Loading...
HomeMy WebLinkAbout20161815.tiffCOLORADO Department of Public Health & Environment Dedicated to protecting and improving the health and environment of the people of Colorado Weld County - Clerk to the Board 1150 0 St PO Box 758 Greeley, CO 80632 June 8, 2016 Dear Sir or Madam: RECEIVED JUN 13 2016 WELD COUNTY COMMISSIONERS On June 15, 2016, the Air Pollution Control Division will begin a 30 -day public notice period for PDC Energy Inc. - Peschel Sec. 20 Pad. A copy of this public notice and the public comment packet are enclosed. Thank you for assisting the Division by posting a copy of this public comment packet in your office. Public copies of these documents are required by Colorado Air Quality Control Commission regulations. The packet must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please send any comment regarding this public notice to the address below. Colorado Dept. of Public Health Et Environment APCD-SS-B1 4300 Cherry Creek Drive South Denver, Colorado 80246-1530 Attention: Clara Gonzales Regards, Clara Gonzales Public Notice Coordinator Stationary Sources Program Air Pollution Control Division Enclosure 2016-1815 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdpl— John W. Hickenlooper, Governor Larry Wolk, MD, MSPH, Executive Director and Chief Medical Officer ?i,d9;e., .I.Al4n.J C,C. = PL , (3(A -J, 1 -AL �'ai -/o -- -1_O Air Pollution Control Division Notice of a Proposed Project or Activity Warranting Public Comment Website Title: PDC Energy Inc. - Peschel Sec. 20 Pad - Weld County Notice Period Begins: June 15, 2016 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: PDC Energy Inc. Facility: Peschel Sec. 20 Pad Oil and gas production facility SWSW SEC 20 T4N R65W Weld County The proposed project or activity is as follows: Applicant will operate loadout of hydrocarbon liquids to tanker trucks for transportation off -site. Emissions from displaced vapors in tanker trucks are emitted to the atmosphere. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • permitted emissions exceed public notice threshold values in Regulation No. 3, Part B, Section III.C.1.a (25 tpy in a non -attainment area and/or 50 tpy in an attainment area) The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 16WE0581 have been filed with the Weld County Clerk's office. A copy of the draft permit and the Division's analysis are available on the Division's website at https://www.colorado.gov/pacific/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Any such comment must be submitted in writing to the following addressee: Bradley Eades Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 cdphe.commentsapcd@state.co.us STATE OF COLORADO LORADO D PStRT N F PUB IC HEALTH AND ENVIRONMENT Vr AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: DATE ISSUED: ISSUED TO: 16WE0581 PDC Energy, Inc. Issuance 1 THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: Oil and gas exploration and production facility known as the Peschel Sec. 20 Pad located in the SWSW Section 20, Township 4N, Range 65W, Weld County, Colorado. THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: Facility Equipment ID AIRS Point Description LOAD -1 002 Truck loadout of condensate. Emissions from the loadout are not controlled. THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION AND CONTROL ACT C.R.S. (25-7-101 et seq), TO THOSE GENERAL TERMS AND CONDITIONS INCLUDED IN THIS DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: REQUIREMENTS TO SELF -CERTIFY FOR FINAL AUTHORIZATION 1. Within one hundred and eighty days (180) after commencement of operation or issuance of this permit, whichever comes later, compliance with the conditions contained in this permit shall be demonstrated to the Division. It is the owner or operator's responsibility to self -certify compliance with the conditions. Failure to demonstrate compliance within 180 days may result in revocation of the permit. (Reference: Regulation No. 3, Part B, III.G.2). 