Loading...
HomeMy WebLinkAbout20161564.tiff Xcel Energy- Siting and Land Rights 1800 Larimer Street,Suite 400 PUBLIC SERVICE COMPANY Denver,Colorado 80202-4256 Telephone:303.571.7225 May 2, 2016 RECEIVED BY CERTIFIED MAIL Tom Parko MAY 0 9 2016 Planning Director Weld County WELD COUNTY 1555 N 17th Ave COMMISSIONERS Greeley CO 80631 Dear Mr. Parko, Each year Public Service Company of Colorado ("Public Service"), an Xcel Energy Company, is required to file a schedule of proposed new construction or extensions of electric transmission facilities and generation facilities for the following three calendar years pursuant to Rule 3206 of the Public Utilities Commission (PUC) Rules Regulating the Service of Electric Utilities. A copy of the Company's 2016 Rule 3206 Report, which was filed on May 2, 2016, is enclosed for your information. The purpose of the report is to provide the PUC with an opportunity to determine whether or not specific projects require a Certificate of Public Convenience and Necessity. Interested parties may file comments with the Commission regarding any of the projects listed in the report. Public Service is planning several new electric transmission projects in Weld County to facilitate replacement of the existing 44 kV transmission system, improve reliability, increase the local load serving capability, and accommodate potential generation resources. These projects include: 1. Ault-Cloverly 115 kV line, Graham Creek and Husky substations (also known as North Greeley Area Project). The project consists of two new substations and two new transmission lines. One substation is planned to be located near the town of Ault and the other planned to be located near the town of Eaton. Completion of this project is tentatively scheduled for 2019. 2. Weld-Rosedale 230 kV transmission line, consisting of approximately 13 miles of new 230 kV transmission between the existing Weld substation and the existing Rosedale substation. 3. Milton-Rosedale 230 kV transmission project, consisting of approximately 7 miles of new 230kV transmission between the existing Rosedale substation south of Greeley, and the proposed Milton substation. Together the Weld-Rosedale and Milton-Rosedale Projects are also known as the Southern Greeley Area Project. 4. The Southwest Weld Expansion Project. In 2016, Public Service expects to make a joint filing to the Colorado Public Utilities Commission with Tri-State Generation and Transmission Inc. to participate in their Southwest Weld Expansion Project (SWEP). The SWEP is a plan to initiate transmission development in the region to improve reliability and increase the capability to serve load growth in the area. Portions of the project are planned to be located near Hudson. Page 1 of 2 affnlinGt.elleaCOw 2016-1564 Consistent with the requirements of § 29-20-108 (4)(a), C.R.S., this letter constitutes notice to you of Public Service's intent to begin sometime during the next three calendar years the work that will lead to the construction of these electric transmission facilities. If they haven't already, Public Service representatives will be contacting you to discuss these projects in more detail and to determine all applicable permits that may be required prior to beginning construction at the facilities. Please feel free to contact me at 303-571-7225 if you have any questions or require additional information regarding any of the projects identified in the enclosed Rule 3206 Report. Sincerely, Susan Innis Manager, Siting and Land Rights Attachment cc: Michelle Martin Planning Manager Kim Ogle Planner Mike Freeman County Commissioner District 1 Julie Cozad County Commissioner District 2 Barbara County Commissioner District 3 Kirkmeyer Sean Conway County Commissioner At-Large Steve Moreno County Commissioner At-Large Page 2 of 2 Xcel EnergysM PUBLIC