'2'4 Trimethylpentane 0.018 0.000146 Hysis Note: The controlled emissions factors for this point are based on a VRU downtime of 7% and flare control efficiency of 95%. 6) In accordance with C.R.S. 25-7-114.1, each Air Pollutant Emission Notice (APEN) associated with this permit is valid for a term of five years from the date it was received by the Division. A revised APEN shall be submitted no later than 30 days before the five-year term expires. Please refer to the most recent annual fee invoice to determine the APEN expiration date for each emissions point associated with this permit. For any questions regarding a specific expiration date call the Division at (303)-692-3150. 7) This facility is classified as follows: Applicable Requirement Status Operating Permit Synthetic Minor Source of: VOC, HAPs, n -Hexane PSD Synthetic Minor Source of: VOC MACT HH Major Source Requirements: Not Applicable Area Source Requirements: Not Applicable 8) Full text of the Title 40, Protection of Environment Electronic Code of Federal Regulations can be found at the website listed below: http://ecfr.gpoaccess.gov/ Part 60: Standards of Performance for New Stationary Sources NSPS 60.1 -End Subpart A - Subpart KKKK NSPS Part 60, Appendixes Appendix A - Appendix I Part 63: National Emission Standards for Hazardous Air Pollutants for Source Categories MACT 63.1-63.599 Subpart A - Subpart Z MACT 63.600-63.1199 Subpart AA - Subpart DDD MACT 63.1200-63.1439 Subpart EEE - Subpart PPP MACT 63.1440-63.6175 Subpart QQQ - Subpart YYYY MACT 63.6580-63.8830 Subpart ZZZZ - Subpart MMMMM MACT 63.8980 -End Subpart NNNNN - Subpart XXXXXX COLORADO Air Pollution Control Division Page 7 of 7 Construction Permit Air Pollution Control Division Permit number: 1 5 W E 12010 Issuance: 1 Date issued: Issued to: Whiting Oil and Gas Corporation Facility Name: Razor 22D Production Facility Plant AIRS ID: 123/9E15/005 Physical Location: NWNW Sec 22 Ti ON R58W County: Weld County General Description: Well Production Facility Equipment or activity subject to this permit: Facility Equipment ID AIRS Point Equipment Description Emissions Control Description SEP-01 through SEP-02 005 Two Separators with emissions routed to the Redtail gas gathering system. When gas gathering system is down, emissions controlled by an open flare. Open Flare This permit is granted subject to all rules and regulations of the Colorado Air Quality Control Commission and the Colorado Air Pollution Prevention and Control Act (C.R.S. 25-7-101 et seq), to this specific general terms and conditions included in this document and the following specific terms and conditions. REQUIREMENTS TO SELF -CERTIFY FOR FINAL AUTHORIZATION 1. Within one hundred and eighty days (180) of the latter of commencement of operation or issuance of this permit, compliance with the conditions contained in this permit shall be demonstrated to the Division. It is the owner or operator's responsibility to self -certify compliance with the conditions. Failure to demonstrate compliance within 180 days may result in revocation of the permit. A self certification form and guidance on how to self -certify compliance as required by this permit may be obtained online at www.colorado.Qov/pacific/cdphe/air-permit-self-certification. (Regulation Number 3, Part B, Section III.G.2.) 2. This permit shall expire if the owner or operator of the source for which this permit was issued: (i) does not commence construction/modification or operation of this source within 18 months after either, the date of issuance of this construction permit or the date on which such construction or activity was scheduled to commence as set forth in the permit application associated with this permit; (ii) discontinues construction for a period of eighteen months or more; (iii) does not complete construction within a reasonable time of the estimated completion date. The Division may grant extensions of the deadline. (Regulation Number 3, Part B, Section III.F.4.) Page 1 of 8 e all i ";=;ial compliance testing and sampling as required in this rml it'"`ults .`'he Division as part of the self -certification process. (Regulation Number 3, Part B, Section III.E.) 4. The operator shall retain the permit final authorization letter issued by the Division, after completion of self -certification, with the most current construction permit. This construction permit alone does not provide final authority for the operation of this source. EMISSION LIMITATIONS AND RECORDS 5. Emissions of air pollutants shall not exceed the following limitations. (Regulation Number 3, Part B, Section II.A.4.) Annual Limits: Facility Equipment ID AIRS Point Tons per Year Emission Type PM2.5 NO„ VOC CO SEP-01 through SEP-02 005 --- 1.25 27.3 5.22 Point Note: See "Notes to Permit Holder" for information on emission factors and methods used to calculate limits. Facility -wide emissions of each individual hazardous air pollutant shall not exceed 8.0 tons per year. Facility -wide emissions of total hazardous air pollutants shall not exceed 20.0 tons per year. The facility -wide emissions limitation for hazardous air pollutants shall apply to all permitted emission units at this facility. Compliance with the annual limits, for both criteria and hazardous air pollutants, shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve month total is calculated based on the previous twelve months' data. The permit holder shall calculate actual emissions each month and keep a compliance record on site or at a local field office with site responsibility for Division review. 