Loading...
HomeMy WebLinkAbout20161975.tiffPLANNED UNIT DEVELOPMENT (PUD) CHANGE OF ZONE APPLICATION FOR PLANNING DEPARTMENT USE DATE RECEIVED: RECEIPT # /AMOUNT # 1$ CASE # ASSIGNED: APPLICATION RECEIVED BY PLANNER ASSIGNED: 0 7_ 0 4. 4 _ 0 2_ 0 0 5 Parcel Number 0 8 (12 digit number - found on Tax I.D. information, obtainable at the Weld County Assessor's Office. or www.co.weld.co.us) (Include all lots being included in the application area. If additional space is required, attach an additional sheet.) Legal Description Lot 5, Gander Valley P.U.D. , Section 4 , Township 6 North, Range 67 West Property Address (If Applicable) Vacant Parcel Existing Zone District: PUD-A Proposed Zone District: PUD-ETotal Acreage: 40.48 Average Lot Size: 3.18 Ac NelMinimum Lot Size: 2.59 Ac Proposed #/Lots 10 Proposed Subdivision Name: Gander Valley Farrr Proposed Area (Acres) Open Space: 6.10 Are you applying for Conceptual or Specific Guide? Conceptual Specific FEE OWNER(S) OF THE PROPERTY (If additional space is required, attach an additional sheet.) Name: Gander Valley Farms, LTD Work Phone # (720) 341-0505 Home Phone # n/a Email Address jim@haiarchs.com Address: 8897 Gander Valley Lane City/State/Zip Code Windsor, CO 80550-2621 APPLICANT OR AUTHORIZED AGENT (See Below: Authorization must accompany applications signed by Authorized Agent) Name: Jeffrey W. Couch Work Phone # (970) 231-9937 Home Phone # (970) 207-1970 Email Address Address: 3468 Shallow Pond Drive jeffcouch7@comcast.net City/State/Zip Code Fort Collins, CO 80528-7002 UTILITIES: Water: North Weld County Water District (NWCWD) Sewer Individual Sewer Disposal Systems (I.S.D.S.) Gas: Xcel Energy Electric: Poudre Valley REA Phone: Century Link DISTRICTS: School: Windsor School District RE -4J Fire: Windsor Severance Fire Rescue Post: Windsor, CO 80550 I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included indicating the signatory has the legal authority to sign for the corporation. I (we), the undersigned, hereby request hearings before the Weld County Planning Commission and the Board of County Commissioners concerning the proposed Change of Zone above descr bed ,unincorporated area of Weld County, Colorado: Fr' ✓1 e71 .ice 2/i 2< 6 �J °/ 1 Lf ///// Sign re: Owner or Authorized Agent Date X12 -/E Signaturner or Authorized Agent Date $ March 29, 2016 Jeffrey W. Couch 3468 Shallow Pond Drive Fort Collins, CO 80528 (970) 231-9937 Ms. Diana Aungst, Planner II, CFM, AICP Weld County Department of Planning Services 1555 North 17th Avenue Greeley, CO 80631 RE: Gander Valley Farm P.U.D. - Change of Zone Application PUDK15-0003 (Lot 5 Gander Valley P.U.D. SE4, Sec. 4, T6N, R67W of 6th P.M.) Dear Ms. Aungst: This correspondence is being provided to address the issues identified in your letter of January 21, 2016 relating to your review of the Gander Valley Farm P.U.D. sketch plan submittal materials. This letter is intended to address those issues identified as part of the P.U.D. Sketch Plan review and is also intended to be part of the required information for the upcoming P.U.D. Change of Zone review. I would like to address the comments from those agencies that responded to your PUD Sketch Plan Referral Process as follows: 1. School District RE -4 (12-10-15) Weld RE -4 School District has determined that land dedication is not a feasible alternative for this project. They requested that a cash -in -lieu of payment of $2,240.00 per each lot be paid to the District as a part of this project. I have had several conversations with Stephanie Watson, Assistant Superintendent of Business relating to when this amount will be due. Apparently Weld County is not able to collect this fee as part of the building permit process. As such, it will need to be collected at some point during the final platting process. Stephanie is working to determine when that payment should be forwarded to the District. 2. Colorado Geological Survey (1-6-16) The Colorado Geological Survey "has no objection to approval of the proposed sketch plan". 3. Weld County Sheriffs Office (12-21-15) The Weld County Sheriff's Office indicated that they "find no conflicts with our interests". Gander Valley Farm P.U.D. March 29, 2016 Page 2 of 4 4. West Greeley Conservation District (1-11-16) The West Greeley Conservation District indicated that they "find no conflicts with our interests". 5. Weld County Zoning Compliance (12-14-15) A submittal referral for the Weld County Zoning Compliance Office was not included with the agency comments summarized in your letter of January 21, 2016. 6. Colorado Division of Water Resources (1-5-16) The Colorado Division of Water Resources commented "that the proposed water supply is expected to be adequate" and requested a service commitment and information on the decreed water sources for irrigation purposes. We were not required to provide this information as part of the PUD Sketch Plan review; however, we have included a Potable Water Service Agreement from North Weld County Water District (NWCWD) approved by the Weld County Attorney's Office for your review. We have also included the owner's irrigation certificates that summarize his ownership interests in the water rights, required water storage and delivery rights for this property. 7. Colorado Department of Transportation (12-10-15) The Colorado Department of Transportation "has no comment" relating to this project. 8. Weld County Department of Planning Services — Engineer (1-7-16) We are in compliance with the items summarized by Jen Petrik, P.E. in her review of 1-7-16. All interior roads will be paved, all easements have been labeled and requested right-of-way dedications are shown in the Change of Zone documentation and will be included with the Final plat. This project has already secured an approved access permit. We have provided a "Trip Generation and Assignment Report" to identify project traffic impacts instead of a full traffic report as required by Ms. Petrik. This change was approved by Mr. Wayne Howard, P.E. as part of his review and an e-mail summarizing the requirements for a Traffic Narrative is included with the PUD Change of Zone submittal material. 9. Weld County Department of Public Health and Environment (1-5-16) We have included the documentation confirming that a potable water service agreement has been prepared by the North Weld County Water District and this information has been approved by the Weld County Attorney's Office. Additional information has been provided to address the Environmental Impacts as required by Weld County Code Section 27-6-40. Gander Valley Farm P.U.D. March 29, 2016 Page 3 of 4 Information regarding those agencies who did not respond to the PUD Sketch Plan referrals is provided as follows: 1. Larimer County This project is located approximately three miles from Larimer County. A referral from Larimer County is attached.. 2. Town of Windsor Windsor responded to Weld County regarding this project as required by the newly approved Intergovernmental Agreement between Windsor, Severance and Weld County. Windsor indicated that they had no interest in annexing this property, they had no infrastructure in the immediate area of this property, and they had no interest in commenting on issues relating to this proposed project. A copy of their written response is included with the PUD Change of Zone submittal information. 3. Town of Severance This project is located outside of the Severance urban growth area. A copy of their written response is attached. 4. Colorado Parks and Wildlife Colorado Parks and Wildlife recently returned its comments to Weld County. S. North Weld County Water District The North Weld County Water District has provided a Potable Water Service Agreement which has been approved by the Weld County Attorney's Office. This information has been included with the PUD Change of Zone submittal information. 6. Weld County Ambulance Service Weld County Ambulance Service has been absorbed by Windsor Severance Fire Rescue. Any comments relating to ambulance service will be developed by the Windsor Severance Fire Recue. 7. Windsor Severance Fire Rescue I met with Ms. Sandra Friedrichsen, Fire Marshal, for the Windsor Severance Fire Rescue. She has forwarded her pressure and flow requirements directly to NWCWD so that the fire needs could be included in the technical review completed as part of NWCWD's process to provide a Potable Water Service Agreement. These comments will be forwarded to Weld County directly from the Fire District. Additional agency responses are attached to this letter. Gander Valley Farm P.U.D. March 29, 2016 Page 4 of 4 Additional major elements which are included with the P.U.D. Change of Zone submittal application for the Gander Valley Farm P.U.D. includes: 1. Modification of the open space tract to meet the 15 per cent requirements. 2. Inclusion of a Potable Water Service Agreement from NWCWD with Weld County Attorney Office approval. 3. Additional Environmental Impact information as required by Weld County Code 27-6-40 4. Approved Access Permit and Trip Generation and Assignment Report. 5. Right-of-way dedication and easement identification as provided on the Change of Zone Plat. We trust that this information will satisfy your Sketch Plan comments and concerns as summarized in your review letter dated January 21, 2016. We look forward to working with you on the next phase of approval relating to the Gander Valley Farm P.U.D. Sincerely, Jeffrey W. Couch Attachments Cc: Mr. Jim Hillhouse Mr. Scott Preisendorf Additional Agency Responses Gander Valley Farm PoU.D. Change of Zone Application April 2016 1. Larimer County - Weld County Referral (Matt Lafferty) (3-30-16). 2. Town of Windsor - E-mail Response (Paul Hornbeck) (12-1-15). 3. Town of Severance - Letter ( Nicholas Wharton) (11-16-15). 4. Colorado Department of Game and Wildlife - Weld County Referral (Brandon Muller) (1-12-16). 5. Windsor Severance Fire Rescue - E-mail Response (Sandra Friedrichsen) (3-30-16). 6. Windsor Severance Fire Rescue - E-mail Response (Sandra Friedrichsen (3-30-16). 