SERVICE COMPANY RULE 3206 REPORT PROPOSED CONSTRUCTION OR EXTENSION OF TRANSMISSION FACILITIES 2017 THROUGH 2019 Proceeding No. 16M-0039E May 2, 2016 INDEX ITEMS PAGE A. NEW PROJECTS THAT MAY REQUIRE A CPCN 2 SOUTHWEST WELD EXPANSION PROJECT PARTICIPATION 3 AULT- CLOVERLY 230/115 KV TRANSMISSION 6 WELD - ROSEDALE 230 KV LINE 9 ROSEDALE - MILTON 230 KV LINE 12 RUSH CREEK - MISSILE SITE TRANSMISSION 15 B. NEW PROJECTS OF 230 KV AND ABOVE THAT THE COMPANY WOULD REQUEST THE COMMISSION TO DETERMINE THAT A CPCN IS NOT REQUIRED 19 WOLCOTT 40 MVAR 230 KV SHUNT REACTOR 18 C. NEW PROJECTS THE COMPANY CONSIDERS TO BE IN THE ORDINARY COURSE OF BUSINESS PURSUANT TO RULE 3206(B)(I) OR (II) AND FOR WHICH THE UTILITY IS REQUESTING THE COMMISSION FIND TO BE IN THE ORDINARY COURSE OF BUSINESS NONE D. STATUS OF PROJECTS LISTED IN PRIOR REPORTS 21 2 Public Service Company of Colorado Transmission Construction Project Name of the project: Southwest Weld Expansion Project Participation Project description: In 2016, Public Service expects to make a joint filing with Tri-State Generation and Transmission Inc. (Tri-State) to participate in their Southwest Weld Expansion Project (SWEP). The Commission granted Tri-State a CPCN in Proceeding No. 14A-0896E and Proceeding 15A- 0728E, Decision Nos. C14-1482 and C15-1135 respectively. The joint filing would seek to amend the Tri-State CPCN to include the Public Service participation in the project. The SWEP is a plan to initiate transmission development in the region to improve reliability and increase the capability to serve load growth in the area. The objectives of participation for Public Service are to provide service for its own customer load growth, align with plans to replace the 44 kV transmission system in and around Greeley, and accommodate new generation resources. The SWEP consists of 230 kV and 115 kV transmission that begins near Ft. Lupton, Colorado, travels east towards Colfer, and then heads north and ultimately connects to the existing transmission a few miles south of Kersey. The project also includes a 230 kV line between Ft. Lupton and Henry Lake substations. Public Service and Tri-State executed an agreement to cooperate in SWEP in November 2014, which provides for Public Service ownership rights for up to 40% of the project. Refer to Attachment A, Exhibit—H from the Tri-State CPCN application filing, for the one-line diagram of this project. Estimated cost of the project: $27 million (Transmission dollars — Public Service share only) Manner in which the project is expected to be financed: Public Service capital budget for Public Service's share of the project Projected date for the start of construction of the project: Under Construction by Tri-State 3 Estimated date of completion of the project: December 2018 Estimated in-service date of the project: December 2018 Proposed general location: The project will be located in Weld County, Colorado. Prudent avoidance measures being evaluated for transmission facilities: The proposed project will be built to meet all prudent avoidance requirements for noise and magnetic fields. 4 Attachment A 6 W R iu w R t4 rn o , vi n d o Z h o v y0 y 8 v CA O m a ! W _ ^ o i v) 0 0 I� U > i w W ^a > i la. 0 •w ZO v .._.._..7 o p.n m " A , -II I . I v v• x z 1 I - o to w ' I �v i Y co m n W cc z Z W 0 4 a Southwest Weld Expansion Project 5 Public Service Company of Colorado Transmission Construction Project Name of the project: Ault— Cloverly 230/115 kV Transmission Project description: This project consists of constructing approximately 20 miles of new transmission in northeast Colorado, north of the City of Greeley. The transmission will originate from the existing Western Area Power Administration (Western) Ault Substation and terminate at a new Public Service Cloverly Substation, on the northeast edge