Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Browse
Search
Address Info: 1150 O Street, P.O. Box 758, Greeley, CO 80632 | Phone:
(970) 400-4225
| Fax: (970) 336-7233 | Email:
egesick@weld.gov
| Official: Esther Gesick -
Clerk to the Board
Privacy Statement and Disclaimer
|
Accessibility and ADA Information
|
Social Media Commenting Policy
Home
My WebLink
About
20170250.tiff
RESOLUTION RE: APPROVE BRIDGE CONSTRUCTION AGREEMENT AND AUTHORIZE CHAIR TO SIGN - LOWER LATHAM DITCH COMPANY WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Bridge Construction Agreement between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and the Lower Latham Ditch Company, commencing upon full execution of signatures and ending February 28, 2017, with further terms and conditions being as stated in said agreement, and WHEREAS, after review, the Board deems it advisable to approve said agreement, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Bridge Construction Agreement between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and Lower Latham Ditch Company be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said agreement. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 23rd day of January, A.D., 2017. BOARD OF COUNTY COMMISSIONERS ATTESTdQ%uw1/;vk. Weld County Clerk to the Board BY puty Clerk to the Board APP' I m D AS i County Attorney Date of signature: O a / 0Co/ WELD COUNTY, COLORA etv Julie A Cozad, Chair Steve Moreno, Pro-Tem arbara Kirkmeyer cc,' Pc() CGt'c/FC) OuPP as/0 2017-0250 EG0074 ip pas MEMORANDUM TO: Esther Gesick, Clerk to the Board DATE: January 17, 2017 FROM: Clay Kimmi, P.E., Public Works SUBJECT: Latham Crossing Agreement for CR 49 Project The attached agreements need to be placed on the BOCC Agenda for a 9 am hearing at the earliest possible convenience. This agreement is between the Lower Latham Ditch Company and Weld County for one ditch crossing. The crossing is located just north of CR 54 on CR 49. This agreement has been reviewed by the County Attorney's Office for consistency with other irrigation company agreements. The agreement is necessary so the County's contractor, IHC, can get started on the crossing. The crossing has to be completed this winter in order to complete the CR 49 Project on schedule. It is anticipated that the crossing will be complete by the end of February 2017. I will plan on attending the BOCC hearing to answer any questions that the Board may have regarding this agreement. Once the agreements have been signed, please send one of them back to me so I can provide copies to the ditch company. 2017-0250 Page I of I M: I —Active Projects \Strategic Corridor\WCR 49 Corridor\Irrigation\Latham Agreement\Latham Cover Memo to CTB 01-17-2017 docx BRIDGE CONSTRUCTION AGREEMENT LOWER LATHAM DITCH COMPANY AND WELD COUNTY COLORADO THIS AGREEMENT is made thisp0/ay ofd 2017, by and between Lower Latham Ditch Company, whose address is 8209 W. 20 Street, Ste A, Greeley, CO 80634 hereinafter referred to as "Company," and the County of eld, a body corporate and politic of the State of Colorado, by and through its Board of County Commissioners, whose address is 1150 "O" Street, Greeley, Colorado 80631 hereinafter referred to as "County." WITNESSETH: WHEREAS, County finds it necessary to rebuild/construct/improve Weld County Road 49, (hereinafter referred to as "WCR 49", which will involve said road's realignment/ construction, as well as the construction of Weld County Bridge Number 49/54A (hereinafter referred to as "WCB #49/54A")], (collectively, the construction of the road and bridge are referred to as "the Project"), and WHEREAS, Company is the owner of that certain right-of-way within which lies all canal improvements and related appurtenances, as well as headgate and diversion structures, (hereinafter referred to as "the Canal"), and WHEREAS, County and Company acknowledge Company's Canal lies within the area of County's Project at the following location: WCR 49 Crossing of the Lower Latham Canal 0.15 miles north of WCR 54, west of Kersey, Co. (A copy of said location information is attached hereto and