7. Windsor Post Office - E-mail Response (Suzan Strood, Postmaster) (3-31-16). B. Poudre Valley Rural Electric Association, Inc. - Letter (Chris Spirek) (04-1-16). Submit by Email Weld County Referral December 09, 2015 The Weld County Department of Planning Services has received the following item for review: Applicant: Gander Valley Farms, LTD Case Number: PUDK15-0003 Please Reply By: January 6, 2016 Planner: Diana Aungst Project: Sketch Plan Application for a Planned Unit Development (PUD) for ten (10) residential lots. This is a replat of Lot 5 of Gander Valley PUD. Location: North of and adjacent to CR 72 and west of and adjacent to CR 19 Parcel Number: 080704402005-R7442298 Legal: LOT 5 GANDER VALLEY PUD; PART OF SECTION 4, T6N, R67W OF THE 6TH P.M., WELD COUNTY, COLORADO. The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. We have reviewed the request and find that it does / does not comply with our Comprehensive Plan because: We have reviewed the request and find no conflicts with our interests. See attached letter. Signature Matt Lafferty 3/30/2016 Date Agency Larimer County Planning Department Weld County Planning Dept. 1555 N 17th Ave, Greeley, CO. 80631 (970) 353-6100 ext.3540 (970) 304-6498 fax Diana Aungst From: Sent: To: Cc: Subject: Diana, Paul Hornbeck <phornbeck@windsorgov.com> Tuesday, December 01, 2015 4:02 PM Diana Aungst PLANNING Gander Valley Farm The Gander Valley Farm proposal is located within the Town of Windsor Growth Management Area but it is not eligible for annexation at this time. Therefore, the Town of Windsor has no comment on the proposal at this time. Thank you, Paul Hornbeck Associate Planner Town of Windsor I Planning Dir: 970-674-2410 I www.windsorgov.com Follow Us www.windsorgov.com/socialmedia i Nicholas J. Wharton 3 S. Timber Ridge Parkway Severance, CO 80550 November 16, 2015 Jeff Couch 3468 Shallow Pond Drive Fort Collins, CO 80528 To Whom It May Concern, This letter is in regards to the Gander Valley Farm P.U.D. located in the Southeast Quarter of Section 4, Township 6 North, Range 67 West of the 6"` P.M., Weld County, Colorado. Per the 2015 Coordinated Planning Agreement between the Town of Severance, Colorado and Weld County, Colorado, Weld County shall refer all property development within three miles of the Town of Severance that is within unincorporated county areas for review and comment. Please let it be known that the proposed Gander Valley Farm F.U.D. is located outside of the Town of Severance's current Growth Management Area (GMA). In turn, The Town has no concerns with the proposed project, and asks that Weld County please allow the development to continue as scheduled through the county's planning process. If there are any additional questions, comments, and or concerns please do not hesitate to contact the Town of Severance. Sincerely, Nicholas J. Wharton, MPA Assistant Town Administrator 3 South Timber Ridge Parkway o P.O. Box 339 o Severance, Colorado 80546 e ph 970.686.1218 • fax 970.686.6250 XFINITY Connect jeffcouch7@comcast.net Font Size - PUDK15-003 From : Sandi Friedrichsen <sfriedrichsen@wsfr.us> Subject : PUDK15-003 To : Diana Aungst <daungst@co.weld.co.us> Cc : jeffcouch7@comcast.net Wed, Mar 30, 2016 11:01 AM This area is within our fire protection district and our ambulance district. It was stated that Weld County Ambulance is a reviewer and they don't exist anymore. They are Banner Health but this subdivision is within our ambulance district therefore we are the referring agency for this entity. Below are the comments from us on this project: 1. Fire hydrants are required to be no greater than 600 feet apart, with no structure greater than 300 feet from a hydrant. 2. Fire flows are required to be 1000gpm at 20 psi for any single family dwelling that is 3600 square feet or less. I was told by the developer that it is unknown what size homes will go into these lots at this time, so this is a general rule and can be changed depending on what size and types of buildings are built on these lots. 3. The cul-de-sac is required to be 100ft diameter with a 25 ft radius. Please let me know if you have any questions. Thank you. Sandra Friedrichsen Fire Marshal Windsor Severance Fire Rescue 100 7th Street - Windsor, CO 80550 Main - (970) 686-2626 Email — firemarshal@wsfr.us www.wsfr.us XFINITY Connect jeffcouch7@comcast.net ± Font Size Gander Valley Farms From : Suzan A Streed - Windsor, CO <suzan.a.streed@usps.gov> Subject : Gander Valley Farms To : jeffcouch7@comcast.net Jeff, Thu, Mar 31, 2016 03:28 PM We have reviewed the sketch plan for the Gander Valley Farm P. U. D and find no issues with the purposed location for the mail delivery unit at this time. Please let me know if you have any questions of concerns. Thank you. se,e 4 Se Postmaster Windsor Powering Your Future Poudre\ Valley April 1, 2016 Jeff Couch 3468 Shallow Pond Dr. Ft. Collins, CO 80528 RE: PROPERTY LOCATED IN SECTION 4, TOWNSHIP 6 NORTH, RANGE 67 WEST OF THE 6TH PM, COUNTY OF WELD, STATE OF COLORADO Gander valley Farm P.0 D.: Poudre Valley Rural Electric Association, Inc. is ready, willing and able to serve all electrical loads within our certificated service territory subject to the Rules and Regulations of Poudre Valley Rural Electric Association. The person(s) signing any contract(s) and or easement(s) grants to the Association the right to ingress and egress for meter readers, tree trimmers, engineers, line personnel, or any agents of the Association for the purpose of reading meters, engineering services, line repair, maintenance, tree trimming and or right-of-way clearing as deemed necessary by the Association. If you have any further questions, please call our office. Cliff Spirek Engineering Representative jm Document2 Poudre Valley Rural Electric Association • 7649 REA Parkway • Fort Collins • Colorado • 80528 • 800-432-1012 P.O. Box .272550, Ft. Collins, CO 80527-2550 • www.pvrea.com • pvrea@pvrea.com Your Touchstone Energy°' Cooperative OA �1 C"a11 'sr4 dvd .l311VA 83aNv p.n..: a is.ua -ason +eYJ.rv..r+e....4 WNfw.\ 'Ca.va+E#q 'CIPt. 'CI.Nwnla0'xo sawn +.v Hue e4 ed•SoncarNy�AiMMAO. AO n >I maitre lunCa ., uN1aC CM Arr.?. n OMR>C3m :0" 14; t.1.- C .. Q:4h.•,J .oaa.. wilt - o •••-a. 71.11L sus-an-cxw w a / also -wallow we awe "ON1 '0NIAMAdf1S ovnam •awovn Jwr os flfl NAM WV ONV-1-11111/4831.N1 Y?+ b i 1 ( 'all 'SV BVd AB 11VA EGONVO DOM w rl 0'Ma sag 4s amfAllsev sr....ft 'ea. -XV P.AA OO%,coo 0030.110'9M nAJMJ 'We Kill >3 .03vA a netts l .Yl1 OJ+VPV: No N a flfl V91WrOln IJC9 A4 II LN11q<N ran,. V10nW 1301 I k w3w.b1fwlan vzs-sn-(&N xv/ / I ico-Ms-f0W trig ccau ono= twoal now oNMsv FIDOI wcf 'ON1 `ONIABASf1S ONV1 J 9iNI V Transportation Documents Gander Valley Farm P.U.D. Change of Zone Application April 2016 1. Weld County Access Permit (Public Works). 2. Traffic Narrative Criteria (Wayne Howard, P.E.). 3. Trip Generation and Assignment Report (LSC Transportation Consultants, Inc.). WELD COUNTY ACCESS PERMIT Weld County Public Works Dept. 1111 H Street P.O. Box 758 Greeley, CO 80632 Phone: (970) 304-6496 After Hours: (970) 356-4000 Emergency Services: (970) 304-6500 x 2700 Inspection: (970) 304-6480 Permit Number: AP15-00590 Issuance of this permit binds applicant and its contractors to all requirements, provisions, and ordinances of Weld County, Colorado. Project Name: PUDI<15-0003 Applicant Information: Name: Jeffrey Couch Company: Lagoon Logistics, LLC Phone: 970-231-9937 Email: jeffcouch7@comcast.net Location: Access is on WCR: Nearest Intersection WCR: Distance From Intersection: Number of Existing Accesses: 72 72 1145 3 Planning Process: PUD PUDK15-0003 Road Surface Type & Construction Information: Road Surface: Asphalt Culvert Size & Type: 15" CMP/RCP min. Start Date: 05/01/2016 Finish Date: 08/01/2016 Materials to Construct Access: asphalt Required Attached Documents Submitted: Traffic Control Plan: No & WCR: 19 Expiration date: 06/28/2016 Property Owner Information: Name: Company: Gander Valley Farms, LTD Phone: 720-341-0505 Email: jim@haiarchs.com Proposed Use: Temporary: Single Residential: Industrial: Small Commercial: Oil & Gas: Large Commercial: Subdivision: Field (Agricultural Only)/Exempt: vi Certificate of Insurance: No Access Pictures: Yes A copy of this permit must be on site at all times during construction hours Daily work hours are Monday through Friday DAYLIGHT to 1/2 HOUR BEFORE DARK (applies to weekends if approved) Approved MUTCD traffic control/warning devices are required before work begins and must remain until completion of work Special Requirements or Comments Parcel 080704402005. Utilize NEW access point on CR 72 (1 -Subdivision) located approx. 1145 ft. West of CR 19. Existing access point on CR 72 located approx. 250 ft. West of CR 19 is Ditch access ONLY. Existing access points located approx. 865 ft. & 1500 ft. SHALL be Closed and Reclaimed prior 6/30/16. Approved by: Weld County Public Works Date: 12/28/2015 Print Date -Time: 12/28/2015 11:34:04AM Access Permit PW008 Page 1 of 1 XFINITY Conned jeffcouch7@comcast.net ± Font Size RE: Gander Valley Farm PUD - Traffic From : Wayne Howard <whoward@co.weld.co.us> Subject : RE: Gander Valley Farm PUD - Traffic To : jeffcouch7@comcast.net TRAFFIC REQUIREMENTS: Thu, Feb 18, 2016 03:30 PM attachment Lower traffic trips (well under 100 round trips per day) 1. Describe how many roundtrips/day are expected for each vehicle type: Passenger Cars/Pickups, Tandem Trucks, Semi-Truck/Trailer/RV (Roundtrip = 1 trip in and 1 trip out of site) 2. Describe the expected travel routes for site traffic. 3. Describe the travel distribution along the routes (e.g. 50% of traffic will come from the north, 20% from the south, 30% from the east, etc.) 4. Describe the time of day that you expect the highest traffic volumes from above. This is the simple traffic narrative description. Let me know if you need anything else! Wayne Howard, P.E. Development Engineer Department of Planning Services P.O. Box 758, 1555 N. 17th Ave. Greeley, CO 80632 970-353-6100, Ext. 3551 Website: http://www.co.weld.co.us Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: jeffcouch7@comcast.net{mailto:jeffcouch7@comcast.net] Sent: Thursday, February 18, 2016 12:57 AM To: Wayne Howard <whoward@co.weld.co.us> Cc: Chris McGranahan <csmcgranahan@lsctrans.com> Subject: Gander Valley Farm PUD - Traffic Wayne: Thanks for your help Wednesday with clarifying the different traffic report classifications. Please send the narrative report requirements to this e-mail address. Jeff Couch image001.jpg 3 KB LSC TRANSPORTATION CONSULTANTS, INC. 1889 York Street Denver, CO 80206 (303) 333-1105 FAX (303) 333-1107 E-mail: lsc@lscdenver.com TRANSPORTATION CONSULTANTS, INC. March 10, 2016 Mr. Jim Hillhouse Gander Valley Farms, LTD 8897 Gander Valley Lane Windsor, CO 80550-2621 Re: Gander Valley Farm PUD Weld County, CO (LSC #160280) Dear Mr. Hillhouse: In response to your request, LSC Transportation Consultants, Inc. has prepared this Trip Generation and Assignment Report for the proposed Gander Valley Farm PUD residential deve- lopment in Weld County, Colorado. As shown on Figure 1, the site is located north of Weld County Road (WCR) 72 and west of WCR 19 in Weld County, Colorado. IMPACT AREA Figure 1 shows the vicinity map. Area Roadways The major roadways in the site's vicinity are shown on Figure 1 and are described below. • WCR 72 is an east -west, two-lane collector roadway south of the site. The intersection with WCR 19 is stop -sign controlled. The posted speed limit in the vicinity of the site is 55 mph. • WCR 19 is a north -south, two-lane collector roadway east of the site. The intersection with WCR 72 is stop -sign controlled on WCR 72. The posted speed limit in the vicinity of the site is 45 mph. PROPOSED LAND USE AND ACCESS The development is proposed to include ten single-family dwelling units. Full movement access is proposed to WCR 72. Emergency access is provided along the east lot line of Lot 5. There