of Greeley. The transmission will also interconnect with two other new substations. The first substation is referred to as "Husky", and is planned to be built near the existing Public Service Ault 44 kV Substation. The second substation is referred to as "Graham Creek" and is planned to be built near the existing Public Service Eaton 44 kV Substation. The Cloverly Substation will replace the existing Pleasant Valley Substation. Previous documents have referred to the Husky Substation as "New Ault", and the Graham Creek Substation as "New Eaton". The approximately six mile transmission between Ault and Husky will be constructed to allow future double-circuit capability, but will initially be operated as a single-circuit 230 kV line. The approximately 14 mile transmission between the Husky and Graham Creek substations will be built to allow for future double-circuit 230 kV operation, but will initially be operated as a single-circuit at 115 kV line. The primary purpose of this project is to replace the existing antiquated 44 kV system in the area with higher voltage transmission. The project will improve reliability, and also increase load-serving capability and allow for future resource accommodation in the area. Refer to Attachment B for the orientation map of this project. Estimated cost of the project: $62 million (Transmission dollars) Manner in which the project is expected to be financed: Public Service capital budget Projected date for the start of construction of the project: 2018 6 • Estimated date of completion of the project: June 2020 Estimated in-service date of the project: June 2020 Proposed general location: The project will be located in Weld County, Colorado. The project area shown in Attachment B is the general geographical area within which alternative transmission corridors could potentially be identified. The ultimate study area to be analyzed for potential routes could be larger or smaller than the area shown in this map. Prudent avoidance measures being evaluated for transmission facilities: The proposed project will be built to meet all prudent avoidance requirements for noise and magnetic fields. 7 Attachment B ULT ' Husky Substation Q ULT (4"kV) _ x.e r. t•to Ault-Cloverly 115kV Line, __.. c,,.,e ){'ELD e -. — COUNT)" - E ,ToN Is 3 cti Cloverly - '-'' -1 Graham Creek' e' - Substation Substation L+EAS.NT VALLEY 1----------.... NC,' u _ o^..ssp, [U si Wes _ • N s Legend a SI tw, E Substation A wwww -^^^-44kV OH Electric Transmission Line i _ —230kV OH Electric Transmission Line - e 33 sms —115kV OH Electric Transmission Line "_, n,_s_ S•urces Esri,geLottne,NAV'iEQ...JSGS;Intermap,in,NRCAN,Esri ......,<,wi -- - - "'°.Japan,METI,;Esri China(Hong Kong),Esri(Thailand),TomTom,2012 Approximate location of the Ault— Cloverly 115 kV Transmission Project 8 Public Service Company of Colorado Transmission Construction Project Name of the project: Weld — Rosedale 230 kV Line Project description: This project consists of approximately 13 miles of new 230 kV transmission between the existing Public Service Weld Substation and the existing Public Service Rosedale Substation. The Rosedale Substation will be upgraded to accommodate 230 kV line termination and a 230/115 kV, 280 MVA transformer. This project, along with the Rosedale — Milton 230 kV project will allow Public Service to improve its ability to serve new loads in the region, particularly those associated with future oil and gas development. The project aligns with plans to replace the existing 44 kV transmission system, and will improve reliability by alleviating potential overloads. The project not only improves load-serving capability, but also allows for future resource accommodation. Refer to Attachment C for the orientation map of this project. Estimated cost of the project: $43 million (Transmission