6. The emission points in the table below shall be operated and maintained with the emissions control equipment as listed in order to reduce emissions to less than or equal to the limits established in this permit. (Regulation Number 3, Part B, Section III.E.) Facility Equipment ID AIRS Point Control Device Pollutants Controlled SEP-01 through SEP-02 005 Open Flare VOC and HAP PROCESS LIMITATIONS AND RECORDS 7. This source shall be limited to the following maximum processing rates as listed below. Monthly records of the actual processing rates shall be maintained by the owner or operator and made available to the Division for inspection upon request. (Regulation Number 3, Part B, II.A.4.) Process Limits Facility Equipment ID AIRS Point Process Parameter Annual Limit SEP-01 through 005 Natural Gas sent to flare while gas gathering system is down 24.0 MMSCF COLORADO Air Pollution Control Division Page 2 of 8 The owner or operator shall monitor monthly process rates based on the calendar month. 8. The owner or operator shall continuously monitor and record the volumetric flow rate of natural gas vented from the separator(s) using a flow meter. The flow meter shall continuously measure flow rate and record total volumetric flow vented from each separator. The owner or operator shall use monthly throughput records to demonstrate compliance with the process limits specified in Condition 8 and to calculate emissions as described in this permit. (for high pressure) STATE AND FEDERAL REGULATORY REQUIREMENTS 9. The permit number and ten digit AIRS ID number assigned by the Division (e.g. 123/4567/001) shall be marked on the subject equipment for ease of identification. (Regulation Number 3, Part B, Section III.E.) (State only enforceable) 10. This permit fulfills the requirement to hold a valid permit reflecting the separator and associated control device per the Colorado Oil and Gas Conservation Commission rule 805b(2)(A) when applicable. 11. This source is subject to the odor requirements of Regulation Number 2. (State only enforceable) 12. The open flare covered by this permit has been approved as an alternative emissions control device under Regulation Number 7, Section XVII.B.2.e. The open flare must have no visible emissions during normal operations and be designed so that an observer can, by means of visual observation from the outside of the open flare, or by other convenient means approved by the Division, determine whether it is operating properly. This open flare must be equipped with an operational auto -igniter according to the following schedule: • All combustion devices installed on or after May 1, 2014, must be equipped with an operational auto -igniter upon installation of the combustion device; • All combustion devices installed before May 1, 2014, must be equipped with an operational auto -igniter by or before May 1, 2016, or after the next combustion device planned shutdown, whichever comes first. 13. The separator covered by this permit is subject to Regulation 7, Section XVII.G. (State Only). On or after August 1, 2014, gas coming off a separator, produced during normal operation from any newly constructed, hydraulically fractured, or recompleted oil and gas well, must either be routed to a gas gathering line or controlled from the date of first production by air pollution control equipment that achieves an average hydrocarbon control efficiency of 95%. If a combustion device is used, it must have a design destruction efficiency of at least 98% for hydrocarbons. OPERATING a MAINTENANCE REQUIREMENTS 14. Upon startup of these points, the owner or operator shall follow the most recent operating and maintenance (O&M) plan and record keeping format approved by the Division, in order to demonstrate compliance on an ongoing basis with the requirements of this permit. Revisions to the O&M plan are subject to Division approval prior to implementation. (Regulation Number 3, Part B, Section III.G.7.) COMPLIANCE TESTING AND SAMPLING Initial Testing Requirements COLORADO Air Pollution Control Divizio Page 3 of 8 15. T' o e r per r all demonstrate compliance with opacity standards, using EPA fer 2 , . .R. P •0, Appendix A, to determine the presence or absence of visible emissions. "Visible Emissions" means observations of smoke for any period or periods of duration greater than or equal to one minute in any fifteen minute period during normal operation. (Regulation Number 7, Sections XVII.8.2. and XVII.A.16) Periodic Testing Requirements 16. On an annual basis, the operator shall complete a site specific extended gas analysis of the natural gas sent to flare from this emissions unit in order to verify the VOC content (weight fraction) of this emission stream. Results of testing shall be used to calculate site -specific emission factors for