is sufficient sight distance along WCR 72 near the proposed site access location. The conceptual site plan is shown in Figure 2. Mr. Jim Hillhouse TRIP GENERATION Page 2 March 10, 2016 Gander Valley Farm PUD Table 1 shows the estimated typical weekday, morning peak -hour, and afternoon peak -hour trip generation potential for the site based on the trip generation rates from the 9th edition of the ITE Trip Generation Manual, 2012. The proposed land use is projected to generate about 95 vehicle -trips on the average weekday, with about half entering and half exiting the site during a 24 -hour period. During the morning peak -hour, which generally occurs for one hour sometime between 6:30 and 8:30 a.m., about two vehicles would enter and about six vehicles would exit the site. During the afternoon peak - hour, which generally occurs for one hour sometime between 4:00 and 6:30 p.m., about six vehicles would enter and about four vehicles would exit the site. TRIP DISTRIBUTION Figure 3 shows the estimated distribution of site -generated traffic. TRIP ASSIGNMENT Figure 4 shows the assignment of site -generated traffic. We trust this information will assist you in planning for the proposed Gander Valley Farm PUD development. Respectfully submitted, LSC Transportation !'nsultants, Inc By: Christo,S. McGranahan, P.E., Princip CSM/wc Enclosure: Table 1 Figures 1 - 4 3-io-16 Z: \LSC\Projects \2016 \ 160280-GanderValleyFarmPUD \ Report \ GanderValleyFann-031016.wpd Table 1 Gander Valley Farm PUD Weld County, CO (LSC #160280; March, 2016) Trip Generating Category Single -Family Homes (2) Trip Generation Rates (1) Vehicle - Trips Generated Average AM Peak Hour PM Peak Hour Average AM Peak Hour PM Peak - Hour Quantity Weekday In Out In Out Weekday In Out In Out 10 DU (3) 9.52 0.188 0.563 0.630 0.370 95 2 6 6 4 Notes: (1) Source: Trip Generation, Institute of Transportation Engineers, 9th Edition, 2012 (2) ITE Land Use No. 210 - Single Family Detached Housing (3) DU = Dwelling Units Easement Summary 1. Front lot line easements are fifteen (IS) feet wide and are designated as utility, drainage and irrigation easements. 2. Side lot line easements are ten (10) feet wide and are designated as utility, drainage and irrigation easements; except for the emergency access easement along the east side of lot S, which is twenty (20) feet wide. 3. The side tot line easements along the south side of lots 1 and 10 have been Increase to fifteen (15) feet adjacent to the north side of Weld County Road 72. 4. Rear lot line easements are fifteen feet wide and are designated as equestrian, access, Irrigation, drainage and utility easements. v:ten *rant ns n•M NSA WUR tD'7an 7�P Shiloh Estates P.U.D. 3.30 Acre r I r r i� r i • • o.m\ Vma.w "."7 i -ore-a lxets Err/:,l 3.31 Acre MONISRiau% Lot 1 3.25 Acre C•y+arrts * Full Movement Site Access 1RANSPORTA •N CONSULTANTS, INC. • Approximate Scale (Scblf NTS , _Go_rtdet VaYeYLam `_ Gander Vley P.U.D. -_ I Lot 6 3.38 Acre T i 3.52 Acre Tact C 0.07Aae I L_ I ' r t ric"' I t t Strain I t t yeq t 11 1 ' This Parcel Not Included Lot 10 \ • With The Proposed P.U.D. 2.96 Acre A3IaJ OtNA*M Weld County Road 72 Etna Cr Rim SE Corner SE Quarter, Sedan 4, Township 6 Nat. Rarge 67 West a) r tt C ' 0 a) Figure 2 Site Plan Gander Valley Farms PUD (LSC #160280) Figure 3 Directional Distribution of Site -Generated Traffic Gander Valley Farms PUD (LSC #160280) 2,500 = Average Daily Traffic Figure 4 Assignment of Site -Generated Traffic Gander Valley Farms PUD (LSC #160280) Weld County Treasurer Statement of Taxes Due Account Number R7442298 Parcel 080704402005 Legal Description GVP L5 GANDER VALLEY PUD Situs Address WELD 000000000 Account: R7442298 GANDER VALLEY FARMS LTD 8897 GANDER VALLEY LN WINDSOR, CO 80550-2621 <].. J,:. V<:> 1 1 G L 1 D l): 1 2 2.: 5 2 4: 2 1 2 1 s l 2 l r C 1 1 C. 0 O• C 1 C 0: 1: 0 C 1 J 1 C 1 2 1 C C 0 1: 0 C 2 1 O O C J 1 2 1 C O J O C C: C O f 2 C 1 0 O: 1 2 1 1 2 C C 1 2 t 0• L 1 1 1 2 0 C C J 2 1 C 1 C L. Year Tax Interest Fees Payments Balance Tax Charge 2014 $610.60 $0.00 $0.00 ($610.60) $0.00 Total Tax Charge Grand Total Due as of 10/08/2015 Tax Billed at 2014 Rates for Tax Area 0430 - 0430 Authority WELD COUNTY SCHOOL DIST RE4 NORTHERN COLORADO WATER (NC WINDSOR -SEVERANCE FIRE WINDSOR -SEVERANCE FIRE (BON AIMS JUNIOR COLLEGE CLEARVIEW LIBRARY WEST GREELEY CONSERVATION Taxes Billed 2014 * Credit Levy Mill Levy 15.8000000* 47.2970000 1.0000000 7.1940000 0.6610000 6.3330000 3.5920000 0.4140000 Amount $117.25 $350.94 $7.42 $53.38 $4.90 $46.99 $26.65 $3.07 82.2910000 $610.60 Values AG -FLOOD IRRRIGATED LAND $0.00 50.00 Actual Assessed $25,285 $7,330 AG -DRY FARM LAND $290 AG -WASTE LAND $18 Total $30 '610 $25,593 $7,420 WELD COUNTY TREASURER Pursuant to the Weld County Subdivision Ordinance, the attached Statement(s) of Taxes Due, issued by the Weld County Treasurer, are evidence that, as of this date, all property taxes, special assessments and prior tax liens currently due and payable connected with the parcel(s) identified therein have been paid in full. Sign Date /O8 /Se Gander Valley Farm P.U.D. Specific Development Guide April 2016 INTRODUCTION Gander Valley Farm P.U.D. is a 40.48 acre parcel identified as Tract Five of the Gander Valley P.U.D. originally approved in 1997. Tract Five was left as a larger parcel with the intent of subdividing and creating additional residential parcels at a later date. The tract is currently vacant and has been used for irrigated crop production since the parcel was created. The proposed Gander Valley Farm P.U.D. is intended to convert Tract Five from its historic agricultural use to a residential use comprising ten residential lots. This conversion will utilize existing land forms and irrigation systems to minimize any impacts associated with the transfer from an agricultural use to a residential use. Additional support infrastructure including paved roadways, water mains, gas mains, and electric lines are adjacent to the proposed development. The information provided as part of this Specific Development Guide was prepared to be in compliance with Weld County Code Section 27-6-30 as part of the Change of Zone submittal. COMPONENT ONE — environmental impacts. 1. Noise and Vibration The Gander Valley Farm P.U.D. will convert an existing agricultural parcel to ten residential tracts. Industrial or commercial activity will not be allowed as part of this development. Activity normally associated with agricultural or business activity including traffic impacts, employment groups, large equipment operation, and business and industrial storage will not be permitted as part of the development. The ten residential lots will create ten single family structures with garages, driveways, and outbuildings that are consistent with the character and scope of adjacent residential structures and residential uses. It is not anticipated that excessive noise and vibration will be created as a part of the proposed residential uses. 2. Smoke, dust and odor The conversion of Tract Five from agricultural to residential use will eliminate the impacts associated with farming operations including plowing, seeding, cultivating, fertilizing, and harvesting. Residential uses will provide paved roadways and yard surfaces providing a landscape to eliminate drainage impacts, soil erosion and blowing dust. Solid waste will be stored in approved containers and removed on a regular basis. It is not anticipated that excessive smoke, dust or odor will be created as a part of the proposed residential uses. Gander Valley Farm P.U.D — Specific Development Guide April 4, 2016 Page 2 Of 8 3. Heat, light, glare. Gander Valley Farm P.U.D. is proposed to create ten lots for the construction of residential structures. The residential structures will include internal heating systems for the residential structures. Lighting will also be internal with the exception of yard lights as approved by the subdivision covenants. The Architectural Review committee created by the covenants will approve siding, roofing, and construction materials being used for the residential construction which will prohibit excessive glare or excessive reflection within the subdivision. 4. Visual / aesthetic impacts. The design and construction of the residential structures will be consistent with the character and scope of the surrounding developments. 5. Electrical interference. Proposed infrastructure needed to provide electricity to the proposed residential structures will be placed underground. Transformers, junction boxes and meters will be sized for residential uses only. Existing perimeter overhead power lines will not be modified as a result of this project. 6. Water pollution. Any runoff created as part of the subdivision construction of subdivision development will be directed to the detention and water quality feature being proposed at the south boundary of the project. 7. Wastewater disposal. Wastewater generated by the proposed ten residential lots within the Gander Valley Farm P.U.D. will be treated by Individual Septic Disposal Systems (ISDS). Site geotechnical investigations completed by Earth Engineering Consultants, Inc. in September of 2015 indicate that the use of ISDS improvements for wastewater disposal would be acceptable at the proposed site. These systems will be constructed to be in conformance with Weld County regulations relating to the design and construction of septic systems and leach fields. They will be designed based on geotechnical investigations and engineering designs created individually for each lot. 8. Wetland removal. The proposed development site is vacant and has been used for agricultural purposes since it was created as Tract 5 of the Gander Valley P.U.D. in 1997. The parcel has been under yearly cultivation and there are no wetlands existing on the site. The removal of wetlands will not be necessary. Gander Valley Farm P.U.D — Specific Development Guide April 4, 2016 Page 3 Of 8 9. Erosion and sedimentation. Erosion during the construction phase of the project will involve the use of silt fence to keep sediment within the disturbed area. Water will be used to treat exposed surface areas to minimize blowing dust. The construction of a storm water detention and water quality pond will be built at the start of the construction process to assure that any erosion created as part of the construction process will be maintained on site. Vegetation of all exposed and disturbed areas will be completed immediately after the completion of site improvements. 10. Excavating, filling and grading. Earthwork proposed for the Gander Valley Farm P.U.D. will be limited to roadway construction within the proposed right-of-way, modification to the existing regional drainage swale, and creation of a storm water detention and water quality feature proposed at the south edge of the project. Topsoil stripped from the site will be reused to stabilize and reestablish disturbed areas. The proposed roadway will follow the site contours and minimum grading will be required. A dirt balance will be achieved on -site and the hauling of material either from the site or to the site will not be required. All other areas representing over 80 per cent of the site will be maintained in their existing condition and existing vegetative cover will be maintained. 