dollars) Manner in which the project is expected to be financed: Public Service capital budget Projected date for the start of construction of the project: March 2019 Estimated date of completion of the project: June 2022 Estimated in-service date of the project: June 2022 9 Proposed general location: The project will be located in Weld County, Colorado. The project area shown in Attachment C is the general geographical area within which alternative transmission corridors could potentially be identified. The ultimate study area to be analyzed for potential routes could be larger or smaller than the area shown in this map. Prudent avoidance measures being evaluated for transmission facilities: The proposed project will be built to meet all prudent avoidance requirements for noise and magnetic fields. 10 Attachment C p t 2 s A.S. �� o .4f. wu= a i VI.,1 at. CR o-4 3 I WELD Weld - m 4M 1, EaU,3. Rosedale , = 230kV 'Line - um at um St .. hxiu si x]usr- ...»._._.tom •,� \, *3:ne _ .aau �r,---' •0SEo0t7LEe~. Q, ,t WELD.. _,e.a;, - . ,... 4.fi lim I. y.. > c rite y s e t L. n. .. e Ncrest Legend E Substation ---^44kV OH Electric Transmission Line —230kV OH Electric Transmission Line -115kV OH Electric Transmission Line = I Sources:Esri,DeLorme,NAVTEQ,USGS,Intermap,iPC,NRCAN,Esri Japan,METI,Esri China(Hong Kong),Esri(Thailand),TomTom,2012 Approximate location of the Weld — Rosedale 230 kV Line Project 11 Public Service Company of Colorado Transmission Construction Project Name of the project: Milton - Rosedale 230 kV Transmission Project description: This project consists of building approximately 7 miles of new 230 kV transmission between the Public Service Rosedale Substation, south of Greeley, and the proposed Milton Substation, which is a northern terminus for the Southeast Weld Expansion Project (SWEP). This project along with the Weld — Rosedale 230 kV Line project (included in this report) will facilitate replacement of the existing Greeley 44 kV transmission system, improve reliability, increase the local load serving capability, and accommodate potential generation resources. Refer to Attachment D for the orientation map of this project. Estimated cost of the project: $19 million (Transmission dollars) Manner in which the project is expected to be financed: Public Service capital budget Projected date for the start of construction of the project: June 2019 Estimated date of completion of the project: December 2022 Estimated in-service date of the project: December 2022 12 Proposed general location: The project will be located in Weld County, Colorado. The project area shown in Attachment D is the general geographical area within which alternative transmission corridors could potentially be identified. The ultimate study area to be analyzed for potential routes could be larger or smaller than the area shown in this map. Prudent avoidance measures being evaluated for transmission facilities: The proposed project will be built to meet all prudent avoidance requirements for noise and magnetic fields. 13 Attachment D d 20th Se a t I e2oe,so d c+Y ',..:,k,,,,d, i I., E21;Ie SF - rc i'. u � _rs.c•' of ROSEDALE 2 Kersey.. j Evans Couaty.Roa454. �._... ..... 421,451 Jl/ v i- 1- '''''' Milton - Rosedale t 230kV Line and >� 2M,y Milton Substation f e Todd Ave County Road 59. i 716,er L+ Cf?-59 -(r_.:6 a c ccc Coun 1 Road 40 ..... CR-At 2 f K 2 ounty Rood 40_. a CR44 v T V U J e 44- ...._. )f vratni -_..-.- _ an ii _..... m c.,,,,,,,,Rcsdl2. _...CF :Mv;..,-.@nell7-Rlaa CF V El _ County Road 40 ... s _ CO.. ......... V 9 Legend N ,, E Substation A cR,a —^pa44kV OH Electric Transmission Line 1 . 