made a part hereof by this reference as Exhibit A), and WHEREAS, Company and County recognize that County has a statutory obligation to maintain its roads and bridges to protect the safety of the travelling public and that Company also has legal obligations to deliver water to its shareholder/members, and WHEREAS, Company agrees that County has designed WCB #49/54A to accommodate the current water conveyance capacity of the Company's canal, as reflected in the construction and design drawings, a copy of which are attached hereto and made a part hereof by this reference as Exhibit B, and WHEREAS, each party desires to cooperate in a manner that permits each to meet its obligations. NOW, THEREFORE, in consideration of the promises and covenants expressed herein, the parties mutually agree as follows: o.o/7-oa.sv 6� Page 1 of 7 I. COMPANY'S RIGHTS AND RESPONSIBILITIES: 1. Construction and Design Drawings: Company and County acknowledge that each has had the opportunity to provide input into the design of the Project, and that Exhibit B is representative of the collaborative design efforts of the parties. In the event that during construction County discovers unanticipated conditions, County shall notify Company of the need for design changes. The revised drawings, plans and/or specifications shall be attached hereto and made a part hereof as Exhibit B (1). 2. Construction of Project: Company hereby grants permission to County to construct WCB #49/54A in accordance with the Exhibit B drawings and thereafter maintain said bridge, within the area occupied by the Company, as described and illustrated in the construction and design drawings reflected in Exhibit B. 3. Grant of Right of Ingress & Egress: Company hereby grants to County the right of ingress and egress to and from the Project and across the Canal property, as necessary and reasonable for the exercise of the purposes of this Agreement. 4. Company's Field Inspections: Company shall conduct field inspections at the initial stage of planning and within three (3) business days of County's notification to Company that construction has been substantially completed. In addition, in Company's discretion, field inspections may be conducted during the construction of the Project. Company shall notify County in writing of all necessary corrective work it deems necessary within three (3) days of such field inspections. Such corrective work shall be completed promptly at the sole expense of County. 5. Company's Present and Future Rights to Maintain Canal: Company has, and shall continue to have full power to operate, maintain, alter, enlarge, relocate, clean and manage the Canal as if this Agreement had not been made. However, no activity of Company shall cause any damage or obstruction of Weld County's Right of Way for WCR 49 and the WCB #49/54A. It is specifically agreed that normal maintenance and repair activities, including the operation of machinery for such purposes upon the canal right of way and within the canal itself, shall be performed with sufficient care such that no damage or obstruction shall be caused to the Right of Way for WCR 49 or the WCB #49/54A. In the event, however, that any such activity on the part of the Company could reasonably be expected to damage County's bridge, road or right- of-way, Company agrees to give prior notice to County, and to cooperate with County to avoid said injuries or damages to the County's bridge, road and/or right -of way, and this Project. 6. Emergency Repairs: In the event Company finds it necessary to perform emergency repairs to the canal, either during County's construction of the Project or at any time in the future, and such activity causes damage to County's bridge, road, right -of way and/or Project, Company shall be without liability for damages to County as the result of the performance of such repairs, except as to such damage caused by Company's negligence. If Company determines that emergency repairs to the canal must be made, which repairs are caused by the acts or omissions of County in constructing or maintaining the Project and/or culvert, Company