11. Drilling, ditching and dredging. The need for drilling, ditching and dredging is not required for the uses and improvements being proposed for the Gander Valley P.U.D. project. 12. Air pollution. Commercial activity, industrial activity, and trash burning will not be allowed within this project. Vegetative cover on disturbed areas will eliminate blowing dust. 13. Solid waste. Gander Valley Farm P.U.D. will require individual home owners to provide acceptable solid waste containers and to contract with waste disposal contractors to remove all waste on a regular basis. The type of container and maintenance of the containers will be governed by the covenants created specifically for the development. One trash hauler will be selected to provide waste removal services to minimize the trips and road impacts on the transportation system. Gander Valley Farm P.U.D — Specific Development Guide April 4, 2016 Page 4 Of 8 14. Wildlife removal. Gander Valley Farm P.U.D. is adjacent to existing residential development on its north, west and east boundaries. Agricultural property is located along the south boundary. The lack of ground cover and wooded acreage limit the habitat for major wildlife activity. It is not anticipated that wildlife populations are located within the development site or that removal of wildlife will be necessary. 15. Natural vegetation removal. Gander Valley Farm P.U.D. is a vacant agricultural parcel that is cultivated on a yearly basis. The removal of natural vegetation will not be required. 16. Radiation / radioactive material. Based on the geotechnical report and subsurface investigation completed by Earth Engineering Consultants, Inc. in September of 2015 the presence of radiation or radioactive material was not evident within the proposed development site. Evaluation of the subsurface geology also indicated that the underlying strata were not conducive to the development of radiation. 17. Drinking Water Source. Gander Valley Farm P.U.D. is located within the boundary of the North Weld County Water District (NWCWD) service area. A Potable Water Service Agreement was prepared by NWCWD for this project as requested by the property owner. This agreement serves as a commitment to provide water to the proposed development and has been reviewed and approved by the County Attorney's Office. This agreement is included with the Change of Zone submittal material along with the written approval from the Weld County Attorney's Office. 18. Traffic impacts. Less than ninety-five trips per day are estimated to be created by the ten residential lots proposed as the Gander Valley Farm P.U.D. development. Based on the Trip Generation and Assignment Report completed by LSC Transportation Consultants, Inc. in March of 2016, anticipated impacts to the existing transportation system are minimal. Improvements to the existing paved Weld County Road 72 and Weld County Road 19 are not required. Improvements to the Weld County Road 72 and Weld County Road 19 intersection will not be required. Improvements including acceleration or deceleration lanes at the intersection of the proposed interior local roadway and Weld County Road 72 will not be required. Offsite improvements based on traffic impacts created by the Gander Valley P.U.D. will not be required and an offsite roadway improvement agreement between the developer and Weld County will not be necessary. The traffic analysis completed by LSC Transportation Consultants, Inc. is included with the Change of Zone submittal materials. Gander Valley Farm P.U.D — Specific Development Guide April 4, 2016 Page S Of 8 COMPONENT TWO — service provision impacts. 1. Schools The Weld RE -4 School District (Windsor) has requested an impact fee of $ 2,240.00 for each lot. The agency response from the School District is included with the Change of Zone submittal materials. Stephanie Watson is the contact person 2. Law enforcement Police services are required by the Weld County Sheriff's Office. Their agency response indicated that they have no concerns with the approval of this development. 3. Fire protection Fire protection is provided by the Windsor Severance Fire Rescue. A agency respons ws forwarded by Sandra Friedrichsen, Fire Marshal, and is included with the Change of Zone submittal materials. 4. Ambulance Ambulance service is also provided by Windsor Severance Fire Rescue. They have no comments regarding this project at this time. Sandra Friedrichsen is the contact person for this agency. 5. Transportation Transportation impacts are summarized in a Trip Generation and Assignment Report prepared by LSC Transportation Consultants, Inc. in March 2016. Interior subdivision traffic improvements are provided by a paved local roadway connected to Weld County Road 72. Weld County Road 72 is a paved collector roadway owned and maintained by Weld County. No offsite improvements or agreements are anticipated. Additional right-of-way was dedicated along the west side of Weld County Road 19 adjacent to Tract S when the project was originally approved as Gander Valley P.U.D. in 1997. Additional right-of-way along the north side of Weld County Road 72 is being dedicated with this project as requested. 6. Traffic impact analysis A trip Generation and Assignment Report was prepared for this project by LSA Transportation Consultants, Inc. which showed minimal traffic impacts. An access permit for the interior roadway intersection with Weld County Road 72 has also been approved by Weld County. Gander Valley Farm P.U.D — Specific Development Guide April 4, 2016 Page 6 Of 8 7. Storm drainage Storm water runoff will be contained by a detention facility located at the low spot at the south boundary of the property. A drainage report is included with the Change of Zone submittal materials. 8. Utility provisions A letter of service commitment for electrical service has been prepared by the Poudre Valley Rural Electric Association, Inc. for the Gander Valley Farm P.U.D. 9. Water provisions Gander Valley Farm P.U.D. is within the North Weld County Water District (NWCWD) service area. NWCWD has prepared a Potable Water Service Agreement for this project and this information has been reviewed and approved by the Weld County Attorney's Office. A looped water system will be constructed within the project via two water main connections. One connection will be made to a 30" water main located along the south side of Weld County Road 72. The other connection will be made to a 14" water main located along the west side of Weld County Road 19. These two taps will be connected by an 8" water main which will provide adequate pressure and volume for individual lot taps as well as fire hydrants. 10. Sewage disposal provisions Sewage disposal will be accomplished by individual sewage disposal systems (ISDS) provided for each lot. 11. Structural road improvement plan Improvements to adjacent Weld County Roadways are not anticipated as a part of this project. Gander Valley Farm P.U.D — Specific Development Guide April 4, 2016 Page 7 Of 8 COMPONENT THREE — landscaping elements. 1. Lot Landscape Individual lots will be landscaped with native grasses by lot owners to control soil erosion and blowing dust. The North Weld County Water District allows individual homeowners to irrigate 6,000 square feet of area adjacent to residential structures and homeowners will need to submit landscape plans to the Homeowner's Association prior to planting. 2. Median Landscape A small landscaped area is being proposed within the median located at the subdivision entryway. Xeriscape elements will be used to minimize the water and maintenance requirements needed to maintain this area. COMPONENT FOUR — site design. The topography existing on Tract Five slopes from north to south at a 1 per cent grade. The existing site has been irrigated historically by an irrigation system of open ditches. These improvements and land slopes and irrigation improvements will be maintained as part of the proposed development. The project is not located in a floodway, floodplain, geological hazard area or airport overlay district. COMPONENT FIVE — common open space usage. A 6.09 acre common open space area identified as Tract A has been provided as a common open space area for this project. This Tract will be dedicated to the Homeowner's Association for maintenance and operation. This tract will be used as an agricultural parcel to provide common area for individual gardens and additional landscaping. The site will be irrigated through the existing delivery system. Water right, storage and ditch right information is attached as part of the Change of Zone submittal materials. Gander Valley Farm P.U.D — Specific Development Guide April 4, 2016 Page 8 Of 8 COMPONENT SIX — signage. Signage for Gander Valley Farm P.U.D. will be limited to a subdivision identification sign to be located at the entrance to the development and traffic regulatory signs as required by Weld County. Signage within the subdivision located on individual tracts will not be permitted. COMPONENT SEVEN — RUA impact. Gander Valley Farm P.U.D. is not located within a Regional Urbanization Area (RUA) as defined by Chapter 26 of the Weld County Code. This includes the 1-25 RUA the Southeast Weld RUA and the Dry Creek RUA. COMPONENT EIGHT - intergovernmental agreement. Gander Valley Farm P.U.D. is located within the Windsor Urban Growth Area and within an area governed by the recently completed intergovernmental agreement between Weld County, Severance and Windsor. Severance declined to comment on the proposed project because it is outside of their Urban Growth Area. Gander Valley Farm P.U.D. is within the Windsor Urban Growth Boundary; however, Windsor also declined to take action regarding this project because it is not eligible for annexation, and they have no infrastructure or provide other support services in this area. Both Windsor and Severance provided written documentation summarizing their conclusions. These letters are included in the Change of Zone submittal materials. Irrigation Water Documents Gander Valley Farm P.U.D. Change of Zone Application April 2016 1. Water Shares (The Larimer & Weld Irrigation Company). 2. Storage Right (The Larimer and Weld Reservoir Co.). 3. Delivery Right (The Finley lateral Ditch Company). NOTE: All existing water conveyances (pipes, head gates and ditches) will not be disturbed or changed in any manner as part of Gander Valley Farm P.U.D. development activity. All existing irrigation easements and system functionality will also remain intact and unaffected by the approval, construction and uses being proposed as a part of the Gander Valley Farm P.U.D. proposal. SHARES $100,00 Each -Z' share s at ONE HUNDRED Dollars each in the Capital Stock of THE AND WELD IRRIGATION COMPANY, organized under the Laws of the State of transferable LARIMER upon the books of the company, in person or by attorney, on surrender of this orado. Stock transferable Certificate. tt Secretary is the owner of F- 16165D -..r....r--.