115kV OH Electric Transmission Line Sources:Esri,DeLorme,NAVTEO,USGS,Intermap,iPC,NRCAN,Esri -- ' . --"-•-'• ----^ � - Japan,METI,Esri China(Hong Kong),Esri(Thailand),TomTom,2012 Approximate location of the Milton — Rosedale 230 kV Transmission project 14 Public Service Company of Colorado Transmission Construction Project Name of the project: Rush Creek - Missile Site 345 kV Transmission Project description: The recommended project consists of constructing the following new transmission facilities to enable the interconnection of proposed Rush Creek 1 (400 MW) and Rush Creek 2 (200 MW) wind generating facilities: 1. Approximately forty miles of 345 kV transmission between the Missile Site Substation and a new Rush Creek 1 345 kV Switching Station. 2. Approximately fifty miles of 345 kV transmission between Rush Creek 1 and Rush Creek 2 facilities. 3. A new Rush Creek 1 345 kV Switching Station This project is required to interconnect the new 600 MW wind injection as part of the Public Service Rule 3660(h) filing. Refer to Attachment E for the orientation map of this project. In the alternative, the Company could construct the Rush Creek — Missile Site Gen-Tie at 230 kV. Estimated cost of the project: $121.4 million Manner in which the project is expected to be financed: Public Service capital budget Projected date for the start of construction of the project: 2017 Estimated date of completion of the project: December 2018 15 Estimated in-service date of the project: December 2018 Proposed general location: The project will be located in Arapahoe, Elbert, and Lincoln counties in Colorado. The project area shown in Attachment E is the general geographical area within which alternative transmission corridors could potentially be identified. Prudent avoidance measures being evaluated for transmission facilities: The proposed project will be built to meet all prudent avoidance requirements for noise and magnetic fields. 16 Attachment E WELD f MORGAN I COUNTY COUNTY JO Rush Creek GenTie - Missile Site 345kV Line ADAMS E aem Age COUVT-Y f zo ,rgndale Rd a ,1 WASHINGTON 2; COUNTY 62 .0 I. dY5a 142===-= 6. Anton -.!=r6,6=6.,.. .4-1-6.6,142====111.6./�,p St burg _ _ — �--^ x CUUL7' �''` AR4�P4HOE COUNTY / ..r Trail rw ` 117 I i 28 gale : - I I a Rush Creek r` Switching Station I Fl. ,..,An lb 5 ��Iea ..-' x.' RIT CARSON+. ELBERT �' — °° �� GO.UNTY COUNTY i, 105 "„.-. a Matheson 2..6 I :. „� 1 LINCOLN �P 69 , COUNTY Cal - 1. ,g7 l �,� al Judge Orr Rd I r 7 t I I. , \ I 1 \ ElPASO I C \.. I COUNTY '-------- - — --- --' CHEYENNE R A' g, COUNTY I Legend N 24 i Q Substation N I' 1. -345kVOH Electric Transmission Line P1 ;,r,va jl: -230kV OH Electric Transmission Line 1 i. Sources:Esri,DeLorme,NAVTEQ,USG5,Intermap,IPC,NRCAN,Esri --- - - - ' -' -• a. Japan,METI,Esri China(Hong Kong),Esri(Thailand),TomTom,2012 Approximate Location of the Rush Creek— Missile Site 345 kV Transmission project 17 Public Service Company of Colorado Transmission Construction Project Name of the project: Wolcott 40 MVAR 230 kV Shunt Reactor Project description: The project consists of installing 40 MVAR (two steps of 20 MVAR) shunt reactors on the 230 kV bus of the Wolcott Substation. This project replaces the Foidel Creek Shunt Reactor project approved in Colorado PUC Proceeding No. 15M-0043E, Decision No. C15-0590. Based on additional analyses, the location of the reactor will be moved to the existing Wolcott Substation, south of Foidel Creek. The purpose of the project is to improve voltage performance in the region. Refer to Attachment F for the orientation map of the proposed project. Justification for Requesting Normal Course of Business: This project is needed to improve voltage issues in the region. The shunt reactors will be located inside the existing Public Service Wolcott Substation. Estimated cost of the project: $6.2 million Manner in which the project is expected to be financed: Public Service capital budget Projected date for the start of construction of the project: September 2016 Estimated date of completion of the project: May 2017 Estimated in-service date of the project: May 2017 18 Proposed general location: The proposed project will be located inside the existing Wolcott Substation in Eagle County, Colorado. Prudent avoidance measures being evaluated for transmission facilities: No new transmission lines are required. No prudent avoidance measures are required. 