2. This permit shall expire if the owner or operator of the source for which this permit was issued: (i) does not commence construction/modification or operation of this source within 18 months after either, the date of issuance of this construction permit or the date on which such construction or activity was scheduled to commence as set forth in the permit application associated with this permit; (ii) discontinues construction for a period of eighteen months or more; (iii) does not complete construction within a reasonable time of the estimated completion date. The Division may grant extensions of the deadline per Regulation No. 3, Part B, III.F.4.b. (Reference: Regulation No. 3, Part B, III.F.4.) AIRS ID: 123/4248 Page 1 of 7 Health and Environment it Pollution Control Division 3. The operator PI .. I i EP .ame ,>-,ting mpling as required in this permit and submit the results to the Division as part of the self -certification process. (Reference: Regulation No. 3, Part B, Section III.E.) 4. The operator shall retain the permit final authorization letter issued by the Division, after completion of self -certification, with the most current construction permit. This construction permit alone does not provide final authority for the operation of this source. EMISSION LIMITATIONS AND RECORDS 5. Emissions of air pollutants shall not exceed the following limitations (as calculated in the Division's preliminary analysis). (Reference: Regulation No. 3, Part B, Section II.A.4) Annual Limits: Facility Equipment ID AIRS Point Tons per Year Emission Type NO x VOC CO LOAD -1 002 --- 42.3 --- Point See "Notes to Permit Holder" for information on emission factors and methods used to calculate limits. Compliance with the annual limits shall be determined by recording the facility's annual criteria pollutant emissions, (including all HAPs above the de-minimis reporting level) from each emission unit, on a rolling twelve (12) month total. By the end of each month a new twelve-month total shall be calculated based on the previous twelve months' data. The permit holder shall calculate emissions each month and keep a compliance record on site or at a local field office with site responsibility, for Division review. This rolling twelve-month total shall apply to all permitted emission units, requiring an APEN, at this facility. PROCESS LIMITATIONS AND RECORDS 6. This source shall be limited to the following maximum processing rates as listed below. Monthly records of the actual processing rates shall be maintained by the owner or operator and made available to the Division for inspection upon request. (Reference: Regulation 3, Part B, II.A.4) Process/Consumption Limits Facility Equipment ID AIRS Point Process Parameter Annual Limit LOAD -1 002 Condensate Loaded 355,000 BBL Compliance with the annual throughput limits shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve-month total is calculated based on the previous twelve months' data. The permit holder shall calculate throughput each month and keep a compliance record on site or at a local field office with site responsibility, for Division review. STATE AND FEDERAL REGULATORY REQUIREMENTS 7. Visible emissions shall not exceed twenty percent (20%) opacity during normal operation of the source. During periods of startup, process modification, or adjustment of control AIRS ID: 123/4248 Page 2 of 7 Health and Environment it Pollution Control Division equipment visitge-nAsicash x opacit los more than six minutes in any sixty consecutive minutes. Emission control devices subject to Regulation 7, Sections XII.C.1.d or XVII.B.2.b shall have no visible emissions. (Reference: Regulation No. 1, Section II.A.1. & 4.) 