�_.--...r..T.�arw'._w.s�.i .-r -.. e -.w.--._ --.- �- INCORPORATED UNDER THE LAWS 'OF__ w!� 1/4 ..lr•`.'."- .a2..s..i. '.y ,rte .. C. .`. Y '..- -ter t .THE STATE OF COLORADO • :Finley -Lateral Ditch Company '1 Inns, II ! ds �.,'.0 A 0 /j/��� �*lL�� 'J�,I 7 �/[f lie ��%��/ j/� �i f Yi L• ��.JL� I - ! ! 'I �� 1Samir Wf�I ['l' •Vli���L. � l�____/04(it Medic ,�, �(- ��e/re'fS9rrl The Finley Lateral Ditch Company, FULL PAID AND NON -ASSESSABLE ' zn Oil1 /�/4'/ /14 e((/..}/ ..' c Me 'i/l - 'w/A w ,`I //),', J i ' " Zeisse r4. 77a? /1/.*y frovendI/` GxSi f€e/%%f?a' //1vje24(•: enSide€''/ N WITN ESS WHEREOF, ;daeGL' o kk•Qn t a aebeSk f-'r'lh7 ien sie� & &gflea/ 4;e4&4we4frd?a4S orf or . / > ' reran/ at Windsor, Colo., ,t cR ope.eicioe � z-.KV ``• . (e1 OOC 5 196 Incorporated August 22, 1890, Under the General Laws of Colorado _. _. FULL PAID STOCK Capital $37,200 THIS CERTIFI ES THAT . Gander Valle Farms Ltd, a Colorado Cor-)oration is the owner of ----TW0-__ transferable only on the books of the Shares of the Capital Stock of the Latimer and Weld Recertificateservoir � This mpanystock is full paid and can only be as - company in person, or by attorney, on surrender of this vided b law for the assessment of paid up stock in Reservoir and Ditch Companies. sassed as now pro y In witness thereof, this said certificate is signed yfthe ompany the resident and Secretary and the seal of the said company affixed at the office of in Eat, olorado on this 14 day of October A.D. 2011 �.�' r�44 • <7� ♦. '• r .z' '1 'r S. 0 � '" •"‘ p t R ti.., u�i. /�.-`4 ./N.'\r u- nt"Z11/V'.Z!\•.lt\..O. evi � .y 1 . ). • �;' K: t). 21 (o -OO6( .CaL 'IV- Change of Zone Drainage Report For Gander Valley Farm P.U.D. A Replat of Lot 5, Gander Valley P.U.D. Situate in the Southeast Corner of Section 4, Township 6 North, Range 67 West of the 6th P.M. County of Weld, State of Colorado Prepared For Mr. Jim Hillhouse, President Gander Valley Farms, LTD 8897 Gander Valley Lane Windsor, Colorado 80550 (720) 341-0505 Project Number 104-15 April 4, 2016 Prepared By: Forbes Engineering, LLC 2908 Cherly Street Fort Collins, Colorado 80524 (970) 295-4874 Forbes Engineering, LLC 2908 Cherly Street Fort Collins, Colorado 80524 April 4, 2016 Weld County Public Works Department 1111 H Street P.O. Box 758 Greeley, CO 80632 Re: Change of Zone Drainage Report for Gander Valley Farm P.U.D. To Whom It May Concern: We are pleased to submit this Change of Zone Drainage Report for the Gander Valley Farm P.U.D. located to the north of Windsor, Colorado at the northwest corner of Weld County Road 72 and Weld County Road 19. The subject parcel was created as part of the original Gander Valley P.U.D. in 1998. The design and layout of the proposed development was completed specifically to maintain the existing rural and farming influences prevalent in this area by minimizing the disturbance of the existing land form, maintaining the historical irrigation patterns and maintaining the existing drainage conveyances. This allows for the development of quality building lots with minimal disruption of existing surface area. Please review this information at your earlies convenience and contact me at (970) 295-4874 if you need additional information. Sincerely, Forbes Engineering, LLC Kevin Forbes, P.E. No. 3526 C t!� ,ii � y• •t, VI uV={ jN . F,• It) e�) s (''� A r a O � fl � Drainage Certification I hereby certify that his report for the preliminary drainage design of Gander Valley Farm P.U.D. was prepared by me in accordance with the provisions of the Weld County storm drainage criteria for the owners thereof. Forbes Engineering, LLC Kevin Forbes, P.E. Number 35265 Change of Zone Drainage Report for Gander Valley Farm P.U.D. I. General Location and Description A. Location 1. Gander Valley Farm P.U.D. is described as a Replat of Lot 5, Gander Valley P.U.D. situate in the Southeast Quarter of Section 4, Township 6 North, Range 67 West of the Sixth Principal Meridian, County of Weld, State of Colorado. 2. Weld County Road 72 is adjacent to the south boundary of the proposed P.U.D. and Weld County 19 is adjacent to the east boundary of the proposed P.U.D. The 40.46 acre parcel is currently vacant and there are no road improvements located on the property. 3. Gander Valley Farm P.U.D. is hydraulically isolated from runoff from adjacent properties to the west and south. Runoff from the east enters the property from a 15" culvert under Weld County Road 19. Runoff from the north is conveyed overland through the existing four lot Gander Valley PUD subdivision. There are no major off -site drainage facilities in the immediate facility of the proposed P.U.D. There are existing roadside ditches along the west side of Weld County road 19 and along the north side of Weld County Road 72 that are adjacent to the property. There is an existing 15" culvert under Weld County Road 19 that drains onto the property. An existing 15" culvert under Weld County 72 drains storm water runoff and irrigation tail water away from the property to the south. The property has historically been irrigated through a series of irrigation ditches located around the perimeter of the property. All existing irrigation structures and conveyances will not be disturbed as part of this project. All existing irrigation operations will maintain historical operations A small existing drainage channel located in the center of the property runs from northeast to southwest and conveys runoff to the 15" culvert under Weld County Road 72. 4. Lot 5 of the Gander Valley Farm P.U.D. is adjacent to Shiloh Estates P.U.D. to the west, I Gander Valley P.U.D to the north, undeveloped agricultural property to the east and undeveloped agricultural property to the south. All adjacent properties are under the jurisdiction of Weld County and are not included within a municipal boundary. Gander Valley Farm P.U.D. - Change of Zone Drainage Report April 4, 2016 Sheet 2 of 5 B. Description of Property 1. The property has an area of 40.46 acres. 2. The property is vacant and has been in continuous agricultural production since 1998. The predominant soil type is defined as a sandy clay (SC) as determined by a Soil Investigation completed by Earth Engineering Consultants, LLC for this project. Information provided by the West Greeley Conservation District indicates that the on - site soils are designated as Otero (sandy loam) and Kim (loam) which have no significant limitations relating to residential development. These soils are identified as part of the NRCS Hydrological Soil Group "B". Information provided by the West Greeley Conservation District is included as Exhibit A. The aerial photo clearly shows historical irrigation patterns. There are no structures located on the property. 3. The property is currently owned by Gander Valley Farms, LTD. There are no major channels located on the property; however, storm water runoff drains towards the center of the parcel and is collected by a small existing drainage swale. 4. The Gander Valley Farm P.U.D. is proposing the development of ten (10) residential lots averaging approximately 3.20 acres in area. A 6.09 acre open space parcel identified as Tract A is located at the center of the site and is intended to be planted, cultivated and irrigated for agricultural production and community gardens. 5. The existing perimeter irrigation facilities are owned and operated by the property owner. The improvements are specifically for the use of the Gander Valley Farm P.U.D. residents and open spaces; however, the ditch located along the eastern property boundary does convey irrigation water to users located south of this project. Documentation identifying the ownership of water rights, storage rights and conveyance rights for this project are attached as Exhibit E. 6. Based on the Subsurface Exploration Repot completed for this project by Earth Engineering Consultants, LLC, there was no indication of ground water to the depth of the boring completed on the site. Gander Valley Farm P.U.D. - Change of Zone Drainage Report April 4, 2016 Sheet 3 of 5 II. Drainage Basins and Sub -Basins A. Major Basin Descriptions 1. The Weld County Master Drainage Plan does not identify any major drainage improvements for this area. 2. There are no major drainage basins located within the project vicinity. 3. The Gander Valley Farms P.U.D is not located in any floodways or flood prone areas. FEMA Flood Insurance Map Panel Number 0802660465D indicates that the property is located entirely within Flood Hazard Zone C indicating an area of minimal flooding. A copy of the FEMA FIRM Map is included as Exhibit B. B. Sub -Basin Description Offsite North Basin - The north offsite basin is composed primarily of four large residential lots created as part of the original Gander Valley PUD. Runoff from this area is primarily composed of unorganized sheet flow which runs towards the north boundary of the proposed project. Offsite East Basin — The East offsite basin is composed primarily of vacant agricultural property which drains to an existing 15: culvert located under Weld County Road 19. The size of the culvert limits the amount of runoff which enters the proposed subdivision. Storm water from larger events is impounded behind the roadway embankment and eventually spills to the south. A small excavation was completed by adjacent property owners and is evidence of waster being contained in this area during larger rainfall events. Onsite Basin A — There is a small narrow subbasin located along the west edge of the property. Historically these flow have been collected by a swale located on the Shiloh PUD development and conveyed southerly to Weld County Road 72. Another swale will be constructed along the westerly boundary of the Gander Valley Farm PUD to insure that runoff will not impact property within the Shiloh subdivision. This runoff will be directed south to Weld County Road 72, then west in a swale along the north side of Weld County Road 72 to a 24" culvert which will convey flows to a detention pond. Onsite Basin B — Subbasin B is composed of the property to the west of the interior roadway (Hillhouse Lane) designated as lots 1-5. The roadway swale along the west side of Hillhouse Lane will convey runoff to a 24" culvert located under the entryway which will convey flows to the detention pond. Onsite Basin C — Subbasin C is composed of lots 6-10 and open space Tract A. Runoff from this area drains to the existing historical "central swale on the property and is conveyed directly to the detention pond. Gander Valley Farm P.U.D. - Change of Zone Drainage Report April 4, 2016 Sheet 4 of 5 Regional drainage information is included as Exhibit C. Onsite