19 Attachment F 13 1 lablot _ Ac'• 72 EAGLE COUNTY e Wolcott 40MVAR 230kV Shunt Reactor End i E.Agt Legend N El Substation A —230kV OH Electric Transmission Line —115kV OH Electric Transmission Line Sources:Esri,DeLorme,NAVTEQ,USGS,Intermap,iPC,NRCAN,Esri ..u,...:- - ...e�a„F..... --• _ - _ - Japan,METI,Esri China(Hong Kong),Esri(Thailand),TomTom,2012 Approximate Location of the Wolcott 40 MVAR Shunt Reactor Project 20 STATUS OF PROJECTS LISTED IN PRIOR REPORTS (The project costs reported in the following table are Transmission dollars only) 21 Change in Item# Project Name Status? Reason For Change Projects in-service in 2015 1 Rosedale 115 kV Line Tap Yes Completed (WAPA) 2 Beaver Creek— Brush 115 kV Yes Completed Reconductor Project 3 Leetsdale 230/115 kV, 280 MVA Yes Completed #2 4 Malta 230/115 kV, 100 MVA#2 Yes Completed 5 Mt. Harris 138/69 kV, 50 MVA #2 Yes Completed 6 Russell 230/13.8 kV, 50 MVA# 1 Yes Completed Replacement 22 Change in Item# Project Name Status? Reason For Change 2016 ISD Projects 7 Arvada 230/13.8 kV, 50 MVA# Yes In-service date of Bank #1 changed 1&2 Replacement from 6/2016 to 12/2016 due to construction schedule. Bank #2 replacement is completed. No CPCN is required for this project pursuant to Decision No.C13-1075, Proceeding No.13M-0019E. Project cost for bank#1 &#2 is $2 million. 8 Weld 230/115 kV, 150 MVA Yes In-service date changed from Transformer Replacement and 11/2015 to 5/2016 due to outage Substation Upgrade restrictions. No CPCN is required for this project pursuant to Decision No. C11-0927, Proceeding No. 11M-317E. Project cost is $10 million. 9 Federal Heights 115/13.8 kV, No Scheduled for in-service 7/2016. No 50 MVA#3 CPCN is required for this project pursuant to Decision No. C11-0749, Proceeding No. 11M-317E. Project cost is $1.1 million. 10 Rifle-Parachute 230 kV Line#2 No Scheduled for in-service 12/2016. A CPCN for this project was granted in Decision No. C13-0256, Proceeding No. 13A-00032E. Project cost is $28.5 million. 11 Happy Canyon 115 kV (IREA No Scheduled for in-service 12/2016. load service, 115/12A7 kV, 50 No CPCN is required for this project MVA) pursuant to Decision No. C06-0761, Case No. 6396. Project cost is $3 million. 23 Change in Item# Project Name Status? Reason For Change 12 Cherokee —Arvada — Russell — Yes In-service date changed from Ridge 230 kV Line Conversion 6/2016 to 12/2016 due to construction schedules. No CPCN is required for this project pursuant to Decision No. C13-0879, Proceeding No. 13M-0019E. Project cost is $4.7 million. 13 Sheridan 115/13.8 kV, 50 Yes In-service date changed from MVA#2 2/2016 to 6/2016 due to the time required for construction. No CPCN is required for this project per Decision No. C12-0777, Proceeding No. 12M-165E. Project cost is $0.27 million. 14 Grand Junction 138/115 kV, 50 No Scheduled for in-service 6/2016. No MVA Transformer CPCN is required for this project Replacement Project pursuant to Decision No. C14-0732, Proceeding No. 14M-0061E. Project cost is $8 million. 15 North 115/13.8 kV, 50 MVA# 3 No Scheduled for in-service 6/2016. No Transformer CPCN is required for this project pursuant to Decision No. C14-0732, Proceeding No. 14M-0061E. Project cost is $0.8 million. 16 Palmer Lake 115 kV, 26.5 ohm, Yes Project cancelled after considering 800 Amp Series Reactor alternative mitigation measures. 