8. This source is subject to the odor requirements of Regulation No. 2. (State only enforceable) 9. This source is located in an ozone non -attainment or attainment -maintenance area and is subject to the Reasonably Available Control Technology (RACT) requirements of Regulation Number 3, Part B, III.D.2.a. Condensate loading to truck tanks shall be conducted by submerged fill. (Reference: Regulation 3, Part B, III.E) 10. The owner or operator shall follow loading procedures that minimize the leakage of VOCs to the atmosphere including, but not limited to (Reference: Regulation 3, Part B, III.E): a. Hoses, couplings, and valves shall be maintained to prevent dripping, leaking, or other liquid or vapor loss during loading and unloading. b. All compartment hatches (including thief hatches) shall be closed and latched at all times when loading operations are not active, except for periods of maintenance, gauging, or safety of personnel and equipment. c. The owner or operator shall inspect loading equipment and operations on site at the time of the inspection to ensure compliance with the conditions (a) and (b) above. The inspections shall occur at least monthly. Each inspection shall be documented in a log available to the Division on request. 11. All hydrocarbon liquid loading operations, regardless of size, shall be designed, operated and maintained so as to minimize leakage of volatile organic compounds to the atmosphere to the maximum extent practicable. OPERATING & MAINTENANCE REQUIREMENTS 12. This source is not required to follow a Division -approved operating and maintenance plan. COMPLIANCE TESTING AND SAMPLING 13. This source is not required to follow a Division -approved operating and maintenance plan. ADDITIONAL REQUIREMENTS 14. A revised Air Pollutant Emission Notice (APEN) shall be filed: (Reference: Regulation No. 3, Part A, II.C) a. Annually by April 30th whenever a significant increase in emissions occurs as follows: For any criteria pollutant: For sources emitting less than 100 tons per year, a change in actual emissions of five (5) tons per year or more, above the level reported on the last APEN; or AIRS ID: 123/4248 Page 3 of 7 i Health and Environment r Pollution Control Division For v• "'""'""`a `. s (;: ,..-,-,s;. nitr :.;a oxides sources (NO„) in ozone nonattainment areas emitting less than 100 tons of VOC or NO, per year, a change in annual actual emissions of one (1) ton per year or more or five percent, whichever is greater, above the level reported on the last APEN; or For sources emitting 100 tons per year or more, a change in actual emissions of five percent or 50 tons per year or more, whichever is less, above the level reported on the last APEN submitted; or For any non -criteria reportable pollutant: If the emissions increase by 50% or five (5) tons per year, whichever is less, above the level reported on the last APEN submitted to the Division. b. Whenever there is a change in the owner or operator of any facility, process, or activity; or c. Whenever new control equipment is installed, or whenever a different type of control equipment replaces an existing type of control equipment; or d. Whenever a permit limitation must be modified; or e. No later than 30 days before the existing APEN expires. 15. Federal regulatory program requirements (i.e. PSD, NANSR or Title V Operating Permit) shall apply to this source at any such time that this source becomes major solely by virtue of a relaxation in any permit condition. Any relaxation that increases the potential to emit above the applicable Federal program threshold will require a full review of the source as though construction had not yet commenced on the source. The source shall not exceed the Federal program threshold until a permit is granted. (Regulation No. 3 Part D). GENERAL TERMS AND CONDITIONS 16. This permit and any attachments must be retained and made available for inspection upon request. The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation No. 3, Part B, Section II.E3 upon a request for transfer of ownership and the submittal of a revised APEN and the required fee. 17. If this permit specifically states that final authorization has been granted, then the remainder of this condition is not applicable. Otherwise, the issuance of this construction permit does not provide "final" authority for this activity or operation of this source. Final authorization of the permit must be secured from the APCD in writing in accordance with the provisions of 25-7-114.5(12)(a) C.R.S. and AQCC Regulation No. 3, Part B, Section III.G. Final authorization cannot be granted until the operation or activity commences and has been verified by the APCD as conforming in all respects with the conditions of the permit. Once self -certification of all points has been reviewed and approved by the Division, it will provide written documentation of such final authorization. Details for obtaining final authorization to operate are located in the Requirements to Self - Certify for Final Authorization section of this permit. 