basin specifics are included in Exhibit E and Exhibit F. III. Drainage Design Criteria A. Regulations All drainage design will conform to storm drainage criteria established by Weld County and the Urban Drainage Flood Control District. B. Development Criteria Reference and Constraints There are no existing drainage studies, master plans, floodplain designations or other written information relating to the drainage in this area. C. Hydrological Criteria All hydrological criteria and the development of flow data was based on Urban Drainage Flood Control District information contained in Volume, One Chapter Six and the City of Greeley Intensity Curves. D. Hydraulic Criteria All hydraulic criteria will be in conformance with Weld County Storm Drainage Criteria and Federal Highway Administration Culvert Design Guidelines. IV. Drainage Facility Design A. General Concept Offsite flows from the north and east are combined with onsite flows and conveyed to a central detention pond and water quality feature located in the center of the project along the north side of Weld County Road 72. Increased flows from the proposed development are mitigated through the detention pond and released into a 15" culvert located under Weld County Road 72. All existing runoff patterns are maintained and all existing irrigation patterns are maintained. B. Specific Details 1. Swale along the west property line to convey runoff from Basin A to the detention pond. 2. Swale along the west side of the interior roadway (lots 1-5) to convey this runoff to the detention pond. 3. Improvements to the swale along the south boundary lone of lot 1 to facilitate the flow of water to the detention pond. Gander Valley Farm P.U.D. - Change of Zone Drainage Report April 4, 2016 Sheet 5 of 5 4. Installation of a 24" culvert from the west side of the entryway to the detention pond. This culvert will accommodate the flow from basin A and Basin B. 5. The minor relocation and sizing of the existing grass swale along the west side of lots 7-10. This swale will convey runoff from the north offsite basin, the east offsite basin and the runoff from lots 6-10 directly to the detention pond. 6. Construction of a detention pond / water quality feature to mitigate development peak flows. Detention Pond sizing is calculated using the FAA Method and a summary of these calculations is included in Exhibit J. 7. Improvements to the roadside swale along the south boundary of lot 10 to improve the conveyance of runoff to the detention pond. 8. Extension of the existing 15" outlet pipe under Weld County Road 72. A water quality outlet will be installed on the end of the pipe within the detention pond. 9. Removal of the existing access and driveway culvert along the north side of Weld County Road 72 to the west of the entryway. V. Conclusion A. Compliance with the Weld County Code All design elements and drainage improvements will meet the Weld County Storm Drainage Criteria. No variations or exceptions are being proposed as part of this project. B. Drainage Concept The development of the Gander Valley Farm P.U.D will not impact existing Weld County Master Drainage Plans. All historical flows will be maintained. Any increase flow created as part of the subdivision will be mitigated with on -site detention. VI. Appendices Additional information is provided as exhibits and attached at the end of this report. LIST OF EXHIBITS Gander Valley Farm P.U.D. Exhibit A USDS Soil Map and Soil Description Exhibit B FEMA FIRM Map — Panel Number 0802660465D Exhibit C Regional Drainage Exhibit Exhibit D Gander Valley Farm P.U.D. — Change of Zone Map Exhibit E Irrigation Ownership Certificates Exhibit F Change of Zone Drainage Exhibit Exhibit G Weld County Department of Public Works Change of Zone Drainage Report Outline Exhibit H FHWA Culvert Design Nomographs Exhibit 1 City of Greeley Figure 3-1 Intensity -Duration - Frequency Curves Exhibit J Detention Pond Summary Exhibit K Table of Design Parameters Exhibit A Location: PART OF SECTION 4, T6N, R67W 0 0,05 0.1 0.2 Mmes N A a) J C O U a a) 0 U) a) L a' C O 0 U N N C O a) E L a a) a) U) O a) U, O a> m co co a. O < Additional Comments Soil Texture a) E as z O U) O- 2 T > zz zz ▪ G) i C) Q)cn> a)> C) O▪ ) O) > 0) U) (1) U) C CO O J >' a Co C J (0(00)0(0 OC J -J LL V) J C C Co l O 22201- N C) N. N (f) C ) C') CO rat -V •' ":≥t c _ ,4: ,,-,.....L::":_-_i Is t1 w c 0. t —' • o •o cu a, . t* • :1 I i E ' ,t' E p t f �ti ij c o v V — J o 0 .• O 2 ..- G J � o 7 • G t f Produced by the West Greeley Conservation District { 1. i (• (1 ( t(I i. 7; / „ Thompson y Lake ._ 7 } • s IT Exhibit C Regional Drainage �i 4�i, I �; I 1 10 N W �N O� a_ x u)O O ¢ O O Z O Oa 0H ww w¢ LL 00) ¢p ¢w OO H WZ 2 O HO 0 is Zm ww H E LL 0w a> >-- >Z CC wa O= ZH Z CO WELD COUNTY ROAD 74 C '011 'SWLHV3 A311VA LI3ONVO n.o, 03,0131 ...,. 'O NI '9NIAHALWIS ONV1 111VflJ J.Ni I LL OVOli AUNI1O0 O13M C4:1 i 1.C.RI E OF P➢PI Ioa EV 1HE SCAM OF COUNTY (;�MMG'IU�Icfi5. cc 0 w 1. •-]ktie. arov SURVEYING CERTFIME: 3 L ry g�g h = ¢ It €d g n .1 1. 3e i{} I, 114 iits phi 61636 1, O1 € O A 8 6 2 C' an'SWF:Ned ,1311VA U3GNVO rr susaI-WO w, / .iso-f—foul 9Y Iram a co. �., ., now a..n a w on 'ONI 'ONIABAFifS �cINV7 1 1IW�IHINI 1.1 S � (MoaH09) F°M suul,,mue3 ?E1 f, I Li 6 W la X W Id C �• r. i r vr. r J/ a.• j • Y. � it 0) rT is it$ to • n I a) o •- U) t'46 cd 0) I .. _O 67 ! � N O o 0 a_ 0 0 O j1 O "O O O >. U U • O G] .Y2 a`O C ID y... >- U3 .(1.) ..5 --. O co tll c U) 0 flG ) in EF `m "P , " -- O �' X7)1. • :l �_ u) • l? �� Q 1 _ 2 f.1 ciJ C ' .�s. ? e Q C 0) 7 [r cc s 12 ns * �.� 114 .�• • -d -0 +,4)] j • {p • _J., CO`1 '• A clii O /!r'ruy Y r✓d myx3 a6auleia auoz iO a6uet,O W 4% 1 o luezw alte43 s 9L0L'tIPdtl xr :P t3 x4Aw1VIM! V agr aver oad :411.0 rap 5LQ:'95 PC aor :Puma 'a.n'd WJaI AeneA Japuso mei uois!naa 6uvica g{2 O PO :yea 11 .-grid vi <.,6 m rn Offsite Basin - East (61.2 Acres) 6 L OVO8 ALNf1OO O13M Iff .a.n.d WINS Exhibit G Weld County Public Works Change of Zone Drainage Report Outline The following checklist is to be utilized as guidance, and may not be all inclusive. Other concerns not included in this checklist may arise during the review process. NOTE: A HARDCOPY OF THE DRAINAGE REPORT AND CONSTRUCTION DRAWINGS MUST BE SUBMITTED TO PUBLIC WORKS FOR REVIEW. Comment Headings IncludedNot Included N/A All reports shall be typed on 8-1/2" x 11" paper and bound. Drawings (24" x 36") shall be included. The drawings shall be bound within the report or included within a pocket attached inside the back cover of the report. The report shall be a stand-alone document and therefore all important reference material, supporting documents, and calculations shall be copied and included within the report appendix. The report shall include a cover letter presenting the drainage design for review and shall be prepared or supervised by an engineer licensed in Colorado. Only original documents sealed in ink will be accepted. The sealed report shall contain a certification sheet as follows: "I hereby certify that this report for the preliminary drainage design of (Insert Name of Project) was prepared by me (or under my direct supervision) in accordance with the provisions of the Weld County storm drainage criteria for the owners thereof." The Drainage Report is stamped, signed, and dated by a registered P.E. licensed to practice in the State of Colorado. V All submitted construction plan sheets are stamped, signed, and dated by a registered P.E. licensed to practice in the State of Colorado. / The following items at a minimum should be discussed in the Drainage Report narrative and should be supported with maps and calculations in the Appendix. Include a copy of this checklist with the Drainage Report submittal. I. General Location and Description i/ A. Location j7 1. Township, Range, Section, 1/4 -Section. V 2. Local streets within and adjacent to the development. V 3 Major open channels, lakes, streams, irrigation and other water resource facilities within and adjacent to proposed project site. 4 Names of surrounding developments including jurisdiction (municipalities). B. Description of Property V 1. Area in acres. 1/7 2. Ground cover and soil types. 1/' 3. Major open channels and property ownership. 1/- 4. General project description. V 5 Existing irrigation facilities and facility ownership information within 200 ft. of property. IV 6. Groundwater characteristics (where applicable). —10— II. Drainage Basins and Sub -Basins V A. Major Basin Description Y 1. Reference to Weld County Master Drainage Plan(s) where applicable. V 2. Major basin drainage characteristics. V 3 Identification of all FEMA-defined 100 -year floodplains and floodways/ affecting the property. B. Sub -Basin Description I/ 1 Historic drainage patterns on the subject property and adjacent properties. V 2. Off -site drainage flow patterns and impacts on the subject property (minimum 200 ft outside property boundary, or until no further off -site contributing flow area is encountered). III. Drainage Design Criteria ✓ A. Regulations V 1' Discussion of the optional criteria selected or the deviation from the Weld County Storm Drainage Criteria, if any. ir B. Development Criteria Reference and Constraints V 1. Discussion of previous drainage studies (i.e. project master plans) for the subject property that influence or are influenced by the proposed drainage design for the site. 17 2. Discussion of site constraints such as slopes, streets, utilities, existing structures, irrigation ditches, and the site plan impacts on the proposed drainage plan. V C. Hydrological Criteria V 1 Identify design rainfall amounts and source of design storm depth information, NOAA Atlas, UD&FCD maps, etc. V 2 Identify design storm recurrence intervals. Reference the appropriate information in the Appendix. V 3 Identify runoff calculation method(s) and any computer models. Include summaries of the routing and accumulation of flows at all identified design points for minor and major storm runoff. Reference the results in the Appendix. 4 Identify detention discharge and storage calculation methods and computer models. Reference the results in the Appendix. Li 5. Discussion and justification of other criteria or calculation methods used that are not presented or referenced by the Weld County Storm Drainage Criteria. D. Hydraulic Criteria V 1 Identify conveyance capacities from County references and any computer models. 17 2. Identify detention outlet type. V 3. Identify check/drop structures criteria used. V 4 Discussion and justification of criteria or calculation methods used that are not presented in Weld County Storm Drainage Criteria. 1.7 IV. Drainage Facility Design iI A. General Concept V 1. Discussion of concept and typical historical drainage patterns. (J 2 Discussion of compliance with off -site runoff considerations and constraints. ./ (/ 3 Discussion of the content of all tables, charts, figures, or drawings in the report. V. 4 Discussion of anticipated hydraulic structures (channels, pipes, rundowns. etc.). B. Specific Details V I. Discussion of compliance with drainage criteria (street, inlet, pipe capacities, etc.) 2 Discussion of drainage problems encountered and solutions at specific design points. 