shall notify County of the need for such repairs; if County is able to conduct such repair work, it will so notify Company immediately, and will commence said repairs within a time period agreed to by Company. If County is unable to undertake said repair work within a time period to which Company agrees, and Company expends any sum for said emergency repairs of the canal, Page 2 of 7 Company shall notify County of the expenditure, submit documentation of the expense incurred and, subject to the approval of and appropriation of funds by the Weld County Board of Commissioners, County shall reimburse the Company for any reasonable expense. 7. Flow of Water During Construction of Project: In order to ensure the safety of those involved in the construction of County's Project, and in order to allow County to take necessary steps to facilitate the uninterrupted free flow of water through the canal, Company agrees to notify County personnel, pursuant to the notice requirements of this Agreement of a release of water in the canal during the construction period. During County's construction of the Project, Company agrees to provide notice to County immediately upon its intent to flow water. Immediately following its receipt of such notice, County shall make provisions to allow the free flow of water through the canal, as soon as reasonably possible. 8. Acceptance of Drainage Water: Company agrees that it will accept the historical flows from the County's right-of-way, normally conveyed in a roadside ditch. County agrees that it will construct the entrance of the historical flows into Company's canal in a manner designed to prevent erosion or damages to the canal banks. II. COUNTY'S RIGHTS AND RESPONSIBILITIES 1. County's Right of Ingress & Egress: County has the right of ingress and egress to and from the Project and across the Canal property, as necessary and reasonable for the exercise of the purposes of this agreement. 2. County to Provide Notice of Work: All work shall be performed only after prior notice and submission of plans and specifications to Company's superintendent, after such engineering and legal consultation as Company considers necessary, following the approval of the same by Company. Such approval shall not be unreasonably withheld or delayed. 3. County's Construction Responsibilities: County agrees to construct the Project, and thereafter maintain it in such a manner as to avoid damage to the canal, particularly the embankments and access thereto, and to avoid interference with the flow of water through the canal. Any damage to the canal caused by County's construction of the Project, including damage to the canal's embankments and facilities appurtenant to the canal, shall be addressed as follows: (1) If Company determines that repairs to the canal must be made, which repairs are caused by the acts or omissions of County in constructing or maintaining the Project and/or bridge, Company shall notify County of the need for such repairs; (2) If County is able to conduct such repair work, it will so notify Company immediately, and will commence said repairs within a time period agreed to by Company; (3) If County is unable to undertake said repair work within a time period to which Company agrees, and Company expends any sum for said repairs of the canal, Company shall notify County of the expenditure, submit documentation of the expense incurred and, subject to the approval of and appropriation of funds by the Weld County Board of Commissioners, County shall reimburse the Company for any reasonable expense. 4. Historical Drainage Patterns: Company and County agree that the design of the project, as reflected in Exhibit B, is expected to preserve historical drainage patterns, and both parties believe that said design shall, therefore, preserve the integrity of Company's facilities. However, in the event that historical drainage patters are altered by construction of the Project, Page 3 of 7 and adversely impact Company, County agrees to correct those characteristics of the Project which created the adverse impact. 