2017 ISD Projects 17 Littleton 115/13.8 kV, 50 MVA No Scheduled for in-service 6/2017. No # 3 Distribution Project CPCN is required for this project pursuant to Decision No. C14-0732, Proceeding No. 14M-0061E. Project cost is $1 million. 24 Change in Item# Project Name Status? Reason For Change 18 Foidel Creek 25 MVAR, 230 Yes Project replaced by "Wolcott 40 kV Shunt Reactor MVAR Shunt Reactor" project filed under "Normal Course of Business" projects in this report 19 Sullivan 230/13.8 kV, 50 MVA No Scheduled for in-service 6/2017. No # 3 Distribution Project CPCN is required for this project pursuant to Decision No. C14-0732, Proceeding No. 14M-0061E. Project cost is $1.2 million. 20 Moon Gulch 230/13.8 kV, 50 Yes In-service date changed from MVA Distribution Substation 6/2018 to 12/2017 due to accelerated load growth in the area. A CPCN was granted for this project in Decision No. C16-0054, Proceeding No. 15A-0929E. Project cost is $1.9 million. Project cost decreased because the new site location closer to the line being tapped. 2018 ISD Projects 21 Thornton Distribution Yes In-service date changed from 2017 Substation to 6/2018 due to permitting issues. A CPCN for this project was granted in Decision No. C15-0473, Proceeding No. 14A-1002E. Project cost is $18.6 million. 22 Bluestone Valley 230 kV Yes New in-service is 6/2018. No CPCN Substation and De Beque- is required for this project pursuant Bluestone Valley 69 kV Line to Decision No. C09-0681, Proceeding No. 09M-392E. Project cost for the 69 kV is $7.2 million. Detailed project description is included in Attachment G. 23 Avery 230/13.8 kV, 28 MVA No Scheduled for in-service 5/2017. A Distribution Substation CPCN was granted for this project in Decision No. C15-0461, 25 Change in Item# Project Name Status? Reason For Change Proceeding No. 15A-0159E. Project cost is $8.1 million. 2019 ISO Projects 24 Pawnee- Daniels Park 345 kV Yes In coordination with the Rule Transmission Line Project and 3660(h) filing, Public Service is filing Harvest Mile 230/345 kV a petition to move the in-service for Substation this project to 2019 from 2022. A CPCN was granted for this project in Decision No. C15-0316, Proceeding No. 14A-0287E. Project cost is $178.3 million. 2020 ISO Projects 2021 ISD Projects 25 Avon — Gilman 115 kV Line Yes In-service date changed from and 45 MVAR Capacitor Bank 6/2019 to 2021 delays in land at Vail Substation acquisition. No CPCN is required for this project pursuant to Decision No. C15-0590, Proceeding No. 15M-0043E. Project cost is $22.9 million. 26 Barker Substation (Distribution, No Scheduled for in-service in 12/2021. 230/13.8 kV, 50 MVA) No CPCN is required for this project pursuant to Decision No. C10-0644, Proceeding No. 10M-206E. Project cost is $18.1 million. 2022 ISO Projects None 26 Change in Item# Project Name Status? Reason For Change ISD To Be Determined 27 Foidel Creek 230 kV Line Tap Yes Project is delayed. A CPCN is required for this project pursuant to Decision No. C13-0879, Proceeding No.13M-0019E. Detailed project cost estimates will be performed during the CPCN filing. 28 Wilson#1 Sub (Distribution, Yes Project delayed due to slower load 115/13.8 kV, 14 MVA) growth. No CPCN is required for this project pursuant to Decision No. C10-0644, Proceeding No. 10M- 206E. Project cost is $3.5 million in 2015 dollars. 29 Monfort 15MVAR, 44 kV Yes Project delayed as long term Capacitor Banks alternatives are being studied. No CPCN is required for this project pursuant to Decision No.C13-0879, Proceeding No. 13M-0019E. Project cost is $1.29 million in 2011 dollars. 30 Vasquez 115/13.8 kV, 28 MVA Yes Project delayed due to slower load # 2 Transformer growth. No CPCN is required for this project pursuant to Decision No. C15-0590, Proceeding No. 15M- 0043E. Project cost is $0.34 million in 2015 dollars. 