the pollutants referenced above (in units of lb/MMSCF gas vented) using Division approved methods. Emission factors established through this periodic testing shall be less than or equal to, the emissions factors established in the permit application and "Notes to Permit Holder" for this emissions point. If the site specific emissions factor developed through this sampling and analysis is greater than the emissions factor established in the permit application and "Notes to Permit Holder" the operator shall submit to the Division within 60 days, a request for permit modification to update emissions factors and emissions limits specified in this permit. The owner or operator shall continue to use the emissions factors established in the permit application and "Notes to Permit Holder" to calculate actual emissions and demonstrate compliance with the emissions limits specified in this permit unless a modification is submitted to the Division. Records of site -specific sampling and emissions factor analysis shall be recorded and maintained by the operator and made available to the Division for inspection upon request. ADDITIONAL REQUIREMENTS 17. A revised Air Pollutant Emission Notice (APEN) shall be filed: (Regulation Number 3, Part A, II.C.) • Annually by April 30th whenever a significant increase in emissions occurs as follows: For any criteria pollutant: For sources emitting less than 100 tons per year, a change in actual emissions of five (5) tons per year or more, above the level reported on the last APEN; or For volatile organic compounds (VOC) and nitrogen oxides sources (NOr) in ozone nonattainment areas emitting less than 100 tons of VOC or NO, per year, a change in annual actual emissions of one (1) ton per year or more or five percent, whichever is greater, above the level reported on the last APEN; or For sources emitting 100 tons per year or more, a change in actual emissions of five percent or 50 tons per year or more, whichever is less, above the level reported on the last APEN submitted; or For any non -criteria reportable pollutant: If the emissions increase by 50% or five (5) tons per year, whichever is less, above the level reported on the last APEN submitted to the Division. • Whenever there is a change in the owner or operator of any facility, process, or activity; or • Whenever new control equipment is installed, or whenever a different type of control equipment replaces an existing type of control equipment; or • Whenever a permit limitation must be modified; or • No later than 30 days before the existing APEN expires. COLORADO tr Pollution Control Division Page 4 of 8 18 `j Fe ra( eg latory progrartis requirefients (i.e. PSD, NANSR) shall apply to this source at any uch fame that-tfiis` Sbtirdr'becorfi'e₹' major solely by virtue of a relaxation in any permit condition. Any relaxation that increases the potential to emit above the applicable Federal program threshold will require a full review of the source as though construction had not yet commenced on the source. The source shall not exceed the Federal program threshold until a permit is granted. (Regulation Number 3, Parts C and D). GENERAL TERMS AND CONDITIONS 19. This permit and any attachments must be retained and made available for inspection upon request. The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation Number 3, Part B, Section II.B. upon a request for transfer of ownership and the submittal of a revised APEN and the required fee. 20. If this permit specifically states that final authorization has been granted, then the remainder of this condition is not applicable. Otherwise, the issuance of this construction permit does not provide "final" authority for this activity or operation of this source. Final authorization of the permit must be secured from the APCD in writing in accordance with the provisions of 25-7- 114.5(12)(a) C.R.S. and AQCC Regulation Number 3, Part B, Section III.G. Final authorization cannot be granted until the operation or activity commences and has been verified by the APCD as conforming in all respects with the conditions of the permit. Once self -certification of all points has been reviewed and approved by the Division, it will provide written documentation of such final authorization. Details for obtaining final authorization to operate are located in the Requirements to Self -Certify for Final Authorization section of this permit. 21. This permit is issued in reliance upon the accuracy and completeness of information supplied by the owner or operator and is conditioned upon conduct of the activity, or construction, installation and operation of the source, in accordance with this information and with representations made by the owner or operator or owner or operator's agents. It is valid only for the equipment and operations or activity specifically identified on the permit. 22. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been determined by the APCD to be necessary to assure compliance with the provisions of Section 25-7-114.5(7)(a), C.R.S. 23. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be deemed denied at) initio. This permit may be revoked at any time prior to self -certification and final authorization by the Air Pollution Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Control Commission (AQCC), including failure to meet any express term or condition of the permit. If the Division denies a permit, conditions imposed upon a permit are contested by the owner or operator, or the Division revokes a permit, the owner or operator of a source may request a hearing before the AQCC for review of the Division's action. 24. Section 25-7-114.7(2)(a), C.R.S. requires that all sources required to file an Air Pollution Emission Notice (APEN) must pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee billing will terminate. 25. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and Control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections 25-7-115 (enforcement), -121 (injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.R.S. COLORADO vt;on Control Division Page 5 of 8 Permit Engineer FT Permit History Issuance Date Description Issuance 1 This Issuance Issued to Whiting Oil and Gas Corporation COLORADO Air Pollution Control Division Page 6 of 8 No rma lrcma theiiaeie'OW this permit issuance: 1) The permit holder is required to pay fees for the processing time for this permit. An invoice for these fees will be issued after the permit is issued. The permit holder shall pay the invoice within 30 days of receipt of the invoice. Failure to pay the invoice will result in revocation of this permit. (Regulation Number 3, Part A, Section VI.B.) 2) The production or raw material processing limits and emission limits contained in this permit are based on the consumption rates requested in the permit application. These limits may be revised upon request of the owner or operator providing there is no exceedance of any specific emission control regulation or any ambient air quality standard. A revised air pollution emission notice (APEN) and complete application form must be submitted with a request for a permit revision. 3) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative Defense Provision for Excess Emissions During Malfunctions. The owner or operator shall notify the Division of any malfunction condition which causes a violation of any emission limit or limits stated in this permit as soon as possible, but no later than noon of the next working day, followed by written notice to the Division addressing all of the criteria set forth in Part II.E.1 of the Common Provisions Regulation. See: https://www.colorado.gov/pacific/cdphe/aqcc-reps 4) The following emissions of non -criteria reportable air pollutants are estimated based upon the process limits as indicated in this permit. This information is listed to inform the operator of the Division's analysis of the specific compounds emitted if the source(s) operate at the permitted limitations. AIRS Point Pollutant CAS # Uncontrolled Emissions (Ib/yr) Controlled Emissions (Ib/yr) 005 Benzene 71432 1690 117 Toluene 108883 2328 161 Ethylbenzene 100414 491 34 Xylenes 1130207 863 60 n -Hexane 110543 13920 961 Note: All non -criteria reportable pollutants in the table above with uncontrolled emission rates above 250 pounds per year (lb/yr) are reportable and may result in annual emission fees based on the most recent Air Pollution Emission Notice. 5) The emission levels contained in this permit are based on the following emission factors: CAS # Pollutant Uncontrolled Emission Factors lb/MMSCF Controlled Emission Factors lb/MMSCF Source N0x 105.3 105.3 CDPHE CO 573.1 573.1 CDPHE V0C 32935 2272.259359 Gas Analysis 71432 Benzene 71.318 4.92044241 Gas Analysis 108883 Toluene 98.228 6.777078627 Gas Analysis 100414 Ethylbenzene 20.7298 1.430208506 Gas Analysis 1330207 Xylene 36.4172 2.512528457 Gas Analysis 110543 n -Hexane 587.34 40.52254522 Gas Analysis Note: The controlled emissions factors for this point are based on the flare control efficiency of 95%. 6) In accordance with C.R.S. 25-7-114.1, each Air Pollutant Emission Notice (APEN) associated with this permit is valid for a term of five years from the date it was received by the Division. A revised COLORADO fur Pollution Control Division Page 7 of 8 than 3>>days before the five-year term expires. Please refer to st t l e to .' ="" rmine the APEN expiration date for each emissions point associated with this permit. For any questions regarding a specific expiration date call the Division at (303)-692-3150. 7) This facility is classified as follows: Applicable Requirement Status Operating Permit Synthetic Minor Source of: VOC, HAPs, n -Hexane PSD Synthetic Minor Source of: VOC 8) Full text of the Title 40, Protection of Environment Electronic Code of Federal Regulations can be found at the website listed below: http://ecfr.gpoaccess.gov/ Part 60: Standards of Performance for New Stationary Sources NSPS 60.1 -End Subpart A - Subpart KKKK NSPS Part 60, Appendixes Appendix A - Appendix I Part 63: National Emission Standards for Hazardous Air Pollutants for Source Categories MACT 63.1-63.599 Subpart A - Subpart Z MACT 63.600-63.1199 Subpart AA - Subpart DDD MACT 63.1200-63.1439 Subpart EEE - Subpart PPP MACT 63.1440-63.6175 Subpart QQQ - Subpart YYYY MACT 63.6580-63.8830 Subpart ZZZZ - Subpart MMMMM MACT 63.8980 -End Subpart NNNNN - Subpart XXXXXX COLORADO Air Pollution Control Division Page 8 of 8 Internal Combustion En AIR POLLUTANT EMISSION NOTICE (APEN) & Application for Construction Permit — Red Emission Source AIRS ID: 0 F. e C)5 at 4 at 4 0 o 6 S c c a Q w k F J a N 0 a Permit Number: Facility Equipment Ill: Section 02 — Requested Action (check applicable request boxes) Section 01 — Administrative Information Request for NEW permit or newly reported emission source Request for coverage under GENERAL PERMIT number GP02 (Natural Gas Only) d t a a I a Cl S T m O 0 L 0 2 ❑ o a c 0. 