5. Flow of Water During Construction of Project: It is a primary goal of County in the construction of this Project, not to interrupt the flow of water through Company's canal. To that end, County agrees that absent accidents involving third parties, or force majeure, as described in Paragraph 111.12 herein, County will not interrupt the flow of water through Company's canal. Additionally, Company has advised County that water is generally run through its canal at the following times: MARCH THROUGH DECEMBER of each year. Therefore, the parties have agreed that the construction of the Project shall take place at a time when water is not expected to flow through the canal; therefore, the parties agree that construction phases of the Project which may interrupt the flow of water through the Company's canal shall be limited to the period between JANUARY lst, 2017 and MARCH Pt, 2017. Construction phases which do not impact the Company's ability to flow water through the canal (i.e. setting girders, installing bridge rail, laying asphalt on bridge, etc.) may occur after March 1, 2017. As the parties are aware that water could be transferred through the canal for a variety of reasons at any time during the construction period, Company has agreed to provide notice to County immediately following Company's notice of intent to flow water. Immediately following its receipt of such notice, County shall begin the removal of its equipment, materials and/or personnel from the canal site in order to allow the free flow of water through the canal, as soon as reasonably possible. Notice of the release of water by Company shall be given to each of the persons named in accordance with the provisions of paragraph 11I.13. 6. Repair and Maintenance of Project After Construction: All post -construction repairs, replacements or maintenance of the Project by County which could impact Company's use and operation of the canal shall, in the absence of an emergency, be undertaken during a period when the canal is not being used to carry water, and such work shall be completed before that use begins. County agrees to notify Company of the need to repair, replace or maintain the Project and Company agrees to provide County with a flow schedule which will allow County to perform its work when the Canal is not expected to be used to carry water. In the event of an emergency situation caused by an immediate and unforeseen incident causing damage to WCB #49/54A which creates a danger to the travelling public, County agrees to immediately notify Company of the need to conduct such repairs, and to the extent possible, Company agrees to cooperate to allow County to complete said repairs 7. County's Responsibilities Following Construction and/or Repair, Replacement and Maintenance: Upon County's completion of construction of the Project, and following any later repair, replacement and/or maintenance activity related to the Project, which takes place upon the canal easement, County agrees to clean the canal and canal bank area in order to place it in the same or better condition than it was before the activity began. 8. Payment of Administrative Fee: County shall pay an administrative fee to Company in the amount of Eight -Hundred Dollars ($800.00). County agrees that the fee is reasonable and represents a fair and appropriate payment to Company for the time expended by its officers and/or employees in review of this Project, entering into this Agreement, and for all activities it must undertake in the performance of its obligations under this Agreement. Page 4 of 7 9. Legal/Engineering Expense Reimbursement: County agrees to reimburse Company for all reasonable legal and/or engineering costs incurred by Company for the legal review of this Agreement and for the professional engineering review of the Project's design, not to exceed a total of Four -Thousand Five -Hundred Dollars ($4,500.00). III. MISCELLANEOUS 1. Board of County Commissioners of Weld County Approval: This Agreement shall not be valid until it has been approved by the Board of County Commissioners of Weld County, Colorado. 