31 New Castle 115/69-24.9 kV Yes Project delayed due to slower load Substation (Distribution, 16 growth. No CPCN is required for MVA) this project pursuant to Decision No. C08-0676, Case No. 6396. Project cost is $1.43 million in 2015 dollars. 27 Change in Item# Project Name Status? Reason For Change 32 Wheeler-Wolf Ranch 230 kV No Project delayed due to slower load Transmission Project growth. No CPCN is required for this project per Decision No. C14- 0732 and Proceeding No.14M- 0061E. Project cost is $17 million in 2015 dollars. 33 Parachute - Cameo 230 kV No Project delayed due to slower load Transmission Line growth. A CPCN is required for this project pursuant to Decision No. C10-0644 in Proceeding No. 10M- 206E. Project cost is $48.1 million in 2010 dollars. 34 Lamar- Front Range 345 kV No Planning studies have been Transmission Line Project completed and project study reports are available. No decisions have been made with respect to project implementation. A CPCN is required for this project pursuant to Decision No. C10-0644, Proceeding No. 10M-206E. 35 Lamar- Vilas 230/345 kV No See Lamar— Front Range (item#34 Transmission Line Project above). 36 Weld County Transmission No No specific transmission project has Expansion Project been identified at this time. It is (Prior versions: TOT7 expected that a CPCN will be Expansion Project &Ault— required based on the decision Cherokee Project) regarding the previously reported Ault — Cherokee Project (Decision No. C10-0644, Proceeding No. 10M-206E). Project cost has not been determined. 28 Change in Item# Project Name Status? Reason For Change 37 Rifle(Ute)-Story Gulch 230 kV No Delayed due to slower load growth. Transmission Line Project A CPCN is required for this project pursuant to Decision No. C10-0644, Proceeding No. 10M-206E. Project cost is $24 million in 2010 dollars. 38 Glenwood Springs — Rifle Yes Project delayed due to slower load 69/115 kV Conversion growth. Project cost will be estimated when an in-service date is determined. 29 Attachment G Bluestone Valley Project Scope Update (item # 22 in Status of Projects Listed in Prior Reports) The original scope of this project consisted of a new Bluestone Valley 230/69 kV Substation. The substation would include a 230/69 kV transformer and would interconnect the existing Parachute - Cameo 230 kV line and the existing DeBeque - Cameo 69 kV line. From Bluestone Valley Substation, a new line would be constructed to a new Grand Valley Power Clear Creek Substation. Public Service has now split this project into two phases: A 69 kV phase and a 230 kV phase of the project. Public Service intends to move forward with the 69 kV portion of the project now. The 230 kV phase may be constructed at a later time based on local load growth. The current plan is to construct a new Bluestone Valley 69 kV Switching Station with associated 69 kV buswork, switches and circuit breaker. The switching station will connect to the existing DeBeque - Cameo 69 kV line by way of a 1.4 mile, in-and-out 69 kV double circuit line. The 69 kV double circuit line will likely use single 477 kcmil ACSR conductor. The project will result in a DeBeque - Bluestone Valley - Cameo 69 kV line. The purpose of the project is to improve the reliability of the local 69 kV transmission system. This phase of the project is estimated to cost approximately $7.2 million dollars. The proposed project will be located near the Town of DeBeque in Mesa County in northwest Colorado. The expected in-service date is June, 2018. The Bluestone Valley Substation project was originally reported in the 2009 Rule 3206 filing. The 2009 filing listed the project as a new 230 kV substation that would interconnect the Rifle (Parachute) — Cameo 230 kV line. The Commission determined that no CPCN was required in Decision No. C09-0681, Proceeding No. 09M-392E. In 2013, Public Service modified the scope to include the 69 kV portion of the project. 30 Hello