18. This permit is issued in reliance upon the accuracy and completeness of information supplied by the owner or operator and is conditioned upon conduct of the activity, or construction, installation and operation of the source, in accordance with this information and with representations made by the owner or operator or owner or operator's agents. AIRS ID: 123/4248 Page 4 of 7 Health and Environment it Pollution Control Division It is valid onl ege�9 Apr-5rt• �o activ ecifically identified on the permit. 19. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been determined by the APCD to be necessary to assure compliance with the provisions of Section 25-7-114.5(7)(a), C.R.S. 20. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be deemed denied ab initio. This permit may be revoked at any time prior to self -certification and final authorization by the Air Pollution Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Control Commission (AQCC), including failure to meet any express term or condition of the permit. If the Division denies a permit, conditions imposed upon a permit are contested by the owner or operator, or the Division revokes a permit, the owner or operator of a source may request a hearing before the AQCC for review of the Division's action. 21. Section 25-7-114.7(2)(a), C.R.S. requires that all sources required to file an Air Pollution Emission Notice (APEN) must pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee billing will terminate. 22. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and Control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections 25-7-115 (enforcement), -121 (injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.R.S. By: Bradley Eades Permit Engineer Permit Histo Issuance Date Description Issuance 1 This Issuance Issued to PDC Energy, Inc. AIRS ID: 123/4248 Page 5 of 7 olor 4:Depa en Notes to Permit Holder " '"me o .e'"" "`"" a 1) The permit holder is required to pay fees for the processing time for this permit. An invoice for these fees will be issued after the permit is issued. The permit holder shall pay the invoice within 30 days of receipt of the invoice. Failure to pay the invoice will result in revocation of this permit (Reference: Regulation No. 3, Part A, Section VI.B.) Health and Environment it Pollution Control Division 2) The production or raw material processing limits and emission limits contained in this permit are based on the consumption rates requested in the permit application. These limits may be revised upon request of the owner or operator providing there is no exceedance of any specific emission control regulation or any ambient air quality standard. A revised air pollution emission notice (APEN) and complete application form must be submitted with a request for a permit revision. 3) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative Defense Provision for Excess Emissions During Malfunctions. The owner or operator shall notify the Division of any malfunction condition which causes a violation of any emission limit or limits stated in this permit as soon as possible, but no later than noon of the next working day, followed by written notice to the Division addressing all of the criteria set forth in Part II.E.1 of the Common Provisions Regulation. See: http://www.colorado.gov/cs/Satellite?c=Document C&childpagename=CDPHE- Main%2FDocument C%2FCBONAddLinkView&cid=1251599389641&pagename=CBONWrapper 4) The following emissions of non -criteria reportable air pollutants are estimated based upon the process limits as indicated in this permit. This information is listed to inform the operator of the Division's analysis of the specific compounds emitted if the source(s) operate at the permitted limitations. AIRS Point Pollutant CAS # Uncontrolled Emission Rate (Ib/yr) Are the emissions reportable? Controlled Emission Rate (Ib/yr) 002 Benzene 71432 266 Yes 266 n -Hexane 110543 2387 Yes 2387 Toluene 108883 350 Yes 350 5) The emission levels contained in this permit are based on the following emission factors: Point 002: Pollutant Emission Factors Uncontrolled lb/BBL loaded - Source VOC 0.2383 AP -42 Benzene 0.0007 AP -42 n -Hexane 0.0056 AP -42 Toluene 0.0010 AP -42 The uncontrolled VOC emission factor was calculated using AP -42, Chapter 5.2, Equation 1 (version 1/95) using the following values: L = 12.46*S*P*M/T S = 0.6 (Submerged loading: dedicated normal service) P (true vapor pressure) = 7.32 psia M (vapor molecular weight) = 53.53 Ib/Ib-mol AIRS ID: 123/4248 Page 6 of 7 lir,olorallaDepa T (tempat0tr�o,of li �pa1;~�� 16.v; lic Health and Environment it Pollution Control Division The uncontrolled non -criteria reportable air pollutant (NCRP) emission factors were calculated by multiplying the estimated mass fraction of each NCRP in the vapors by the VOC emission factor. 6) In accordance with C.R.S. 25-7-114.1, each Air Pollutant Emission Notice (APEN) associated with this permit is valid for a term of five years from the date it was received by the Division. A revised APEN shall be submitted no later than 30 days before the five-year term expires. Please refer to the most recent annual fee invoice to determine the APEN expiration date for each emissions point associated with this permit. For any questions regarding a specific expiration date call the Division at (303)-692-3150. 7) This facility is classified as follows: Applicable Requirement Status Operating Permit Synthetic Minor Source of: VOC NANSR Synthetic Minor/Major Source of: VOC MACT HH Major Source Requirements: Not Applicable Area Source Requirements: Not Applicable 8) Full text of the Title 40, Protection of Environment Electronic Code of Federal Regulations can be found at the website listed below: http://ecfr. gpoaccess. q ov/ Part 60: Standards of Performance for New Stationary Sources NSPS 60.1 -End Subpart A — Subpart KKKK NSPS Part 60, Appendixes Appendix A — Appendix I Part 63: National Emission Standards for Hazardous Air Pollutants for Source Categories MACT 63.1-63.599 Subpart A — Subpart Z MACT 63.600-63.1199 Subpart AA — Subpart DDD MACT 63.1200-63.1439 Subpart EEE — Subpart PPP MACT 63.1440-63.6175 Subpart QQQ — Subpart YYYY MACT 63.6580-63.8830 Subpart ZZZZ — Subpart MMMMM MACT 63.8980 -End Subpart NNNNN — Subpart XXXXXX 9) A self certification form and guidance on how to self -certify compliance as required by this permit may be obtained online at: http://www.colorado.gov/pacific/cdphe/air-permit-self-certification AIRS ID: 123/4248 Page 7 of 7 Colorado Air Permitting Project Version No. 1.00 Project Details Review Engineer: Package #: Received Date: Review Start Date: Section 01- Facility Information Bradley Eades 345966 3/29/2016 6/3/2016 Company Name: County AIRS ID: Plant AIRS ID: Facility Name: Physical Address/Location: Type of Facility: What industry segment? Is this facility located in a NAAQS non -attainment area? Yes If yes, for what pollutant? ['Carbon Monoxide (CO) ❑ Particulate Matter (PM) PDC Energy Inc. 123 4248 Peschel Sec 20 Pad SWSW Sec 20 T4N R65W Exploration & Production Well Pad Oil & Natural Gas Production & Processing Section 02 - Emissions Units In Permit Application (] Ozone (NOx & VOC) AIRS Point # Emissions Source Type Emissions Control? Permit N Issuance tt Self Cert Required? Action Engineering Remarks 002 Hydrocarbon Liquid Loading No 151/VE0581 1 Yes Permit Initial Issuance Section 03 - Description of Project This facilty was recently modified to receive production from nine (9} newly -drilled wells. Concurrently with this permit service, PDC is requesting updates to GP01 to update througput and new GP02 registrations for engines to be used for gas compression. This permit is for condensate loadout, which is uncontrolled. Section 04 - Public Comment Requirments Is Public Comment Required? Yes If yes, why?' Greater than 25 tons per year in Non -Attainment Area Section 05 - Ambient Air Impact Analysis Requirements Was a