2. Agreement Binding: This writing, together with the exhibits, constitutes the entire Agreement between the parties hereto with respect to the subject matter herein, and shall be binding upon said parties their officers, employees, agents, and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. This Agreement may be assigned by County to another governmental entity who by annexation or other governmental action assumes jurisdiction over the Project, without the written consent of Company. Company agrees to notify County of its intent to assign this Agreement in order that it may take such formal action for ratification as may be required by its Board of County Commissioners. 3. No Third Party Beneficiary: It is expressly understood and agreed that the enforcement of the terms and conditions of this Agreement, and all rights of action relating to such enforcement, shall be strictly reserved to the undersigned parties, and nothing in this Agreement shall give or allow any claim or right of action whatsoever by any other person not included in this Agreement. It is the express intention of the undersigned parties that any entity other than the undersigned parties receiving services or benefits under this Agreement shall be an incidental beneficiary only. 4. Fund Availability: County has budgeted the funds required to perform its obligations under the terms of this agreement, and assumes that all expenses it is required to pay will be expended within the current calendar year unless otherwise stated. Financial obligations of the Board of County Commissioners of Weld County payable after the current fiscal year are contingent upon funds for that purpose being appropriated, budgeted and otherwise made available. By execution of this Agreement, County does not warrant that funds will be available to fund this Agreement beyond the current fiscal year. 5. Time of the Essence: Time is of the essence in each and all of the provisions of this Agreement. 6. Severability: If any term or condition of this Agreement shall be held to be invalid, illegal, or unenforceable, this Agreement shall be construed and enforced without such provision, to the extent that this Agreement is then capable of execution within the original intent of the parties. 7. Choice of Law: Colorado law, and rules and regulations established pursuant thereto, shall be applied in the interpretation, execution, and enforcement of this Agreement. Any Page 5 of 7 provision included or incorporated herein by reference which conflicts with said laws, rules and/or regulations shall be null and void. 8. Attorneys Fees/Legal Costs: In the event of a dispute between County and Company, concerning this Agreement, the parties agree that neither party shall be liable to or responsible for the payment of attorney fees and/or legal costs incurred by or on behalf of the other party. 9. Governmental Immunity: No term or condition of this contract shall be construed or interpreted as a waiver, express or implied, by either party, of any of the immunities, rights, benefits, protections or other provisions, of the Colorado Governmental Immunity Act §§24-10-101 et seq., as applicable now or hereafter amended. 10. Entire Agreement/Modifications. This Agreement contains the entire agreement between the parties with respect to the subject matter contained in this Agreement. This instrument supersedes all prior negotiation, representation, and understanding or agreements with respect to the subject matter contained in this Agreement. This Agreement may be changed or supplemented only by a written instrument executed by both parties. 11. Compliance with Laws: The parties agree that each shall comply with all applicable federal state and local laws. Ordinances and rules in connection with the construction and/or maintenance of the Project, that each shall obtain such permits and/or approvals required by applicable governmental entities in connection with the construction and/or maintenance of the Project and shall take such affirmative and/or remedial actions required by such entities. 