3. Discussion of detention storage and outlet design. V 4 Discussion of maintenance access and aspects of the design. t% 2 Provide copies of Draft CDPHE, CAFO, DRMS, or State Engineer's permit applications where applicable. V. Conclusions A. Compliance with the Weld County CODE ✓ 1. Statement of whether or not the design will meet Weld County Code. V B. Drainage concept 1. Effectiveness of drainage design to control damage from storm runoff. V 2. Influence of proposed development on any applicable Weld County Master Drainage Plan recommendations. V 3 Identification of and intent to obtain written approval of affected irrigation company or other property owner(s). Weld County may require that the applicant provide evidence that offsite impacted jurisdictions have been notified of the proposed plans. / q Reference all criteria and technical resources utilized. V The Appendices should include at a minimum the following information. The Drainage Report should be a standalone document and needs to include copies of all pertinent references used in the generation of the Drainage Report. VI. Appendices V A. Hydrologic Computations V 1 Vicinity Map showing location of the site in relation to surrounding area. Show the approximate boundaries of the site. )/ 2 FIRMette showing location of the site in relation to the FEMA mapped floodplains/floodways. Show the approximate boundaries of the site. 1/ 3 Soil Survey Information/Map showing soil types and soil hydrologic groups for the project site. ; / l� 4 Rainfall Maps with the project location identified. Maps can be from UDFCD or NOAA as applicable. ✓� 5. Land use assumptions regarding adjacent properties. 6 Initial and major storm runoff computations at specific design points. (5- yr, 10-yr, and 100-yr) / 7. Historic and fully developed runoff computations at specific design points. 8 Computer model input and output. Include model files and/or spreadsheets on a CD-ROM to be attached to the Drainage Report. B. Hydraulic Computations v —12— 1. Preliminary culvert sizing. i/ 2 Preliminary storm sewer and storm inlet sizing. Include the street capacity evaluations. 3 Preliminary swale or channel sizing. The calculations need to show stability calculations for unvegetated and vegetated conditions. 4 Preliminary riprap or other revetment design. The calculations need to include design for bedding and geo-fabric. 5. Preliminary pond area/volume capacity and outlet sizing. Show calculations for the 100 -year water surface elevations and overflow facilities. i/ 6. Preliminary check dam and/or drop structure sizing. V 7. Changes to calculation methods. If applicant/ design engineer modifies any portion of the UDFCD spreadsheets used for hydrologic or hydraulic calculations, the applicant/design engineer shall identify all changes to calculation assumptions or computer programs as to the type of change and specific factors that were modified. 8. Any computer model input and output. Include model files and/or spreadsheets on a CD-ROM to be attached to the Drainage Report. � C. 24 x 36 Maps 1 A General Location (Vicinity) Map shall be provided at a scale of 1"=2,000' or larger in sufficient detail to identify upstream off -site drainage areas flowing into the proposed development and general drainage patterns. 2. Drainage Plan of the proposed development shall be provided at a scale of 1"=100' or 1"=200' on a 24"x36" drawing. The plan shall show the following information: V 2a Existing contours at a 2 -ft maximum interval. Contours must extend at least 200 feet from all project boundaries or further if necessary to show upstream and downstream drainage relationships that impact the proposed development. The plans and report shall describe the horizontal and vertical datum (NGVD-29, NAVD-88, NAD83, etc) used on the plans and reconcile the differences where necessary. V 2b Property lines, existing and proposed lot lines, and existing and proposed easements. 2c. Streets with names. V 2d Existing drainage facilities, pipes, structures, irrigation facilities, and sizes. / 2e. Overall drainage area boundary and sub -area boundaries. 2f. Proposed contours and flow directions using arrows. V 2g' Location of proposed storm sewers, swales, open channels, culverts, detention ponds, and other appurtenances. V 2h. Proposed outfall point(s) for runoff from the development area and facilities to convey flows to the final outfall point without damage to downstream properties. / 2i Locations and elevations of all defined 100 -year floodplains and floodways affecting the property. 1/ 2j. Location and types of proposed permanent erosion control features. V 3. Historic Drainage Basin Map. Show drainage basin boundaries (on -site and off -site), 2 ft on -site and off -site drainage boundaries, design points, historic flow path, flow path length, and flow path slope. / ✓ 4 Fully Developed Drainage Basin Map. Show drainage basin boundaries (on -site and off -site), 2 ft on -site and off -site drainage boundaries, design points, developed flow path, flow path length, and flow path slope. Show drainage easement including metes and bounds description around all drainage related features. Show any other drainage easements that may exist on the project site. Go Back to Part II Go to Chart 6 DIAMETER OF GUL.'ERT :r; tN INCHES r.r.IJC}xRC1 C. :Si - Ivr3 144 r ?32. '20 �S 10$ 0- Ce 0.4 s�. 7t -- 51J u4 4e 42 - 21 IF. IS • 12 10,000 6,003 -- :,U00 3,04C - 2 O0O 1,40Q 000 600 Kos? 400 F 30.0 cgU. r 200 La; ••WO 04 - 50 -- 4O CHART EXAMPLE 0.36 le4l O. 66 c:e. Nog NW r- I+es1I DI ' a 5.i l;l 7.I 0.5 (r1 2.2 6.6 ID in frt. I E N Y R; NCE TYPE iII lid :. v2II RI WINr4: •: ror lam r: 1.1O1 131 Pi:Jrelinq To- ula 1:fI4 RI a* I. I prrj.: r Jr; Baalellr 'la !molt I.15, Ilor 1.11 a•ranghl m:!acrd li. Iar4a�h li ar•J J 4iclti, a1 reirii4 rI. 1u:I rnI', ,'5 HEADWATER DEPTH FOR G. M. PIPE CULVERTS WITH INLET CONTROL 15 Inch Inlet and Outlet Culverts Exhibit H Go Back to Part II Diii'TETER C' CUi ERT {;ti: 'rN INGIIES $-rr1paa; 4:IF IRO-T- PA156 144 '3E 20 !GS 90 34 72 -- 63 STRI TIBA. P_.s7E u. 10,000 6,000 EXAMPLE - 5,417,} O. 35 'r.[htt 13,9 kk!' - 0,004 x}•66':/t - 4,000 HM' HW 3,0574 r1 Owl 2,000 L2I "..I G s I ₹.2 6.6 •D in !oe• t00 400 500 L►' •. I 0 40 CC ... a4: :. 3� 60 4[ ''} 50 24 • 21 • I$ 30 HAY $CAL 20 - a 6 5 III Ti'PE Ile=dvall Idllar4 •a torlarlr ri }I4pi P,e)et!;r,q To ue■ acol.l21 0, ICI prof■=• q rirrronliimol• III. Iran Lee ••ruIgbI ,eerinra Ilry IM•«L �h S b Uri •5 1.( Iti, 67 rt IFI•I Pt ITIue I ro1.C I.0 OtAMETER z Lir c• S 0 W Go to Chart 6 CHART 5 (I} 2) c. — 5. = 4_ -a. r 2, I.� I.i — .� - .6 r- 2. 1_5 • 1.0 —.6 - .0 — .T .6 _5 1 .5 HEADWATER DEPTH FOR G. M. PIPE CULVERTS WITH INLET CONTROL 24 Inch Entryway Culvert LIOSTONE BI ANDERSON. INC. 1994 (BASED ON NOAA ATLAS. 1973 8 7 cc 6 0 tit a (I) J S V z 0 ~ 4 ELT t- U Ui CL 2 00 10 2030 TIME IN MINUTES City of C Free ey Gtaalt. I Tom the Ground Up. . ■ i:I:EigliiEBiiiiii' mammon I.a■a�it .■.�.■C ■ ■ 'igiiiilliff ICI :CimploC.mIIIaC.. ....C C� ..S.. CC■. sal mon ■R MuMO.ill' Imam 111111..■ 1■ .� � ..■III■I IC 1 ■I C■ .. ■.C. s ■.■.i ■■ C ■. ■■li■ l ■CCI{a& �.. C Ia = RN. UC► .. I■. * IIIIIIIIII NI■ ■.IC ... E . m 10EI �.CC.I.. II..I.■ICI mI ala■...ID ' ■ ..� ■I. IIROII i6611111•ICI.I ■■m.■...IUm Im ■m. IIII■IMOO II MIUNN..l III'I CU."I.' . EIuu. IICIIC'I'.m. C IIIIIIIC11 m..mmm..1 O..m.IIIIMOO1C.. III I...UIIIIIII III."' I'I'IIC III.' C. C. CIII. I ,. C .I■■� iIII� .I .■ ...I.II..■IC..C C. I ........ I I C. :::Ill C ■.�. lie II . ■IINII... *pUUNIICIIIIIC lulu.....■..ui... .... III: ' I'IIII..IC.CII•I.. � s■ .".. . ■C .. IIIII m■� .I.■ C.I.= IO�ia i .I I ..... .....IIIIIIIII INIII Im.. IRiu Ili ■m1m.�ICQ .C..I..I .......a.. C I m... 'Ili IBM . m■■I■■: ■■IIIII ■a... ■■ ■.a■C.:.I■C I.■■ ■■ . .IUU. .C.. C...I . l ■..m.■.m.■ ,'. 'NINNIES NIIIP■...■.■.I..I■ .CCIIIEI■...IN.■l■C I 1.m.■I ■■I. _ CC.� ECU C I ■...■....II "CluIEO■ml I• MOC".i.IOMEMIRC 1■■■...■ . ._■ um CC.=.CN.iaa.i. El11'.al'u"momm NOME MOOOMMC.C C"ia'i'mV mill psmmlEmil ' m l' i 'U'mINUIINl uI■C..m. emu .■ ... C. alll■I. ..am.m.■Il .iau m .i immix l6C.■C■ .a ■IIIC ..sam■ma.aNm ■aaC ■ .. ■I i. ■ m111C11.. ■.``a.E""■■.►I..RiI....R■ ■..a■ ■■aim■ "CECEICCNlICI:�Cmam. m \! mmsommLSIUIUIIE ■� ■ C ■ ■.".as"...C..MOMMO Ui■ ■. ■ ..l■IIm1N1�.Cl.l.pNN■.....I.I. ■■ ■ ma■ • m CIII'I: IMO am. ■ m MOON i■ ■■ . m UUUNi IIUNURIUI"' I 111111116:011.1.11k1119 I'pIu.EIICCI=IIICCVIII$II.CC""1'"".IC'Ua=•CuICNm.muul■ uIsl .. m. ■■.m..■ .1 I■ .MU■U� � ... "IIii1 MMONil Iii■ ' l ■i i.mi■ .1..► iGCIiN..I I�ak■.■ .■.Ill C.C.l1C■.� CCIa..►I.. it s'CIEI1 ..•■...Im...m...■...CI.■1lClll IIIIIIIIIII '.■ .. . ilia.►! � ■mmm■tt�m■■.•■ter3, Imm ■m► ■s ls. hl "r.str „L ima I!I 3 d■ g1CIICCC .■ ■..■m " aU■I■ NIC■ ■ CICIMOOMOIO.a■■ U C■.■.....�■ml Q I mII ..lm am ►•CC■ll IIIC.CIRC..INNIIU" I■.CCC...■.IiIIII C CIIIIIIIIm III ■CIIWIEIIIII ■m ■IIIIIIIMI IIII RI*UIN IC.lu.'ICIu!•'IC ..iRN.IIli'CCli I�■C..i."■ UU.■ . m .�.. ■.�'.■� CC ►U=I IIIV.•UI.I."CC..II ■N.•aminimum •al CCG1■ aml■ ■ .mmUUU■I.Im.. lI am 'CICIIIIIIIli►timmiCCIICEI■■■IIUCCI' 11. ■■ C Cu..l ..a.a II■clpilliiI•IIIIU marC m..II...II...Plll■""'"CI .a■ ■ aa.� ■ ■.. ■a C1■ICC NaMIC■ CC ■I ■ m►�UIUm ■.A ■m(1aa.■ ■'ia■ ..ma . l.l"IIIIIC ..UI ■mar n,.n M■ OOMMONMARM UUUlil'l s oR MIONNOOM C,CCII� MI�k'MRC'I.C.UDIRIO ='w1..1MIIM ■ CC".... .. . I ' ■ ■ IIU W►SNNRN'I" II Clam■ � imamU I N' ...�►• .: � ,. IEUCmll.CGI! '49... ■-� u. Uu.0 II a l.`IIUUI'l IiIIIl 1.l ■■ ■m.-■. .G�' ■.. mil ■ ...Ill III1 III .a ..I. -I.mll MICA CIC�IC.CIII b+_�� I l'lMi 'CIillal�'•IICNI II"iimme.m.Ii.jl_■P■M.■ as .r■.. •'Ui IICIIEIIC="' mils limn G... ■l""■Ui■CC■.=�i �a U ..r ■.. m. s.rN....■.•.mm . m. ■ .■ m `:'.II.*UI1 VIII' limI IP;U 11 _mill ■C ' IMR.C■ . _ 1 ul.ma m E '�llml mutt I �CIC■■ mom ll.mUi■l "■■.■ pops ■.■maC1G ^ s r,�( : �CaZage �:f.._:.��■■ 'Ammo .■ .IIuIIIII... ■I IIIIIIIIiIII ■ +II.i Ill . III PUUIsC"II' mmliar'e'pl_' U:=I B IIIM1"11 UNIUIII I... .sll m■ 6 = IN•I ■. C6. Ia..CICm..I......mEasC mill■..... ■IllllmmIII ■ ■. C IGii.:I;a.N="m.i �� .. . �y , 'lir ... �Ilm■C. NIImIl■ilia l■ I iii .C. ICIII■ imam ■■.mmmmm■■ ■■ IN■.UNIIIC Gi; . -■■ �c ..■ ■■ ■ Il p■�� ■ ■l ■NIUMCIIIIl ii._ VIII■■■m■ ■■l .Cl ■ I■ ■. ■.VIII■ m P■■MIU ill E mil Mi ■■■ m■■UUl C ■ ■ml■ ■■ Ina III I i IIII i'iil■ CI11■islimiilllamllC lam I■ee ICII■■ ■.mmUCU■ ■■m■ ill..■ ' ■CCI UUIC C" 1 II Ili' II� I IIIINU'1:::"':1C":NRIII'�'I:1 II. i C .II. "II"m■CL" ■■ ■ ■ C C '=CICq :IC ' I CICI ' '11::1'0 C:C :I '1 o: I' I:ICC .IIECICC...C6■m..CI.�...m60�I....R1.