42. v C o • E .a as a) an ° s a c .E u >, C O Cl c ❑ a are Y 0. c W •F C a P .a b a a a 0 `0 0 a w 0 0 a d E = E a o q c c x • - a a U `r O n 0. .F .. E a o u C❑❑ y y v c _w y a s •r % i ≥, 3 i a G .c `m G Z p u >. i C ` z c''' o y o a p a ro a Q a V Li) : 0 Q G u m n. = a O LL Ti E < 0 0 J• < 00 0 o O 10 00 0 U7 O Z. • V `,5 'v c m 0 0. 4 '> -o.p 0 .. ,U .. .+ v 6 E .� 0 U U v y w' v a c c0. c _ C)❑❑ z z❑ ❑ z y ® ❑ ❑ ❑ ❑ ❑ a —z Whiting Oil and Gas Corporation O P N 00 0 U N O erl O 00 cia C a 303-802-8369 Phone Numbe Chenille Wozniak 720-644-3636 CDH PEcorrespondence)w hit Section 03 — General Information T va N C) v 0 N General description of equipment p c J 9 c a o p a ' a v. Z is 9 z U o. 0 c eb .4. d o L Q 5 of ..C- 7 t a c G v ' go". �' E c c a > ,e e a o t- E2 F A 0 c -$ C c az o _ 00'v y) c W ` .. S •m ace; b0 L O y� . z ^ a> O `° 0 �' m s , Q S D c -a UY y a a 0] O mS a' a F q 3 y C) 0 S = p y 0 ≥. p u a L a c o a �F , E o a ca` 0. c a la o w `v' 3 bj a.. e: o> o N L M O Q R O G c o O a O Q m °.. 'o ,0 m d E d o° v a eV ; R —02 F 0.)Zz L Q U O .p O J g n 'E ` O a C.: F p 2 _ C) s a4_ ,• b —m U v,`U =y1o0oc m _ 0 G 59 V a a A a: Q N `o =1 _ o -Tr N=I c 2 X. �I °' 0I .JI 1 31 -o y N € o w z - L()X Ca Q 0 N 0 C Date the engine was ordered: Q z Date the engine was relocated into Colorado: c O 0 ❑ 0 z m � ine Information Section 04 — En (7 0 U 2 et a U Manufacturer: P. 0- • 00 00 00 0 a 0 0 N Zn J Cm p � z ❑Z •p o .0 p'E U°¢ C N 0 -J ,s co — o n ca o Ei5 E 3 — c 0 l OU ® ❑ O 0 a O O a Y 0 p G L Y ro X. v 0 s - U ti 4 ar V N V] 2 E c c > .L. ❑ ❑ .- ELt OZ X d 5 a F a O C 'C v Y v 7 a 0 q .T v. Lt. N a 0 wp C)' - 'E° 0 LU 2 2 LLl U m 0 �o p c a' 0 L 0 0 `0 `0 X0- c c v a m 0 0 0 0 R 0. 5 o v v - c 0 % 0 c 0 s L Y Y 0 0 as S S ®® C) 0 4 Z 0 0 to n U 00 c u w 3 I C) 0.0 W-. L C) F F F C) S h N Y z C)) a 0 C' C 0 L. FORM APCD-201 ela .9 Internal Combustion En AIR POLLUTANT EMISSION NOTICE (APEN) & Application for Construction Permit — Red 0 d .01 Sc4 a 44 b tCia V O c C en N .. N W � N v U 0' E- 0 O N o. E en C b m e H en 00 z O a 00 e Q e G. F In N 'C OO 2. O e z sin 0 O ro 8 00co tEo II p x O C 3 G N J 8 O c ® 7 4U. 0 U 4 U 0 o u N EZ .Oi 43 o o z o to y ,C a C O Q0 � 0 s tion Information Section 06 — Fuel Consum H U Seasonal Fuel Use (% of Annual Use) O 6 on C J 7 A N N U. N O U CO N W U C- OO C 0 C U wJ CC Requested Permit Li L U 'C VD Cot Natural Gas z Is this engine equipped with an Air/Fuel ratio controller? Section 07 — Emissions Inventory Information & Emission Control Information Q z d `a n C E S G L e I Estimation Method or Emission Factor Source AP42 N AP42 Manufacturer Spec Manufacturer Spec Manufacturer Spec Manufacturer Spec AP42 AP42 Please use the APCD Non -Criteria Reportable Air Pollutant Addendum form to report pollutants not listed above. Requested Permitted Emissions Controlled (Tons/Year) In H: 2.62 7.5 b Uncontrolled (Tons/Year)) E a E 9 de minimis E O I 9 44.6 2.62 bin ^ E C E 9 de minimis E C E 9 Actual Calendar Year Emissions' Controlled (Tons/Year) Uncontrolled (Tons/Year) Emission Factor Units Z a C a 0 a g/hp-hr_. _] L a 0 0011 0 s 0 r °° 0 a 0 a 0 a Uncontrolled Basis] C1 ON ON O co; C1 0 a O o co W 0 p— 0 . 0.7 12.4 Q O C1 Cl O 0 M Cl co 0 00 N co 0 Control Efficiency (% Reduction) 'q - P P m GC Control Device Description Secondary m E P. NSCR/AFRC NSCR/AFRC NSCR/AFRC Pollutant F0. 2OOO a OD Formaldehyde Acetaldehyde C 0 Q Benzene et so ri N P - o r U 5 AN o. N 0 4,-C m ao 5 C o .o v • O 0 o U Q U U N v AA o 3 o s m n.Ba. U O ti .5 O U d 0 0 3 � P a Iq '` 0 yam! U m C O C Y O 7 A • O2 cc C EN L F C y 4' U t r L r 0 U P. P 0 O N - U C 0. cc q A a O V L N A V CA 3 4 F U 0. n et O y5 ` w a e� O tro a) S Environmental Professional III October 8, 2015 H cc q FORM APCD-201 Fam_APCD-20J -RICE APEN Razor 22D.docx N 0 N N m a. an ro U Emission Source AIRS ID: [l cave blank unless APCD has already assigned a permit # & AIRS ID) 0o O a, at U V E 0 9 G LU LL O 3 � O 0 O .0 0 ❑ 0 0 s Y O V a G 0 s 0 9 s 0 aJ o! . 0 .E >, 0 a c .., Cl 6 30 V o F L, ❑ O o O` a o ti o F Le CC 0 C m c Q. V > U F ca v p� O �'E�❑ c❑❑ .m 0. W h Q .