12. Interruptions: Neither party to this Agreement shall be liable to the other for delays in performance or a failure to deliver or otherwise to perform any obligation under this Agreement, where such failure is due to any cause beyond its reasonable control, including but not limited to Acts of God, fires, strikes, war, flood, earthquakes or Governmental actions. 13. Notices: Any notice required or permitted hereunder shall be deemed effective no more than 24 hours after transmitted by facsimile to the numbers provided below or no more than 24 hours after receipt via mail. If the notice is deposited in the United States mail, it shall be sent postage prepaid, certified mail, return receipt requested, and addressed to the party to whom notice is to be given, as follows: Notice to County: Weld County Public Works Attn: Clay Kimmi, P.E. Email: ckimmico.weld.co.us Fax No: 970-304-6497 P.O. Box 758 1111 H Street Greeley, CO 80632 Weld County Public Works Attn: Ron Graves, Foreman Email:avesna,co.weld.co.us Fax No: 970-304-6497 P.O. Box 758 1111 H Street Greeley, CO 80632 Page 6 of 7 Notice to LOWER LATHAM DITCH COMPANY: Lower Latham Ditch Company Attn: Douglas C. Seely, P.E. Email: lowerlatham@msn.com Fax No: 970-352-8866 8209 W. 20th Street, Ste A Greeley, CO 80634 Lower Latham Ditch Company Attn: James Park, President Email: smobax@msn.com Fax No: 32730 County Road 50 Kersey, CO 80644 *In the event that County or Company designate another individual(s) to receive notice, or change the address or facsimile number listed above, the other party shall be notified in writing of the new information. The failure to provide new or corrected information shall release the other party of all responsibility for any losses suffered by the party failing to provide the new information.* IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, two duplicate originals of this Agreement, each of which shall be deemed an original, on the date first written above. LOWER LATHAM DITCH COMPANY By: Name (Printed): James Park Title: President ATTEST: d. i .::(4. Weld County Clerk to the Bo BY: Deputy Clerk IL -L-O/1 Date BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO Julie A. Cozad, Chair, I JAN 232017 p)oi7- 0,255 G) Page 7 of 7 3 0 0 ) r imome ANIS RELEASED FOR CONSTRUCTION Project No./Code 0 0 0 WELD COUNTY ROAD 49 TITLE SHEET Sheet Revisions E E 6000 r.. Project No./Code Sheet No. 01-002 ORIGINAL CURRENT/REVISED BOOK I SECTION RFC DATE RFC DATE 13 . ROADWAYS SEGMENT 162 ROADWAY PLANS 07/12/2016 07/12/2015 SEGMENT 1 & 110INTING PLANS 08/10/2016 04/10/1016 aa 9 8 $ 16 • MAINTENANCE OF TRAFFIC 16-001 to 16074 PHASE IATRAR6 CON I ROL PLANS 0sH1/2016 05/11/2O16 III' WELD COUNTY ROAD 49 INDEX OF PACKAGES Structural Numbers Sheets: I —lo/ 1 o _ I 17 - LANDSCAPING II I -T 11 • wCO& PORATED INTO BOX ELDER CREEK BRIDGE PLANS Designer: KRK 0 toiler: KNO Subset: INDEX SEGMENT I G 3 FRIED ACCESS __— SEGMENII&1 DRIVEWAYS PANT I 14 - SIGNING AND PAVEMENT MARKING SEGMENT I& 2 SIGNING AND PAVEMENT MARKING PLANS 15 -STRUCTURES JIM CREEK BRIDGE PLANS BOX ELDER CRE EX BRIDGE PLANS GILMORE DITCH BRIDGE PLANS NERDS BOX COI VERT PI ANS LATHAM DITCH BRIDGE PLANS STANDARD BRIDGE PLANS As Constructed WELD COUNTY COLORADO k --r: Department of Public Works 1111 H Street, Greeley, CD 50631 Phone (970 356-4000 SHEET NUMBERS =L Y a sa o ri 0 I 0 ^ ^ I uy - o iii a 8i a III Sheet Revisions Dole Comments I Initials In O.V 0 CS. i a a in r F C o _ P O 4F4 6 C e C O 'a 3 zito co 1 0 S C 3 K Q G2_ n C ¢ n 3 a' i " 'z f 3 e x a a 3 3 0000 Print Date: 11/25/2016 1➢:15:13 AM File Name Al14353 O2TTLol.e g Hor zontal Same: N/A - Vert cal Scale'. N/A 6300 Sous Sy Ruse Way 4 ,P.":";0331s. em0 : 8 8� 8I 88 _ 8 8 a I q 8' a o 91 -8Z -1l NOIlOflaLSNOO L1Od 03SV313a a 0 0 0 N v _ 7 0 0 0 X w 6 alt b £ 5 13445 iErctIEFli 0 5 wo6 '-0`5 -- o wCOT •th O Caw �o n 0 o z O n N 0 Q O CC 1 L V E E 0000 0 Horizontal Scale'. N/A 9 9L -9Z -L L NOI1011NLSNO0 HOd 03SV31]H LATHAM DITCH BRIDGE PLANS a ila 3001a9 ELD COUNTY RD 49 I r r< V 8 8 NVIa3 p ;9L 0-11O S3NV1 f 100 01 100 S3NV1 f NB WELD COUNTY 0-,9f U O0,4 13 a lIVH 3001218 UC1N5 ,2 LC 210115 9- ci I z 0- w 0 z ' *0251 �IIII�IIII�IIII�II