�...E ..NII ..el N■N.m 4O 50 60 INTENSITY -DURATION -FREQUENCY CURVES PUBLIC WORKS DEPARTMENT STORMWATER MANA 1001 NINTH AVENUE i1E FIGURE 3-1 Exhibit I SCALE: NTS rISED AUG 1996 MAJOR DETENTION VOLUME BY FAA & MODIFIED FAA METHOD (See USDCM Volume I Runoff Chapter for description of method) Project: Gander Valley Farm PUD Basin ID: On -Site Detention Pond (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (Note: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) The user must fill in all of the blue cells for these sheets to function. Destgn Information (Input): Catchment Drainage Imperviousness Catchment Drainage Area Predevelopment NRCS Soil Group Return Period for Detention Control Tme of Concentration of Watershed Allowable Unit Release Rate (See Table A) One -hour Precipitation Design Rainfall IDF Formula I = C1` P1/(02+Tc)4C3 Coefficient One Coefficient Two Coefficient Three I. = 0.15 percent A = 63.0000 acres Type = B _ A, B, C, or D T = 100 years (2, 5, 10, 25, 50, or 100) Tc= 54 minutes q = 1.20 cfs/acre Pr = 3.20 inches C, C2 C3 _ 28 50 10.00 0.79 Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient Inflow Peak Runoff Allowable Peek Outile+, Rate Ratio of Qpout/Qp-in c= 0.60 Qp-in = 129.00 cfs Qp-out = 75.60 cfs Ratio = 0 59 Determination of MAJOR Detention Volume Using FAA & Modified FAA Method 20 s- Enter Rental) Duration eaaemental Increase Value Here (e g. 5 for 5 -Minutes) Rainfall Duration minutes zinc_,u Rainfall Intensity inches / hr .,...::v11 Inflow Volume cubic feet (adord) Average Outflow (FAA, cfs) (output) Outflow Volume (FAA, of) (output) Storage Volume (FAA. cf) (outp:Al Adjustment Factor (Modified) 0.tilrnr.) Average Outflow (1:137 cl'.;. (cbfr;ut. Outflow Volume (Mmxl, of) !uv!o,jll Storage Volume (rAutl, .) i'O:ln,, 0 0.00 0 000 0 0 0 00 000 0 0 20 6 21 281,671 75 60 90,720 190,951 1.00 75.60 90.720 190,951 40 415 376,280 7560 181.440 194,840 100 75.60 181.440 194,840 60 3.18 432,675 75.60 272,160 160,515 0 95 71.82 258,552 174,123 80 261 473,017 75.60 362,880 110,137 0.84 6332 303,912 169,105 100 2 22 504,589 75 60 453.600 50,989 0 77 58 21 349,272 155,317 120 1.95 530645 7560 544,320 -13,675 0.73 5481 394,832 136,013 140 174 552,909 75.60 635,040 -82,131 069 52.38 439,992 112,917 160 1 58 572,405 75 60 725,760 -153,355 0.67 50.56 485.352 87,053 180 t44 589,787 75.60 816,480 -226,693 0.65 49.14 530.712 59.075 200 1.33 605,501 75 60 907.200 -301.699 0.64 48.01 576.072 29.429 220 1.24 619,863 75.60 997,920 -378,057 0 62 47.08 621,432 -1.569 240 1.16 633,106 7560 1,088,640 -455,534 061 46.31 666,792 -33,686 260 1.09 645,407 75.60 1,179,360 -533,953 0 60 45 65 712 152 -66,745 280 1.03 656,903 7560 1,270.080 -613,177 0.60 45.09 757.512 -100,609 300 0.98 667,703 75.60 1,360,800 -693,097 0.59 4460 602,872 -135,169 320 0.93 677,894 75.60 1.451,520 -773,626 0.58 44.18 848,232 -170,338 340 0.89 687,548 75 60 1.542,240 -854,692 0.58 43.80 893.592 -206,044 360 0.85 696,724 75.60 1,632,960 -936,236 0.58 43.47 938,952 -242,228 380 0 82 705,473 75 60 1,723,680 -1,018,207 0.57 43.17 984,312 -278,839 400 079 713,836 7560 1,814,400 -1,100,564 0.57 42.90 1,029,672 -315,836 420 0.76 721,850 75.60 1,905,120 -1,183,270 0.56 4266 1,075,032 -353,182 440 0.73 729,546 75 60 1,995.840 -1.266,294 0.56 42.44 1.120.392 -390.846 460 0.71 736.951 75.60 2.086.560 -1.349,609 056 4224 1,165.752 -428,801 480 0.68 744,088 7560 2,177,280 -1,433,192 0.56 4205 1,211,112 -467,024 500 066 750,978 7560 2,268,000 -1,517,022 0.55 41.88 1,256,472 -505,494 520 0.64 757,641 75.60 2,358,720 -1,601.079 0.55 4173 1.301,832 -544,191 540 0.62 764,091 75.60 2,449,440 -1,685,349 0.55 41.58 1,347,192 -583,101 560 0.61 770,344 75.60 2,540,160 -1,769,816 0.55 41.45 1,392,552 -622,208 580 0.59 776,413 75.60 2,630,880 -1.854,467 055 41.32 1,437,912 -661,499 600 0.57 782,309 7560 2,721 600 -1,939,291 0.55 41.20 1,483,272 -700,963 620 0.56 788,044 75.60 2,812,320 -2,024,276 0.54 41.09 1,528,632 -740,588 640 0.55 793,627 75.60 2,903,040 -2,109,413 0.54 40 99 1,573,992 -780.365 660 0.53 799,066 7560 2.993.760 -2,194,694 054 40.89 1,619,352 820,286 680 0 52 804.370 75.60 3,084.480 -2.280.110 0 54 40 60 1,664.712 -860.342 700 0.51 809.547 7560 3,175,200 -2,365,653 0.54 40.72 1,710,072 -900.525 720 050 814.602 75.60 3.265.920 -2,451,318 0 54 40 64 1,755,432 .940,830 FAA Major Storage Volume FAA Major Storage Volume (cubic ft.) a (acre -ft.) = 194,840 Mod. FAA Major Storage Volume Mod. FAA Major Storage Volume (cubic ft.) = (acre -ft.) = 184,840 4.4729 4.4729 UDFCD DETENTION VOLUME ESTIMATING WORKBOOK Version 2.01, Released August 2006 1810 Storybook -Detention Proposed Conditions (4), Modified FAA Exhibit J 4113/2016, 9:55 PM MAJOR DETENTION VOLUME BY FM & MODIFIED FM METHOD (See USDCM Volume t Runoff Chapter for description of method) Project: Basin ID: Gander Valley Farm PUD On -Site Detention Pond 3,500,000 3,000,000 2,500,000 2,000,000 a U. 1,500,000 1,000,000 500,000 Inflow and Outflow Volumes vs. Rainfall Duration Intersection of Modified and FAA Outflow Plots is at maximum detention volume 100 200 300 400 500 Duration (Minutes) 600 700 • -Inflow Volume }Modified Outflow Volume --'-FAA Outflow Volume 1810 Storybook -Detention Proposed Conditions (4), Modified FAA 4/13/7016, 9:55 PM Table of Design Parameters Basin Area Overland Flow Channel Flow Vertical Slope Outlet Impervious C1on Tc I Q100 (Acres) (Feet) (Feet) (Feet) % % (Minutes) (In/Hr) (CFS) fsite ONorth 21.5 1500 - 22 1.2 NE Corner 2 0.46 28 4.42 43.7 Offsite East 61.2 2790 - 102 3.7 15,E CMP 2 0.46 26 4.80 135.1 Basin A 5.16 400 1200 30 1.0 24' CMP 15 0.53 26 3.64 8.6 Basin 12.14 500 959 30 2.1 24" P 15 0.53 23 4.42 24.7 Basin C 23.21 400 1300 25 1.5 Pond 15 0.53 23 4.02 42.9 General Notes 1. Basin A and Basin B combine and discharge into a 24" CMP in the entryway which conveys 100 year discharge into the detention pond. 2. Discharge from the North offsite drainage basin is limited to 9.5 cfs due to the capacity restriction of the existing 15" CMP under Weld County Road 19. 3. The central swale conveys drainage from both offsite basins and Basin C. The 100 year flow from these Basins equals 61.8 cfs. Exhibit K 0 50' 100' SCALE: 1' =100'-0" 1.8'(h)x2.4'(w) CMP (sgwash) Culvert Inv. FL Southwest = 4897.63 Inv. FL Northeast = 4897.66 Concrete lined ditc 15" CMP Culvert Inv. FL West = 4894.1 Inv. FL East = 4894.27 S89°09'51"E 205.59' 200' 15" Steel Culvert Top of Pipe Southwest = 4899.6 Top of Pipe Northeast = 4899.72 Found 1/2° Rebar' (length unknown) wit( cap marked LS 7242. O a. co W cu W O Found 1/2° Rebar (length unknown with no cap. Fenceline (typ) 15' Drainage and Utility Easement. N „ I_ O —x 8" Brick Wa Found 1/2" Rebdr (length u known) w cap mark d LS 7242. Approximate cen erline of Cornerstone X85 tlo A S N Lo 3.23ecre 15' Drainage and Utility Easement. N 546°25'35"E 83.33' N51 °47'34"E 77.99' N84°21'57"E 65.55' Propose 0' Utility, Drainage and Irrig on Easement (Typ) Lot 2 0 Acre ropos N87°14'44"E —Found 1/ ✓iii \ \ ound ound 1/2r Rebar (length Lot S 3. • 'cre re Hydrant 5Utility, I '.,eand Irrigation Easement (Typ 83.89' N I I I / Gander Valley Lane ---7- MEM- SF OM- IMF OF Found 1/2° Rob ength unkno .. cap marked 242. lz AS Inv /ALSc.�.- Propose. 0' Emergency 148 1 11 ccess Easement 1 with / Rebar (length unknown) with no kap. .2° Rear (length unit wn) bent with no cop. 1 \ 1 Rknown) with no cap. \ \ \ Water Meters (Typ 4880 ot1 3. Acre 12 op Top Proposed Roadway 320' Centerline Radius Proposed 8" Diameter Water Line Tract B i F cre 15' Draiia �Jtility Os 4873.52 / 4873.37 m 30.00 X _ elephone pedestal. X --x x as line warning sign x x _ Cu ve, Vrtn 4370.28 Inv. FL So,.th ' '859.37 N89°08'00"W 2607.99' 0' County Road Right of Way. / / / /// v fl irj rej 51 11 11 11 11 11 / --2222-- ---\ �------- _-- ----� I _ Fete support on North enc.) = -_299.56 I I I I I I I ill Gander Valli y P.U.D. III 1 1 III I I Offsite BOO - North (21.6Abres) I I 15' Access, rigation and Utility Easement. 'roposed 15' Equestrian, Access, Irrigation, Drainage al Utility Easement (Typ) 1 Se'',. 279F BgOgs Lot 6 \I 3.38 A cre4890 I L Fire Hydrant 40.46± acres Proposed Roadway 320' Centerline :.:' Pr ameter Water Line Connection to Existing North Weld County Water District Line Tract A 6.09 Acre Water Meters (Typ) Approximate centerline of nature' _ drainage swale. Pedestrian Shelter / Bus eig .or ood ,: it Box osed Detention Pond / Overhead Entryway ' eature I i I 08.26' J / / Lot 9 2.59 Acre inage Easem Lo 10 2.96 &cre N 1 / / Water Meters (Typ) Found No. 4 Rebar (length unknown) with 1' red plastic cap marked LS 23027. Lot 7 3.52 Acre Found 1/2" Rebar (length unknown) in. illegible cap. enceline (typ) X Ex•:oiing 70' ROW -5' age one .;til'ty yE:se—e^c. "Town of indsor" buried pipeline sig-. Wot Valve and Water blow —o . Tr•. C .07Acre 1 389°58'17"W Found 1/2" Rebar length unknown) with no cap. 72.07' 524°11'03'W 133.79' Found 1/2" Rebar (length unknown) / with no cop. S53°10'54'W 134.39' Found 1/2° Rebar (length unknown) with no cop. S16°03'51'E 102.17 This Parcel Not Included With The Proposed P.U.D. Found 1/2" Rebar ength unknown) with no cap. �J• 15' Drainage and tility Easement. X —X N Set \o = Rebar (16" Icnc • " ---eter red plest c'aec L5 30462 at /. on County Road ▪ Lof ,. .r,cy. /Project Benchmark (BM 1• Elevation = 4895." 2' ELD COUNTY ROAD 72 Asphalt gesph of Stop Ahead sign peed Limit 55 sign Existing 60' ROW ) 3 East Quarter Co Sect on Fount No. 6 Rebc• (length nknowr) n't^ Alunir,Lm Coo mcrkec cs show-. 6N R67W St 153 HA3.=S 2. v0NES / LS 22098 / WELD COUNTY ROAD 19 Concrete 'gation structure. ell c s dge of Asphalt Gander Valley Farm P.U.D. A Replat of Lot 5, Gander Valley P.U.D. Situate in the Southeast Quarter of Section 4, Township 6 North, Range 67 West of the 6th P.M. County of Weld, State of Colorado. 0 a) ) .a CD IV � 0> ca. Fe cn N M - - - M EI Found 1/2" Rebar length unknown) with no cap. C, C J a) Q ^2 Proposed Drainage Improvements 1. Channel along west property line of lots 1-4 2. Channel along west side of Hillhouse Drive 3. Channel along south property line of lot 1 4. Culvert under entryway to detention pond 5. Relocation of existing central channel 6. Proposed detention/water quality feature 7. Relocation of channel along south property line of lot 10 8. Extension of existing 15" outlet pipe into detention pond 9. Abandon existing culvert and driveway The project Benchmark (Town of Windsor BM 19) is located 53.66 feet to the northwest of the Southwest Corner of Section 4, Township 6 North, Range 67 West at an elevation of 4895.53. -6N R67W 5a 153 S9 I510 1994 LS 12374 Southeast Corner Sect'on 4-6-67 =ounc No. 6 Reba, - (length unknown) wtr. 2-1/2" Alt.rnir.,m Coo ncrkea as sno.m.. 14.00' Ditch 4.00' Shoulder 12.00' Travel Lane 60.00' ROW _ 32.00' Roadway 12.00' Travel Lane Bituminous Pavement Aggregate Base Grass -Lined Existing Ground Channel Fill Slope Hillhouse Lane Street Section (Local Street) 14.00' 4.00' Shoulder NTS a) C J Q 2 Cl_ Cu O a) Cu C 0) a Tract A, Lots 9 & 10 a) C N O a) 0) C -c U a) Z C CO 0 O N O C, U O to O N N C Cu CD 0 N .Q C Designed: JCC 0 m a C E2 0 0 -3 a) a) s U y Farm P.U.D. L O a) O N O O) C U SHEET 1 SE Corner SE Quarter, Section 4, Township 6 North, Range 67 West 1 OF 1 File Nome: Gander Valley Form PUD. dwg Plotted: 4/11/2016 Hello