quantitative modeling analysis required?2 No If yes, for what pollutants? If yes, attach a copy of Technical Services Unit modeling results summary. Section 06 - Facility -Wide Stationary Source Classification Is this stationary source a true minor' Is this stationary source a synthetic minor? If yes, explain what programs and which pollutants here: Prevention of Significant Deterioration (PSD): NA Title V Operating Permits (OP) : VOC Non -Attainment New Source Review (NANSR): VOC Is this stationary source a major source? If yes, explain what programs and which pollutants here: Prevention of Significant Deterioration (PSD): NA Title V Operating Permits (OP) : NA Non -Attainment New Source Review (NANSR): NA No Yes No Section 01- Adminstrative Information Facility AIRs ID: in County 4248 002 Plant Point Section 02 - Equipment Description Details Detailed Emissions Unit Description: Loadout of hydrocarbon liquid to tank trucks. Emission Control Ho. Control Device Description: Control Efficiency %: Section 02 - Emissions Inventory Analysis AP -42: Chapter 5.2 Equation 1 L = 12.46'SP'M/T L = loading losses in lb per 1000 gallons loaded S = Saturation Factor P = true vapor pressure of liquid loaded [pia] M = molecular weight of vapors Ilb/Ib-mole] T = temperature of bulk liquid loaded [deg. RI 1 degree Fahrenheit = 460.67 degree Rankine Criteria Pollutants Variables S P M 0.6 Submerged loading: dedicated normal service 7.32 psia 53.53 lb/lb-mole T 516.461 deg. R L 5.67 2.38E-01 Annual requested Throughput Annual requested VOC emissions lb/10A3 gal lb/bbl 355,000 bbVyr 4.910,000 Gallons per Year 4.57 Pounds per Year 422 Tons VOC per Year Non -Criteria Reportable Air Pollutants/Hazardous Air Pollutants lb VOC/lb Gas 1 Mass Ratio Uncontrolled (pounds Emission Emissions Are Emissions Com onent HAP/ ound VOC Factor lb/bbl lb Reportable? Benzene 0.315% 0.00075 265.98 Yes n -hexane 2.822% 0.0067 2386.93 Yes Toluene 0.414% 0.0010 350.43 Yes Ethylbenzene 0.004% 0.0000 2.97 No Xylenes 0.095% 0.0002 81.33 No 2,2,4-TMP 0.068% 0.0002 57.82 No Section 03 - Regulatory Considerations Is this site considered an exploration and production location (e.g. well pad)? Yes If yes, review the following two exemptions for applicability: Does the operator unload less than 10,000 gallons (238 BBLs) of crude oil per day on an annual average basis? If yes, this emissions point is categorically exempt from permit requirements per Regulation 3, Part B, Section 11,O.1.I Does this operator unload less than 6,750 bbls per year of condensate via splash fill or 16,308 bbls per year of condensate via submerged fill procedure? No If yes, this emissions point is categorically exempt from permit requirements per Regulation 3, Part B, Section II.D.1.1 Is this site located in an ozone non -attainment area? Yes If yes, this source is subject to Reasonably Available Control Technology (RACT) requirements under Regulation 3, Part B Section III.D.2.a. This requirement may be met using "submerged fill" and/or vapor balance with emissions routed to an emissions control device. Is this facility classified as a major source of HAPs? No If yes, evaluate if 40 CFR. Part 63, Subpart EEEE "Organic Liquids Distribution" MACT provisions apply Does this facility involve the loading of refined crude/condensate in the form of "gasoline"? If yes, proceed to evaluate the following: Is this facility classified as a "Terminal" as defined per Regulation 7, Section VI.C.2.a? If yes, the provisions of Regulation 7, Section VI.C.2 may apply No Is this facility classified as a "Bulk Plant" as defined per Regulation 7, Section VI.C.3.a? No If yes, the provisions of Regulation 7, Section VI.C.3 may apply No Technical Analysis Notes: "Emissions calculated for HAPs are more conservative than when calculated using the W&B composition and 1.00% VOC, therefore the generic compositional values used by applicant are being used to calculate HAP emissions (as represented in the table above. 