- d F Ut- y a c a4 J L. O b Q m U F C d L. C E y C 0, G. o I. ` 0 O Do a 0 G C ti 0- 00.. O ea s Y al V U J J J C C ❑ C ❑ ❑ Section 02 — Re Section 01— Administrative Information APEN Submittal for Permit Ezempt/Grandfathered source PC a w a at z L7 a Y a 0 C y a at 0- 0 J V .0 Cf Z LU a a� ®❑ ❑ ❑ ❑ <al en O N Z Whiting Oil and Gas Corporation Company Nam eo 3 M e at - N W a) v N Chenine Wozniak Person To Conta Section 03 — General Information 0 N w 3 T Z Z Z Z ® ®®®® In 0 a) a) } } } } } N 9T 3 0 r H n >. G O Y N C Nej v at 0. a O O U V J C ro v O � p i C E v � y = v o — r 2 G Z ¢ c o O O w c o Z ® 0 3 c U a « c" c v 000 DUoE Al .O. W O G h C 9 > O ro to U 0 ro C A 9-ro > E ❑ ❑ v U � ro C C U r. o .) O U ?YE' ro o V _ _ V E C F J C C 2 B' C a) o -o '-o _� o - O 0 O U D O C C ro o 0 O d$ m o d= n '5' E r o O N G i 6r U E07:-260-5(8,0 0 a TY C,Y} m LLl C ,t° Ca cob- 0 - " ° O g L •J ro c o 3 Y 3 AI O u. O 9 W a, V '0' = U G p & p . p o'0 N-0 0 'J Pi. C o G m C. co O o X cv5 .4 V & .V U '- - P 6 6 5 o 0 ') ale S ..-e T 1�i 0 V N , Y 0 _ 0, -53 Lc c c . O w L n i at a a. CO >, O 0 J J > ≥ Z 0 y gro L= V E>> c y0 d E G o CO 0 - m o a d • �= o C a, » 9 c .a J T O 00 O .� C L': 0s o� ay _ a`i0 Z L^ na 44 w �_ 4/, 6 N t _ 4 Til CO os,V .4t. a e u w0 0 N V N U 0 O .0 0¢ m o U �, 10 ..7, J v .7 • ' u° w c N a U E O p m Coiq N• ,Q G. O O J w Eele ro m y o w E d o L O v at E— W cs L N d e9 c " E LZ2 oa,^�°0° C v0is °,$ "a pO m v E. O p y, O m i O,AY C.::: + cf 9 4J :24 E 1. 1.! N L - 4 O F .�...r L p V W O O n'^ T 6- L1. �' O O > ue�2 PSLt= itu<ep [. `0 0 x 0 itzr M r'1 tri y; N N N a O.0) Z .c.o co _ E: r,n O O O 10. Information an Section 04 — Stora T al CI >o T .D ..0 0 O 11-1-0 d Requested Permit Limit: Q Z a, G ❑ Internal Floating Roof: Date Of First Production (Month/Year) In 0 N. Installation Date of most recent storage vessel in storage tank (Month/Year) Id 0 0 Total Volume of Storage Tank (bbl) 2,400 # of Liquid Manifold Storage Vessels in Storage Tank .O Storage Tank ID PW-01 to PW-0b Wells Serviced by this Storage Tank or Tank Battery (E&l' Sites Only) Newly Reported Well ■ A O Lei Name of Well Razor 22-271211 Razor 22D -2207A Razor 22D -2208B Razor 22D -2703A API Number N 0 .. 05-123-38507 05-123-38508 N 'C Vi m M N1 O en N N VI O 0 C .-T-I V , OO Cr) FORM APCD-207 AIR POLLUTANT EMISSION NOTICE (APEN) & Application for Construction Permit — Produced Wat Emission Source AIRS ID: Permit Number: ion) Location (Datum & either Lat/Long o 0 0 7 0 qCO `V ry as M 4O N OD Section 06 —S 0 L O O 5 0 ao 4 W 04 r%] 8I > o < w� Hp — o N 0 Z C — Sa cal with obstruc stack outlet (check one): Exhaust Opening Shape & Size (check one): Section 07 — Control Device Information z r - C: 0 V a . O o O C H Y Cl L. A Cl .to ° 7 w >. 00 H m Cii co W ..n 0 ckl -44 wrec W y C .. O .3 a f. 0 o E U E e 0 o O W a C. L r r ow 0 g 'O t o ' C g 003 A O C ° y a aO U yyy a`� `' 0 -- ply .J fl 'fit r C4 C = Cl al) tr..4 H .) o'2 WE C C G w 11 h e 11 CA Co V' 6 W e Irt 0 CO O y.o o E O N O 14 VS 2. 4 3 a � Estimation Method or Emission Factor Source AP -42 d 4. '~ el So. 0 E N Q PS Memo 14-03 _I I PS Memo 14-03 Please use the APCD Non -Criteria Reportable Air Pollutant Addendum form to report pollutants not listed above. Requested Permitted Emissions Controlled (Tons/Year) O o N oN O c 4. G 0.05 Uncontrolled (Tons/Year) 71.7 N O. 6.02 Actual Calendar Year Emission2 Controlled (Tons/Year) Uncontrolled (Tons/Year) Emission Factor Units Ib/MMBtu .0 s Uncontrolled Basis 0.068 (controlled) 0.262 0.310 (controlled) 8 O N N O O Pollutant XOPI VOC CO Benzene 0 E° 0 CC N i >..,<, E 0 IV W. E 0. T t C F (-4. Environmental Professional III a d � ad 2 u p O22 0 © O 'a u as es ps V1 W Z.L.. r c W .5 a .0 0 0 4) © .. C ++ 0 .p E.ae d � w e 0 C y W d � .CC 01 C t u 0 C a7 a • E e, t � u CT C L 'C 0 r toa a. tla g 01) .. 4) I CC 0 O L.. V1 u .ii C 00 d O O a _ 2 0. •O W 11 o E et Z •o 6 A8 9. •0 of � Q -i (0z p id 0.•o Aa En. W �w 'g N _ O a At 8 a C >+A�3 Ts f5 t: 00 o o g 2 H 0.. qco aa_ r O AP Font-APCD-207-PwducedWaterTank-APEN.doc FORM APCD-207 L o g ci) + = O • a o C C L' W O c U oo mo U O F = o Gi O. d z zE D• L W V O= W LI ..a O CI Permit Number: O O 0 T 9 • 0 O d Facility Equipment ID: nested Action (Check applicable request boxes) Section 02 — Re Section 01 — Administrative Information General Permit GP07 Individual Permit at Whiting Oil and Gas Corporation ❑ N C CID U :J Z [a4 C C R 5 V U • G CC O � E � E t 2 C w d x c 4ri m m 9 b Q R z EC Lv ≤ d _ C G z - S R ▪ < b a o • G C O Cl d ._ x x 3 EEO En 86 ch o U U oo z Razor 22D Production Facility z 00 3 m e C J O 00 o 1 Person To Contact: CDPIIECoruespondence@Whiting.com E-mail Addres 303-802-8369 Phone Numbe Addl. Info. & Notes: Section 03 — General Information N Nonnal I fours of Source Oper It 0 N CC truck loadout of crude oil 0 Y O Don't know 3 0 Y `2 g. 0 0 Don't know ❑ ❑ ❑ ❑ ❑ Z • Z ZZZ } < } V } } d ❑ ❑ ❑ ❑ O_ t E G V u p, o m ¢ o U ry Ca 0 O Q 7 q `b C ... C v C 0 v T E O 2Cn V C = O A .°•G R C R b 0 Ca C R OI d O Q s = C 2 C .0 N Litt; 2 C_ G > O U Z G .. N .- T Nn a =) R - C (i OO "O . T .^ Ca = N _ d O E. 8_ ` m c T a) • v c R oi R c c_ 9 y N Ld F 4 -5- d C R S m 0 V d V o m` o c R E a a) o c • h " ° a o - J G o L = V C 3 O O • • A • c o oc C, ▪ v N en en en N N N 0 S P V" li ‘.O 0 0 • y r Ca F P. O v S Q 'Ca 0 U OI 0 APEN forms: www.colorado us: www.colorado. Ca a 0 (www.colorado 9 d a C ❑ Product Loaded: 5 r a[ C • 3 ✓ o .2 y Y G u v 0 O ✓ o ps N 7 ct ee • a d R R z o CC 1/44 put FORM APCD-208 uid Loadin H CCO 0 R 0 L b .07 ILO xyq 7 yea s ae ,. G 0 V C L_ ceV Cl 'J 0 up y b U.