I1� 9 8 8 III11111 IIII IIII� a O O 0 z N N O h E a As Constructed 2 c O 0 En 9000 0 E 79 r.. 91-82-11 NOI13fl LSNO0 HO1 01SV31BH 0 0 0 a {L9f9b -13 00'00+90011 JM 09'9c99 l3 00'00+90011 Id 69f99 13 00'00K0011 1M 0 0- 0 O Z N O M 0 0 0U aE -J <xO 0rte re O jrG x oeo 5U 0 W N W O 0- F 6 0 V O O tt N E 0 8 0000 e • 3 9t -8Z -t t NOIlDf1NLSNOO L10d 03SV3132i CH BRIDGE PLANS Z I ar Lfl O 5 a 0 0 O 2 N ET 0 a) 0 < z o VI Q 2 00, 01 z0 < 0<U o. �g- o z w o 3 iE a m u 0 0 G Sheet Revisions E 000 ,73 cb E 8 91-92-14 NOI10f1N1SNO0 HOd 03SV313H o a E a a a a E,' a IIIIIIIIII II III III IIII III 1111111II IIII IIIIII V IIIIIII IIIIII III II II IIIIIII 1 6py III IIIIIII IIIIII IIIIIII I IIIIIIIIIIII1111 II IIII V 1111III (IIIIIII IIII III I IIII o in o .n a in o in o .n a a a a a A 0 00 0 0 V L O"M O dF O ▪ E 300 rn oho 9O3 TL 0 0-0 021 • O co • 0 Z v 0 No. 15-505 m 0 0000 rerw 0 z7z 0<d OFw "5i a w w 8 8 m U `o Sheet Revisions 0000 C 91-8Z-1 L NOIl0112i1SNO0 2IOd 03SY31321 Project No./Code sheet tie . 15-506 WELD COUNTY ROAD 49 LATHAM DITCH HYDRAULIC INFORMATION Designer: KMG Structure 40/16A Befallen KLT Numbers Subset'. BRIDGE Sheets: B006 of 14 As Constructed b - WELD COUNTY COLORADO O[' Department of Pub I lc Works 1111 H Street. Gree Iey. CO 80631 4:. i I Phone:1910) 356-4000 \1 V1. N 382286 6796 \ \ 1 E 251082.5132 EL 462800 Sheet Revisions E E 8 0000 Print Dote: 10/24/2016 6:58:11 AM File Name: 114353-D2BR0G—Hydrouncs2—04—GroaingPoi Horizontal Scale:15-506 Vertical Scale:N/A 8303 South Syracow V858 rein mai benewo 9L -8Z -L L Nolioneaswoo HOd OaSVIITLI EXPANSION JOINT CHART •₹ u'�f u'5 u'5 In .rn 5 b b u Project No./Code N 0 In Y F 0 0 O 005 ZoZ 0 0<0 O5 z hi 0 w 0 3 U At D V O 0 Q 0O C N c cc N E E 0000 C 0 r.. 9L -93-L L NOIl3fla LSNO0 HOd CHSVI1321 LP HAM DITCH BRIDGE PLANT a 0 2 Project No./Code v U 0 O 4 m 0 N N C E E N ©000 E 8 91-82-1 l NOIlOf12i1SNOO LIOd 03SV3132d 4.4 .77 Project No./Code m 0 0 0 a 0 w 00 -0z Oz 0 0 w w E m m E z ecTs As Constructed LD COUNTY Sheet Revisions o: € E 0000 DO—Abut-1-04.dvg E 91 -8Z -1l NOII3n 1SNO0 NO3 03SV313H m ry 21, 5 (3 eves 3d331S 0- aE. 3 wo ens 1) 0 S HaLON BY1S I HSVOHddY I r°I bObtldb L 'nay I sae a z a- Project No./Code 0 ua z O a 0 w CZ F oz D<0 x 05N z w w 3 m 3 S v V = U Q 0 zLa: O C) La S 0I cc V N 8 0000 E e TLL 91 -9Z -1l NOIlOf1N1SNOO HOd O3SVa1aH 0 4A iN3niner A UNIdV3e ABOVE BEARING SEAT TO BE Project No./Code E As Constructed E 0000 O 0 r.. 9L -8Z -L l NOI±Of1211SNOO 2103 03SH31323 Project No./Code sheet N. 15-5121 L TABLE ag 36 .9 oL G _ _ �n No O O On WELD COUNTY ROAD 49 LATHAM DITCH WINGWALL SECTION & DETAILS Structure 49/54A Numbers Sheets: RD12ot 1a .888.8 mom aN WINGWAL q _ a — - - _ - > r e IP'Po {om—' m i s - ago oo Z 'tll9 .c 810S nnnn 1 ,5z Fr, 8 D ignen S.REDD D bile!: V.MIRANDA Subset: BRIDGE _it o 03333 Y DEEP POURABLE JOINT FILLER — ELEV A OR ELEV. B av cc VARIES FINISHED GRADE IS AT EXTERIOR BEARING SEAT ELEVATION /t&N I'-0" 2_C m3 "4 ' .92;1 -9-.L 2ic 0 O r urn o rc O As Constructed I - rc I3'JO tl91 0 313tlJNOJ a 31 , ao yn �m 7: e O 9 ,9 n oN ttOp /I u3 ¢ 3 �v N 0 d y 5 N �u3 3p WELD COUNTY col.oRAuo r, Department of PUDI la Works 1111 H Street. Greeley. CO 80631 } ,1' r I Phone :I 9701 356-4000 \ I u5HE0 GROUND LINE > \"�_. rttr SEE PILE CAP DETAIL. THIS SHEET I STEEL H —PILING —(r— STEEL H —PILING (ttP-) @ PILE y--(TYP.) fl FVATION SEE CHART (TYP_) #4® —T 0 I' —o_ rE. eILG. #5 (TO1 qB T O6' (tt` \ \ P.J ABUTMENT REINS /4 O I'-0' qB J O 6 (IYP,) SEE CHART (TP.) WINGWALL SECTION Sheet Revisions '.. Dale I Comments I Initials 0000 'Print Date: 10/27/2016 x37:42 PM File Name: 114.353—D2RRDO—WW-044wg Horizontal Scale. loo Vertical Scale: N/A — II . az s�eeoc . . • . r 1 r� m .0-.L .6 9-.Z 91-82-1l NOIlOfHISN00 NOd 03SV313H O 030010 i z a 0,i In J a co 0 St+a .kta1 du) 13 a GIRDER SCHEDULE C gi 00 C 0 Project No./Code n IC 5 m a w p W x p0o! U O0 O ZQU OFw 3v w J R w H 3 w a a E LLA v V V O U Q Lla h!IS re N 0000 4353-o2BRDc-clme at. 9I-9 -LL NOIlOIIalSN00 HOd 03SV313H rc 0 U 0 z N 0- a z m 0 a F Lu O U a00 w Ott FZQU J JCo O R' J w w a 8 E 3 w o` U Q Sheet Revisions E E 0000 r.
Hello