'A copy of the NOS was submitted via email on 6/8/16 and PDC requested removal of condition I requiring NOS be submitted within 15 days os permit issuance. Requirement I was removed and a copy of the NOS was placed in package. Section 04 - SCC Coding Emissions Factor Pollutant (lb/1,000 gallons) VOC 5.67 lb/1.000 gallons Benzene 0.02 lb/1,000 gallons n -hexane 0.16 lb/1,000 gallons Toluene 0.02 Ib/1, 000 gallons 40600132: Crude Oil: Submerged Loading (Normal Service) Use d S = 0.6 40600137' Crude Oil: Splash loading (normal Service) Use if S = 1 45 40600142: Crude Oil: Submerged Loading (balanced Service) Use if S = 1.00 40600145. Crude Oil: Splash loading (Balanced Service) Use S = 1.00 and splash loading 40600148: Crude Oil: Submerged Loading (Clean tanks) Use if S = 0.5 Please select one SCC codes above based on the design and operation of your site. For these codes"Crude Oil" is a generic term that includes both condensate and crude oils. Delete SCC codes not used. No COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POWmON CONTROL DIVISION FACILITY EMISSION SUMMARY Company Name County AIRS ID Plant AIRS ID Facility Name P00 Enerm. Inc 113 4218 Pe0MI Sec 30 Pad History File Edit Date Ozone Status 8012118 No -Attainment EMISSIONS - Uncontrolled (tons per year) EMISSIONS nth Controls (tons per year) POINT AIRS 0 PERMIT Description PM10 PM2.5 H28 SO2 Not VOL Fug VOC CO Total HAP, PM10 PM35 825 SO2 NOt VOC Fog VOC CO Total HAPs REMARKS Premou FACILITY TOTAL 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 Prem. Penn/lied FacdtyfdaI 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 001 GP0I Condensate tanksi¢5006d 3000 T4 1.2 39.0 24 04 002 16WE05R1 Condensateloasout 42.3 t5 423 15 003 GP02 ENG-1 pm vpdec 921hp 118 03 17 0.1 09 04 1] 01 004 GP02 ENG-2amwaist 920e 118 04 17 00 09 08 1] 01 0.0 00 0 0 0a 00 00 00 00 00 00 0.0 00 00 00 00 00 FACILITY TOTAL 0.0 0.0 5.0 0.0 23.8 343.5 00 3.4 90 0.0 00 0.0 0.0 3.0 82.5 0.0 1.8 2.1 VOL) Syn Minor IPSOMANSR and OP) NO,: Minor (PSDMANSR and OP) CO: Minor(PS0 and OP) HAPS: Minor B. T. S. HCHO a Total HH: Minor a affected Area MIL Minor Pumned Fealty Ts el 0.0 00 00 00 236 3435 00 34 90 00 00 00 00 30 825 00 5.8 21 Exclude units exempt from perm4yAPENs (d)COa ge in Permitted miymns 00 00 00 00 30 825 00 5.8 Pubcom B modeling (not) required based on (0 change emissions) Nate Total VOC Feallry Emssors l point and 1+011 el i3l Chenoe in Total Pe nutted VOC emissions (pa land I Itvel 82.5 Facility is eligde for 0042 because< 50 toy Propel emissions less than 2640 tM 82.5 PermO 161/VE0581 will go To putllc notice since permitted emissions are 9154101 than 25tuy in a non -attainment area Note2 Page 4015 Printed 6/8/2016 COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION DIVISION FACILITY EMISSION SUMMARY- HAPs Company Name PDC Energy, Inc County AIRS ID 123 Plant AIRS ID 4248 Facility Name Peschel Sec 20 Pad Emissions - uncontrolled (Ibs per year POINT PERMIT Description Formaldehyde Acetaldehyde Acrolein Benzene Toluene Etcylbenzene Xylenes n -Hexane McOH 220 -VP H2S TOTAL 0PID Previous FACILITY TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0.0 C01 GP01 Condensate tanks 19-50Cbbl 1420 1900 17 476 10579 396 7.4 002 16WE0581 Condensate loadout 266 350 2387 1.5 003 GP02 ENG-1 gm vortec 92hp 133 18 7 10 2C 0.I 004 GP02 ENG-2 gm vonec 92hp 0.0 00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 TOTAL Itpyl 0.1 0.0 0.0 0.8 1.1 0.0 0.2 6.5 0.0 0.2 0.0 0.0 90 `Total Reportable = all HAPs where uncontrolled emissions t de minlmus values Red Texuncontrolled emissions c de minimus Emissions with controls (Ibs per year POINT PERMIT Description Formaldenyde Acetaldehyde Acrolein Benzene Toluene ethylbenzene Xylenes n -Hexane MCOH 224 TMP H2S TOTAL (tpy) Previous FACILITY TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0.0 001 GP01 Condensate tanks 19-500bbl 71 95 085 23.8 528.95 C 19.8 0.4 002 16WE0581 Condensate loadout 266 350 2387 1.5 003 GP02 ENG-1 qm vonec 92hp I 133 18 17 10 20 0-1 004 GP02 ENG-2 gm vonec 92hp 133 18 17 10 20 0 I 00 0.0 0.0 0.0 00 0.0 0.0 0.0 TOTAL hpy) 0.1 0.0 0.0 0.2 0.2 0.0 0.0 1.5 0.0 0.0 0.0 0.0 2.1 5 16W E0581. CF1.xlsm 5/8/2016 uid Loadin drocarbon Li fV J CO CO N Permit Number: Provide Facility Equipment ID to identify how this equipment is referenced within