- E E o � oWcp F � � O + E v � O � a0G o •cez V a Ca U 0 0 C 0 0 0 E 9L O a , C O •� V L Q 100 V R N O C 0 U Ct bz 6ryn0 H F� D O 14' 091 c E r o O°1 y O co 00 R 0 2 2 v .0 R E o 8 C V t `r0 V 0 C 0 - n z H E O 00 0 0 U, CO rei en Cm Le' z� °N3 0 z en 0 Q z b J T o a > CO o¢ u. en In 0 N A O en en O iT• V II U CL V U c 0 0. ot C en .5 II ` — 0 o U O rol Device Information N 0 0 V CO .0 using a vap L V G a ❑ CC Requested: 100 C & IIAP Control Efficiency: N 00 ao' rol of the loadout emissions O T Steffes Dual Tio/SVG-3 3 m e V aaz 0 cie E C 0 ❑ T V V 0 ; W i b U r V CO C. V R i W O t 0 Cp o it u U a C E a ° O 2 E V U . U T> U a F 0 0 C 0 0 W 00 C 0 E V C R 0 O 0 E 0. a 7.0 OD L 9 0 0 CC _ ° Lz m` O 0 0 b N C a O O C 0 nb C) n n N 0 U O y C. C U O 0 C V C) n a O O O C 0 C m C) n 0 a U O O V a U ❑ Data year for actual calendar year emissions below & throughput in Sec. 04 (e.g. 2007): Emission Factor Documentation attached (If using site specific emission factor) Estimation Method or Emission Factor Source N e a Q Aspen Hysys V8.4 & EPA Tanks 4.0.9d N e a Q Aspen Hysys V8.4 & EPA Tanks 4.0.9d Aspen Hysys V8.4 & EPA Tanks 4.0.9d Please use the APCD Non -Criteria Reportable Air Pollutant Addendum form to report pollutants not listed above. Requested Permitted Emissions v L' a b o > o ne T. 0 e c c e 0• 0 0 0 OH Uncontrolled (Tons/Year) o e O O e e^ C Actual Calendar Year Emissions' Controlled (Tons/Year) Uncontrolled (Tons/Year) Emission Factor Units 2 1 0 o o m g lb/1000 gal at c O a a a y Uncontrolled Basis 0.068 (controlled) 2.40 0.310 (controlled) - co O O O Control Efficiency (% Reduction) Identify in Section 07 Control Device Description L R C C 0 h z R Cr DOA b = 2C 2 O u b N 0 -6 a 0z n 2 e` C C L R L U I- 04. V 0 I. • C R 0. C c, E d V 6 E C b Vt C ` 0 0 V 0 G C o A V r 1' 3 $ 3 t U e c....Li E e ° V E„. a a i R V C O. 0 V a 3 C O R C C R °u b c i _ w a E w s 0 R C C R Environmental Professional III Y C V C G C U N 00 .o O O 0 F c 00 CZ a y 0 >1 00 a 0 O E z a O ature of Person Legally Authorized to Supply Data CO [Leave blank unless APCD has already assigned a permit N & AIRS ID] 3 v O o -05 C .O v ❑ O x V d m L d ao E Cl h. y a0 N G C J a a o o ° O C v + d w L L F C a, d Q ` A CC } U F '`Jo =_yo C ❑ ❑ R a E w, V . Q., • z 7, Cl CJ C U O a m G C w Z CO O 7 8 0 E u 6 c F ° F P. d z .4 Q b 0 U J E O a '0-, c y Le0- q a O z O w m E HLJ °. C A N a U in v,Cl Cl « U U z Cr S S W Cl a ❑ ❑ d Section 02 — Re Section 01— Administrative Information APEN Submittal for update only (Please note blank APEN's will not be accepted) ZUD ❑ ❑ rn V] UU U z En 3 u U en co O c a' c a N U G 303-802-8369 Chenine Wozniak Person To Contac E O Section 03 — General Information N CC Y . 3 T Z Z Z DEM co) o - V } T -o 3 o ®❑❑ e • .00 a ro c N -o .27 v c O ` O a O C O ° O z G z° a) 2 co G o 0 v ▪ to x z ,. CO Q -2: 0 E a ° U F• ' Al ❑ ❑ z E E ❑ ❑ roj rt. t g y J > E � , J N L c C U L a) 14 O G R C C C U C CC m C a O p a a c C O O S aO w o a' a < ° U o d U o a E = O L G LV rjj >,, J C u Q A F TL C H ._ l/, o .E c v O. Ea. u O ,o ® v �c C F • Y "O C E E Al 59 a t o • >_ 'A E. ao _ E a a) C C .c ° aci Cl ▪ z U .' O P J •C O CJ • Q ° °,), 'g W Gn to o F =• o�'E' u` T V ➢ C F ro• " ,T °) ° N O— p d '� a O p . d Q 'a ❑ O ,C.' It X • N .V+ L G 0 C) CO Q F. ra 3 U v U- For new or reconstructed sources, la C a U c Q E U, L C O 3 w>— c E 0 E a, N C L a Z 4E T_O0 J C o > ' Z o Lv E> w�. c y o C E as 0' c 0- N z C L y y L y o O O c �.` Co 0' v > E o L L C'- o C O a a o `? .- v. 9 K N __Z CCH CT 'n al ,T, a%' La) r G ..... .O v, 3 v __5 o ,°, 'J m 5d a��`iR-S 'J_ "' Z 00 CJ O, Y d U .' L U N S o a 0 ci ,` i. a o a C v. Q L t0 - 0 J U7 • E C 0 .F C a it (LLi = G N ° E o m go 0 J I.. E • w `o c • o"• CCq n E • N q ori> v4..y 00m CU ° c E . 3-3. w 'C Q '- o� C U o 'gee) t 9 po m o F V L w c U' 'c W j n y rn p U o > ou o �.��E7s �d Ii¢ td o �% Q .� .� 4J G i ii ta, L U Q� O S `o o DC v m C•11 N a O aC 00 en en to o en �,tt C oil _ MCI —5 -11 -1I C r. 1-0 1-01I FE E C w° a a d a) A d In vi U External Floating Roof ec 0 `o O COkw Z L H O ON.' m r a O N ti O O CC �— O L a O `n F O YF Wells Serviced by this Storage Tank or Tank Battery (E&P Sites Only) Newly Reported Well ❑ ® ® c Name of Well Razor 22-27121-I Razor 22D -2207A Razor 22O -2208B Razor 22D -2703A API Number 05-123-36257 0 05-123-38507 o to CC m CC r, N r. en N I t o e APCD-2l0-CmdeTankAPEN.doc Q N 0 C) a 0... Cr.) C r FORM APCD-210 Emission Source AIRS ID: Permit Number: 2 C- 0 0 0 .-1 d a a 04 E a Q O 0 O m CO 8 O U 0 CO tion 06 —Stack (So v° a c E D L U 00 N W -5 t a0 0 o G U. aa2 vC L a m een Cr) e 0 v ° r v v W °O0 s 0 E OO 00 en 7N^ 0. en eAz a — H en m 0 C CD Y =m m y 0 F en u d ea C `0Y o W CL J .5 d 0 0 0 w 0 U .0 0 O N N .y O L C h� . 2 Sew 0 cj 0 C v O °o.r > Q y cU u (~ L u° 0 0.0 .. C m T 0. 84 C.9 Y O a0. m a d yCO 0 La 7 O .^ F -I a -5 CO p o o O O N y N N y t .., V he .0 W I O.• I et 40, o C �em o F N • a"i a a0) 07 ' Emission Factor Data Source N O L a Hysys & Tanks 4.09d N L a Hysys & Tanks 4.09d Hysys & Tanks 4.09d Hysys & Tanks 4.09d Hysys & Tanks 4.09d Hysys & Tanks 4.09d 9 O v Y G E- E:,z T 3. Please use the APCD Non -Criteria Reportable Air Pollutant Addendum form to re. ort • ollutants not listed above. Requested Pennitted Emissions Controlled (Tons/Year) N N O N O en o en o O a o O - a co, ti O O 0 N O en O O Uncontrolled (Tons/Year) a ^ 5.92 bo R co N H ti N b N Actual Calendar Year Emission2 Uncontrolled (Tons/Year) I Controlled (Tons/Year) Emission Factor Uncontrolled Basis I Units FL a x 2 �" a 2 .O 2 L 2 L 2 O L 2 L 0.068 (controlled) b N 00 0.310 (controlled) 0 O O NN O O 01 CO O co CO O O N O 00 O O Pollutant X O z> U O° U Benzene C _ 0• C) E N D � m Qj 0 X 0 0 m cXi E 0) N O L T o t .4., N 0 W 0 L m .L, 44, 4.4 L 0 0 G m d06 Go m •� E a O 6 y C. .G d 2 u on 6 G 0. 0 m = 9 — 0 V .. A= •3 9 d a E a w G CO .2 0 y E E5 L •_ a 9 a G m 9 Y c a d O. r 0 t a CO C ,0 0 m G w 2 .CO m E C. 0 W m m a T FT w t, u y N .0 r L t 4 Go L Cn t U O u r general permi Environmental Professional 111 Chenine Wozniak October 8. 2015 0 0 55 a 0 .c 0 G O 0. 0 0 O 0 8 0 F c O. d 0 eel qC 0, T CC 3 C) C v 0 2 C CO a F y to .2 c O c 0 .O. • 6 C E cri Oh m O S F d LL1 0 ea AP Fonn-APCD-2I0-CmdeTankAPEN.doc N 0 N bOO CO FORM APCD-210 Emission Source AIRS ID: [Provide Facility Equipment ID to identify how this equipment is referenced within your organization.] SEP-01 throu Permit Number: Facility Equipment ID: Section 02 — Requested Action (check applicable request boxes) Section 01 — Administrative Information Request for NEW permit or newly reported emission source Whiting Oil and Gas Corporation 0 N a a 00 3 O v 0 E ." K m s > > c o i° 5 o V W .0 U F ❑ ❑ e Z E tkt 65 a O c o 0 S L 0) U U 0 C ❑ ❑ o 0 U o I ,v 00 y U C, LL Request to limit HAPs with a Federally enforceable limit on PTE Mailing Address: 1700 Broadway, Suite 230 Request APEN update only (check the box below that applies) ZIP Code: 80290 0 't 303-802-8369 Chenine Wozniak Person To Contact tail gas gathering system downtime (5° o) with 720-644-3636 Fax Number: Section 03 — General Information N 00 O a) OO r 00 up -o y a u v LL. tn C 0 2 0 a) O 3 c 0 LL tj 0 T i tl N L 0 J W u � 3 c 0 E 0 r C r 0 m 0 a N Lz O 7 Cc O F _a Do V, u P m . v 5 z > Kr, - C U- b0 Y N N N m C o ¢ A ai = ° , a e 0 E 0 T E _ r, n m aai o a:]U . c coo a a m v .0.• . O ��`� w a 0 ,c a s w K°m T z s °' '> 0 fie ..�} a < boo S Q cn C S o m ¢ m > "U0 _ U .. la) ._ 0 00 O o C > qo „v._ 3 E a a v L .c° o 0 O U .. 50 00 U o' m a rip 0 °a. 0 3 C p U LI t w S. 0 t 3 G 'C. ^ O p Y a?. LE. T o E E O e o°. 3.. C m> t m t E N 0 o< a, c. CQ >k� GatiUco L. ,G v 00 'v c Q ,�`op m rO 0 o,9 P' c V - -• 0 O o v 9 fn L .p 7 40 . m U C 5 'kg p> DO G C z .0 ...2 L c, a l a'� i Uavp w4r ¢ ¢ 03 0 Y r o co a) c 0 o o ¢ z T c c broL c m F v O E '` 5 0 O a R 0 u 2 O o a > y 0 0 U W EL. 0 O -c O O c E w0 $ 5 0 a c q o v c 3 v3 FLp ro y n- 'z 0 s, ntent Information {i Section 04 — Processin Een 'a N S U C7 77) 05 00 c C O a 0 o a o ,-'8 ,C a v 0 a E 0 0 U z cn c a o ° ° 3 0 laJ . :00 .00 0 O c Z .a c a .. 4 — 0 3 a m a c o 3 m o s 3 7 U O o c' ❑ ® ❑ ❑ ❑ ❑ b E T w C Ta z 00 b R Process Parame u p e E 00 0 v e U eJ T 0 X O E F c r 0 O 0 0 0 U= O c > V O a CU. m a 0 a3 U O C G U v D a O o o '0 0 a C E u u 0 a OO o 0 9 -o 4. .. O o > >, 0 a 0 0 0 0 0 0 > a Eor 0o 0 0 a F 0 0 U Z AP Fonn-APCD-21I-Natural-Gas-Venting-APEN.doc zat 0 0 W A C ... a 0,S 0 V o _R OO E Cif ` 0•u �V o0 m E co Ms v` c7 U U)-0. z v (_L. c. 00 < 00 bi U.7 FORM APCD-211 AIR POLLUTANT EMISSION NOTICE (APEN) & Application for Construction Permit — Natural Gas Ventin Emission Source AIRS ID: Section 06 —Stack (Source, if no combustion) Location (Datum & either Lat/Long or UTM) Section 05 - Stack Information (Combustion stacks must be listed here) E `o 00 u ❑_ u 00 o V 9 Z E E E F'0 o c B � z W h z� cgU 203 a zz c z � r U v > a a. 0. G 0- O a aw F 0 A N en 00 v' z Other (Describe): Direction of stack outlet (check one): Width (inches) _ Exhaust Opening Shape & Size (check one): Control Device Informatio N O 0 G C Co 0 00 I. a 0) 40' e Make/Model: VRU used for control o Manufacturer Guaranteed: 0 In C The VRU recycles venting emissions to: ❑ Describe Any Other: E Section 08 — Emissions Inventory Information & Emission Control O W 1. Z ¢I Y °d A_ t a O O v ❑ i Em p 0 0 C O y V E O73 b O rap m E J � N U O V E EJ y CCI Estimation Method or Emission Factor Source Gas Analysis N Q N v Q Gas Analysis Gas Analysis Gas Analysis Gas Analysis Gas Analysis Please use the APCD Non -Criteria Reportable Air Pollutant Addendum form to report pollutants not listed above. Requested Permitted Emissions Controlled (Tons/Year) 27.3 En N ., 5.22 O 0 ao O 0 0.02 O 0 0.48 Uncontrolled (Tons/Year) N en cow' O 9II El O 10.43 o b Actual Calendar Year Emissions° Controlled (Tons/Year) Uncontrolled (Tons/Year) Emission Factor c D EE a a m 7 a � 7 a EEEEE 3 a a s a.6 a a al a Uncontrolled Basis b O b oi 0.068 (controlled) 0.310 (controlled) I O N O O N M O O N 0 O O CO Cre y O O 10.2226 Control Efficiency (% Reduction) In In Q In Q Cr, 195 P Overall Collection Efficiency Control Device Description Secondary E t Y W EC Y O X 1 O X b Wed W 4) ; 4) al W C J o ❑ VOC O z" e O IBenzene N C _ o F E �Q y T L U -0' x U C v x Y 0 'O ea aa cu O O i d rs 2 F O co 0 O aa ° Q a a CO O 3 a 0 D O h .C.' F Q E N rid 0 00 0 3a b au o O q E Ed .Euz L r d C W 0 O N C •O L. Iv ea o E 0 t a' nn-APCD-21 l -Natural-Gas-Venting-APEN.doc N 1,1 0 0 N 0 Cd Or FORM APCD-211
Hello