your organization.] Facility Equipment ID: nested Action (Check applicable request boxes) Section 02 — Re Section 01 — Administrative Information General Permit GPIl7 Individual Permit PDC Energy, Inc. E C' F 6 0 V J d t aS a a N u h a '` ° t Nd E c z d ❑ • on 7 R 'J 0 as - d c ^ L V T 6- .7: O off E C z ww� Z c� cc cc u c c C c u U d d d CC L a O S ❑ ❑ ❑ ❑ SWSW Sec 20 T4N R65W Source Location CO Co) 1775 Sherman Street, d 2 3r c O U 0 a) i— L E a R C Cd Ld L 9 C' Cd CO 0 O co d U N Z L G R V G d C F c cc E v7 O ad. R 7 9 Cd J L Cd w 0. C Gd o Cd 3 Elizabeth,Duncan@pdce.com E-mail Address: Addl. Info. & Notes: Section 03 — General Information N S d d i '0 r r F e Normal flours of Source Operation: CO 0 N Co 0 Don't know Don't know Z Z Z Z Z ID ID EDE < < C O U d >- ? Y Y 'r Cd Cd n d v '0 F U 0 v F • C _ Tar. • a ≤7. d d z C G F c o0 O L < �d o = V. '0 • 3 • C C o e c V a a n 'J O .t^.. F a ..r 0' ^ l co C 7 - o F o .d. - C O d o S O C <S. . 0 C M c< r. C • o -=;'... 5- n Z Fr.' ecc - - R' 0 F cc,v ..-. .t C F. 0 ` - 0 0C Ln R R O y d C6 _ E V ^_ 'J V C 7 V V d ..' .d is a T L V c - r R n ._ "` . F O d 0 as a .. n "0 m d F 0 0 - a, 0. - o d C = o 1^ • G ` ' L U o. C -- r) O - = d - • C N 0 T'v O h r O ) d `o 7: o 3 a 0 _L U ale and federal rules. O O O N CO L O pU V 0 a Y 3 C o '^ d 0 Cie Cd C u n Q E v L L A • U rn o : U 01 C C - E m o H • 0 0 ❑ R Ln G a 'rm' r O U -J O I O 9 V V b e E O Cd d d F co cc c • _ J o z w a a ^ 0 S V 5 A 'J - ^ C_ L A < 0.1 c c 3 0 CdCD — ▪ m d c t c r: N - O L. — d c U p. ` O z e O y a .. E U d > 2.,• < J Cd 'O d cc L a0. V 0 • O O cc 0 C' V_ t 0 d j LL. Cd d U. Co CO `O Ct d n ❑ 0 on 7L-3. re) F n N C- True Vapor Pressure: S - ` • J Y G E c Ez > o 'v K C C FORM APCD-208 N 0 d cn a uid Loadin N C O3 N tvu 5 0 w 0 -J F L C CO 0 O R 0 0 cei E O O C C) CO O rn O CO 0 Ct N 0 C) cip 0 ✓ m 0 5V 2 o `O ▪ N ry COGCC Website 4) CD M m 0 -104.69314 op r>n ❑ u 0 O >- y• � 3 U y¢ E• ° CO 1/• a“ an O 1 O �s o Direction of stack outlet (check one): Section 08 — Emissions Inventory Information CZ CC L L M 0 0 C) V CC CO CO X X C) V X CO O cc p cc x — o 0 0 c O O V N C 0Z 0 L R ]]▪ � i _CO 0 re YE O ON0 O O 0 w U �O0 ii t R o y C b C E o i- U U R I N 03 C 0 O V) C a OX 0 3 C e E C R C m R R C R O Emission Factor Documentation attached (If using site specific emission factor) Estimation Method or Emission Factor Source CIS O 2' a CO 2 O a CO O a Please use the APCD Non -Criteria Reportable Air Pollutant Addendum form to report pollutants not listed above. Requested Permitted Emissions Controlled (Tons/Year) O 265.98 lb/yr 2386.93 lb/yr (h Ni Uncontrolled (Tons/Year) 42.30 265.98 lb/yr 2386.93 lb/yr Actual Calendar Year Emissions5 Controlled (Tons/Year) _T 2386.93 lb/yr O Cr) CO N 0) -sr Lri CD N Uncontrolled (Tons/Year) O 265.98 lb/yr 2386.93 lb/yr M Ni V Emission Factor w _0 s a Uncontrolled Basis CO CD O O LI) CO Co N O O O O O Control Efficiency ((VD Reduction) Identify in Section 07 Control Device Description Secondary CO b N_ ❑ = 0 z O > ;, C0 _ C. C R L u R V L ✓ C v pa E L C C E C C u C O m C b O O. R C • O ▪ Ca 707 - R b 3 s CIS -J EHS Professional Elizabeth Duncan CJ Name of Legally Authorized Person (Please print) O b C R R W C L b O L y �_ tr a C R M` CR t M• \. E • N ▪ L CO _ d ` Ca C Z L 0 _ R O R _ t` y R t CO V CO Z N.a 0 0 v c CL 0 E) U 0 N C) cL CO 2 O z w O 0 O w U_ z O f/) w ✓ r J J 0 0 w J CO 0 I- a. cL cL w li U z O z (\; co -o N, U M N N I CD E z N cn .7t c O O Permit Number• Company Name: Plant Location: c0 co c) LU c0 O r) Fax Number: Elizabeth.Duncan@pdce.com E-mail Address: Controlled Actual Emissions (lbs/year) 350.43 Uncontrolled Actual Emissions (lbs/year) Co 0 u) M Emission Factor Source ProMax Emission Factor (include Units) 0.0010 lb/bbl -Control: Equipment / Reduction (%) 0 Chemical Name - a) C (1) O H 1 Chemical Abstract Service (CAS) Number co Co co 0 - r co O N Calendar Year for which Actual Data Applie M a) a) O EHS Professional a) O > Q Q Cr) O a) N O 4 cn O) a) c O a) Eaa_c) m o c N W Title of Person Legally Authorized to Supply Data Name of Person Legally Authorized to Supply Data (Please print) Form Revision Date: A Hello